Rev 0 to Training Procedure 72TR-TRN-002-0S, License Requalification Training Program
ML20203L929
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/01/1986
From: Moore C
GEORGIA POWER CO.
To:
Shared Package
ML20203L915 List:
References
72TR-TRN-002-0S, 72TR-TRN-2-S, TAC-62742, NUDOCS 8609020060
Download: ML20203L929 (16)


Text

.

ENCLOSURE! 'b e GEORGIA POWER COMPANY l DOCUMENT TYPE: l PLANT E.I. HATCH l TRAINING PROCEDURE I PAGE 1 0F 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAININCnPROGRAM ./ l 72T9-TRN-002-OS l O A ROVALS pt F TIVE DATE:

[ , EXPIRATION DATE: ,

GEN. MGR N WC DATE d 1

~

~

1.0 OBJECTIVE This procedure outlines the License Requalification Training Program conducted at Plant Hatch and specifies the training requirements for individuals participating in the program.

2.0 APPLICABILITY '

s 2.1 The License Requalification Training Program applies to all NRC licensed Reactor Operators and Senior Operators in the plant organization including staff members, Senior Reactor Operator certified instructors and certified Shift Technical Advisors.

2.2 Vendor Senior Reactor Operator certified instructors will be allowed to teach license and requalification programs upon presenting documentation to the utility that they are certified and meet the require.nents of an appropriate vendor requalification program. Such vendor instructors are exempt from this procedure, except that attendance or presentation of plant design changes, procedure changes, and license changes will be required for those vendor instructors assigned to the Training Department for a period of greater than one C quarter (3 months).

2.3 Individuals who maintain operator or senior operator licenses far the purpose of providing backup capability to the operating staff shall participate in the program.

2.4 Waivers from specific portions of the License Requalification P.rogram may be gra'nted in accordance with approved plant procedures for the following reasons:

2.4.1 Licensed and certified personnel who present lectures may be waived for attendance for those lectures presented.

2.4.2 Licensed and certified instructors who prepare or grade segment or diag-nostic examinations may be waived for that segment, limited to no more than two instructors per segment. Instructors will be rotated as required to ensure that no instructors are waived f rom all segment exams given in a year.

2.4.3 Instructors who conduct evaluations of all manipulations scheduled for a i segment may be granted a waiver for the performance evaluation during that segment of training. However, the annual simulator and oral examination may not be waived.,,,;

8609020060 860822 PDR V

ADOCK 05000321 PDR 9 Reference Omy MGR-0002 Rev. 2

. ~ _ _ _ - . _ . -

ENCLOSURE GEORGIA POWER COMPANY l l PLANT E.I. HATCH l l PAGE 2 0F 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-OS I O

-C " 2.4.4 Personnel who prepare training materials for notice of procedure, design, and license changes may be waived for attendance at those lectures.

2.5 Newly licensed individuals shall be e.nrolled in the License Requalification Training Program beginning with the subsequent training segment ^except that required training on plant design changes, procedure changes, and license changes will begin upon receipt of license.

2.6 An individual receiving his license with.in six months of the annual simulator and oral examination is exempted from taking this exam.

2.7 Reactor Operato[s enrolled in a Senior Reactor Operator upgrade program will be exempted from the requirements of this procedure except for attendance at required training on plant design changes, procedure changes, and license changes, while so enrolled. However, if an individual does not obtain an SRO license, he will be required to pass a simulator and comprehensive written examination and meet the requirements of Section 7.3.4 prior to resuming licensed duties as a Reactor Operator.

3.0 REFERENCES

3.1 10 CFR 50.54 3.2 10 CFR 55, Appendix A 3.3 70AC-TRN-001-OS, Plant Training Program 3.4 71TR-PQL-001-05, Qualification and Certification of Instructors 3.5 71TR-TRN-001-05, Maintenance of Training Records 3.6 72TR-TRN-001-05, Operations Training Program 3.7 Georgia Power Company letter to Nuclear Regulatory Commission dated Decenber 17, 1985, Revised submittal of the Plant Hatch Licensed Operator Requalification Program 3.8 INPO GPG-02-10-80, Nuclear Power Plant Requalification Program for Licensed Personnel -

3.9 INPO 85-002, The Accreditation of Training in the Nuclear Power Industry 3.10 INPO 85-025, BWR Control Room Operator, Senior Control Room Operator, and Shif t Supervisor Qualification 3.11 Nuclear Regulatory.Cbahission letter to Georgia Power Company dated April 22, 1986, Safety Evaluati'on of GPC Licensed Operator Requalification Program L

Reference Ony MGR-0001 Rev. 1

, ,. . ENCLOSURE l GEORGIA POWER COMPANY l l PLANT E.I. HATCH I L PAGE 3 0F 16 DOCUMENT TITLE: 1 LOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-OS l O 4.0 REQUIREMENTS 4.1 PERSONNEL REQUIREMENTS o

4.1.1 Personnel who provide requalification pregram training wilPieet the minimum qualifications outlined in approved Training Department pror.edures and be certified as an Instructor.

4.2 MATERIAL AND EQUIPMENT REQUIREMENTS N/A - Not appliqsble to this procedure.

4.3 SPECIAL REQUIREMENTS N/A - Not applicable to this procedure.

5.0 PRECAUTIONS / LIMITATIONS 5.1 PRECAUTIONS A revision of this procedure which results in a decrease in the scope, duration, or frequency of the NRC approved program requires specific authorization by the Commission per 10CFR50.54(i-1).

5.2 LIMITATIONS N/A - Not applicable to this procedure.

6.0 _ PREREQUISITES N/A - Not applicable to this procedure.

7.0 PROCEDURE 7.1 PROGRAM SCHEDULE l

l 7.1.1 The License Requalification Training Program will run continuously on an

. annual basis during a two year cycle.

7.1.2 The program will be divided into segments.

7.1.3 The program consists of Lectures, On-The-Job Training, and Evaluations.

l 7.1.4 The program training schedules will be developed and promulgated by the Operations Supervisor, Training.

l . . .; ,(-

l L Reference Only MGR-0001 Rev. 1

. Ei1 CLOSURE GEORGIA POWER COMPANY l l PLANT E.I. HATCH l [ PAGE 4 0F 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-OS I O

(. 7.2 LECTURES 7.2.1 The requalification program shall include planned lectures on a continuing,

' segmented basis over a period of two years in those areas where diagnostic  ;

, exams, other written examinations, and operating /indus.try sitperience indicate that emphasis in scope and depth of co<erage is needed in the following subjects: F 7.2.1.1 Theory and principles of operation 7.2.1.2 General,and specific plant operating characteristics 7.2.1.3 Plant instrumentation and control sysums 7.2.1.4 Plant protection systens 7.?.1.5 Engineered safety systems 7.2.1.6 Normal, abnormal, and emergency operating procedures 7.2.1.7 Radiation control and safety.

7.2.1.8 Technical specifications 7.2.1.9 Applicable portions of Title 10, Chapter I, Code of Federal Regulations 7.2.1.10 Quality assurance fer operations 7.2.1.11 Major upcoming eveats (necessary personnel only) t 7.2.1.12 Heat transfer, fluid flow and thermodynamics 7.2.1.13 Mitigation of accidents involving a degraded core ,

7.2.1.14 Opera'ing experience 7.2.1.15 Plant changes 7.2.2 The lecture series is presented prirnrily by Plant Hatch Training Staff.

7.2.3 The specific ltems covered in each topic area will be based on the annual diagnostic written examination, other examinations, and operating / industry experience.

T.2.4 A minimum of 20 contact hours per segment with a minimum of four segments per year will b6 s'cheduled for the lecture series. Use of films, videotapes, and self study will not exceed 50 percent of the minimum time.

7.2.5 One hundred percent participation in the lecture series is required unless

/ otherwise specified in this program. Lectures missed must be made up with ,

( either instructor contact or documented self-study prior to completion of the subsequent segment.

Reference Odv '

MGR-0001 Rev. 1 ,

ENCLOSURE GEORGIA POWER COMPANY l l PLANT E.I. HATCH l l PAGE 5 CF 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

.. LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-OS I O 7.3 ON-THE-JOB TRAINING 7.3.1 Reactivity Controls

/

7.3.1.1 Each licensed operator is required to manipulate palant-cont'rols, and each senior licensed operator is required to either manipulate plant controls or direct the activities of individuals during plaat control manipulations, during the term of his license. ,

1 3 7. 3.1. 2 For reactor operators and senior operators, these manipulations shall consist of at least ten reactivity manipulations in any combination of reactor'startups, reactor shutdowns, and/or other control manipulations which demonstrate skill and/or familiarity with the reactivity control system.

7.3.1.3 Each individual shall perform or participate in a combination of reactivity control manipulations based on the availability of plant equipment or a plant specific simulator.

7.3.1.4 The use of Plant Hatch Technical Specifications will be maximized during the manipulations.

7.3.1.5 Personnel with senior operator licenses are credited with manipulations if they direct or evaluate the control manipulations as they are performed. The use of evaluating manipulations will be limited to no C more than fif ty percent of these manipulations perforined in a sagment.

7.3.1.6 The following types of manipulations are required to De performed annually (within one segment of the scheduled segment):

7.3.1.6.1 Plant or reactor startups to include a range such that reactivity feedback from nuclear heat addition is noticeable and a heatup rate is established.

7.3.1.6.2 Manual control of feedwater during startup and shutdown.

7.3.1.6.3 Any significant (> 10 percent) power change using manual rod control or recirculation flow control.

7.3.1.6.4 Loss of coolant including: Inside and outside primary containment, large and small (including leak-rate determination).

7.3.1.6.5 Loss of core coolant flow / natural circulation 7.3.1.6.6 Loss of all feedwater (normal and emergency)

. . : ,(

L Reference Only MGR-0001 Rev. 1

ENCLOSURE' GEORGIA POWER COMPANY l l PLANT E.I. HATCH l I- PAGE 6 0F 16-DOCUMENT TITLE: l DOCUMENT NUMBER: l RE%ISION NO:

l 72TR-TRN-002-OS l 0

(-  :

LICENSE REQUALIFICATION TRAINING PROGRAM

\'

7.3.1.7 The following types of manipulations are required to be perfGrmed biennially (within one segment of the scheduled segment):

^

7.3.1.7.1 Plant shutdown , ,

Loss of instrument air

~

7.3.1.7.2 7.3.1.7.3 Loss of electrical power and/or degraded power sources 7.3.1.7.4 Loss of condenser vacuum 7.3.1.7.5 Loss of service water 7.3.1.7.6 Loss of Shutdown Cooling 7.3.1.7.7 Loss of component cooling systea or cooling to an individual component 7.3.1.7.8 Loss of normal feedwater or normal feedwater system failure 7.3.1.7.9 Loss of protective system channel 7.3.1.7.10 Mispositioned control rod or rods (or dropped rod)

( 7.3.1.7.11 7.3.1.7.12 Inability to drive control rods Conditions requiring the use of the standby liquid control system 7.3.1.7.13 Fuel cladding failure or high activity in reactor coolant or off-gas system 7.3.1.7.14 Turbine or generator trip f 7.3.1.7.15 Malfunction of automatic control system (s) which affect reactivity l

l 7.3.1.7.16 Malfunction of reactor coolant pressure / volume control system 7.3.1.7.17 Reactor trip 7.3.1.7.18 Main steam line break ir.s $;ie or outside primary containment 7.3.1.7.19 Nuclear instrumentation failure (s) l l 7.3.1.8 Required manipulations will normally be completed during the simulator portion of the, segment training.

7.3.1.9 Manipulations'and/or evolutions conducted on shift may be used when j

properly documented on a form similar to TRN-0006, Training Report.

7.3.1.10 Where appropriate, plant design changes, procedure changes, and license changes will be included in segment simulator trainirg.

Reference On y MGR-0001 Rev. 1

ENCLOSURE l 4

GEORGIA POWER COMPANY l l PLANT E.I. HATCH I l PAGE 7 0F 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-OS I O

. 7.3.1.11 Failure to complete the required reactivity manipulations on an annual

- or biennial basis as described above will require that an individual be removed from shif t duties until the manipulations are completed.'

s 7.3.1.12 Completion of required manipulations will be docuntented^on a ' form ~

i similar to that shown in Attachment 2.

7.3.2 Knowledge of Systems Each licensed reactor operator or senior reactor operator is required to demonstrate, in the performance of his duties, his satisfactory understanding of the opera' tion of systems and apparatus and his knowledge of operating procedures in each area for which he is licensed.

l 7.3.3 Active Status 7.3.3.1 All licensed operators and senior operators shall participate in the License Requalification Program.

7.3.3.2 All requirements of the License Requalification Program must be met and all evaluations be satisfactory for a licensee to remain on active status for the purpose of performing licensed duties.

7.3.3.3 To remain eligible for control room licensed shift duties and SRO licensed duties involving fuel handling, licensed operators must have performed a minimum of 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> of licensed duties during the preceding C four months. License duties used to meet this requirement will be limited to duties performed on shift in the main control room by the On Shif t Operations Supervisor, Shift Supervisor, Plant Operator, and Assistant Plant Operator. Department Managers are responsible for notifying the Training Department when this requirement has been met.

7.3.3.4 To remain eligible for SRO license duties involving on-site line responsibility for diracting day to day control roon activities, the licensee must meet all requirements of Section 7.3.3 with the provision that the 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> in the preceding four months may be met by duties involving on-site line responsibility for directing day-to-day control room activities, or as described in 7.3.3.3.

7.3.4 Inactive Status I

7.3.4.1 Any licensed operator who fails to meet the requirements of active license activities as defined in 7.3.3 or who is removed from license duties as described elsewhere in this procedure will be designated as inactive.

.: t 7.3.4.2 Individuals will be designated as inactive by written notice to the individual and the appropriate Department Manager.

7.3.4.3 Inactive license maintenance will require participation in the license requalification program. i Reference Only MGR-0001 Rev. 1 4

_ _ . . - , . _. , , . - , _ , . , - - - , . , <r.-. .-- ..-,...-m..,._m,,.,_.s . . , . _ _ _ _ ,,_ . _ , _ _ , , _ , , , , . . . , _ , _ . - - _ . . , _ . _ , - . _ _ . . , . . . _ - . .

~

LNLLUJUKt GEORGIA POWER COMPANY l l FLANT E.I. HATCH I 1 PAGE 8 0F 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAINING PROGRAM i 72TR-TRN-002-OS l O (i

  • 7.3.4.4 Prior to reinstatement to active status, an individual placed in an inactive status due to not actively perforring the functions of an operator or senior operator for a period of fcur months or longer per

,e 10 CFR 55.31(e) is required to demonstrate that his knowledge of current plant operations and administration is satisfa:tofy by'the following steps:

7.3.4.4.1 Review of all applicable plant, procedure and license changes during the period the license was inactive, and review of missed material

. presented during segment lectures and examination, and 7.3.4.4.2 Sati'sfactory performance of all required reactivity manipulations which were missed during the previous. segment training, and 7.3.4.4.3 Satisfactory performance of four shifts under supervision, and 7.3.4.4.4 Evaluation by the Manager-Operations, Deputy General Manager, or General hanager-Plant Hatch, or satisf actory completion of written, simulator and oral /walkthrough examinations, the extent of which will be based on the length of inactivity.

An unsatisfactory result on the evaluation requires th'e operator to have On-The-Job Training in areas determined as weak until either

the Manager-Operations, Deputy General Manager, or General t

( Manager-Plant Hatch is satisfied that he has adequate knowledge of

( current operations.

7.3.5 Plant Changes 7.3.5.1 Each licensed operator and licensed senior operator will be kept informed of all plant design changes, procedure changes, and license changes. This will be accomplished by written notice of these changes to each holder of an operator or senior operator license.

7.3.5.2 Changes of a magnitude requiring detailed explanation will be reviewed by lecture or simulator as appropriate with 100 percent attendance of licensed personnel.

, 7.3.E Procedure Reviews l

7.3.6.1 Each licensed operator and licensed senior operator is required to review the contents of all applicable abnormal and emergency procedures annually.

7.3.6.2 The procedures review requirements will be scheduled on a segment basis l' to be completed while the licensees are assigned to training.

I 7.3.6.3 A delinquency of 30 days on the procedure review will require that the licensee be removed from license duties until the procedure review is l completed.

L 7.3.6.4 Procedure review completion will be documented on a form similar to TRN-0006, Training Report.

l Refereixe OnLv "

MGR-0001 Rev. 1 1

.~ _._,_ ._ __ _ ,.___ _____._-__ ____ _ _ . _ _ _ _ . . . - _ _ _ _ . _ _ _ _ _ _ - .

, EN ',LOSUR,E.

' GEORGIA POWER COMFANY l l PLANT E.I. HATCH l l PAGE 9 0F 16

) DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

. LICENSE RE00ALIFICATION TRAINING PROGRAM i 72TR-TRN-002-OS I O 7.4 EVALUATION 7.4.1 Annual Diagnostic Examinations J

l 7.4.1.1 A writt.en diagnostic examination will be administdred annually to determine areas in which retraining is needed to upgrade license operator and senior operator knowledge. The examination will be administered to all liceased operators and licensed senior operators.

7.4.1.2 The examination will be based on applicable knowledge areas as listed in 7.2.1, objectives from the License Requalification Program and initial license' programs, and operating / industry experience.

7.4.1.3 Two examinations for reactor operators and two examinations for senior I operators will be prepared with each exam being given to approximately one-half of the respective exam population. Each of the two exams will dif fer by at least 30 percent. i 7.4.1.4 The same examinations will be administered to all scheduled groups and for any required makeups.

7.4.1.5 The examination will have a nominal length of four to six tours and will consist of approximately 80 to 100 points.

! 7.4.1.6 An exam average score will be calculated for each separate diagnostic

, examination. Any individual who receives a score of less than 70 percent of the exam average score for his respective group will be

{ removed from licensed duties and assigned to accelerated requalification 3 training.

7.4.1.7 The diagnostic examination analysis results will be used in conjunction

, with results from other exams and operating / industry experience to j select the topic areas for the subsequent year's requalification lecture j series.

i 7.4.1.8 The diagnostic examination will not be substituted for segment examinations..

! 7.4.2 Written Evaluations I

i 7.4.2.1 Written examinations which determine licensed operator's and licensed l . senior operator's knowledge of the subjects covered in the requalific-l ation program and provide a basis for evaluating their knowledge of

, abnormal and emergency procedures will be administered during each l ,

training segment.

1

..: E 7.4.2.2 A segment exahlination score of less than 70 percent will require that an i

individual be removed from licensed duties and assigned to accelerated requalification training consisting of reattendance of specific pcrtions or all of the segment that was failed.

Reierence Only j MGR-0001 Rev. 1 -

. - . . _ - - . - - - _ , . - . _ _ , _ _ . . - . _ _ _ _ . , - , .,..m---m-,__ _.- -_. _ r - - .-

l . ENCLOSURE!

t

( -

UEORGIA POWER COMPANY l l l PLANT E.I. HATCH l [ PAGE 10 0F 16 4

DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICf.NSE REQUALIFICATION TRAINING PROGRAM I 72TR-TRN-002-OS I O l

I 7.4.2.3 The scores from all segment examinations administered during a year will be a>eraged to determine an overall annual examination score. The average will be determined following ccmpletion of the last segment in a

e ,

year including any required retest of that segment,.

i 4

7.4.2.4 An overall annual examination score of less than 8'O percent will require that an individual be removed from licensed duties and assigned to ,

accelerated requalification training which will be based on the weak-nesses. identified.

7.4.2.5 Examination scores from administration of any segment re-exams will be used in' determining a new overall annual score.

l 7.4.2.6 Individuals who score less than 80 percent but at least 70 percent on segment examinations will receive additional training and retesting if the individual's Department Manager determines that the individual's performance history warrants it. The intent of this provision is to ensure that identified weaknesses are addressed prior to the end of the

, annual cycle.

7.4.2.7 Examinations will be prepared and graded in accordance with approved Training Department Instructions. Examinations will be prepared by I either Plant Hatch Training Department Personnel or an outside agency.

l [ 7.4.2.8 Examinations will be graded and analyzed, as appropriate, within 30 days

( of the date administered. This time period may be extended by 30 days with corporate approval if conditions warrant.

l 4

7.4.3 Observation and Evaluation 7.4.3.1 Systematic evaluation of the performance and competency of licensed i operators and senior licensed operators by supervisors and/or training staff members will be accomplished as follows:

7.4.3.1.1 Evaluation during regularly scheduled segment simulator training, and 7.4.3.1.2 Conduct of an annual simulator and oral examination. The simulator portion may be waived only if the plant-specific simulator is not available. An individual receiving his license within six months of the annual simulator and oral examination is exempted from taking this exam.

7.4.3.2 The evaluations conducted in 7.4.3.1 will include actions taken during actual or simulated, abnormal and emergency conditions.

7.4.3.3 An unsatisfartory evaluaticn by any of the methods specified by 7.4.3.1 or unsatisfactory performance during an actual event while on shift will  :

require that the individual be removed from licensed duties and enrolled '

in Accelerated Requalification Training, h 7.4.3.4 Evaluation of performance during regularly scheduled segment simulator training and annual simulator exams will be documented on a form similar '

to TRN-0064, Simulator Performance Evaluation Checklist / Progress Report.

MG7-0001 Rev. I deiereMe Qg

-r,wmm-----..w-+,rwe. eye-weww +*-.-.---t- _ _ - - - - - - - - -

. ENCLOSUREi GEORGIA POWER COMPANY l l ,

PLANT E.I. HATCH l [ PAGE 110F 16 00CUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

4 LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-05 1 0 7.4.4 Accelerated Recualification Program 7.4.4.1 Accelerated requalification training is for licensed individuals having

/ identified deficiencies requiring assignment to a special retraining effort.

( ~

7.4.4.2 Licensed individuals meeting any of the following criteria shall be removed from licensed duties and assigned to accelerated requalification

, training:

7.4.4.2.1 A score of less than 70 percent of the average on the annual

diagnostic examination l 7.4.4.2.2 A score of less than 70 percent on a segment requalification

, eramination

, 7.4.4.2.3 A score of less than 80 percent on the overall annual requalific-ation examination score 7.4.4.2.4 An unsatisfactory simulator evuluation during regularly scheduled segment simulator training 7.4.4.2.5 An unsatisfactory evaluation on the annual oral and/or simulator I examinations ,

7.4.4.2.6 An unsatisfactory evaluation or performance as described in 7.4.3.3 above. I

! 7.4.4.3 The Accelerated Requalification Program content will be based on weak areas as determined by approved Department Instructions for examination and/or evaluation analysis.

! 7.4.4.4 Accelerated requalification program lectures require a minimum of two l instructor contact hours for each segment or category below 70 percent.

7.4.4.5 (fpon successful completion of Accelerated Requalification Training, an

, individual may be returned to licensed duties if he otherwise meets the

! requirements uf 7.3.3. Successful completion is based on the reason an individual is assigned to training as follows:

l l 7.4.4.5.1 Failure of a segment requalification examination requires successful I completion of a written segment examination with a score of 70 percent or greater.

! 7.4.4.5.2 An overall annual examination score of less than 80 percent per 7.3.2.2 Jequires r

successful completion.of a written, four-category, comprehen'sive examination with a score of no less than 80 percent overall and no less than 70 percent-in any category.

b i

l Reference Only

e . ENCLOSURE; GEORGIA POWER COMPANY l l PLANT E.I. HATCH I l PAGE 12 0F 16 l '

DOCUMENT TITLE: l DOCUMENT NUN 8ER: l REVISION NO: i LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-OS I 0

' 7.4.4.5.3 A score of less than 70 percent of the average on the annual diagnostic examination or an unsatisfactory simulatc,r or oral i evaluation requires completion of a satisfactory evaluation on a

,- simulator and/or oral examination.

> > n.

~

7.4.4.6 Examinations will be prepared and graded in ac6ord&nce with approved Training Department procedures based on the objectives identified as weak areas by analysis of the failed examination.

7.4.5 Program Evaluation 7.4.5.1 The Lic6nse Requalification Training Program will be reviewed at least annually by the Training Department to ensure that training requirements and commitments are being met.

7.4.5.2 Trainees and Instructors will complete post-training evaluation forms as required by approved Training Department procedures.

7.4.5.3 The segment of training prior to an NRC Requalification Program evalu-i ation may consist of a preparation period. When the evaluation is not scheduled sufficiently in advance of the segment, previously scheduled l topics for that segment may be deferred until after the evaluation.

7.5 RECORDS 7.5.1 The following records are required to be maintained to document t N articip-ation of each licensed operator and senior operator in the requalificatian -

program and accelerated requalification program:

7.5.1.1 Lesson plans / instructor guides l 7.5.1.2 Program File 7.5.1.2.1 Master / key of all written examinations 7.5.1.2.2 Summary of exam results i

7.5.1.2.3 Curriculum l

l 7.5.1.2.4 Attendance records 7.5.1.2.5 Distribution cover sheets of design, procedure and license changes 7.5.1.3 Individual Files 7.5.1.3.1 Examina,t,lon t answers /results 7.5.'1.3.2 Results of all evaluations I

7.5.1.3.3 Observation results L

Reference On!y l

MGR-0001 Rev. 1 ,

l

EtICLOSURE

~

GEORGIA POWER COMPANY l l l PLANT E.I. HATCH I 1 PAGE 13 0F 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-OS I O 7.5.1.3.4 Reactivity control manipulations 7.5.1.3.5 Accelerated Requalification attendar ce, if applicable 1

7.5.1.3.6 Documentationrelatedtoindividual'slicenseitatui 7.5.1.3.7 Waivers from specific portions, if applicable l l

7.5.2 Attendance Records 7.5.2.1 Document;ation for traine.e participation in training will consist of the following:

7.5.2.1.1 Record of hours attended on a form similar to TRN-0067, Daily Attendance Record.

7.5.2.1.2 Completion of License Requalification Training Attendance Record sheets, similar to that shown in Attachment 3, to document participation in each lecture. .

7.5.2.2 A Training Report (TRN-0006) or Specialized Training-Lecture Attendance List (TRN-0015) may be used to document participation < and/or completion of specific requalification topics.

( 7.5.3 Training records must be maintained in accordance with approved plant procedures.

I i

. . .; ,f L  :

Reference Ogy MGR-0001 Rev. 1

ENCLOSURE o -

o GEORGIA POWER COMFANY l l PLANT E.I. HATCH l 1. PAGE 14 0F 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAINING PROGRAM i 72TR-TRN-002-OS I O

. ATTACHMENT 1 l ATTACHMENT PAGE:

I

' TITLE: DEFINITIONS l 1 0F 1 1

Licensed Duties .

^

Licensed duties shall be considered to be those duties performed on shift by Operations Supervisors, Shif t Supervisors, Plant Operators, and Assistant Plant Operators, duties involving fuel handling, and duties involving on-site line responsibility for directing day-to-day control room activities.

Active License Status A licensed individual is allowed to perform all duties of his position which i- . require an NRC Reactor Operator license or Senior Operator license.

Inactive License Status A licensed' individual is not allowed to perform any duties 'hich w require an NRC Reactor Operator license or Senior Operator license.

Contact ficur Presentation or self--study with an instructor insnediately available.

l l

. . .: ,(-

L Reference On'y MGR-0009 Rev. 1 ,

. - - - - - _ ~ . - - ... ._ - . - - - . . - _ . - -- - _ - - . . - - - - . .--- -_-_-.- _-__-__ .

. ENCLOSURE o o-GEORGIA POWER COMPANY l . l PLANT E.I. HATCH l l PAGE 15 0F 16 DOCUMENT TITLE: l DOCUMENT NUMBER: l REVISION NO:

LICENSE REQUALIFICATION TRAINING PROGRAM l 72TR-TRN-002-OS l 0 ATTACHMENT 2 l ATTACHMENT PAGE:

I

~ TITLE: RECORD OF CONTROL MANIPULATIONS I - 1 0F 1

/

(TYPICAL - USE LATEST REVISION) *  : r.

GEORGIA POWER-COMPANY l PLANT E.I. MATCH I PAGE ' 0F 1 FORM TITLE:

RECORD OF CONTROL MANIPULATIONS Na.~ 9 License (SR0/RO)

Renewal Date Fr,om To TITLE: Record of C' ol Manipulations .

Manipulations required per NUREG-0737. Senior Reactor Operators may be credited with these manipulations if they supervise (direct), evaluate, or perform the activity.

! Enter P (perform), S (Superwhe), or E (evaluate), instructor initials, and date as the appropriate item is completed. Do not enter S or E for RO's, since they will not be credited for supervising or evaluating the item.

A. Manipulations retuired annually DATE P.S.F INIT. CATE P.S.E INIT

1. Reactor startup and heatup 1 l t  ! I i l l
2. a. Manual control of feed during l l l l l l l startup 2a l_ l I I I I l
b. Manual control of feed during l l l l l l l shutdown 2b l l l 1 1 1 l
3. 10% power change (rods or recirc) 3 l l All Mti I l
4. Small LOCA inside containment 4 l l .4'M % % Mt. l l C S.

6.

Snrail LUCA outside containment Large LOCA inside containment 5 l j

4 \M l'.W M < Wi \

.. \M W MIW l

l l

l

7. Large LOCA outside containment l_~

1%I E 'l l l

8. Loss of both recirc. pumps l l h l\ i di l l l l
9. Loss of all feedwater y' Al l i W l l l l (normal, HPCI, RCIC) , 4# I l I l l B. Manipulations required every two years. DATE P.3.E INIT.
1. Plant Shutdown 1 l l t l
2. Loss of instrument air 2 l l 1 l
3. Loss of electsical power ~ 3 l 1 I l 4 Loss of condenser vacuum 4 l l l l
5. Loss of service water 5 l l 1 l
6. Loss of shutdown cooling 6 l l i l
7. Loss of component cooling 7 l l 1 l 8 Loss of normal feedwater 8 l l 1 l
9. Loss of protective system char.nel 9 l t l l
10. Miscositioned control rod or rod drop 10 l I i l
11. Inability to drive control rods 11 l l l l
12. SBLC initiation '

12 l l l l

13. Fuc1 allure /high offgas 13 l l l l
14. Turbine or Generator Trip 14 l l l_ l
15. Malfunction of Recirc speed control 15 l_ _ l 1 l
16. feedvater system Malfunction 16 l t l
17. Pressure Regulator failure 17 l l l
18. Reactor Trip 18 l 1 l
19. Main Steamlire. break 19 l l t l
20. Nuclear Instru'mqfntation failures 20 l t l l C. Other .nanipula tioni. DATE P.S.E INIT.
1. 1 l l l l
2. 2 ] 1 1 [
3. 3 l l l l 4 4 [ l l l
5. 5 l l l l TRN-0063 Rev. O f 72iR-TRN-002-05

, Rererence On"y MGR-0009 Rev. 1

ENCLOSURE GEORGIA POWER COMPANY l l PLANT E I. HATCH I L PAGE 16 0F 16 1 DOCUMENT TITLE:

I l DOCUMENT NUMBER: l REVISION NO:

__ LICENSE REQUALIFICATION TRAINING PROGRAM i 72TR-TRN-00?-OS I O ATTACHMENT 3 ATTACHMENT PAGE:

TITLE: LICENSE REQUALIFICATION TRAINING ATTENDANCE RECORD 1 1 0F 1 s (TYPICAL - USE LATEST REVISION) > .

e.

GEORGIA POWER COMPANY I PL ANT E. I. HATCH I PAGE 1 0F 1 FORM TITLE:

LICENSE REQUALIFICATION TRAINING ATTENDANCE RECORD CLASS DATES INSTRUCTIONS: ATTACH TO DAILY ATTENDANCE RECORD

'X" = TRA!NING ATTENDED 'A' = f,':SENT FKOM TRAINING TOPIC IDENTIFICATION l ll 21 31 41 51 61 71 al 9110111112113114l15116117118l191201

__g.-i__l__l-_l__l_.g._l__l__g__[__l__l..l__l__l__l__g l__l l l 1 1 1 I l l I I I i l l i l i I I n I

-[__l__;__g._l__g

_g__g._l__l__l__l__l__;__[__[__l_l  ;--l__l l l l 1 1 I I I I I I I 1 I i i l i I I I g._[__l-_l__g__l__l__l__l -i__[_l_.g..l__l__l__l__;__l__l__l l 1 I I I I I I I I I I I I I I I I I I I l__l__l_ l__l_ i._[__g__l_.l__g__g__g__;..l__l__g--l__l__l. l l l I I I I I I I I I I i i l i I I I I I

_l_..;__l__g__[._g__l__l__l__g .[__g__[__l_ l _i_.l..[__l__[__[

l l I I I I I I I I I I I I I I I I I l l__l__l..l--l--l--l--l--l L- -l--l--l--l--l--l--!--l--l l I I I I I I I h

(

I I I I I I I

- l __ g _. p _ l .-g g . _l g_l__I l [ _l l_l_.[__g _l__l l 1 l

  • I I i i i l l I

-l- l_ l .;

__[__l_ [_l__l__l..l__l l l 1 1 I I I I I I I I I I I

-[_ 4

[_  ! ,

[i

_[ _l__l ;__l__l__l..[__l_ l_.l..l l 1 4 I I I l l l 1 1 I I I I l

__l__l_.[__l._l__l__l__l__l__l_g._j..l__l..[

l 1 y_ I I I I I I I l l l l l l 1 1 I

-3._l_.g .l__l__l__;--[__l__;. ;__l_.li.-[__l__l__l__g__[__l__l 1 1 I I I I I I I I i l l I I I I I I I I

-i._l__l__g..l__[__[_.q._l__[__l__[ .[__l__l__l__l__i_ g__g--l

-- l l l 1 1 I I I I I I I I I I I I I I I I


l..l__l__; [__l__l__l- [__l_.i--l _;__l l__l_.i__[__]__l__l l 1 1 I I I1 I I I I I I I I I I I I i 1 l__l__l__l__l__l _l__l_.;__[._l__[--g__l--;__l

-l__l__l.--J.-j_

l l l l l l l l I I 1 l l 1 I I I I I q__g__l_.l_.l__l..;__l_.l_.g._l__l__l._l__l__1 j l__[._l__; _l__l 1 I I I I I I I I I I l l l l l 1 1 I I l

-l__l__[__l__l__l__l__l__l_ :__l__l__l__l__[__l_. __j--l__l__g i I I I I I I l i I I I i ! I I I I I I g__l__[.q __l__l__g._l__j__l_.;__l .l__;__l__l._Il__;__l__l__g i I I i i 1 1 I I I I I I l l I I I I I I

___l__l_.g._[._[__;__l _[..l__l__l__l__l__;._g--i._[ .g__g _l__l l l l l l l I I I I I I I I ! I I I I I

, l__[. l__;__[__l__l__l__l__l__l__l__g._l__l_.Ig.. ..l__[..l__l l I I I I l l l l l l 1 1 I I I I I I I I

-g__g._[__l__l_.g._l__l__;__[__;__[._g__[_.l__l__l__l_.[__[__l

. , I I I I I I I I I I I I I I I I I I I I I

._c, -

REQUIRCD MAKEUP TRAINING:

NAME TOPIC COMMENT L -ee. . 0 neuerence only " - N e> ~

MGR-0009 Rev. 1

_ _ _ . . . _ _ . .