ML20215J855

From kanterella
Jump to navigation Jump to search

Forwards Rev a to EE-EQ-0057, Evaluation of Test Data for Confirmation of Fire Water Flow Rate to Circulator Water Turbine During EES Cooldown for Safe Shutdown Cooling
ML20215J855
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/04/1987
From: Brey H
PUBLIC SERVICE CO. OF COLORADO
To: Calvo J
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
Shared Package
ML20215J857 List:
References
P-87171, TAC-63576, NUDOCS 8705080288
Download: ML20215J855 (1)


Text

3 h Public Service- lcWo 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 May 4, 1987 Fort St. Vrain Unit No. 1 P-87171 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Attention: Mr. Jose A. Calvo Director, Project Directorate IV Docket No. 50-267

SUBJECT:

Additional Information for Analysis of Firewater Cooldown for 82% Power Operation

REFERENCE:

PSC letter, Brey to Berkow, dated March 20, 1987 (P-87110)

Dear Mr. Calvo:

PSC has completed the special test that was discussed in PSC's Response 7 in Attachment 1 of the above Reference. The results of this test are evaluated in " Evaluation of Test Data for the Confirmation of Fire Water Flow Rate to the Circulator Water Turbine During EES Cooldown for Safe Shutdown Cooling," EE-EQ-0057, Rev. A.

One copy of EE-EQ-0057, Rev. A is enclosed for your information in accordance with PSC's Response 7 in Attachment 1 of the above Reference.

If you have any questions about this evaluation, please contact Mr.

M. H. Holmes at (303) 480-6960.

Very truly yours, 8705080288 870504 PDR ADOCK 05000267 H. L. Brey, Manager F PDR Nuclear Licensing and Fuels Division HLB /AW:jmt I

g60 Enclosure cc: Regional Administrator, Region IV Mr. R. E. Farrell Attn. Mr. J. E. Gagliardo, Chief Senior Resident Inspector Reactor Projects Branch Fort St. Vrain

- - . - . ._ ._