s .'-

TVA EMPLOYEE CONCERNS REPORT NUMBER: 207.4(B)

SPECIAL PROGRAM REPORT TYPE: SEQUOYAH ELEMENT REVISION NUMBER: 1

. NON-RESTART JUSTIFICATION

SUMMARY

TITLE: DEVIATION DOCUMENTATION CAQ Documentation PAGE 1 0F 2 REASON FOR REVISION:

Revised to incorporate TAS comments.

4 ,

i1 PREPARATION

. PREPARE BY-l7  %

SIGNATURE DATE REVIEWS 1: EVI OMMITTEE f& 7f5 SIGNATURE / DATE lZ <8 ispf* SIGNATURE DATE CONCURRENCE 5

[ -

8701090534 861224 -

fDR ADOCK 0500 7 CEG-H: h W S W /2-7-4 DAlt SRP: h 51GNAlVRE*

}2 22-8C DAlt SIGNATURL

  • SRP Se.cretary's signature denotes SRP concurrences are in files. '

, APPROVED BY:

MU8AWECSP'MANfGER it1s-r6 DA1E Ria MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY) 12/06/86 Page 1

. 1 SEQUOYAH NUCLEAR "* ANT ENGINEERING RELATED EMPLOYEE CONCERNS SPECIAL PROGRAM NON-RESTART JUSTIFICATION

SUMMARY

, SUBCATEGORY / ELEMENT 207.4(B)

The issues identified in this element refer to a possible programmatic deficiency in the engineering corrective action process. The issues involve a concern that practices within engineering require an approval cycle for documentation of conditions adverse to quality (CAQ), and the approval cycle hinders the reporting of conditions adverse to quality by employees.

The programmatic impact of this concern being valid would be the potential need for modifications to the procedures and practices governing the CAQ process. Such modifications would be oriented towards improving the effectiveness and freedom of the corrective action system.

Investigation to date indicates that engineering procedure changes have been accomplished which address the issues identified in this element.

Specifically NEP-9.1, " Corrective Action" (Rev. O, July 1,1986), now provides measures enabling the originator of a CAQ to escalate a concern to higher

-management - in the event of disagreement between the originator and supervisor on the validity of the concern. The previous engineering procedure (OEP-17) did not provide for such recourse. In addition to the modification to the engineering procedures, the existence of the TVA Employee Concerns

g.9 Program provides a method available to the employee to circumvent undue j '

restrictions in the CAQ process.

Therefore resolution of this programmatic item is not considered to be a requirement for plant restart.

i

[

.\TTACHMENT: List of Issues for Programmatic ELEMENT NO. 207.4(B)

Date: 10/05/86 b b, 0611D Page 2

.R (h *

  • i SUBCATEGORY 207 - DEVIATION DOCUENTATION d' ELEENT NUleER 207.4 LIST OF PROGRAMETIC ISSUES APPLICABLE ELEENT DESCRIPTIOh E WLOYEE CONCERNS SQN RESTART - NO DATE: 10/05/86' i

CAQ Documentation I-85-761-NPS SQN RESTART - NO ELEENT InmBER 207.4 ELEENT netERE RESPON-ISSUES ADDRESSED SIBLE GEERAL APPROACH /ETH000 LOGY FOR ELEENT REPORT CONCERN NUMBER (S) l-85-761-NPS 1. Existing practice for approval of 207.4 LA All issues DNE practice f or approval of CAQs hinders reporting of CAQs CAQ Documentation (i.e., PIR & by employees. 1. Review procedures and practices covering the SCR) hinders the reporting of origination and processing of CAQs.

conditions adverse to quality by 2. Because the present system requires 207.4, LA certain approval steps, some 2. Review level of CAQ activity and character-esployees. istics of that activity to ascertain the legitimate potential CAQs are not effectiveness and freedom in the system.

even being documented.

3. There is no path for recourse 207.4 LA p(rovided in is e.g., There the nopresent

" appeal"system.

process).

0897d-50 2

3

m .

O ,

REFEREtiCE - ECPS120J-ECPS121C TEilNESSEE VALLEY AUTHORITY PAGE -

68 FREQUENCY - REQUEST OFFICE OF t4UCLEAR POWER RUN TIME - 12:57:19 O Ofte - ISSS - RHM EMPLOYEE C0t4CERil PROGRAM SYSTEM (ECPS) RUN DATE *12/02/86 LIST OF EMPLOYEE C0tlCERf1 INFORMATION CATEGORY: EN DES PROCESS & OUTPUT SUBCATEGORY: 20704 CAQ DOCUMENTATI0H O S GENERIC KEYHORD A H APPL QTC/NSRS P KEYHORD B CONCERN SUB R PLT BBSH INVESTIGATION S CONCERN KEYHORD C HUMBER CAT CAT D LOC FLQB REPORT R DESCRIPTION KEYNORD D O

I-B5-761-NPS EN 20704 N HBN YYYY SS DHE PRACTICE FOR APPROVAL OF CAQ DOC K-FORM UMENTATION (I.E.,PIR & SCR) HINDERS THE REPORTING OF CONDITIONS ADVERSE O TD QUALITY BY EMPLOYEES.

1 CONCERNS FOR CATEGORY EN SUBCATEGORY 20704 0

O O

O

-O -

/.

/"

O

(

O g

O O

O lli