ML20235A202

From kanterella
Jump to navigation Jump to search
Trip Rept of Headquarters 760322-24 Visit to GE Vallecitos Nuclear Ctr Re Matl Control & Security Assessment
ML20235A202
Person / Time
Site: 07000754
Issue date: 04/02/1976
From: Schuster M
NRC
To:
NRC
Shared Package
ML20234F575 List:
References
FOIA-86-410 IE-V-118, NUDOCS 8707080352
Download: ML20235A202 (2)


Text

--_ - -_ - - - _

$N 1

AI k W. $

I

~

April 2, 1976 l

gg.4.-il Y Memo to Security Files Docket No.70-754 TRIP REPORT - HEADQUARTERS VISIT TO GENERAL ELECTRIC COMPANY VALLECITOS HUCLEAR CENTER,liarch 22-24, 1976 An entrance / exit interview was conducted and attended by:

G.E.

NRC W. Smith R. Rentschler R. lioschner D. Thurman G. Cunningham F. Pagatio f

D. James D. Joy l

J. Lillpop B. Minnelli I

R. Light i

B. Brock J. Kemper i

-M. Schuster R. Darmitzel

?.LeNorderhaug-l Scope l

Russ Rentschler, NRC Team Leader, described the purpose of the meeting i

as follows:

,1 l

l 1.

Material Control and Security Ass ssment I

l 2.

Not an inspection although group findings and observations may j

be explored at a later date during formal I&E inspections.

i

~

l 3.

Assessment of adequacy of licensee systems to mest current Regulatory requirements, 4.

Observations and findings related to upgrading as may in the i

future be necessary as a result of Gf.SMO or public comments on 10 CFR 73.55.

I Basis l

l r

7.w.y The basis against which judgments are made will be the hypothetical threat 74't of (1) one trusted employee normally having access to.S!q and (2) three armed individuals with military training an4 g' kngwledge~of the facility l

one or more of that group may be an insider.

e frW

.l..

.. h.. c

'c 8707080352 B70701 C 1 l

PDR FOIA

.1. '

SKINNER 86-410 PDR l

F' i'f 9Ae~ -b y l

~ sec:fre ;,.

.. w 5h los t

l' O

4./ '/ b/ && si v 4.f i :i i e ib/) N

((

.r if '

jdhp 'N I

Memo to Security Files Trip Report - HQS Visit to GE VNC 3/22-24/76 l

i 1

i Ouestions to be Answered l

Could an adversary (group) successfully steal 2,000 grams of "Part 73" materials in a single act or in a series of undetected acts over a period of a year?

t Findinos and Recommendations See Enclosure No.1

\\

Field Notes l

l See Enclosure No. 2 i

l M. D. Schuster, Jr.

I Physical Protection Inspector I

Enclosures:

f As Stated' l

i l

l 1

l l

1 1