ML20211E151

From kanterella
Jump to navigation Jump to search
Rev 2 to T1-CL-I-01, Sys Scope & Boundary Instructions - Form 1
ML20211E151
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/26/1997
From:
AFFILIATION NOT ASSIGNED
To:
Shared Package
ML20211E051 List:
References
T1-CL-I-01, T1-CL-I-1, NUDOCS 9709300050
Download: ML20211E151 (6)


Text

-. . _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

l M;11 STONE UNIT 2 SYSR PROJECTINSTRUCTION PI-01 SYSR IMPLEMENTATION CllECKLISTS AND WORKBOOK O

T1-CL-I-01 SYSTEM SCOPE AND BOUNDARY c INSTRUCTIONS - FORM 1 O

Signature Dats Prepared: Nld4fA U T 3 97 Reviewed: , .- -

M Approved:

i # J'/f/

Approved: _

,_ 9!f4N7 D/pdty hoject Duector / '

~

9709300050 970926 PDR P ADOCK 05000336 PDR O

- Panons Power Group inc. -

P1 - 34 Revision 2 l'141. DOC September 23,1997

MILLSTONE UNIT 2 SYSR PZOJECTINSTRUCTION Pl 41 SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK lh 1,0 FORM 1 - SYSTEM SCOPE AND BOUNDARY 1.1 The purpose of this form is to:

  • Define all the selected system interfaces e Define the inspection limit of supporting systems 1.2 The OB adds the Parsons Power Document ID number, NNECo system code, system title to the form header, and indicates the responsible SLE.

1.3 Upon initiation of the form, the OE signs and dates the appropriate Revision block in Part A.

1.4 l.iinit of Review Boundaries interface with, and portions of, other systems will be included within the boundary of the selected system to the extent they are necessary to support the functional requirements of the selected system. System boundaries may be defined at appropriate components that provide physical isolation, as long as the selected boundary does not split the component between systems. All passive devices such as support and restraints, within the system boundaiy are included within the scope of the SYSR.

1,4.1 Support system boundaries will be limited to:

1.4.1.1 Mechanical The boundary is extended to the first level of support system interface. As an example, at a heat exchanger, the interface will be verified at the level of data associated with the temperature and flow rate of the cooling media. The interfacing system equipment / data / design will be verified to the extent that the input parameters can be validated with respect to a verified calculation or vendor document.

1.4.1.2 Electrical Electrical power will be verified from the acttating component or power supply to the ultimate on site source required for the component to perform its intended function. All selected system loads and their design parameters will be verified.

Verification will focus on the review ofloads associated with the selected system. Design documents will be reviewed to the level confirming that the intended function can be accomplished.

O

- Panohn Power Croup inc. -

Pl.35 Revision 2 Pl.ol. DOC Septemter 23,1997

MILLSTONE UNIT 2 SYSR PIOJECTINSTRUCTION PI 41 SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK 1.4.1.3 Instrumentation and Control I&C will be verified from the individual field sensor to the component or device required to perform an intended function. Verification will include any portion of the instrument loop, power supplies, circuitry, interfacing hardware and rangehet point required to assure the intended function is accomplished. The SVSR will concentrate on verifying (1) signals associated with the selected system and (2) that the instrument loop performs its primary function. Design documents reviesved will be reviewed to the level of confirming that the intended function can be accomplished.

1.4.1.4 Pipina Will be reviewed to the point ofinterface with the component and/or supporting structures.

1.4.1.5 Structural Supporting structures will not be considered within the system boundary.

1.5 Using the applicable NNECo documenta, the OE completes Part B of the form.

1.5.1 For each interface indicated, the extent of the boundary is to be included. The boundary shall be consistent with Section 1.4 1.6 The OE will count the number of pages and enter the appropriate total in the header box of the form.

1.7 The OE submits the form and checklist to the interface reviewers in accordance with the Generalinstructions for Review and Approval in Section 6.0 of this document.

O

- Persons Power Group Inc. -

Pl.36 Revisian 2 Pl411. DOC September 23,1997

_a --,: a----- - -

1 DOCUMENT IDi SSHD- Page.Iofn MILLSTONE UNIT 2 SYSTEM CODE:

! ICAVP SYSR SYSTEM:

4 SYSTEM SCOPE & BOUNDARY DEFINITION Responsible Engmeer; J (System Team I.ead)

PART A BOUNDARY INTERFACE SIGN OFF )

REVISION O REVISION 1 REVISION 2 woimsw w .sw woimsw

1. ORIGINATOR
2. REVIEWED - - -

{

Mechanical Lead

^

Electrical Lead Control Systems Lead i

Piping /StructuralImd Operations Engineer  !

Procedures Engineer 3

Testing Engineer

3. APPROVAL - - -
Sy6 tem lad Engineer 4

(O V

d SYSR Lead Engineer PARTB SYSTEM BOUNDARY DEFINITION Instructions: (1) Provide a brief description of the of the system, highlighting major features, system functions, and all j system laterfaces (mechaalcal, electrical, IAC, etc.)

(2) The boundary should be described for each laterfacing plant system (mechanical, electrical, or I AC),

structure and functional nork group (mechanical, procedures, programs, etc.).

1 i .

1. SYSTEM DESCRIPTION:
2. SYSTEM FUNCTIONS:

a.

3. SUPPORTING SYSTEM (S) INTERFACES:

(Interfaces are to be described fully so that the estent of the boundary (review)is clearly understood), List each applicable functional group separately.

A.1 Mechanical

l. *

- Parsons Power Group Inc. -

FORM:el I-01 I Fackage Sequence No. 2 l Resisite 2 Fl_SSBDB. DOC 9/23/97 l

DOCUMENT ID: SSHD. Page J of n MILLSTONE UNIT 2 SYSTEM CODE:

Q(m ICAVP SYSR SYSTEM:

SYSTEM SCOPE & BOUNDARY DEFINITION Responsible Engmeer:

(System Team int)

A.2 Mechanical Estcot of Boundary 1.

B.1 Elejas 1.

B.2 Pinine Estent of Boundary 1.

C.1 Structural 1.

C.2 Sitwetural Estcat of Boundary 1.

D1 Electrical 1.

D.2 Electrical Estent of Boundary 1.

E.1 ]RElDmeritation in.d. Control 1.

E.2 Instrumentation and Control Estent of Boundary 1.

F.1 Procedures 1.

F.2 Procedures Estent of Boundary 1.

G.1 Iggjag 1.

- Parsons Power Group lac. -

FORM: 01 1-01 2 Package Sequence No. 2 l Fl.,$$BDB. DOC Rettsion 2 9/23/97 l

DOCUMENT ID: SSHD. Page 3 of us MILLSTONE UNIT 2 SYSTEM CODE:

O iCivesvsa SYSTEM SCOPE & BOUNDARY svsrea:

DEFINITION Responsible Engtnect.

(system Team lead)

G.2 Testine Estent of Boundary 1.

H.1 Prostramig 1.

H.2 Pronrams Estent of Boundary 1.

LI Q1htr 1.

L2 Other Estent of Boundary 1.

O O - Parsons Poner Group Inc. -

FORM:01 1-01 3 Package Sequence No. 2 l Restslon 2 Fl SSBDB. DOC 9/23/97 l

_ _ _ _ _ _ - _