CARGENT O LUNDY E N GIN E E RS

  • CHICAGO i

2:

51

~

i i

l

ATWS MITIGATION SYSTEM SPECIFIC DESIGN FOR BYRON /8RAIDWOOD STATIONS COMMONWEALTH J

1 1

I i

4 4

861222033586121h PDR ADOCK 05000454 P PDR l

---,--,% yr-,,..- ,e,---r--w..-=,s--....v------,-,---,,, . , - - -- , , , - - - , ,%-,,w,--.o,-,.v,--,,,-mwe,y-wm..e'-,%--,-e-%-

.OARGENT O LUNDY ENGINEERS CHICAGO

. TABLE OF CONTENTS Section Title Pg

1.0 INTRODUCTION

1-1 2.0 DESIGN BASIS 2-1 3.0 FUNCTIONAL REQUIREMENTS 3-1 4.0 PLANT SPECIFIC DESIGN DETAILS 4-1

5.0 REFERENCES

5-1

CARGENTQLUNDY ENGINEERS CHIC AGO

1.0 INTRODUCTION

The purpose of this document is to provide a description of the specific ATWS Mitigation System design proposed for implementation at the Byron and Braidwood Stations. The description is intended for the use of the Nuclear Regulatory Commission in evaluating the specific design for compliance to the ATWS rule of 10CFR 50.62(c)(1).

1-1 i

CARGENTO LUNDY

""$d$AGO 2.0 ATWS MITIGATION SYSTEM DESIGN BASIS The Byron /Braidwood Stations ATWS Mitigation System (AMS) design is based on the following requirements:

a. The ATWS Rule (Reference 1)
b. ATWS Quality Assurance Requirements (Reference 2)
c. Westinghouse AMSAC Generic Design Guidance (Reference 3)

The foregoing documents provide the basis for the specific AMS system design as described in Section 3.0. In addition to the details provided in Section 3.0, plant specific information, as requested by z

the NRC in their letter (Reference 4) stating acceptance of the Westinghouse AMSA Generic Design, is included in Section 5.0.

2-1

CARGENTO LUNDY ENGINEERG CHICAGO 3.0 ATWS MITIGATION SYSTEM FUNCTIONAL DESCRIPTION This section will functionally describe the proposed ATWS Mitigation System (AMS) design for the Byron and Braidwood Stations. The operation of the proposed AMS is defined in Figure 3-1 and by the following descriptions.

3.1 System Overview The required initiating actions of the AMS are as follows:

a. initiate the auxiliary feedwater system, and
b. trip the main turbine The plant variable that is monitored to determine loss of heat sink and provide for the actions described above is main feedwater flow to each steam generator. Each steam generator feedwater line is monitored by two existing sets of flow instrumentation. Either of the two flow measurements indicating low feedwater flow is an indication of loss of heat sink for that steam generator.

As shown in Figure 3-1, two identical sets of logic trains are provided and are defined as AMS Train A and B respectively. Both the main turbine trip and auxiliary feedwater actuation signals are initiated by the two logic trains.

3-1

CARGENTQ LUNDY ENGINEERG CHICAGO Each logic train monitors one of the two flow transmitters from each steam generator feedwater line for a total of four inputs per train. A 3 out of 4 coincident logic scheme is employed for each logic train to interrogate these feedwater flow signals, therefore requiring three of the steam generators to indicate a loss of heat sink in order to actuate the AMS.

The AMS Train A logic will actuate the auxiliary feedwater system (i.e., motor driven auxiliary feedwater pump and related equipment) and trip the main turbine (through the emergency trip). Similarly the AMS Train B logic will actuate the auxiliary feedwater system (i.e., diesel driven auxiliary feedwater pump and related equipment) and trip the main turbine (through the auto stop trip). In both logic trains a time delay (approximately 25 seconds) is provided to allow the unfaulted main feedwater pump to automatically increase flow in the event of a single main feedwater pump failure and avert an AMS initiation.

Arming of the AMS is accomplished manually by placing a

" Bypass / Arm" control switch in the " Arm" position when the C-20 power level (70% of nominal full power) permissive is satisfied. Upon a decrease in power below the C-20 power level the AMS will be automatically disarmed. The C-20 power level 3-2

r CARGENT Q LUNDY ENGINEER 3 CHICAGO permissive is developed in the AMS system based on turbine impulse pressure.

After an AMS initiation of the auxiliary feedwater system and tripping of the main turbine, the AMS will self reset. That is, after AMS initiation as power decreases and after a time delay (approximately 60 seconds), the C-20 interlock will inhibit the t.

logic trains thus allowing shutdown of the auxiliary feedwater system and reset of the main turbin trip. The time delays allows the AMS to remain armed long enough to perform its function in the event of a turbine trip.

The logic provides for two inhibiting signals which are manually implemented under administrative control that prevent the logic from initiating its intended functions (i.e., start the auxiliary feedwater system and trip the main turbine). The first of these is an AMS " Bypass / Arm" control switch. When the switch is in the

" Bypass" position, the operation of both AMS logic trains is inhibited. The intent is to provide the operator with a positive method of bypassing the AMS manually.

The second inhibiting signal results from the requirement that the AMS must have the capability for testing during power operation. Each logic train can be tested independently thus allowing a logic train to remain in service while the other is in the test mode. When the operator selects the AMS test mode for either logic train, the final AMS actuation output devices 3-3

" ~

CARGENTO LUNDY

" " $d "[co* "

(relays) for that train are inhibited from operating and inadvertently initiating the auxiliary feedwater system or tripping the main turbine during power operation.

Control of the auxiliary feedwater system and main turbine are provided for by existing controls and are not in the scope of the AMS design.

3.2 Main Control Room Interface The control room interface between the AMS and the operator includes the following alarms and indications located at the main control boards:

a. Alarms -

AMS Initiated AMS Inoperable Train A*

AMS Inoperable Train B*

125 VOC/24VDC P/S Failure

b. Indications - AMS Initiated Train A - Ret, Light AMS Initiated Train B - Red Light AMS Armed Train A - Green Light AMS Armed Train B - Green Light AMS In Test Mode Train A - Red Light AMS In Test Mode Train B - Red Light 3-4 i

e CARGENTO LUNDY ENOlNEERG CHICAGO

c. Bypass Permissive Light Box - AMS Bypassed C-20 Permissive
  • Inoperable alarm includes loss of power, AMS in test, manual.and automatic bypass.

3.3 Termination of Steam Generator 810wdown Steam generator blowdown will not be automatically terminated by the AMS. Since the innediate effect of steam generator blowdown, in the event of an ATWS event, is to remove heat from the steam generator, automatic isolation is not necessary. Once AMS is initiated, steam generator inventory can be adequately satisfied with both trains of auxiliary feedwater operating. Auxiliary feedwater flow per steam generator will be approximately 320 gpm with maximum blowdown flow per steam generator of 90 gpm.

Operating procedures could be developed, however, if necessary, to address the manual termination of steam generator blowdown flow if the AMS is initiated.

3-5

SGA SGB SGC SGD SGA SGB SGC SGD FW FW FW FW FW FLOW FW FW FW FLOW FLOW FLOW FLOW FLOW

< 50 % <50% FLOW FLOW

<50*/. <50% < 50*/. <50% <50% <50%

i i

l ir1r1r1r 1r1r1r1r 2/4 LOGIC 3/4 3/4 C-20 PERM SWCN PERM TRAIN A l TRAIN 8 d LOGlC

\QNJ L0 GIC qr d

\QNf \QFy QFy i r 1r 1r 1r TRAIN A ir u TRAIN B yr1r AND AND INHIBIT SYSTEM FCR TEST AND INHIBIT SYSTEM FOR TEST AND I CONT l CONT SWCH SWCH

.I i=

1P 1r 1r ilr Af0 AND 1r 1r 1r 1r j INITIATE MOTOR DRIVEN TRIP MAIN TURBINE INITIATE DIESEL DRIVEN TRIP MAIN TURBlNE AUX FW PUMP BIELATED (EMERGENCY TRIP) AUX FW PUMP & RELATED SYSTEM COMPONENTS (AUTO STOP TRIP ) i SYSTEM COMPONENTS i FIGURE 3-1 ATWS MITIGATION SYSTEM SIMPLIFIED LOGIC DIAGRAM

t CARGENT O LUNDY H AGO 4.0 PLANT SPECIFIC DESIGN DETAILS The following section provides the plant specific design details as requested by the NRC. Each topic is addressed in the order in which they are listed in Reference 4.

4.1 Diversity The ATWS Mitigation System (AMS) design for the Byron and Braidwood Stations uses equipment which is largely diverse from that used in the Reactor Protection System (RPS). AMS inputs are derived from the existing feedwater flow instrumentation which, while they are located in the RPS Westinghouse 7300 protection cabinets, no longer provide a reactor trip function, (instrumentation provides indication and alarm function only).

The AMS feedwater flow inputs are isolated from the existing feedwater flow instrumentation loop signals by Technology for Energy (TEC) Analog Signal Isolators. These isolators are classified as safety related. After isolation the feedwater flow signals are fed to Rosemount master trip units which generate the feedwater low flow logic inputs to the Rochester Solid State Logic System. The Rochester Solid State Logic System provides implementation of the c incidence logic, permissives, test inhibits, time delays and other AMS functions. Outputs from the logic system are then used to trip the turbine and start 4-1

CARGENTOLUNDY ENGINEERS CHICAGO auxiliary feedwater via a number of interposing relays. The interposing relays interlocking safety related circ'uits are classified as safety related. These relays are the same as other safety related relays used in similar circuits elsewhere in the Byron and Braidwood Station designs.

Power supplies used within the AMS for DC to DC voltage reduction are supplied by Lambda. Major components of the AMS are therefore provided by manufacturers who are diverse from those used in the Westinghouse 7300 protection cabinets and Westinghouse solid state logic cabinets.

i 4.2 Logic Power Supplies The 125 VDC system at Byron /Braidwood consists of two independent safety related trains. Each train consists of a battery, battery charger and DC distribution center. Each train's DC distribution center is divided into two sections. One section is dedicated to feeding the safety related DC system loads. The other section is dedicated to feeding the non-safety related DC system loads. The non-safety related loads are isolated from the safety related DC bus by two safety related breakers in series (Ref. FSAR, Appendix A, compliance with Reg. Guide 1.75). Figure 4-1 illustrates the Train A DC system configuration. Each train of the AMS shall be powered from one of the independent trains of the 125 VDC system.

4-2

r CAR 2ENT O LUNDY E N GlN E E QG CHICASO The guidelines in 10CFR40.62 (ATWS Rule) state that:

o The AMS power supply is not required to be safety-related, o The AMS must be capable of performing its' safety-related function following a loss of offsite power, o The AMS logic power must be independent from the power supply for the Reactor Trip System.

Selection of the 125 Vdc system, as the AMS power supply, complies with the guidelines in 10CFR50.62 as discussed below:

a. Safety Classification of AMS Power Supply As illustrated in Figure 4-1, each train of the AMS shall be powered from an independent division of the 125 VDC system. The AMS cabinet shall be powered from the section of the DC distribution center dedicated for non-safety related loads. The power feed shall be from a dedicated circuit breaker. The ultimate power supply for each train of the AMS cabinet is a safety-related 125 VDC battery.

Utilization of a safety-related power source exceeds the requirements of the guidelines provided in 10CFR50.62.

4-3

CAR 2ENT Q LUNDY ENClNEERO C HIC AGO

b. Operation Following Loss of Offsite Power Since each train of the AMS cabinet is powered from a de source (i.e,. the 125 VDC batteries), the system is capable of performing its' function following a loss of offsite -

power.

The Byron /Braidwood DC system design does not require load shedding of non-safety rela 6ed loads following a loss of offsite power.

c.

Independence From Reactor Trip System Power Supply As illustrated in Figure 4-1, the Reactor Protection System cabinets are energized from an NSSS Instrument Power (IP) inverter. The normal power supply to the inverter is from the station Auxiliary Power System. The de supply serves as the reserve power supply. Several levels of circuit breakers (e.g., circuit breakers at IP distribution panels.

IP inverters and de distribution panels) ensure that malfunctions (e.g., short circuits) in the Reactor Protection System do not result in loss of the 125 Vdc System.

As illustrated in Figure 4-1, the ."eactor Trip Switchgear is fed from the safety-related 125 Vdc bus. Fuses and circuit breakers ensure that malfunctions (e.g., short 4-4

CARGENTQ LUNDY

$b5?c5 l

circuits) in the Reactor Trip Switchgear do not result in loss of the 125 Vdc system.

l It is recognized that utilization of the 125 VDC system as the AMS logic power supply does not result in a power supply totally independent of the reactor trip system power i i

supply. However, as discussed above, the DC system design provides sufficient isolation to ensure that malfunctions in the reactor trip system do not disable the ATWS Mitigation System.

4.3 Safety-Related Interface Two safety-related interfaces exist between the MS and the existing protection system. The first is the interface between the MS and the main feedwater flow instrumentation circuits. As previously discussed in Subsection 4.1, isolation is provided by the use of Technology for Energy Corporation analog signal isolators. The existing criteria for physical separation between reactor protection and non-safety system wiring will also be utilized. Speci fically RPS Ch.1 main feedwater flow signal inputs will be routed to MS Train A for isolation and RPS Ch. 2 main feedwater flow signal inputs will be routed to MS Train B. Both trains of MS are located in the same cabinet, however, the 4-5

CARSENTO LUNDY ENOlNEEDO CHICAGO cabinet is physically divided into two sections by a metal barrier.

The second interface, while it is not a direct interface between the reactor protection system and the AMS, is between the AMS and the safety-related station batteries.

A discussion of this interface is included in Subsection 4.2. ,

4.4 Quality Assurance Safety-related components which are part of the AMS will be procured with the appropriate quality assurance required for safety-related equipment. All other components in the AMS design will be procured using the quality assurance requirements stated in Generic Letter 85-06 (Reference 2).

4.5 Maintenance Bypasses Maintenance at power can be accomplished by taking the affected AMS train out of service administratively and removing power to that train. It is recommended that the main test switch for that train, located in the AMS cabinet, be placed in the test mode to ensure that maintenance activities do not result in spurious actuation of the AMS output relays. It is not however a requirement 4-6 L _ _ _ __ -_ __

CAR 2ENTOLUNDY GNClNEEOO CHICA 50 to do so since power must be available for the AMS to actuate auxiliary feedwater and trip the turbine. Loss of power to a train of the AMS or placing a train in test mode will result in an AMS inoperable main control alarm. This alarm along with other AMS alarms and controls will be grouped and located on the main control board utilizing human factors engineering practices.

4.6 Operating Bypasses The AMS shall be manually armed by the operator coincident with power above C-20 (70% of nominal full power) as a permissive. Bypass of the AMS shall be either manually initiated by the operator or automatically initiated if the power is reduced below C-20. The C-20 power level is measured by dedicated transmitters for each AMS train. The transmitters will measure first stage impulse pressure at the high pressure turbine. The basis for the 70% of full power setpoint is provided in WCAP-10858 (Ref. 3). The manual or automatic bypass of the AMS is alarmed as AMS inoperable. Separate annunciator windows are provided for AMS Train A&B. The C-20 power level permissive and AMS bypass will be indicated at the Bypass Permissive Light Box.

4-7

CAMUENTO LUNDY ENCINCE00 C HIC AR@

4.7 Means for Bypassing The manual bypass switch discussed in Section 4.6 is a permanently installed selector switch with three positions, arm, normal and bypass. 'This control switch is located

c. i with the AMS indicat'ing lights and annunciator alarms at a main ,ntrol boa'rd location selected in accordance with human tors engineering practices.

l 4.8 Manual Initiation Manual actuation of the AMS is not provided. Manual initiation of auxiliary feedwater and manual tripping of the turbine can be accomplished by the operator at existing controls provided on the main control boards. ,

4.9 Electrical Independence From Existing Reactor Protection System The interface between the main feedwater flow instrumentation loops and the AMS is made through Technology for Energy Corporation (TEC) Model 156 Nuclear Qualified Analog Isolators. These isolators have been used in many other nuclear plants and have been evaluated by the NRC. Documentation is available for purchase from TEC which 4-8

r CARGENT & LUNDY ENClNEERD CHICA20 addresses the concerns of Appendix A to the NRC letter.

(Reference 4).

The AMS output interface to the safety related auxiliary feedwater circuits is provided at the output relays via coil to contact separation. The output relays are Westinghouse auxiliary relay model numbers ARD 8800R and ARD 440VR.

4.10 Physical Separation From Existing Protection System The AMS hardware is located in its own cabinet which is separate from the existing reactor protection system cabinets. Actual isolation of the main feedwater flow signals will be done in the AMS cabinet. The two sets of main feedwater flow signals (RPS Ch.1 - four signals routed to AMS Train A and RPS Ch. 2 - four signals routed to AMS Train B) will be the only direct interface between the reactor protection system and the AMS.

4.11 Environmental Quali fication The AMS cabinet is located in a mild environment. The environmental parameters for the location, Zone A1, are l listed in the Byron /Braidwood FSAR Table 3.11-2.

l I

1 l

4-9 l I

, ,- ----m-. -.,-.,, _ ,- e - , - - - , -,,-----4.,-v-g-m-gm_-,,--e..n.g.m+,y ,g- -,---------m.,-w-- -

<.-,,n--w-_-,-w,

CAZ2ENTQ LUNDY ENCINEERO CHICAEO The existing main feedwater flow transmitters are also located in a mild environment. The environmental parameters for the location, Zone A8, are listed in the Byron /Braidwood FSAR Table 3.11-2.

Both non-safety and safety-related components of the ATWS cabinet and the main feedwater flow transmitters will be designed to meet the environmental conditions existing in the zones they are located.

Seismic qualification will be provided for the AMS cabinet and internal safety-related components which provide the input and output AMS interface to external safety related circuits.

4.12 Testability of Power The AMS is designed to allow testing of the master trip units, solid state and relay logic system, and final AMS output relays during power operation as well as below the C-20 power level permissive. AMS testing is subdivided into three areas which are described individually below.

a. Testing of master trip units (MTU) - Each logic train requires four MTV's (one per steam generator) which are housed in a single MTU chassis. A calibration 4-10

\'

CAMENTO LUNDY

. . ENQlNEERO 6LP CHICAGO t

s' ,

, unit with a dual readout assembly is provided to

, insert in the MTU chassis and calibrate each

, individual MTU. One calibration unit will serve both trains of logic since only one train of logic is to be tested at a time allowing the other train to remain in service.

The calibration unit when placed into the MTU chassis allows testing or calibration of each MTU (only one MTU can be tested at a time). The calibration unit generates a calibrate command signal, calibration current, and a calibration status signal. Calibra -

tion of any selected MTU in the chassis is initiated by the calibrate command signal directed to that MTU, which causes the MTU under test to accept a calibra-tion current in place of the input signal. The input i

signal is switched to a fixed resistor (located in v

the MTU), while the MTU is under test, to prevent opening the input circuit. The calibrate command signal also causes the MTU under test to generate a calibration / gross failure output signal which energizes the cal / gross failure relay. While the MTU

) is under test an AMS inoperable alarm for the logic I

train under test is annunciated in the MCR via the cal / gross failure relay.

4-11 e

CARGENT O LUNDY -

E N GIN E E RG CHICAGO '

1 During testing, the MTU receives a calibration current (continually adjustable) from the calibration

_ unit which is simultaneously displayed on the readout assembly as the ' calibration status signal. A second display on the reado'ut assembly tracks the calibra-1

' tion status signal until the MTU changes state (non-1 E' '

trip to trip state or vice versa). The calibration

, curreit reading at that point is latched on the trip current display by the trip stat'us signal from the MTU under test. This allows an accurate determina'-

tion of the MTU trip setpoint setting.

When the MTU is returned to normal operation, the input signal is switched back to the MTU, and the cal / gross failure relay is de-Energized (provided the input signal is within its normal range of 4-20 ma

' ~

DC). Each MTU is provided with a process indicator which will display the input process signal (differential pressure) or the calibration current.

2:

a Although each MTU can be tested on an individual

', -basis, the AMS actuation signal for the train under test should be blocked from inadve.rtently actuating the final AMS output relays. This is accomplished by placing the AMS test mode selector switch in the test

\

4-12

CARGENT O LUNDY E N GlN E E R9 CHICAGO position. This action will illuminate an indicating light both at the MCR and AMS cabinet and also will activate the AMS inoperable annunciator alarm for the logic train under test. To return the AMS logic train under test to normal service a two step process is required since otherwise resetting the AMS test mode selector switch to normal during a test would inadvertently actuate the final AMS output relays.

Once testing for a particular logic train is completed the operator would return the AMS test mode selector switch to normal and then press the respective logic AMS train test reset pushbutton.

b. Testing of system logic (solid state and relay) -

Since the MTV's are tested individually, it is not possible to force more than one MTU into a trip status simultaneously from the calibration unit. To artificially initiate the system logic for testing, external MTU test switches are provided for each MTU. The MTU test switch is a three position. Switch with each position accomplishing the following respective function:

4-13

CARGENTO LUNDY EN01NEERG CHtCAto MTU Test Switch Position Furction Norm Allows the MTU to directly operate the MTU trip relay Test-Trip Disconnects the MTU trip relay from. the MTU and energizes the trip relay creating an artificial " trip situation."

Test-Norm Disconnects the MTU trip relay from the MTU and de-energizes the trip relay creating an artificial "non-trip or normal situation."

This position allows logic testing during fuel load and maintenance when the input signal would normcily mairtain the MTU in a tripped state.

Placing the MTU in either test mode from the MTU test switch causes the AMS inoperable alarm for the logic train under test to be annunciated in the MCR. An indicating light for each MTV at the AMS cabinet alerts the operator when the MTU trip relay is artificially energized by the MTU test switch.

To test either train of system logic the AMS test mode selector switch for that train would be placed in the test mode. As described previously this action would prevent the actuation of the final AMS output relays during test. The AMS test mode 4-14

CARGENT O LUNDY ENOlNEERO C HIC A10 indicating light for the train under test would illuminate in the MCR and at the AMS cabinet and the AMS inoperable annunciator alarm would be activated. The operator would proceed to place two or more MTU's in the tripped state until all combinations are tested for the train under test.

Successful generation of the AMS actuation signal by the system logic is verified when the AMS initiated indicating lights are illuminated in the MCR and at the AMSC and also.by actuation of the AMS initiated annunciator alarm. Prior to returning the train under test to the normal mode by the AMS test mode selector switch and pushbutton, each MTU test switch should be placed in the normal mode.

c. Testing of final AMS output relays - The testing circuits used for the final AMS output relays and final actuated devices will be similar to the testing schemes used in tht. Byron /Braidwood Safeguards Test Cabinets. However, for the purpose of the AMS, testing of the final AMS output relays and final actuated devices will be limited to a continuity test

. only of the circuits and not full actuation of the 4-15 j

CARGENT O LUNDY ENGINEERG CHICAGO 9

final devices (control relay which operates the auxiliary feedwater pump, for example). k[f5fd

,t <-

Continuity testing of the circuits will be used because, o the AMS is not safety-related, o any additional peririic cycling of safety related system components ir the auxiliary feedwater system as a result of AMS testing should be limited in order to maximize the qualified life of those components, and o tripping of the turbine at power is ooviously unacceptable.

4.13 Completion af Mitigative Action Once initiated the AMS actuation signal will go to completion except as delayed by the 25 second time delay which allows for main feedwater pump recovery in the event of a single main feedwater pump failure. The C-20 permissive is delayed from de-energizing for 60 seconds to ensure that the permissive signal is present so that AMS operates.

4-16 l

l l

)

CARGENT O LUNDY ENOINEERQ CHICA20 Seal-in of the AMS actuation signal is not necessary at the logic level, since the final actuated or tripped equipment control circuits (auxiliary feedwater and turbine trip) will remain in that condition until stopped or reset by the main control room operator.

4.14 Technical Specification No specific technical specification is proposed at this time.

l 4-17 l

l

BATTERY ,

CHARGER 1

U)

O!

A

O C  :  ;; ,, ,,

U3 0 ,,,0 U) 0 3

of n of of

^ ^

m FEED TO AMS 12 5V DC '

op4c ,

, TRAIN A BATTERY OTHER 3, CHWc ,

LOADS . . ,

FEED TO j * .

OTHER

^ ^ LOADS i 3ggc ,

U 1 w DISTRIBUTION PANEL FOR NON-SAFETY RELATED LOADS REACTOR TRIP FEED TO SWITCHGEAR OTHER LOADS V \

' m (U. . . (U IP STATION OhT&

^

a c,9 DISTRIBUTION PANEL AUXILIARY 3@ ($' * * ($

POWER SYSTEM NSSS INVERTER y y FEED TO RPS CA894ETS FIGURE 4-1 POWER SUPPLY ARRANGEMENT FOR AMS C ABINETS , R PS CABINETS AND REACTOR TRIP SWITCHGEAR TRAIN A.

TYPICAL FOR TRAIN B.

  • CARGENT O LUNDY ENG1NEER2 CHIC Ato i 5.0 References I

L

1. ATWS Final Rule - Code of Federal Regulations 10CFR50.62 and Supplementary Information Package, " Reduction of Risk from Anticipated Transients Without Scram (ATWS) Events for Light-Water-Cooled Nuclear l Power Plants".

l 2. " Quality Assurance Guidance for ATWS Equipment That is Not Safety-Related", Generic Letter 85-06; April 16, 1985.

t l l

3. "AMSAC Generic Design Package", WCAP-10858.

)

4. Rossi, C. E., " Acceptance for Referencing of Licensing Report", NRC Letter to L. D. Butterfield, Chairman of ATWS Subcommittee, Westinghouse Owner's Group, July 7, 1986.

l 5-1

_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _