Rev 2 to Tl-CL-I-04, Sys Corrective Action Checklist Instructions - Form 4ML20211E263 |
Person / Time |
---|
Site: |
Millstone ![Dominion icon.png](/w/images/b/b0/Dominion_icon.png) |
---|
Issue date: |
09/26/1997 |
---|
From: |
AFFILIATION NOT ASSIGNED |
---|
To: |
|
---|
Shared Package |
---|
ML20211E051 |
List: |
---|
References |
---|
T1-CL-I-04, T1-CL-I-4, NUDOCS 9709300079 |
Download: ML20211E263 (7) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept ML20203F6931998-02-20020 February 1998 Rev 6 to PI-MP3-11, Discrepancy Rept Submittal & Closure ML20203E2131998-02-19019 February 1998 Cancelled Rev 26 to 1-OPS-10.11, Locked Valve List ML20203D4111998-02-18018 February 1998 Revised 1-OM-index Unit 1 Operations Dept OM Index & Rev 2 to OM 3.8, Millstone Unit 1 Operations Manual ML20203F6751998-02-16016 February 1998 Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems ML20203F6601998-02-16016 February 1998 Rev 5 to Audit Plan for Independent Corrective Action Verification Program ML20216H7351998-02-11011 February 1998 Independent Corrective Action Verification Program Status Rept 1999-05-10
[Table view] |
Text
_ _ _ _ _ _ _ _ - _
MILLSTONE UNIT 2 SYSR PROJECTINSTRUCTION PI 01 SYSR IMPLEMENTATION CilECKLISTS AND WORKHOOK T1-CL-I-04 SYSTEM CORRECTIVE ACTION CHECKLIST INSTRUCTIONS - FORM 4 O
fiignalutt. Dalt Prepared: / 8/ff/#4w 'Ih,!9'/
9 8 Reviewed: -
sisR 6 Leaa /
Approved: 94 4 9/> r/97
'aFer Cornpany Quahty '
Approved: ,7/24,4 h 8!14/'N
'g,. %dty/ Project Dacetor
( [k khoh 0 ho 6
- Parsons Power Group Inc. -
Pl.80 Revision 2 P!41 IXX' September 23,1997
MILLSTONE UNIT 2 SYS2PROJECTINSTRUCTION PI 01 SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK 1.0 FORM 4 - SYSTEM CORRECTIVE ACTION CilECKLIST 1.1 The purpose of this form is to:
Provide review of the NNECo Correction Actions (CAP)
- Document the results to assure that the CAP adequately addresses the items requiring corrective action 1.2 The OE adds the Parsons Power Document ID number, NNECo system code, system title to the form header, and indicates the rerponsible SLE. Each corrective action requires a separate form and document ID number, 1.3 Upon initiation of the form, the OE signs and dates the appropriate Revision block in Pan A.
1.4 The SLE in concert with the OE will review the specific checklist requirements and assign each requirement to the (1) OE, (2) discipline, or (3) specialist reviewer. The OE adds to Part C, the assigned group (s) and types / prints the reviewer /mspector's name to each specific checklist requirement.
1.5 Checklist Requirement (Part C) 1.5.1 Using the NNECo CAP and other inputs documents as applicable, the OE completes Part C of the form.
1.5.2 If the requirement is assigned to another reviewer / specialist, the OE is responsible to track and assure the requirement input is provided.
1.5.3 The CAP checklist requirement result should be described in sufficient detail.
The OE/ inspector determine the depth of the review, Wordy paragraphs are to be used only if required.
1.5.4 Upon completion of review of the checklist requirement, the assigned inspector provides a disposition in accordance with the instructions in Part C, signs and dates the specific requirement (s). This signature indicates that the inspection of this requirement is complete.
1.6 The OE of the form assures all the reviewer /mspector inputs are included for each requirement and that the requirement has a (1) disposition, (2) inspector signature, and (3) date. The OE counts the number of pages and enters the appropriate total in the header box of the form.
1.7 The OE submits the form and checklist to the SLE who reviews each of the individual requirements in Part C that are dispositioned as a " Discrepancy." The
- Parsons Power Group Inc. -
Pl . 81 Revision 2 Pl.01. DOC September 23,1997
MILLSTONE UNIT 2 SYSR PROJECTINSTRUCTION PI 01 SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK SLE completes Part B by providing a summary disposition, indicating any discrepancy requirement number (s), and signing and dating the form.
1.8 The OE of the form reviews each of the individual requirements in Part C that are dispositioned as a " Discrepancy" and indicates the requirement number in Part B of the form.
1.9 The OE cubmits the form and checklist to the interface reviewers in accordance with .ae General Instmetions for Review and Approval in Section 6.0 of this document.
2.0 Each Corrective Action associated with the selected system will be placed on a separate form.
2.0 CHECKLIST REVIEW REQUIREMENTS 2.1 The attached requirements and questions are to be used ta generate the specific checklist questions to be incorporated onto the fornt These que'tions and requirements are based upon the NRC Order, Overvicw Plans, and SSFI/IDI procedures.
2.2 The system review team (GLE, SLE, discipline reviewers, and specialists) will
\ use these requirements / questions to generate the system specific review requirements for the selected system.
2.3 Based upon the system selected, the review team will determine what additional detail is to be provided and incorporate it into the customized system workbook.
f'N U
- Parsons Power Group lac. -
Pl.82 Revision 2 PI-01. DOC September 23,1997
MILT 3 TONE UNIT 2 SYS3 PROJECT INSTRUCTI',N PI-01 TR IMPLEMENTATION CHECKLISTS AND WORKBOOK
,.~
CORRECTIVE ACTION PROGRAM CilECKLIST QUESTIONS AND REQUIREMENTS INSTRUCTIONS
- 1. Corrective actions are reviewed using the following checklist and the results are recorded on Form 4.
- 2. The SLE shall use the following questions / requirements as the basis for preparing the specific review questions to be utilized by the inspection team.
- 3. The SLE reviews the following questions, expanding them as required, and completes the appropriate system specific form in the workbook.
Note: these questions / requirements are customized for each selected system and does not require the SLE to include each question ifit is not applicable to the selected system, c
- 4. If applicable, the SLE may use other checklist questions contained in the licensing basis checklist, modification checklist or Appendix A.
. is the problem clearly identified?
e Does the solution identify the root cause?
. lias the deficiency been corrected?
If the deficiency has not been corrected is there acceptable documentation that justifies restart without the correction being completed?
Does the solution address any generic or programmatic ssues?
llave the corrective actions been adequately documented and any required configuration control document changes made?
- ls the corrective action technically and programmatically acceptable?
- Does the corrective action include procedure or process changes to prevent recurrence?
O d
- Parsons Power Group inc. -
P1 83 Revision 2 Pl.01. DOC September 23,1997
I DOCUMENT ID: RC.CA. P:ge .1 of us MILLSTONE UNIT 2 SYSTEM CODE:
ICAVP SYSR SYSTEM:
SYSTEM CORRECTIVE ACTION CAP Number CilECKLIST CAP Title Responsible Engmect:
(System Team lead)
PART A CORRECTIVE ACTION CllECKLIST CLOSE-OUT REVISION O REVISION 1 REVISION 2 bar netwo.T)ste nasneewetnote $4rneturs14te
- 1. ORIGINATOR
- 2. REVIEWED - -
Mecharucal Lead Electncallead Control Systems lead Piping / Structural Lead Operations Engineer Procedures Engineer Testin;. Engineer
- 3. APPROVAL - - -
System Lead Engineer SYSR lead Engineer PARTH SYSTEM CORRECTIVE ACTIONS PROGRAM OBSERVATIONS & FINDINGS
SUMMARY
Instructions: (1) The SLE will review the attached ches Lijst and supplementu material and indicate whether the NNECo Correcthe Action Program adequately considered or incorporated the indicated requirements into the s) stem.
(2) For each DISCREPANCY found during t.ie audit, the SLE is to indicate the requirement item number (s) under the appropriate Revision sad assur e oil discrepancies are processed per PP-07.
REVISION 0 REVISION 1 REVISION 2
- 1. Is the correcthe action satisfactorily 0 Yes O No O Yes O No r4 .'es O No incorporated or will be incorporated into the system design?
- 2. Summary of Discrepancy (les) Items Signature SLE/Date O
- Persons Power Group lac. -
FORM: 4 1-04 1 Package Sequence No. 5 Retision 2 F4_CLCB. DOC 9/23,9 7
DOCUMENT ID: RC CA- Page 2 of u MILLSTONE UNIT 2 system CODEt ICAVP SYSR SYSTEM:
SYSTEM CORRECTIVE ACTION CAP Number ClIECKLIST CAP Title Responsible Engtncer:
(System Team lead)
PART C CIIECKLIST REVIEW INSTRUCTION Instructions: For each regulrement listed below:
(1) GLE, SLE, OE and system team deselops the specific requirements to be reviewed using the generic questions in the Instruction and Attachment A Source Book. Egih requirement will be given a new item number and include steps A, B, C, and D.
(2) Each requirement will be consecuthely number starting with I (one).
(3) The system lead Engineer will assign the function group responsible for reviewing each requirement.
Mechanical = M. Electrical = E, Controls = IAC Testing = T. Precedures = P Operations = 0 (4) The indhidual that reviews the requirement will sinn and date., prmide a disposition, Indicated interfaces, and provide a response based upon the following:
- a. Yes Requirement is satisfactorily addressed. Include reference source, revision, and date. No esplanation/results is required.
- b. No Requirement is not satisfactorily addressed. Include reference nurce, revision and date,if applicable, if an RAI was generated to clarify the requirement,,he reference RAI number and subsequent NNECo response reference is to be provided. Prmidi en explanation of how you concluded the requirement was not satisfied. Include reference sorce, revision, and date.,if applicable. Disposition as a DISCREPANCY. The responsible inds,Muni thallimmediately advise the SLE of any requirement that is to be dispositioned as a DISCREPANCY. Initletion of Project
' Procedure PP-07 will be by the OE.
- c. NA Requirenient is not applicable. Esplanation should be included only ifit clarlfles the disposition,
- d. INF Requirement could not be terified because information could not be found. Include a statement under results that indicates th$ information could not be found and disposition as a DISCREPANCY. The responsible indhidual shallimmediately advise the SLE of any requirement that is to be dispositioned as a DISCREPANCY. Initiation of Project Procedure PP-07 will be by the OE.
PartD Review Requirement item Group Status Reviewer's Signature
- 1. O Yes O No O NA O INF Date A. REOUIREMENT B. REOt!IREMENT IS CONSIDERED AS,1 0 SATISFYING Tile LICENSING / DESIGN BASIS O DISCREPANCY (Process per PP-07)
C, REFERENCE (S) & SOllRCE/ REVISION / DATE:
Os D. REV1EW SIIMMARY/RESITI,T U
~ Persons Power Group Inc. -
FORM: 4 104 2 Package Sequence No. 5 Resisjon 2 F4 CLCILDOC 9/23/97
DOCUMENT ID: RC.CA. Pcge .3 of in l MILLSTONE UNIT 2 SYSTEM CODE:
O iCive stsR svsTEMI SYSTEM CORRECTIVE ACTION CAP Number CIIECKLIST CAP Title Responsible Enginect; (System Team Lead)
O O - Persons Power Group lec, -
FORM: 4 1-04 3 Package Sequence No. 5 Revlilon 2 F4 CLCB. DOC 9/23/97
_ - _ _ _ _