F Srtary 5,1998 MEMORANDUM TO: Distribution FROM: Diane Beardo Special Projects Office

SUBJECT:

NRC INSPECTION ACTIVITIES - ENCLOSURES Attached is the NRC INSPECTION ACTIVITIES document that was issued on January 23,-

1998. I have included Enclosure 1 which had been omitted from original distribution.

4 1

4 e

6 e

l' i

9802200120 980205 PDR G ADOCK 05000423 PDR

km Riog

=

i UNITED STATE 8 -

i* }* NUCLEAR REOULATORY-COMMISSION:

W ASHINoToN, D.c. 206MW001 January 23,1998

=f Mr. M. L. Bowling, Recovery Officer, Unit 2 C

/o Patricia A. Loftus, Director - Regulatory Affairs for Millstone Station PO Box 128 <

Waterford, CT 06385

SUBJECT:

NRC INSPECTION ACTIVITIES

Dear Mr. Bowling:

Enclosure 1 is a summary of the NRC inspection activities that are tentatively planned for

- Millstone Unit 3 during February and March 1998. These tentctive dates have been

- developed to assist both NRC and Northeast Utilities in our respective planning efforts, importantly, these dates are dependent upon your completion of corrective actions in thesa '

areas. These i:ispections are part of our program for restart assessment and are in addition .

to the routine resident inspector and contractor activities. AlthoJgh the inspections of program areas will not be conducted by teams, the inspections will generally be staffed with two or three inspectors.

As a result of the significant amount of inspection required to be completed in the limited Etime frame, several of the activities will occur concurrently. NRC policy is to schedule inspections to minimize the regulatory impact on licensees. For example, when a team.

inspection is planned, other activit'es, such as program area or individual region based inspections, are not scheduled (to the extent possible) for the time period of the team inspection.

We request that within 7 days of receipt of this letter that you confirm that you will be

- able to effectively support the planned inspections without a resultant adverse regulatory impact to your organization.

Further, the Operational Safety Team inspection (OSTI) will be conducted as described in

- the NRC Restart Assessment Plan and as noted in Enclosure 1. The purpose of this inspection is to assess your readiness to safely restart and operate Millstone Unit 3. In order to conduct this type of comprehensive inspection, we will need to review, in advance of the inspection, certain documents. Attached is a list (Enclosure ?) of documents to be available for review by the team during the onsite OSTI preparation week. The team tentatively plans to conduct our onsite preparation commensurate with your approach to plant heatup.

go i 30061

.ste m m + ,i i

Mr. M. L. Bowling 2 Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this request or the inspection, you may contact Jim Trapp at (610) 337 5186.

Sincerely, 1 . ,

l/

Wa)y i kh

. Lanning, Deputy Director of nspec ns Special Project Offi cc w/ encl:

B. Kenyon, President and Chief Executive Officer M. H. Brothers, Vice President - Operations J. McElwain, Unit 1 Recovery Officer D. M. Goebel, Vice President, Nuclear Oversight G. D. Hicks, Unit Director - Millstone Unit 3 J. A. Price, Unit Director - Millstone Unit 2 M. J. Ross, Manager - Nuclear Training Assessment Group D. Amerine, Vice President for Engineering and Support Services P. D. Hinnenkamp, Director, Unit 1 Operations F. C. Rothen, Vice President, Work Services J. Stankiewicz, Training Recovery Manager R. Johannes. Director - Nuclear Training S. J. Sherman, Audits and Evaluation L. M. Cuoco, ticquire J. R. Egan, Esquirs V. Juliano, Waterforo Library J. Buckingham, Department of Public Utility Control S. B. Comley, We The People State of Connecticut SLO Designee D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN S. P. Luxton, Citizens Regulatory Commission (CRC)

Representative T. Concannon E. Woollacott, Co-Chairman, NEAC 1

l l

l

- . - - . . _ . - -. . .~. . . .. - -.

I Mr. M. L. Bowling 5 cAwlenci and Attachment 1; H. Haynes, Director, Nuclear Training

< D. Lazarony, Supervisor, Operator Training Distribution:

DRS Master Exam File PUBLIC Nuclear Safety information Center (NSIC)

V. Curley, DRS

- J. Munro, NRR/DRCH/HOLB -

Region i Docket Room (with copy of concurrences; FILE CENTER, NRR (with original concurrences)

NRC Resident inspector W. Axelson, DRA -

B. Jones, PIMB/ DISP

- M. Kalamon, SPO, RI W. Lanning, Deputy Director of Inspections, SPO, RI D. Screnci, PAO W. Travers, Director, SPO, NRR J. Wiggins, DRS L. Briggs, Chief Examiner, DRS >

W. Lanning, SPO, RI J. Durr, SPO, RI A. Corne, SRI DRS OL Facility File S. Stewart, DRS ,

s

f ENCLOSURE .1 *

- Teani insoections:

  • Independent Corrective Action Verification Program (ICAVP) Corrective Action Inspection (2/23, 3/2, 3/9/98';

s

  • NRC Inspection Procedure 40500 " Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing Problems" (2/9,2/16/98)
  • Operational Safety Team inspection (OSTI) (3/2, 3/9/98)

Proaram Area insoections:

  • Motor Operated Valves (2/9,2/23/98)
  • Fire Protection / Appendix R (awaiting licensee completion date)
  • Operator Training / Licensing (3/2, 3/9/98) 4 Deferred issues Review (2/9/98) 1 Team and program area dates indicate weeks of on site inspection. There will also be a one week on-site preparation period for the OSTI during the week of 2/2/98.

an ,,