Text
..
TENNESSEE VALLEY AUTHORITY e
Watts Bar Nuclear Plant P. O. Box 800 Spring City. Tennessee 37381 f
December 24, 1986 Mr. Harold Denton Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814
Dear Mr. Denton:
In the Matter of the Application of
)
Docket Nos.
50-327 Tennessee Valley Authority
)
50-328 EMPLOYEE CONCERNS TASK GROUP (ECTG)
Enclosure I provides a listing of the report numbers, the related employee concerns, and the previous submittal dates if applicable. To assist you in your review of these reports, Enclosure 2 provides a comparison between the ECTG Writer's Guide recommended report format and the transmitted reports. As has
~~
been previously discussed with your staff, the welding reports addressing employee concerns have been left in the format used by the Weld Task Group. to this letter transmits, for NRC's review, two initial element reports addressing Sequoyah Nuclear Plant employee concerns in the engineering category.
(These reports have been reviewed and approved by the Senior Review Panel). transmits the final element reports for 20 elements addressing Sequoyah Nuclear Plant employee concerns in the following categories:
Construction
- 4 reports Engineering
- 12 reports Operations
- 3 reports Welding
- 1 report As indicated by the report cover sheets, these reports have completed final review by the Senior Review Panel and the Employee Concern Task Group management. With these final reports, all employee concerns related to Sequoyah have been addressed for Construction Subcategory 10700, Instrument Tubing and Engineering Subcategory 23500. Electrical Safety Design.
8701090475 861224 b
PDR ADOCK 05000327 hd P
PCR An Equal Opportunity Employer k
r I2 1
Nr. Denton Please telephone Martha Martin at (615) 365-3587 (Watts Bar) if you have any questions.
Very truly yours, TENNESSEE VALLEY AUTHORITY y.J. A. Mcdonald Watts Bar Nuclear Plant Site Licensing Manager l
cc (Enclosures):
Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C.
20555 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. Gary Zech 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. B. J. Youngblood, Project Director l
PWR Project Directorate #4 Division of PWR Licensing - A U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Room 440, 5 Story Phillips Bethesda, Maryland 20814 Nr. B. D. Liaw, Branch Chief j
U.S. Nuclear Regulatory Commission l
7920 Norfolk Avenue Room T-1132 Bethesda, Maryland 20814 i
l l
I J
e-i l
l
ENCLOSURE 1 Page 1 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 23801 IN-85-432-001 Conduit Overfills and Cable Damage (Initial)
IN-86-036-001 IN-86-310-001 IN-85-313-001 IN-85-506-001 IN-85-622-001 IN-85-685-001 IN-85-743-008 IN-86-034-001 IN-86-266-003 IN-85-642-001 IN-85-856-003 IN-86-028-002 IN-86-262-001 IN-85-832-001 IN-85-312-001 IN-85-734-001 IN-85-367-001 IN-86-262-004 IN-86-254-009 IN-86-206-001 OW-85-007-003 Engineering 23803 OW-85-007-002 Cable Tray Overfills (Initial)
IN-85-186-003 and Wall and Floor WI-85-100-011 Penetrations IN-85-798-004 IN-86-238-003 IN-86-232-002 IN-85-688-N05 IN-85-919-001 IN-85-432-002 IN-85-688-001
-IN-85-856-003 i
PH-85-003-023 IN-86-028-002 IN-85-312-001 IN-85-734-001 i
IN-86-262-001 IN-85-832-001 IN-85-207-001 IN-85-519-001 WI-85-100-015 i
ENCLOSURE 1 Page 2 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Construction 10603 IN-86-183-001 Bolting Material (Final)
IN-85-021-X04 Compatibility IN-85-824-001 NOTE: Report 10603 and listed concerns were added after 9/26/86.
Initial report transmitted 11/17/86.
Construction 10703 IN-85-707-002 Bending Equipment / Material (Final)
IN-85-740-002 IN-85-740-003 IN-85-773-002 IN-85-831-001 NOTE: Initial report transmitted 11/17/86.
Construction 11103 IN-85-228-001 Methods Used During Installation (Final)
IN-86-116-001 XX-85-070-007 NOTE: Initial report transmitted 9/25/86.
Construction 11305
- HI-85-020-N02 Anchors Cut Off as (Final)
- HI-85-073-N04 Related to Construction
- HI-85-113-N02 IN-85-020-001 IN-85-037-001
- IN-85-246-003 IN-85-285-001
- IN-85-625-002
- IN-85-664-001
- IN-85-982-001 IN-86-140-002
- IN-86-177-001
- IN-86-221-001 IN-86-294-002 PH-85-002-026 PH-85-035-007
- PH-85-054-NO3
- QCP-10,35-8-23 SQP-5-005-002 SQP-5-005-003 SQP-5-005-004 SQP-5-005-005 SQP-5-005-006 SQP-85-005-001 SQP-85-005-007 WI-85-011-001 XX-85-010-001 XX-85-010-N02 NOTE: Initial report transmitted 9/11/86
ENCLOSURE 1 Page 3 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 20302 WI-85-100-034 Feedback to Design (Final)
Organization not Properly Utilized NOTE: An initial report was not necessary. This will be the only submittal for 20302.
Engineering 20503 WI-85-100-043 Calculation Records Retention.
(Final)
IN-85-110-004 NOTE: An initial report was not necessary. This will be the only submittal for 20503.
Engineering 20703 IN-86-077-001 Deviations to Pre-op (Final)
Test Acceptance Criteria.
NOTE: An initial report was not necessary. This will be the only submittal for 20703.
Engineering 20704 I-85-761-NPS CAQ Documentation (Final)
NOTE: An initial report was not necessary. This will be the only submittal for 20704.
Engineering 21202 IN-85-027-001 NRC Bulletin (Final)
SQN-86-002-02 79-14 ABR Program NOTE: An initial report was not necessary. This will be the only submittal for 21202.
Engineering 21801 SQN-86-002-03 Thermal Analysis (Final)
SQN-86-001-03 of Piping Subjected
- IN-85-038-001 to Temperature Less IN-85-039-001 Than 120* F.
- IN-85-039-002
- Concerns added after 9/26/86.
NOTE: An initial report was not necessary. This will be the only submittal for for 21801.
l
ENCLOSURE 1 Page 4 of 5 4
SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 22902 XX-85-127-001 Radioactive Panels (Final)
IN-85-143-003 Drains Into Floor IN-85-197-002 Drains
- IN-85-514-002 IN-85-748-001 IN-85-952-001 IN-85-983-001
- Concern added after 9/26/86 NOTE: An initial report was not necessary. This will be the only submittal for 22902.
Engineering 22905 IN-85-348-002 Control Air System (Final)
Adequancy.
NOTE: An initial report not necessary. This will be the only submittal for 22905.
Engineering 23209 IN-85-772-005 Freezing of (Final)
Condensate Lines.
NOTE: An initial report was not necessary. This will be the only submittal for 23209.
l Engineering 23501 WBM-5-002-003 480 Volt Power (Final)
EX-85-154-007 Receptacles Unsafe.
NOTE: An initial report was not necessary. This will be the only submittal for 23501.
Engineering 23508 IN-85-973-003 PVC Liguidtight (Final)
Flex Conduit l
NOTE: An initial report was not necessary. This will be the only submittal for 1
23508.
r l
ENCLOSURE 1 Page 5 of 5 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 24103 XX-85-094-006 No Megger Test on (Final)
Low Voltage Cables.
NOTE: An initial report was not necessary. This will be the only submittal for 24103.
Operation 30701
- IN-85-847-001 Plant Operations Review (Final)
Committee (PORC) Process
- Concern transferred from 70500.
NOTE: An initial report was not necessary. This will be the only submittal for 30701.
Operation 30704 XX-85-070-005 Workplan Process (Final)
XX-85-070-003
- XX-85-070-002
- XX-85-070-006 SQP-86-003-003 SQP-86-003-N06 IN-85-305-NO3
- Concerns added after 9/26/86.
NOTE: An initial report was not necessary. This will be the only submittal for 30704.
Operation 30804 IN-86-073-002 Program / Procedure (Final)
IN-86-315-002 Violations IN-86-110-001 SQP-85-004-006 JAN-86-001 I-86-233-SQN JLH-86-001 NOTE: An initial report was not necessary. This will be the only submittal for 30804 Welding WP-23-SQN XX-85-124-001 (71100)*
Control of Unused (Final)
Weld Material.
- Data base subcategory as shown in 9/26/86 printout.
NOTE: An initial report was not necessary. This will be the only submittal for WP-23.
[
b
__.e-i a
,c-.,
.-- +
_,.--,.p.---
,,w.
.,"-.-.y
CONSTRUCTION CATEGORY Enclosure 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue I.
Introduction Characterization II.
Summary of Perceived Problem 2.0 Summary IV.
Summary of Findings Conclusions (Portion) 3.0 Evaluators Cover Sheet Information 4.0 Evaluation III. Evaluation Process Nethodology
5.0 Findings
IV.
Summary of Findings 6.0 Root Cause 7.
Root Cause (Collective Significance)**
- Overall Root Cause will not be considered at this report level.
7.0 Attachments /
VIII. Attachments List of Concerns Other items included VI.
Corrective Actions in Construction Element (To be provided by Reports line orgainzations)
VII. Generic Applicability
- i i
190ST f
ENGINEERING CATEGORY Page 1 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue 1.
Characterization of Issue (s)
Characterization 2.0 Summary 9.
Discussion, Findings and Conclusions 3.0 Evaluators Cover Sheet Information 4.0 Evaluation 8.
Evaluation Process Process
5.0 Findings
9.
Discussion, Findings, and Conclusions 6.0 Root Cause (Collective Significance)M*
- Overall Root Cause will not be considered at this report level.
7.0 Attachments /
Attachments as required List of Concerns Other items included 2.
Have issue (s) been identified in Engineering Element in another systematic Reports analysis?
3.
Document nos., tag nos.,
locations or other specific descriptive identifications stated in element.
I 4.
Interview files reviewed l
5.
Documents reviewed related to the element 1992T
4 ENGINEERING CATEGORY Page 2 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT Other items included in Engineering Element 6.
What regulations, licensing Reports commitments, design require-(cont'd) ments, or other apply or control in this area?
7.
List requests for information, meetings, telephone calls, and other discussions related to element.
t t
f I
I
OPERATIONS CATEGORY Enclcsura 2 ECTG WRITER'S GUIDE OPERATIONS (0P) ELEMENT REPORTS NOTES / COMMENTS 1.0 Issue I.
Title The brief introduction Characterization Very brief introduction touches on the source of the concerns, i
i 2.0 Summary I.
Title
- 1. The Conclusions are Very brief introduction towards the end of the findings.
III. Finding (Conclusions)
- 2. The conclusions services as a summary of the findings.
J
]
3.0 Evaluators Cover Sheet
- 1. The printed name of the original evaluator (s) appears on the cover sheet.
- 2. The peer reviewer and i
)
CEG-H approval signa-tures are also on the cover sheet.
4.0 Evaluation II. Specific Evaluation Process Nethodology i
i
5.0 Findings
III. Findings 3
1880T P3 I
EIclesura 2 ECTG WRITER'S GUIDE OPERATIONS (OP) ELMENT REPORTS NOTES / COMMENTS 6.0 Root Cause IV. Root Cause
- 1. At the element level (Collective Significance) the Root Cause is often not identifible.
- 2. Collective significance j
is not addressed at the element report level.
7.0 Attachments /
II. Specific Evaluation
- 1. A list of the concerns List of Concerns Methodology with text are included within this section.
- 2. Other reports are j
sometimes attached.
l 1
i i
1
Ercicarro 2 ECTG WRITER'S GUIDE NSRS/ERT*
WELD PROJECT (WP) REPORTS NOTES /COMPENTS 1.0 Issue Background Info Issues Addressed Characterization (Section I)
By Concerns (Section II) 2.0 List Of Concerns Background Info Scope of Evaluation (Section I)
(Section I and Att-1) 3.0 Evaluators Coversheet Coversheet i
i I
i 4.0 Evaluation Scope Not Delineated As Part Process (Section II)
Of The WP Reports however it is addressed as part of the J
Weld Projects Program Manual i
5.0 Findings
Findings Validity or (Section III)
Substantiation (Section III) i I
i 1
l 6.0 Root Cause**
Conclusion and Validity or
- Note that recommendations l
are not included in element reports under the current ECTG program, and Conclusion Recommendations Substantiation Overall Root Cause will (Section IV)***
(Section III) not be considered at this I
report level.
l
- The Weld Project has endorsed a number of ERT Reports and general issue level reports as adequately addressing the concerns at this level for SQN.
I