Rev 0 to SO-OPS-05-1286, Spent Fuel Pool Transfer Canal Gates
ML20245B830
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/10/1986
From: Sumner H
GEORGIA POWER CO.
To:
Shared Package
ML20245B770 List:
References
FOIA-87-76 SO-OPS-05-1286, SO-OPS-5-1286, NUDOCS 8707010328
Download: ML20245B830 (2)


Text

_ _

v g

i

' GEORGIA POWER COMPANY l l PLANT E.1. HATCH I l PAGE_ 1 0F 2 NEUMENT TITLE: l DOCUMENT NUMBER: REVISION ND:

SPENT FUEL POOL TRANSFER CANAL GATES l S0-OPS-oS -1286l l 0 DEPARTMENT Operations Date of Issue: // - n. T l'.

Date of Termination:

TO: Operations Supervisors on Shift Shift Supervisors The Spent Fuel Pool Transfer Canal gates h ve been installed to maintain the spent fuel pool in the configuration assumed by the FSAR. These gates are to remain in place at all times except during time periods when the canal is being used to i transfer fuel between the Unit I and Unit II spent fuel pools.

If the gates have to be removed to transfer fuel, then the following time limits apply on re-installation of the transfer canal gates:

1) If the fuel transfer is completed, the gates ]

must be re-installed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the  !

completion of the fuel transfer. I

2) If fuel transfer is stopped for an unforeseen reason (example: refueling bridge nee'ds main- ,

tenance), the gates must be installed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of stopping the fuel transfer.

3) If there is a planned halt to Euel transfer (example: no fuel transfer during a weekend),

then the gates must be installed prior to ceasing activities fo.r_the planned break.

t The SRO involved with fuel handling at the time of completion of fuel transfer for 1), 2) or 3) should instruct the appro-priate personnel to re-install the gates, i The gates may be removed only with the permission of:

l Manager of Operations John Lewis- (if Manager is absent)

Ronnie Musgrove (if John Lewis is absent)

Operations Supervisor on Shift (if all

, of above are absent) g ,g7, 7 -i 8707010328 870619 -

PDR FOIA MURPHYB7-76 PDR MGR-0001 Rev. 1 j

4' ,

r i GEORGZA POWER COMPANY l l PLANT E.1. HATCH l -

l PAGE2 0F 2

-DOCUMENT TITLE: ,

l DOCUMENT NUMBER: l REVISION NO:

SPENT FUEL POOL TRANSFER CANAL GATESl SO-OPS-OS -12861 0 The service air hose station valves that are used to maintain the seals inflated must be controlled by a clearance in the open position upon installation of the gates..'The Shift Supervisor and the Manager of Operations must at least be on the subclearance for these v'alves.

l 1

C

( h/Mn NfunA H. L. Sumner  ;

Manager of Operations .)

l l ,

1 I

MGR-0001 Rev. 1 x

.,