|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept ML20203F6931998-02-20020 February 1998 Rev 6 to PI-MP3-11, Discrepancy Rept Submittal & Closure ML20203E2131998-02-19019 February 1998 Cancelled Rev 26 to 1-OPS-10.11, Locked Valve List ML20203D4111998-02-18018 February 1998 Revised 1-OM-index Unit 1 Operations Dept OM Index & Rev 2 to OM 3.8, Millstone Unit 1 Operations Manual ML20203F6751998-02-16016 February 1998 Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems ML20203F6601998-02-16016 February 1998 Rev 5 to Audit Plan for Independent Corrective Action Verification Program ML20216H7351998-02-11011 February 1998 Independent Corrective Action Verification Program Status Rept 1999-05-10
[Table view] |
Text
-. . _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
l M;11 STONE UNIT 2 SYSR PROJECTINSTRUCTION PI-01 SYSR IMPLEMENTATION CllECKLISTS AND WORKBOOK O
T1-CL-I-01 SYSTEM SCOPE AND BOUNDARY c INSTRUCTIONS - FORM 1 O
Signature Dats Prepared: Nld4fA U T 3 97 Reviewed: , .- -
M Approved:
i # J'/f/
Approved: _
,_ 9!f4N7 D/pdty hoject Duector / '
~
9709300050 970926 PDR P ADOCK 05000336 PDR O
- Panons Power Group inc. -
P1 - 34 Revision 2 l'141. DOC September 23,1997
MILLSTONE UNIT 2 SYSR PZOJECTINSTRUCTION Pl 41 SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK lh 1,0 FORM 1 - SYSTEM SCOPE AND BOUNDARY 1.1 The purpose of this form is to:
- Define all the selected system interfaces e Define the inspection limit of supporting systems 1.2 The OB adds the Parsons Power Document ID number, NNECo system code, system title to the form header, and indicates the responsible SLE.
1.3 Upon initiation of the form, the OE signs and dates the appropriate Revision block in Part A.
1.4 l.iinit of Review Boundaries interface with, and portions of, other systems will be included within the boundary of the selected system to the extent they are necessary to support the functional requirements of the selected system. System boundaries may be defined at appropriate components that provide physical isolation, as long as the selected boundary does not split the component between systems. All passive devices such as support and restraints, within the system boundaiy are included within the scope of the SYSR.
1,4.1 Support system boundaries will be limited to:
1.4.1.1 Mechanical The boundary is extended to the first level of support system interface. As an example, at a heat exchanger, the interface will be verified at the level of data associated with the temperature and flow rate of the cooling media. The interfacing system equipment / data / design will be verified to the extent that the input parameters can be validated with respect to a verified calculation or vendor document.
1.4.1.2 Electrical Electrical power will be verified from the acttating component or power supply to the ultimate on site source required for the component to perform its intended function. All selected system loads and their design parameters will be verified.
Verification will focus on the review ofloads associated with the selected system. Design documents will be reviewed to the level confirming that the intended function can be accomplished.
O
- Panohn Power Croup inc. -
Pl.35 Revision 2 Pl.ol. DOC Septemter 23,1997
MILLSTONE UNIT 2 SYSR PIOJECTINSTRUCTION PI 41 SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK 1.4.1.3 Instrumentation and Control I&C will be verified from the individual field sensor to the component or device required to perform an intended function. Verification will include any portion of the instrument loop, power supplies, circuitry, interfacing hardware and rangehet point required to assure the intended function is accomplished. The SVSR will concentrate on verifying (1) signals associated with the selected system and (2) that the instrument loop performs its primary function. Design documents reviesved will be reviewed to the level of confirming that the intended function can be accomplished.
1.4.1.4 Pipina Will be reviewed to the point ofinterface with the component and/or supporting structures.
1.4.1.5 Structural Supporting structures will not be considered within the system boundary.
1.5 Using the applicable NNECo documenta, the OE completes Part B of the form.
1.5.1 For each interface indicated, the extent of the boundary is to be included. The boundary shall be consistent with Section 1.4 1.6 The OE will count the number of pages and enter the appropriate total in the header box of the form.
1.7 The OE submits the form and checklist to the interface reviewers in accordance with the Generalinstructions for Review and Approval in Section 6.0 of this document.
O
- Persons Power Group Inc. -
Pl.36 Revisian 2 Pl411. DOC September 23,1997
_a --,: a----- - -
1 DOCUMENT IDi SSHD- Page.Iofn MILLSTONE UNIT 2 SYSTEM CODE:
! ICAVP SYSR SYSTEM:
4 SYSTEM SCOPE & BOUNDARY DEFINITION Responsible Engmeer; J (System Team I.ead)
PART A BOUNDARY INTERFACE SIGN OFF )
REVISION O REVISION 1 REVISION 2 woimsw w .sw woimsw
- 1. ORIGINATOR
- 2. REVIEWED - - -
{
Mechanical Lead
^
Electrical Lead Control Systems Lead i
Piping /StructuralImd Operations Engineer !
Procedures Engineer 3
Testing Engineer
- 3. APPROVAL - - -
- Sy6 tem lad Engineer 4
(O V
d SYSR Lead Engineer PARTB SYSTEM BOUNDARY DEFINITION Instructions: (1) Provide a brief description of the of the system, highlighting major features, system functions, and all j system laterfaces (mechaalcal, electrical, IAC, etc.)
(2) The boundary should be described for each laterfacing plant system (mechanical, electrical, or I AC),
structure and functional nork group (mechanical, procedures, programs, etc.).
1 i .
- 1. SYSTEM DESCRIPTION:
- 2. SYSTEM FUNCTIONS:
a.
- 3. SUPPORTING SYSTEM (S) INTERFACES:
(Interfaces are to be described fully so that the estent of the boundary (review)is clearly understood), List each applicable functional group separately.
A.1 Mechanical
- l. *
- Parsons Power Group Inc. -
FORM:el I-01 I Fackage Sequence No. 2 l Resisite 2 Fl_SSBDB. DOC 9/23/97 l
DOCUMENT ID: SSHD. Page J of n MILLSTONE UNIT 2 SYSTEM CODE:
Q(m ICAVP SYSR SYSTEM:
SYSTEM SCOPE & BOUNDARY DEFINITION Responsible Engmeer:
(System Team int)
A.2 Mechanical Estcot of Boundary 1.
B.1 Elejas 1.
B.2 Pinine Estent of Boundary 1.
C.1 Structural 1.
C.2 Sitwetural Estcat of Boundary 1.
D1 Electrical 1.
D.2 Electrical Estent of Boundary 1.
E.1 ]RElDmeritation in.d. Control 1.
E.2 Instrumentation and Control Estent of Boundary 1.
F.1 Procedures 1.
F.2 Procedures Estent of Boundary 1.
G.1 Iggjag 1.
- Parsons Power Group lac. -
FORM: 01 1-01 2 Package Sequence No. 2 l Fl.,$$BDB. DOC Rettsion 2 9/23/97 l
DOCUMENT ID: SSHD. Page 3 of us MILLSTONE UNIT 2 SYSTEM CODE:
O iCivesvsa SYSTEM SCOPE & BOUNDARY svsrea:
DEFINITION Responsible Engtnect.
(system Team lead)
G.2 Testine Estent of Boundary 1.
H.1 Prostramig 1.
H.2 Pronrams Estent of Boundary 1.
LI Q1htr 1.
L2 Other Estent of Boundary 1.
O O - Parsons Poner Group Inc. -
FORM:01 1-01 3 Package Sequence No. 2 l Restslon 2 Fl SSBDB. DOC 9/23/97 l
_ _ _ _ _ _ - _