Rev 2 to T1-CL-I-02, Sys Licensing Bases Current Design Listing Instructions - Form 2
ML20211E204
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/26/1997
From:
AFFILIATION NOT ASSIGNED
To:
Shared Package
ML20211E051 List:
References
T1-CL-I-02, T1-CL-I-2, NUDOCS 9709300063
Download: ML20211E204 (3)


Text

_ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

MILLSTONL UNIT 2 SYSR PROJECTINSTRUCTION PI-01 SYSR IMPLEMENTATION CllECKLISTS AND WORKBOOK O

T1-CL-I-02 SYSTEM LICENSING BASES CURRENT DESIGN LISTING INSTRUCTIONS - FORM 2 O

Sigatulc_ Dale Prepared: [hM(//ru 9/A3!9'/

Reviewed: -

9 9/Am'/I [h sa orm(picad /

Approved:

h n crl'om my Quahty 7/.2r/f? _

Approved: 26 9////9/ '

e14/utf1%ectDirector '

(

O

- Parsons Power Group Inc. -

9709300063 970926 6 Pl.37 Revision 2 DR ADOCK 0500 M tm. k 23,1997

l MILLSTONE UNIT 2 SYS3P'0JECTINSTRUCT12N Pi el SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK (v  :.0 FORM 2 - SYS'sTM LICENSING BASES CURRENT DESIGN 1.1 The purpose of this fonn is to:

Obtain '.h- selected system's current licensing basis e Obtain docketed NNECc, licensing commitments to bulletin, orders, etc.

  • Documen! the results tc allow comparison of the current system design wndillda 1.2 The dli adds the Parsons Power Document ID iumber, NNECo system code, system title to the form header, and indicates the responsible SLE.

1.3 Upon initiatlan of the form, the OE signs and dates the appropriate Revision block in Part A.

1.4 Using the applicable NNECo documents, the OE comp..tes Part B of the form.

Note:- 0.'Jy the current UFSAR and docketed licensing commitments are to be included. Input on NNECo licensing commitments contained in docketed material shall be provided by the Regulatory Review group as described in Project Procedure PP-04, 1 A.1 The licensing requirement should be described in suflicient detail. Wordy

( paragraphs are to be used only if required. As an example:

e The RWST accident volume is 350,000 Gallons.

1.5 The OE will count the number of pages and enters the appropriate total in the header box of the fonn.

1.6 The OE submits the form and checklist to the interface revkwers in accordance whh the General Instructions for Review and Approvalin Section 6.0 of this document.

O

- Persons Power Group loc. -

P1 38 Revision 2 P141.1X)C September 23,1997

DOCUMENT ID: LCCD- P:ge .1 of MILLSTONE UNIT 2 SYSTEM CODE:

O iCivFSvSa LICENSING BASES -

SvsrEu:

CURRENT REVISION XX OF FSAR fs CI$te$d#7 PART A LICENSING BASES (CURRENT thru FSARe Rev. XX) INTERFACE SIGN OFF REVISION O REVISION I REVISION 2

$4snetur*14te $4snatureakte $4sneturmikte

1. ORIGINATOR
2. REVIEWED - - -

Mechanical 1xad Electrical Lead Control Systems lead Piping / Structural Lead Operations Engineer l'rocedures Engineer Testing Engineer

3. APPROVAL - - -

System Lead Engineer SVSR Lead Engineer O PARTB SYSTEM CURRENT LICENSING BASES Instructionst Rettsion ss of the FSAR and other licensing commitments will be used to determine the current system licensing basis. For each bases, enter the requirement and the reference section and page.

lita Licensinn Recultglugl Reference - Section & Paar 1.

2.

3.

4.

S.

b G

- Parsons Power Group fac. -

FORM: 02 1-02 . I PacLage Sequence No. 3 Revision 2 F2 LBCB. DOC 9/23/97