Requests Insp & Audit Per 10CFR50,App B of Licensee Activities Supporting Request for 82% Power Operation. Requests That Insp Be Conducted & Completed within 180 Days
ML20214S836
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/27/1987
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TAC-63576, NUDOCS 8706100007
Download: ML20214S836 (2)


Text

___

.t

, UNITFO STATM i 'l NUCLE AR R EGUL/\T uhY CCM.....~.~..

[', i W ASHIVMON. D. C. 20655

%...../

tay 27,1987 Docket No. 50-267 MEMORANDUM FOR: Eric H. Johnson, Director Division of Reactor Projects, Region IV FROM: Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects, NRR

SUBJECT:

REQUEST FOR INSPECTION AND AUDIT OF LICENSEE DESIGN AND ENGINEERING WORK SUPPORTING 82% POWER OPERATION -

FORT ST. VRAIN (TAC N0. 63576)

References:

1. PSC letter, Warembourg to Berkow, dated December 30, 1986 (P-86683).
2. PSC letter, Williams to Berkow, dated January 15, 1987 (P-87002).
3. PSC letter, Brey to Berkow, dated February 17, 1987 (P-87055).
4. PSC letter, Brey to Berkow, dated March 20, 1987 (P-87110).
5. PSC letter, Brey to Berkow, dated April 10, 1987 (P-87122)

In support of the licensee's request for 82% power operation, extensive docu-mentation referenced above has been submitted for NRC review. Our review of the licensee's supporting documentation finds that* his meth:ds depend exten-sively on the use of calculations, which are then reported to have been inde-pendently verified. These independent verifications are reported to have been performed by the licensee's contractors, but are not submitted to the NRC for )

review. For certain portions of these calculations, the staff and its contrac-tors have the capability to independently verify the licensee's results.

However, for other portions of the calculations, particularly those concerned with firewater flows, a check cannot be performed of the licensee's results. i Hence, we must rely on his independent verification.

'l CONTACT:

K. Heltner, NRR/PD-IV 49-27592 0706100007 070527 7 l Dit ADOCK 0500

, ja ..

May 27,1987 Thus, we believe it prudent to request your office to conduct an inspection

\ and audit against the requirements of 10 CFR Part 50, Appendix B, Section III (Design Control) of the licensee's activities supporting his request for 82%

p'ower operation. The inspection and audit should review (1) the licensee's follow-through verification actions" on subcontracted calculations as required per FSAR Section 13.5.2.4 and (2) the application of the requirements of ANSI N46.2.11-1974 (FSAR Table B.5.4). Particular attention should be given to the

, use of alternate calculations in lieu of independent design review and the use 4

of available plant measured data to verify and qualify calculations. The NRR i staff and it consultants are available to support your efforts as appropriate.

We request that you conduct and complete this inspection and audit within 180 days of the date of this memorandum.

met Mya4 "

g c.q,g. &us.ha Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, VandSpecialProjects cc: J. Calvo J. Gagliardo, Region IV J. Jaudon, Region IV DISTRIBUTION iDo~ket c File NRC POR Local POR PO4 Reading DCrutchfield KHeitner PNoonan l

4 8 \'

0R4Ab Pt A PO4/PH PNoonan KHeltner:as PO4:0 36 JACalvo FSchroeder' s O f7)/C _.

0 lc'hf FeTd 5/h/87 5/II/87 5/t l /87 5/h/87 5/p7/87

--. -__ - _. - . ,-. - . ~

. - _ _ _ _ - _- ---. - - - - _ . - _ _ . - . - - _ _ - . . . . . - _ -