ML20211E293
| ML20211E293 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/26/1997 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | |
| Shared Package | |
| ML20211E051 | List: |
| References | |
| T1-CL-I-06, T1-CL-I-6, NUDOCS 9709300087 | |
| Download: ML20211E293 (3) | |
Text
.
MILLSTONE UNIT 2 SYSR PROJECTINSTRUCTION PI-01 SYSR IMPLEMENTATION CllECKLISTS AND WORKBOOK O
v i
T1-CL-I-06 SYSTEM MODIFICATION
SUMMARY
LISTING INSTRUCTIONS - FORM 6 O
Sj7. nature D.ats Prepared:
NWaf.
_, f/AS[f'7 h
I 9/b5M7 Reviewed:
SYSR Oloup Lead
/
Approved:
9// '%
9/3r/$3 h
er Company Quality ~
Approved:
7,//La,
9/zd/97 utiIfoject Director (V
D DO K 05 0 336 P
- Parsons Power Group Inc. -
PI-86 Revision 2 PI-01. DOC. /
September 23,1997
)
MILLSTONE UNIT 2 SYSR PROJECTINSTRUCTION PI-01 SYSRIMPLEMENTATION CHECKLISTS AND W'*RM OOK 1.0 FORM 6 - SYSTEM MODIFICATION
SUMMARY
LISTING 1.1 The purpose of this form is to summarize and document the modifications that will be reviewed for the selected system.
1.2 The SLE adds the Parsons Power Document ID number, NNECo system code, system title to the form heade., and indicates the responsible SLE.
1.3 Since the purpose of the this form is to document the applicable modifications that will be reviewed, the individual who originates the Modification Screening Form will fill in the appropriate sections based upon the results of the screening.
O o
v
- Parsons Power Group Inc. -
PI-87 Revision 2 PI41. DOC September 23,1997
DOCUMENT ID:
SMSL-Page 1 of xx MILLSTONE UNIT 2 SYSTEM CODE:
ICAVP SYSR SYSTEM:
SYSTEM MODIFICATION
SUMMARY
LISTING Responsible firy meer:
(System Team l cad)
Item NNECo Modification Title of Modification Number 1.
2.
Modification in Process O
1.
Modification Canceled 1.
O
- Parsons Power Group Inc. -
FORM: 6 I 1 Package Sequence No. 7 l Regi 2
F6_MODLDOC