tkuember 21, 1997 j
Florida Power Corporation Crystal River Energy Complex
'Mr. Roy A. Anderson (SA2A)
Sr. VP Nuclear Operations ATTN:
Mgr.. Nuclear Licensing 15760 West: Power Line Street i
Crystal River. FL 34428-6708 r
SUBJECT:
MEETING
SUMMARY
, CRYSTAL-RIVER 3 ENGINEERING AND RESTART MEETINGS _
j
Dear Mr. Anderson:
]
This refers to the meetings on October 30. and 31,1997, at your Training
' Center. The purpose of the meetings were to discuss the status of your actions to resolve technical issues and your progress toward readiness for restart.
It is.our opinion, that these meetings were beneficial, g
Enclosed is a List of Attendees and Florida Power Corporation (FPC) Handouts.
The discussions included the following topics: Configuration Document Integration Project (CDIP) Update. Emergency Diesel Genera +cr Update. Control i
Complex Habitability Envelope (CCHE) Update. Appendix "R" Update, and FPC Restart Progress Status, l
In accordance with Section 2.790 of NRC's " Rules of Practice." Part 2.
i
-Title 10 Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
-Should you have any questions concerning this letter, please contact-us.
-i Sincerely.
Original signed by Johns P. Jaudon t
Johns P. Jaudon.-Director Division of Reactor Safety
Enclosures:
1.
List of Attendees
\\
2.
FPC Handouts
\\
\\
. Docket No. 50-302:
pod)hfb License No.-DPR-72 J
p s. &
~
II):TAY a
BSSRE.EIE sw
t FPC-2
- I cc w/encls:
John P. Cowan, Vice President i
Nuclear Production (NME)
FPC. Crystal River Energy Complex 15760 West Power-Line Street Crystal River, FL-34428 6708 i
C. G. Pardee. Director t
Nuclear Plant Operations (NA2C)
FPC. Crystal River Energy Complex 15760 West-Power Line Street Crystal River, FL -34428-6708 i
B. J. Hickle. Director
. Nuclear Plant Operations (NA2C) i Florida Power Corporation Crystal River Energy Complex 4
- 15760 West Power Line Street l
Crystal Rivar, FL 34428-6708 Robert E. Grazio. Director Nuclear Regulatory Affairs (SA2A)
FPC. Crystal River Energy Complex 15760 West Power L1ne Street Crystal River, FL 34428-6708 4
James S. Baumstark, Director Quality Programs (SA2C)
FPC. Crystal River Energy Complex 15760 West Power Line Street Crystal River..FL 34428-6708 R. Alexander Glenn, Corporate Counsel florida Power Corporation
- MAC - ASA-P. O. Box 14042 St. Petersburg, FL 33733-4042 I
Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304
- Bill Passetti Office of-Radiction Control De)artment of Health and Rehabilitative Services
- 1317 Winewood Boulevard i
Tallahassee, Ft 32399-0700 cc w/eacis continued:
See page 3 1
l.
i
4 FPC 3
i cc w/encls:
Continued i
Joe Myers. Director Division of Emergency Preparedness Department of Contr. unity Affairs 2740 Centerview Drive Tallahassee FL 32399-2100 t
che rman Board of County Comissioners i
ritrus County 110 N.-Apopka Avenue Inverness. FL 34450-4245 Ocoert B. Borsum Framatome Technologies 1700 ( v kville Pike. buite 525 Rockv1He 19 2'?89-1631 Distribution w/cnc13:
L. Raghavan. NRR R. Schin. KIl P. Steiner. Ril B. Crowley Ril F. Wright. RII-L. $tratton. RIl PuuliC NRC Resident inspntor U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River. FL 34428 4
s,-
w
~.
wn amm v mua D4n 15p]
/VT 11/ Igy /77 11/
/77 11/
/VT 11/
/VT 11/
/V7 11/
/V7 arn m
n (wy a ns a
ns
=
l ns
=
ns m
us
=
1 ottiotaa' etcomo carv\\ /
pocumni mass.: c:\\cafsIAL\\MEEllNG\\CR-5UM10.91 et
,~vv-
+w*
e s-w-*m--e-
--e,
-~mr---,n
,w a,---
---,-w-,-,
m,,w--vn--
,-,--~sw----,-wc--~,w--
--r,,-m,--s,-
,,,-----.-wwe--
-v-
LIST OF ATTENDEES I
Florida Power Corocration R. Anaerton, Senior Vice President. Nuclear Operations J. Andrews. FPC J. Saumstark. Director Quality Programs G. Beuris, investor Relations J. Breman PSC Staff Engineer 4
R. Bright. Nuclear Principal Lirensing Engineer R. Colthorpe. General Manager. NUS Information Services l
J. Cowan, Vice President. Nuclear Production A. Glenn. Corporate Counsel R. Grazio. Director. Nuclear Regulatory Affairs i
G. Halnon. Assistant Plant Director. Nuclear Safety J. Holden. Site Director. Nuclear Engineering and Projects B. Hickle. Director. Restart P. Holmes-Ray. Senior Licensing Engineer E. Kane. Vice President. Engineering. Framatome D. Kunsemiller. Manager. Nuclear Licensing M. Marano. Director. Nuclear Site and Business Support J. Maseda. Manager. Nuclear Engineering Programs R. Haughan. Department Support Administration M. Clary. FPC
'R. McKeown. Vice President. Professional Development. CJRW J. Mckinnon. Chairman NGRC. FPC C. Pardee. Director. Nuclear Plant Operations A. Petrowsky. Manager. Nuclear Operations Engineering S. Powell. Principal Nuclear Licensing Engineer M. Rencheck, Director. Nuclear Engineering and Projects D. Sells Consultant. Florida Municipal Power Agency T. Taylor. Director. Nuclear Operations Training J. Terry. Manager Nuclear Plant Technical Support M. Van Sicklin Chief. Nuclear Operator E. Vilade. Communications Coordinator Nuclear Reaulatory Comission S. Cahill. Senior Resident inspector. Crystal River H. Christensen Chief. Engineering Branch. Region 11 (Rll)
K. Clark. Senior Peblic Affairs Officer. Ril F. Hebdon. Director. Project Directorate 11-1. Office of Nuclear Reactor Regulation (NRR)
J. Jaudon. Director. Division of Reactor Safety (DRS)
J. Johnson. Director. Division of Reactor Projects (DRP)
K. Landis. Chief. Branch 3. DRP S. Ninh. Project Engineer. DRP L. Raahavan. Project Manager. Project Directorate 11-1. NRR L. Reyes, Regional Administrator. RIl S. Collins. Director. NRR T. Cooper,' Resident inspector. Crystal Riter l
l
. A s
a m.
.- g Public-4 4
i
-1. James. Staff Writer. St. Petersburg Times i
R. Cundiff. Reporter.. Citrus County Chronicle i-H. Saeleno. Reporter. AP i
I t
j i
i f
I 1-i t
s 3
1
?
t k
I i
t.
P f
1 e
s
-m w a -Mg-9qJe - w ryg g-w'-wm yv g4-9-4w-ygy9 c9M*
-g g w wg, q n.
w-vwy y y-,yw q'w y % w-w y 3p,,w,y,gm--mw,,wgy gy wpw,g.y y,y+y.,
nww mww w wwy"cg 9-y-y
--ermwwv, g-n4e.rg.,1-ry+ ye g
,-yww+--
n= A fi5 Nuclear Regulatory Commission l
l Florida Power Corporation Technical Meetinu o
t October 30,1997 I
- [ ' M * '"*ge8,48
~W, 4T*'
.s_. -.
q).
AGENDA 1
= Configuration Document Integration Project (CDIP) Update a Emergency Diesel Generator Update a Control Complex Habita3ility Envelope (CCHE)
Update s Appencix R Upcate a Concluding Statements
l;ll
- i'
!i
!t l:'
tne t
m ce u
j c
o o
r D
P n
~
n n
o o
i i
t t
a a
r r
u g
g e
t f
n
~
i n
I
~
o S w-C
,e
~
e n
kw,e 1
f a
i=
,l1 I
l>
l l
a ii!l
(
I!:
i, l:1
tri
~ ~ +fi Configuration Document f.%
Integration Project e Integration of tLle primary licensing documents
- Improved Technical Specification Bases
- Design Basis Documents e Used Information. ' rom Extent of Condition Reviews as stated in the Confirmatory Action Letter m Deve.oping direction for future configuration contro o? t:1ese c ocuments i
.. _1 1'
2 '
e
==~ k Configuration Document tt Integration Project e Total Issues Collectec 1936
- Translated into 2966 Document Changes
- FSAR Related Document Changes......1836 s Total Issues Resolved This Outage...1131
- Required for FS AR Revision 24............
271
- Translates into 318 FSAR Changes e Overall Success; 2/3 of FSAR issues are being adc ressed in Revision 2L i
tt &
Configuration Document we
+
<E=o c
. "3 Integration Project mc FSAR RESTART Document Change Distribution by Chapter
'2s
,WMARs___
l 4
lOcther imLARs
[mPrecursors 105 85 23
.3 5O d5 s
e 10 8
17 9
25 4
4
+
+
+
+
+
1 2
4 5
6 7
8 9
10 11 14
~~
FSAR Chapter
_is
- k bh '
d
-,s CDIP (R-20) Open Items Rev 24 Open items
- - -- Rev 24 Work Off t
200
-USAR " Electronic" Open items i
-l._
~
150 e
I 100 R
i 50 O
e e e e e e m 0
^* ^
. w R R R @
g g _ Q_ g' Ryy3$c 98 R
R @
@ G Q nee a;fEENE8.5858g O
g S 888n EM s a e e e e e e e e
_.__mi.;.
~ - -- -
1
l
% % T ?} '",,
M D,$ Configuration Document
~?
Integration Project SA/USOD RESTART issues Work Off Curve t4o.
120
--- ^
..... Work Off Vahre S A/USOOs To Go Prepcfmg
~
100 w
~.
s
,h ~~
79 so n
g n
60
~ ~.,
e 40 e,
a 20 Oe O
t t t
$ ?
@..R R R ? O k
? t t
7 t
? t t t t t
?
t t
t E
a5 0 3 $ $ eE E E e8 egGgg9
? & G e B S 5 8 8 ge8 E e 2 :
e 9 9 9
- e - -
e : : : : : : : : : :
s 8 aaaa e e e Date k
2-
~;-
A Y2 Configuration Document gp Integration Project e Issue c ate for FSAR Revision 24 is Monday, December ~lst.
i l
}
t l
i l
m Issue date for ITS Bases and EDBD will be prior to Mode 2 i
1 I
i
ll-l
- j,l
, i l,ih ll il ii l
e e
t s
a e
d i
)
p I
U yc r
n o
e t
g a
r r
e en m
e E
G
& e>.
13
+$mA= 4..
!l:!
- l
- 4 l-
'-il l
l lll
W
~tt A
"$.{if NDG Loading Issue i
Part of a Three-tierec Strategy
- Power Upgrade j
- Load Optimization i
i t
- Margin Verification i
l I
I t
l l
l I
l
,'~
w-vw
~
=J g &
Diesel Generator Upgrade l
~
3500 kW l
l 30 Min. Rating i
i l
New 200 Hr.
3400 kW Rating l
3250 kW 200 Hr. Rating New 2000 Hr.
3200 kW Rating i
3000 kW 2000 Hr. Rating 2850 kW Contin. Rating Sept. '96 Oct. '97 i
l' i
l l
- .e,.arr fA EDG Load Optimization 1
l i
l e <W Meters ra Load Management P-T-L Control Handles EFP-1 Trip Defeat Switch i
e Loac. Removal / Rec uction i
- ASV-204 (125kW)
- DOP-2A/2B (10kW) i
l es yt vgy Mb Diesel Generator Upgrade 4) 3500 kW 30 Min. Rating l
3400 kW l
200 Hr. Rating 330g kW 3'2 5 0 k W (ITS Upper SR Limit) j 3200 kW ITS Lower SR Limit l
3100 kW l
3000 kW 2000 Hr. Rating 2850 kW Contin. Rating Sept. '96 Oct. '97 4
4
1!
{l
!,il!)l' i
I 1
j jr ll7 7
77 7
7 7
7l 7 7
7 e
9 9 9
9 9
9 9
9 9 9 9
g s
n
//
/
/
/
/
/
/
/ /
/
n 7
6 8
7 7 2 2 8
4 1
i 1
x/1
/
d
/
2 n
1 1
1 1
1 1
2 / / /
/
/
/
/
/
2 n
i 1
r 1
1 1
1 1
1 1
1 1
1 1
u e
P 1
I 1
1 1
1 1
1 o
T i
k 7
9 r
/
g t
o 3
n a
W 2
i
/
d 1
d n
c 1
e le P
i H
f e
i g
a d
k g
c n
o i
a d
P n
M k
e P
ro W
d n
g e
i s
t k
a I
2 2
0 0_0_2_5_5_0
_. 1 - 1 1
1 1
1 1
1 1
1 1
l
~
0 0
0 00 0
00 0
0 0_
r B.9_7_l e
k5 7-4 2 5 2 1
1 1
0 0
. 0 04 i0 1
1 1
1
.1 1
_8 m0
_ 3 7-4 MM5 R
8
- 5 5 2
050 0_0 0
1 u1 0 0 0 4 0 1
1 47 7-7 7-7 7
N 7 9_7_9_j 9
!6%6 66 7-9 9
,!9+!
1 9
9,!, 9 9 9,:
9 G
jn
_ e s t
e
. s l
s D
mS nyd
)_
t d
h
)
n o
_ c c
t n
a c M.
h
_ e c
r-nH in_
E i_M E
_ e al m_(
wo s
n t
cwo t
(
y s
o a
u_s s
a u
r S.i_s_t e
_l i
t gd p p n e
l t
u_d e
d e
a
- a_l a
e e
o a_i_b o
o i
t r.M M_ReE l
r d Re i
j K_C r
g o e
a t
t c
n_C S
r L M_V 2_2_g t
pMd e
s e _2 2
o o
o r
r v
r U
o yF e
t i
eb t
D r B l;
I c
t M.d
&[*
m F_. F_i I
a e
a e2 h p
WioH_H.d i
i n
u/ 4
. a t
r d
ud t
oA0 P 2 2 at R T o
. a a
a t
i 1. R A A_R R P R G
P-V-wS i /
P G
i i i i i
o X W F E_B_B.B E_BG X X_.
fq,
.l DOS D
D l
i I
DAKBS E_
E E
il t
\\
j!
- !l
- ,i,l; i
- i 1
i:
iI
l i
s h. __b
.p.?-
= _ =.
_a l
Sp.
EDG Upgrade i
l s Raciator discaarge air recirculation pata to be minimizec i
f
~
i
- - " " - - - - - - - - - - ~ ^ ^ - -'
' - ~
l MSk EDG Radiator Exhaust Air gs 1
Recirculation i
i l
i j
l l
Radiator Discharge Missile Shield Structure Recirc r
Air i
l Radiator Fan 1
-~
Outside Air N
Missile Shield with N
Flood Protection j
l Radiator Compartment i
G Mdk EDG Radiator Exhaust Air Pv7 Modification
.L l
Radiator Discharge Missile Shield Structure l
l Radiator Fan l
Outside Air f
N hl. _.
l Missile Shield with N
g Flood Protection
[;;.
pj.p j
=
Radiator Compartment l
l t
i i
m-.
m
2-1 f
i
..n wwwy,
<-r -
Msins
,s EDG Qualification e EDGs will be qualified at increased intermediate-power ratings based upon:
- Vendor Testing f
i l
- FPC / Vendor Analysis 1
l
- Site Testing i
i I
i
)
i I
l E
~4-
-n T# A
- _m t
EDG Testing Objectives s Achieve operating stability at new rating j
e Demonstrate engine operates wit ain specifiec
.imits at new power ratings t
j e Demonstrate generator will perform as required at i
new power ratings j
i si Demonstrate new rac iator will perform its function i
l at new ratmgs j
i i
s Demonstrate room anc component temperatures wit:lin criteria i
i 1
o l
l
l i
t 1
_e if A
.in.
/A T
i l
9#".b EDG Loading Profile Akde4
{
I 3500 -
Ibwer Qrate
{
Sury. Ibn i
Ibdiator En Ible Rtst Start Nkxle5
/
,/
j M ll A dj/
ustnent 16ns 1 I!r Run Ibdiator hkxl I
Rst Start l
l i
i 4 _ /_
ll 7 Su.veillance Run i Il-16n J
1 4
a f
2500 i
/
1 l
Ibt Start BriterTestino*
1 I k-Ibn j
$ 2000 4
e i
3 Pover Lhrate Test 5"
Radiator J
1 24 Fbur 1000 i
Rm 1
9 l
Singlelargest inad 500 i
j j
Ikjection j
0I 4
i l
+
i i
+
t-
-1 t-
- -- + - - !
.i
'a Unhukil /o m
e
-t m
o e co e
m o
m e e cv o
m e
e m
o e Maintenante m
co
-t v
in o
ts m
m os o
- m cv co e
to e e Ibn ggjp jgy y g 11XX'&I3 Actuation s
i 4
j
)
l L
A i
- + g j
=J Power U1 rate Testino
'E>
Summary i
Test Description j
v Start and load run start and run at various load ratings l
l v
Fast start time to start & reach voltage and freq.
l v
Combined ES Act de-energize safety bus, EDG auto-start i
and LOOP and auto-load sequencing.
v Single load reject.
single largest rejected, volt. & freq.
Full load rejection reject max. load, voltage & no overspeed v
v Endur. & margin 14 hrs @ 3100 kW & 22 hrs @ 3300 kW v
Hot restart full temp. restart - volt., freq. & time
~
v Reliability Start & loading
e 8 N2 Diesel Generator Margin (v) l l
~. ' >-
3500 kM 30 Min. Rating
{
3400 kW
\\
I 200 Hr. Rating 3300 kW 3250 kW l
(ITS Upper SR Limit) 1 l
315' kW Auto Connect Load I
ITS Lower SR Limit 3100 kW i
3000 kW 2000 Hr. Rating i
2850 kW Contin. Rating Sept. '96 Oct. '97 I
,l ll ll,
,1;;I! l 1ill!,
1!l!!!
ep x
o l
e e
lp v
n m
E o
7 w
C y
t c
i l
l o
i r
b t
a n
t i
o b
C a
II B-@4..
2_-
!l:
lI,
,l
8dhle
. Control Complex
.?Il Habitability Envelope l
Demonstrate Protection of tae Control Room Personnel During Podtulatec Events
.._..m..
l w am-s
~~
. Ems i
552__. k"
/g
[__
pf)
% AHDtD 4
<Er E$
l
' ~~f "'
l m
.CG i
l l
A H f.127,
\\
l AHD 9s GAS l HEPA g
CHARCOAL AHDt AHD-2 %
S g
g AHO-74 AHD-25 NORMAL o
FITTER
~
AMI-II ^#3
(
AHF-1/ A AHD 26 AHD-27 AHD-3 A H F.1, 8 D
NORWAL FILTER BAS l I
ggpA
)
J 8
CHARCOAL
{
C-a Contro! Room C=s 145 Ft j
Cable Spreatng Room C===
134 Ft l
C=2 ErlC Rooms Control Rod Dnve hoem. & ES 480 voit Switch Gene Rooms C==
'.'24 Ft l
C='
i Battery Rooms, inverter Rooms. & ES 4160 voit Seitch Gear Rooms
%s AHD 12 108 Ft PRE MOD!FICATION NORMAL MODE Q jps"'
9D Ft l
\\
l l
b
n-~~
?y..
y
.i e-s
.f
}
~~
- b A H D - 10 (speet f uel bidg)
I)((
g l
Ew Etwoha l
j l
l TOUC l A H F -16 A I
\\
AHD.99 G r6S HEPA i
g i
CHARCOAL i
AHD-1 l
AHD 2 %
j AHD 24 AHD-25
('
AHF 21 A!9 j
NORMAL FILTER k
AH/ '7A l
AHF-19 A/B s.
AHD-3 A H F.178 i
NORMAL FILTEH j
l~~~
R M-A5 l j
)
I CHARCOAL l
C-s Controt Rorim C==
14==
145 Ft I
Cm Cable Spreading Room C==
134 Ft 1
- C__,
EFIC Rooms. Contrat Rod Drive Room, & ES 480 voit Switch Gear Rocms C=
124 Ft i
~
I
[
C==
[
Bet:ery Rooms. Irverter Poems. & ES 4160 volt Swi:ch Gear Rooms N
AHD 12 108 Ft i
g PRE MODIFICATION RECIRCULATION MODE j
Q p$ED 95 Ft 1
i i
O MI$b' Control Complex
.k Habitability Envelope a
Assess and Seal Penetrations Initial Phase for Conduits Completed on 10/10/97 m
Perform Information Test Test Complete a
Install Redundant and New Dampers in Each Isolation Path Modification Packtige Issued, Completion by 11/17/97 m
Revise and Consolidate Calculations Calculations in Final Review, Completion by 11/14/97 m
Demonstrate Operator Exposure is within Limits Test Complete, Results in Review J
m
y
_a
~ e er r:a v IF
-"*d.,++
33 3,
%s AHD1E a
- +:
Q=
e
~" ~
N AH D-1C o,
- I l
l ANF lag l
l HEPA
[\\
GAS g
CHARCOAL Atandoned AHD-2E N g AHD-24 :
AHD-25 ArtD-2C %
g g
i g
NORMAL FILTER AHF-21 A/B AHF-17A AHD-2s AHD-27 AHF-19 A!B
\\
AHD-3 AHF-17B NORMAL
[
FILTER r-----
g RU A5 l HEPA
)
s CHARCOAL HyAC "cuipment Room p
Controt Room C==>
145 Ft 6
Cabte Spreading Room 134 Ft 6
EFIC noems. Control Rod Drive Room. & ES 480 voit Switch Gear Rocms C==>
124 Ft C==>
N AHD-12 Battery Rooms. Inverter Rooms,8 ES 4160 vott Swrtch Gear Rooms s AHD-12D 108 Ft POST MOD 5ECIRCULATION MODE Q _= $$ED 95 Ft
1"J"!
Control Comp ex l
~X.y) r,
=mc 7.
Penetration Seal
~
CCllE wall
/
46%dif f.Wi!O$$v$v:wy$$n5p 3.sm:w ;;y n;i
@Fkff3^4v marinite
. 6,s<9: Sit s.Wq2onduitssp%g i p '5 ;i h W ; S3.y n> y :vT5 p a.s;rg g 9f;. n
- m board 04 9
- $ w ig g,
%r n;
4 b
'f kNNhh hk hff,h
$kh
$Nh.
h.k ['
} f'h A
i
~..s ~t4 &
,% % M $t.d. M *.
egf. AYLFC '&;::% g t*k ChfQ:
qqn< ': syn, 3;tli-gfp-)
12%:.
k6 chm
- :9O
.i
- Ty
- p
,.f4 Q "bles:'
- WA *4M';% y' j,d.7,*y
.4--
y
.;.f k~f gcpq ca 3d _.:E.49 '
2 JIiditMR. T ;1;a;,R5XQ,.c y$hh$
- ~
w
- ~
4, ~ j';?,,-:.Y
> Q.
t,Q ki; V.'?,
gg c-g g # c{f xxxxxxxn ff;t
'+
i
?
s gm ebbIYh k b$kt$
a~u wna
<4 r,: p@ g? t' N 4 Q f' ac g
d 9-N'd.I F UEM%7
'r"giM y'* K.Qt
-m
+%y cQJMg
. 3 'r?
, iL lILp%g;h @k e
- 4:
-k sp Ny y hbB;
"~
!*h Cjl,.0h IOYik.*(k
$f[j hk
\\
v.
.[
.,%w I
s a v. m ~,,,.
~. ~ -
Mk Preliminary Test Results gy i
Dose Accident Scenario Previously Assumed InLeakage Based on InLeakage Measured Value
[
Duration Wind Speed l
O to 8 Hrs 2.7 mph 355 cfm 80 cfm i
8 to 24 Hrs 4.6 mph 355 cfm 129 cfm 1 to 4 Days 7.2 mph 355 cfm 197 cfm l
l 4 to 30 1
16.3 mph 355 cfm 435 cfm Days l
I Thyroid 26.5 REM with 43sq" 26.5 REM with 60sq" l
l Exposure:
breach margin breach margin l
l
IA 2
Preliminary Test Results
<.g3 Toxic Gas e C;alorine a Sulfur Dioxide
'g 3
I MIb2 Control Complex
<p
.S.
Habitability Envelope a Su amit Revised Ha3ita3iLity Report 11/7/97
- Identification of Current Licensing Basis
- Dose Calculation Description
- Leak Test Description
- Basis for Acceptance of Revised Habitability Configuration a Su amit Tec anical Specification Change 11/21/97 m Preparc Operability Evaluation prior to Moc.e L iaw NRC GL91-18rl
..nnrw navy.n, w-M8
. Control Complex
.k Habitability Envelope I
I l
l Demonstrate Protection of the Control Room Personnel During Pos,tulated Events i
i
t CI$
t
)
- d c
x
- M g
u%
4 s
C5 i
4 y<pg'.;
\\
, a x.,,Q,w
-n Jgs Appendix R Update RCP Oil CoIIection System
- Maintenance WRs Written.
Complete
- Modification Field Work.
Complete
- Modification Testing Complete
- Remote Oil Fill Line Exemption.
Submitted
'O
. ~
dM, ES[h'*
1ppendix R Update Modifications
- List of Issues and Modifications Provided to NRC 1
i l
7 of 20 Restart Issue Packages ready for review.
1 Field Construction Underway i
Design Work Continuing I
l I
i
a:a 1;s..m.
e
- wshw_ _ <a
~
Appendix R Modifications W o rk j
l D e s c rip tio n N um be r D e sia n l P a cka c e l F ield W o rk ! T arno ve r i
D e g ra d e d S e a l M a te ria ls
- 97-06-07 01 11/17/97 i
RCP Lube O il C o lle c tio n 97-06-16-01 10/30/97 f
C T S e c o n d a ry P ro te ctio n i97-02-11-01 l
F G t1 - 1 (S tru c tu ra l) {
i F C id - 2 ( 5 0. 5 9)
RSP H o t S h o rts n 9 7 -0 3 -0 2 -01 11/27/97 F C ?J - 1 (S e p a ra tio n s ) l F C tJ -2 (tJ e w U S G D) l l
F C fJ - 3 (" A " B u s s it e m s )
F C t) - 2 (~B " T rain Ite m s ) l 11/17197 F C tJ -G (~ A ' T ra sn ite m s) b 11/20/97 D H V -3, 4 C a b le S e p a ra tio n
,97-02-18-01
'12/12/97
! 97-02-18-02 12/12/97
{
if4 9 2-18 M O V s l 9 7 -0 6-13 -01 11/25/97
}
F C tl - 1 l
1 112 7197 E m e rg e n c y Lig h tin g j
11/28/97 F C tJ - 1 (E D G A C C E S S )
10/30/97 1 P e n ding l
P e ndin g
{
11/28/97 l
A H F -2 2 0, C, D C a b le s (E D G ) j 9 7-0 5-19-01 11/17/97
~
l 9 7-0 5-17-0 2 12/1/97 j
EDG D e tu g e R ise r
[97-06-11-01 T h e rm o-L a g Circuit H e ro u te s i 97-05-17-01 11/12/97 1
i i
I i
_4%
p'*
t#1&s l
Uh!?
1ppendix R Update l
IN 92-18 l
l
- Re-evaluation Cornpleted. Hot Shutdown Valves being l
Modified.
- Design / Field Work Package Issued i
j
- Completion Scheduled 11/27/97 l
- Review of New Plant Modifications continuing i
I s
1 i
l 1
i l
,l l
C L
\\
?
l L
1 l
Y I
N l
c j
i 0
i k
1 i
y o
i i
.e.
e l
J
)
g..~-
=
FLORIDA POWER CORPORATION m
-p 4
CRYSTAL RIVER - UMT 3
. w.#
~
PROGRESS l
l l
October 31,1997 l
1 i
~
l 10/31/97 l
1 i
I..-...
_ - - _ - - -.. _ - - - _ - _ -, _ _ _ _. _. - ~ _ -. _ - _ - -.
AGENDA Y
w.g FPC CR-3 Opening Remarks R. A. Anderson Restart Status / CAL Status J.P.Cowan l
Operations Status / Update C. G. Pardee
~
Operations Training / Development T. H. Taylor Technical Issues M. W. Hencheck l
Corrective Action Program J. J. Holden j
Regulatory Submittal Status R. E. Grazio Restart Readiness / CH-3 Metrics B. J. Hickle i
o/3 Concluding Statements R. A. Anderson 2
i l
j 7,,7 l
~-
Current Status MiI.
m FPC CR-3 Plant Conditions Preparation for Final Vacuum Control Complex Habitability Envelope (CCHE) Tests
~
Diesel Generator Work 10/31/97 3
CR
- 3 Readiness Program et&p Objectives FPC CR-3
(
- 1. Frequent Open Communications
- 2. Resolution of Confirmatory Action Letter Issues
- 3. Close Book on First 20 Years of Operation
- 4. Invest for the Next 20 years of Operation
- 5. Integrate Startup Activities Into Long Term l
Improvement Plan Do What Is Right For The Long Haul, Not Just What is Required For Startup l
10/31/97 l
4
m i
Restart Schedule
.t l
+.. c 4
D__
= 3rd Otr96
= dth tr 98
" 'S' Otr 97
" 2nd Otr 97 m 3rd Qtr97 m 4th Otr97 a 1st Otr 98 m CR-3 Design And Licensing Basis Review l
i l
2 stovesw Damian seses -
m sesseness venouseam.
}
Plant Modifications Enni ;;;ina 2
m Constructinn m
m
}
Testino y
Regulatory Requirements
[
I NRC Reviews f
2 m
]
TECH SPEC Changes / Approval l
m w
1 i
NRC Restart Authorization A i
Procedures And Training EOPIAPIOP Training m
m MAR Training
[
]
l Startup j
l System Lineups Heatup & Tejs ineg n
Reactor Startup j
10/31/97
+
5 il 1
n :.
Confirmatory Action Letter
&S@
' C
% Complete FPC CR-3
- 1. Design Issues Identified in FPC 95 %
l Letter of 10/28/96
?
- 2. Extent of Condition Reviews 100 %
i l
- 3. Resolution of Safety and Licensing 82%
Issues l
86%
I
- 4. MCAP II Progress
- 5. Regional Administrator Concurrence 10/31/97 for Mode 2 9
h.
it I
n j j:l j -- j--
J l'I 1 ;l I
c
- h-
'i j __l li qja" Vs 3
g,--
,1 l
!}
l
--8 s.r
- I-7l n,
Ek
._==
.g.3.._.........fy]3._j_..._j.gg..,_
g
).......
,..q.{_.....
q.
9I i
i--
g "f >
3 fit i
i )! pff jl m
i i
i c
$l 4ji pl l
l l
I f, E I--
M:affj l
,l
[I
$ _f l
I i
i
[LiIfEl i
j l.r '
s!) a l
l
=, yl n
e
- O
- f bj 1
.j p$i.!
i
' i T.
1 1 l
I e
i 1,
7 it m
. m.!
b h!o I
l I
r i
i c.
l
,I 1.
/- j'!-
y l
- h 8
i A
,=
i - );d
. :j;;bli:
[m.
f/)
as p ;
- 9 j,4 ll l
3 t
tu
{j oc
/
I l
n o n g
i i
i l M k 1.!
i ;'
i D4 lis i ji d 1,,.! ]
M1. (lp.ai to b
I L
l l
hq e
M "Nk [$ g t
I l
l t
D ilj i
i d j
n.
I i
i
.t o
I m
g;erj_.,f! ( kjA
( 'ii j
j8 g
!P 9
I 7,l g
4 ip i
o bl3 h}gl i
-- [e
- v
,i l
<t jld l
l
$A j lhl k9 P l sl, j
L J a l7 : e, s
t, m-m.
e, i s.
i i
4 e
m m
1 l
j l
lp J
l l
c u
slll h
i 4 1 1 1 a
u
- 1 1
ii I
b
!);
11 h
d 9 h jl l
,I l i h d a
e e' 1
a ii y,
4 1 j )l v, {
y y,--
+
7 l
l a
s l
t
.h;.
(
Q a
f,j d
l1 l
l
-p I
l]q dp,,'-
2 t
l f)g h
bd
,l a
- x.
8 b *3 ix 4
9, rf.'
s
'g'y m i
it - 14
..a.g t y e.
.q t
Goe s
N.
ou NO
,=
[l!
- i l,
i 6
ys9 r
e 1
c c ou8 f'
f_
f_
w w
w we e
_ e e
t CN C C N C
N C
N s
a s2 m
e ; w e
c t
w w
t e
c e
g e
o 0
f_ N e
t p
N N
n y
6 e
s t
g s
w m -
p n
u r
n l
e;S e
e e
o u
C C C
J C
A T
N f
g1 i
n h
nif ta r k k
0 0
9 e
r 0 0 3 5
0 9
o so 0
d o 5
0 0 9 8
eW8 1
1 1 1 it e
C Dr i
& g l
s ai t t
c e e e
e e
e t
e ie r
t t
t t
t t
u ; n p p n p
p p
le s
e e e
e c
n B ee e
t l
i l
p f
t C
. N e oM n
m m
m e
e e
o r e
s m
ort S
a 4
e a
o C C 0
C C
C 1
t R
N e e T
nt L
te t
na Rte e e e
e e
e oe t t t
t t
P a
_ p p p e
c e
c e c l
i l
5 l
- ,I n
m n
t y
p p
r o
e e
LC s
s m
s s
s t
sa o a o
o o
i s s g e C C CC C
C C
C t
nR G
u P
c irBf nF f
C a R S e e e e e
e e
e t
l t : :
s t
t N
e -
- ,ly p
n
_ e e
e h
l l
ey";
p oo (e
n T
. n o
e m
s T
i s
e:
_ e C C C C C
C C
C sim t
p N
e e
n r
e c o n
s e
o u
t t
s C iL s P
s a
t n n y r o e y S o r
c D ts RA r
e e
e n
ioi n a r
t f
a.
n r
f o n t
e r t
i e
e o
a aT p t
s k
S a
G s
t n
o t
d s tp sf n l
i e
n ea og wC i
t e
s al cs F
r r d n
d de i
n c
deo s i e
s sfoeo f
a e
sd e e s
f s pD e
C i e
e t i l
t e i gd s a
D R nn u e n y e
e 6
n ei
)
e y e
,B H
, D ai r
s6 i
e t
y S
d -. d n
u nt n r l
e eP ;d a ; a e a 4n s
e s
s s
o y ut N n e 6 o r n6 e s
P S P t s aL uA 9 P i
6L n
I t
a w
l I
i g
P P P e a
L F
G HHL R L
i se D
A 8CD L
F G
H g~$r.c3 e
7 9
g
/
~
1 8
eR
3
/
S, rC 0
1 1\\ll!l
.l lf:!
l j
ji
d I
i I
l I
i f
f i
i l
E l
.mme l
E e
G 2
E 6
w O
E G
O E
.N i
d h
2.
C l
. )>-
- 1 e
~
g e?
s Ge
%M
~
2 4R.
(
e M
k a
-.\\
i
[;;E Operations Readiness for E.e Restart
~
FPC CR-3 Readiness for Restart Objectives l
j
-Well Prepared Operating Staff
-Lowering Rate and Significance of
~ ",
Human Performance Errors i
~.[
-Operator Confidence in Plant j
l 4
Physical Readmess l
-Willingness and Ability to Identify and Correct Errors i
l
, o,3.,,,,
i 10
I W
Operations Readiness i
l
,4%i$
E0P Improvement Status c
FPC 140 -
j CR-3 l
en I
D-120 -
.'s i'
3
's u) x g 100 -
's s
A s '
80 -
's aa s '
4 A
60 -
j s
s
- A ctual N
- -A - Workoff N
j g
A e
o s
i O
s i
20 -
Q.
j
's's 0
4 Jun Jul Aug Sep Oct Nov Dec 1997 i
10/31/97 WellPrepared Operating Staff
l l
m ee r-Operations Readiness i
m V.< ' p AP Improvement Status gg 4
l 1
,,?
200 -
l FPC cc 180 -
'~~w CR-3 c.
$ 160 -
's m
's i
g 140 -
's j
i J
i j
0 120 -
's c.
s O.100 -
's 4
\\
l
- e --Acto.i g
80
_4_wo, ion;
's a
t 60 -
~. A s
i Q)
\\
O 40 -
s O
i s
b s
i i
D.
20 -
x s
\\
i 0
i Jun Jul Aug Sep Oct Nov Dec l
1997 l
10/31/97 gr llPrepared Operating Staff j
12 e
... ~ - -
l
~
Operations Readiness
, -(p Operating Procedures l
g j
W -T g~ g j
i i
FPC j
i CR-3 1000 -
j
.1 900 -
s.
m l
800 -
I k3 5E 700 -
. l 5
600 -
\\
$ o@
500 b
3 Goal = 25 or Less 3
O-
\\
i i
O l
Prior to Heat Up
'u j g 300 -
--o.workoff
\\
E o 200 -
a
\\
s z
Actual 100 -
j 0--
1 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 i
1G/31/97 i
WellPrepared Operating Staff i
,3 i
1 l Q' Operations Readiness j
_!b)?
Operator Error Rate l
W 4
7 FPC CR-3 0.25 -
4 o
C E
s 0.20 -
E i
5 E 0.15 -
l "E
Et
$ 8. 0.10 -
Goal = 0.10 or Less ma uO o
E 0.05 -
l 5a O
0.00 j
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 10/31/97 Human Performance Error Reduction
,a
3i
- lI
,3 l:
(
- i:ll
,l l!!
L.
fN s
a,,
' ^
C D pMaCx@ EmnC 38@2 n
t e.
9
@9 M
ma Jodc'Em2SS v@m@@
1
)
~
4
(
g, e
m
,yO nc&
s e
g r
le l
a f.
hC l
a n
m, o
i
/
ta r
e p
m, O
$>7.
t n
a m,
t ro p
m
. 'Y o,
.{
I c
r I
i =
- T ir
>q E k=
k EI8 I E
$~
geG$e8 Q
u sc Nm a=oR~ heheeBe" i
2
- j' 4
l b
!i l
l
er Operations Readiness Systems Remaining to be O'I[4 Accepted by Operations FPC l
CR-3 120 -
j
~
~
- E 100 -
~
i o
Ee 1
i S8 80 -
E<
m.
\\
+4 60 -
?2 e en m c 40 -
E
\\
l
}E
~
r E
Goal = 0 Prior to Heat Up h
-o Workoff E
- Actual l
~,
l l
O s
s I
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec i997 i
10/31/97
,e Operator Confidence in Plant Systems
\\
--.A
R Operations Readiness Mr$P Self-identified Precursors W.7 FPC CR-3 1
\\
?
l g
0.8 C
g 6 "' " '8 ' "'****'
0.6
- [;
s I
j 4
2 $
0.4 O (1.
O
~
5 0.2 E
4 0
i i
Jan Feb Mar Apr May Jun Ju! Aug Sep Oct Nov Dec 1997
' *'N
SelfIdentification ofErrors I
l
Crystal River Unit #3 - Operations Leadership Plan I
1 Mar i
Apr i
May 1
Jun 1 Jul i
Aug i
Sep i
Oct i
Nov I
Dec-I
~w..my...'
e MPROGRESS n-------
9enctwnert t
y
......... y........ n
= w ~... n 7...~~ L...? ? n g 55* :~E..J;
~ t- + _
==
- .: u -
.. ~,
a EG-eEEmEdisusi j
[ tag VLCL])!
Kzz_* =
._..-;~
. NW?AW! $W2?"l?~h?%$-5?lh%
~-m i.
p ~_ _
_s.*
y_.
% -~ _.
_ _ _ = e_- &_&_
i 10/31/9T
=
t-18
- -mms m
=
4 4
Crystal River Unit #3 - Operations Training I
Jun i
Jul i
Aug i
Sep i
Oct l
Nov i
Dec i
f I
. Gj
'4',
' [: ~, '
r - - _
L iAdCoremeng TW ams :
EOP e
Og$ rater Annues Ewns i
SCHEDULED I
p.__________$*
O O
p------__
___g
{
m Trase e
G e
W 4
4 9
O O
. start e,
=
l Yramang' 6
e t
10/31/97 19
l Personnel Development FFC i
l
'"~3 More Licensed and Non-Licensed Operators
'J Non-Licensed Operators Training with j
Operating Crews l
Management SRO Certification L
Change Leadership 4
Operator Training Self-Evaluation 10/31/97 20 l
l Operations Readiness for i
m' m
Restart - Summary e
I FPC l
CR-3 ChaIIenges Primarily Training Related
- Leadership Plan Driving Results i
- Performance Measures in Place
~
Organization Thoroughly involved 10/31/97 21
i t
i I
j gysyw7 l
l "+F Technical Issues
\\
e FPC CR-3 l
Ensergency Diesel Generator l
~
Control Complex Habitability Envelope Appendix 'R' 4
N 10/31/97 l
22 i
EDG Related Modifications FPC CR-3 Iiids,iim Nanter l Design j\\i6FliFackap Ficiili%:kjTamar I.
EdGIbwerlIgrile
%I(RiRilyksund - 7benedNW@]
12T27%
.=
- +
~
4 nagd
' (hug &delj__11/12/97; fa-12-17-Ol[IsssQi -
k DOP-2A/2BNbd
~As%2DIKbd
!%11-01111Ilemnd i Insiid A Qusphle[T171W97 vn w lIdiowatt MeterIEplacenrnt l,9fMB-12-01hissuedkng5ennedgg{fl7f4797]
EDGStandby KeepwarmSystem9f>07-15-Ol plessed,ggissuini gj Working 11/11/97 l
TSWTRV7I'1ContmlI-hndles fy74Ti41MilKIssued;j tisuedflKQj "EFP-1'liipIlfeat Switch 197-01-01-Oih<lssuiiuCjW:,m_ e aughte2 d
Omphee
-an; I
pr EDGRoom%ntilation Nbds l97&G02 lhs+ueA;3 -
. as Working i1/17/97j
=
i n w w ma j EDGAlf-22 Cables
=
w l97-05-1941hksued;;f,
_g_g Working 11/6 97;
__ __ a 1
'IssurdM_ ~ Working 11/28/97; l
EDGAlf-22Stmetumi l97-05-17-02Ellssued-a
_ __ _ a p
m
___EDGRadiatorNbds(M:ch) j974150lkissued17 Clemnd=3 Thl.<ing 11/17/97;
_a s
Llas wr_ued :y. Working 11/17/97;
! EDGRadi.atorNbd3(Bect) 9741502rlssued'.
m som s EDGIbtectiveIElays 9Misilliifissued 2Isii$IndNd 11/23/97; 12/1797 t
m_amaa IEDORadiatorEMiaast j97-0801-01 Working Itnding j Itnding j Itndingj 10/31/97 23
I[
Diesei Generator Margin l
FPC 3500 kW CR-3 30 Min. Rating 3400 kW 3300 kW l
200 Hr. Rating 3250 kW (ITS Ilpper SR L.imit) 1
-~ s 3200'kW 3159 kW Auto Cormect Load MGR I
i
~~ ~
~'
- %W"N5b. ! - 3kWi ITS Lower SR Limit 3100 kW 3000 kW 2000 Hr. Rating
..)
2850 kW Contin. Rating 10/31/97 Sept. '96 Oct. '97 24
p.
Control Complex m
l r%Y*4 Habitability Envelope 9
4 FPC I
i l
CR-3 l
Assess and Seal Penetrations i
Initial Phase for Conduits Completed on 10/10/97 Perform Information Test i
Test Complete Install Redundant and New Dampers in Each Isolation Path Modification Package issued, Completion by 11/17/97 Revise and Consolidate Calculations Calculations in Final Review, Completion by 11/14/97 Demonstrate Operator Exposure is within Limits Test Complete, Results in Review 10/31/97 25
(,_-
-=
Appendix R Modifications g%m9 %P 4-
.C 3
W ork FPC i
CR-3 D e s c rip tio n l Number Design ! Package Field Work ! Turnover
(
De g ra d e d S e a i M a te ria is j 9 7-06-0 7-01 W O R KIN G 11/17/97 R P Lube lie ctio n i 9 7-0S-16-01 10/30/97 CT S e conda ry P rote ction
{97-02-11-01
~
~
~
l
~~FCN-1 '(S trutitural) \\ '
^
\\
FCN - 2 ( S0.59)
Y s
S P H o t S h o rts j 97-03-02-01 W O R KIN G 11/27/97 l
FCN-1 (S eparations)ll FCN-2 (New US OD)
~
~~F CN-3'("A " B us s ltb~m's)'i ~~ ~~~
l
~
i FCN-4 (~B " Train item s) { ~
~
~ ~
W O R KIN G 11/17/97 D H V -3, ble e p a ra tio n
__... _ _.j 97-02-18-01 W O R KIN G.
12/12/97 IN 92-18 M O V s l 97-06-13-01 W O R KIN G 11/25/97 FCN-1
~ l~
~
W O R KIN G
~ 1'1/27/97' l
Em e rge ncy Lig hting W O R KIN G 11/28/97 FCN-1 (EDG A CCESS) 10/30/97, P ending i P endin g l'
~11/28/97 A HF-228, C, D Ca bles (EDG) { 97-05-19-01 W O R KIN G 11/17/97
?
l 97-05-17-02 W O R KIN G 12/1/97 i
s
~
f EDG Deluge Rise r l 9 7-06-11-01 f he rm o-La g Circuit Re route s !
97-05-17-01 W O R KIN G 11/12/97 i
10/31/97 26 l
e a
W Corrective Action Program DtkiR~
CARB Effectiveness FPc CR-3
- Ensuring Quality of Root Causes l
Reduction of CAP Open Items
- Decreasing Trend 3 Barriers of Defense in Depth for PCs Required for Restart
- PCs Screened as Restart Issues
- PCs Screened as System Readiness Review Issues 1
- Ali Corrective Actions Reviewed for Mode Restraint New CAP Information System Implemented 10/1/97
- Facilitates Tracking Mode Restraints at 10/31/97 Corrective Action I_evel 27 i
i I
DE 4
s
- Qua ity of Root Causes y
N
' ^ V- ?
f FPC CR-3 l
20 -
A t
i 18 -
EXCELLENT
^
Goal = 16 or Greater Y
16
- x_
9 j
m14 f[
MEETS Lu STANDARD m12 _
l
........u,,..
l 0 10 --
^
- 8-I cn l
g6-NEEDS O4-IMPROVEMENT 2-V i
0 i
i i
i i
i i
i Apr May Jun Jul Aug Sep Oct Nov Dec 10/31/97 1997 j
28 i
l l
Open Precursor Cards e
n%%
Wf'P 4
27 l
j FPC CR-3 HEIGrade A/B iGrade C t_; Grade D
-+-Total Open
-o-Initiated i
i 2500 i
- n. - a m7 7m g
3 Week ud e i
N
./
Rolling Ave 7~
g V 2000 N
^
l 6
s teem open c m w,,, %
eis j
e O
~
- cm Acwm wm tenee Re,wwws
- M i
i
,o 1500 W
l
~
w
- s o
e 1000 n.
c e
ct 500 O
0
.C.
.E".
.E",E l
8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26 10/3 10/10 10/17 10/24 1
10/31/97 1997 29 i
_Am.aeMwm -a memess.EW-h-am m -
-ameurm a.
w.mpe m m..m m.m m m.a e AAe.A_F,ms.KAL mA mm M m w#s p.sd ss - wshJ.
E" L15 G
2 m
- ee O
M
- 5
\\
'Ct G
l l
M L
.. i
Regulatory Readiness
-7,,
License Amendments and y%k[,
Tech Spec Submittals l
FPC i
CR-3
" A*"I "S i
25 -
Goal = 0 20 -
- Actual f
A y
-- m -- Action Plan j,
l
$ li 15 -
m :s
\\
2 # 10 -
\\
EE E
a 5-s'y 1
z
\\
's 0-Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 10/31/97 31
)
Regulatory Readiness for e
m-w8P Restart B
4
- 4 Status of License Amendment FPC and Tech Spec Submittals ca-3 l
Letter S ubmittal D escription Technical P repared D ate Input C om plete l
Appendix R - RCP Withdraw 10/31/97 10/31/97 11/3/97 11/7/97 Exemption Service Water Overheating 10/31/97 10/31/97 11/18/97 11/24/97 i
CCHE Test Results 10/31/97 10/31/97 11/4/97 11/7/97 l
l CCHE/CREVS Surveillance 10/31/97 11/6/97 11/18/97 11/24/97 i
f 10/31/97 10/31/97 11/4/97 11/7/97 e
on 10/31/97
[
j 32 I
l m
Regulatory Readiness E~
Other NRC Restart Submittals FPC f
CR-3 25 -
MAdditions
-l
- Goal = 0 l
--o workoff T6 20 -
^
Actual
\\
=
Action Plan
$ 315 _
ME
\\
i'
~e
\\
0# 10 -
EE N
i N
i E
N
\\
i j
5-
,5 N
0-Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 10/31/97 33 l
i Regu atory Readiness for w'SM, Status of Other Regulatory Submittals Rh Restart FPC CR-3 Letter Review S ubmittal l
D escription Technical P repa red C om plete D ate Input 4
Reactor Coolant System Attached Com plete Com plete 10/30/97 10/31/97 Piping Fatigue Analysis f
Integrated Safety Assessment 11/26/97 11/27/97 11/28/97 12/1/97 Jet Impingement Supplement 11/4/97 11/5/97 11/7/97 11/10/97 I
Letdown Line Rupture - NRC RAI Complete 10/30/97 10/31/97 11/3/97 i
System Readiness Review 11/7/97 11/10/97 11/14/97 11/14/97 P rogram Summary Report NRC RAI-Emergency Diesel 10/31/97 11/3/97 11/5/97 11/7/97 e
Generator Protective Trips j
NRC RAI-Emergency Diesel 10/31/97 11/3/97 11/5/97 11/7/97 Generator Testing Restart Request Letter 11/21/97 11/21/97 12/1/97 12/1/97 10/31/97 FSAR Revision 24 11/21/97 11/21/97 12/3/97 12/4/97
[
34
i' l!i!
i l1 l,
l 1l!!
ss e
s n
c i
i d
r a
t e
e R
M t
3 r
a R
t s
C e
R
?,
%< C -
1 5 f
7 9;
- b.
9
~
3
/
P PR 33 5
?"
FC
/
S 0
1 K
I i
j!lill l4l 4l
RESTART MILESTO~NES l
July l August.l September l October November lDecemberj System Discovery Complete g
0 #C iuie, Review Of Operating Experience Q (Compdete) l Power Ascension Program Developed l
0 #C==P ese; l
Personnel Fqr Augmented Startup Organintion Selected O
tC==rie'e)
I Special Testing - Secondary Systems Commenced O
(C==rtesel Startup StalTTisined l
Q (C==psete) y Operatingfrocedures Resised V oe re.rm<,
7 Functional 'esting Scheduled (Cer:rletet On-Shift Stapup Organiution Implemented vttn %)
l Startup eence Commenced CAL ltems Complete I
0 I
All S} stems Rc*urned To Sersice 0
I Plant Ready For IIcatup i
0 l
Operator Training & Annual Esams Complete l
l Plant Readv For Reactor Startup h
I Plant Ready For Power Ascension O
10/31/97 riantipsre-er 36 i
t Crystal R'ver Un't #3
~
%J
%+,>.h*
Startup P ateaus 4
l FPC CR-3
[
Power Ascension j
j
- ro.or l
HOLD 90% Power me l
l Reactor Startup Noto son power l
l c.
i 940de 2 i
n,-io c.%
Plant Heatup o.oo,m..
,,umse w l
HOLD Rx Surtup & Mode 2 l
RCt g garms TerrtpfPress
,,,.m-m3 Reactor uous e Startup Plant Preparations 3,,,2 ace. c-
=
i HOLD - Res HeeDJP L Node 3 l
Hestyp i
r.aremnrws temmenes
{
ECCS Response TestavJ Compteted j
f aca rmain=s w Prep rations i
Condename & Foeowner Comesp I
Lyaw Vacuum uOto veevur,,
I q
30 Days
?
l (Contingency Shutdown We Add 14 Days) 10/31/97 37 i
i
)
I
ww--mm_-w.
w u o.- m m #m-m m a e n w a -sc-ww--wmw,m amm.-j-mma aumm%sg,g_4,w.,,s4sgum em a.m,w w.w se m m.pse--
--s ms w-
..a,m--wama.ms
.w.myw.wma p, 1
l 8
p k
d e
1 1
1 i
G i
- =8
@E ee B
Q
._,h p.
i.
- j.. )s e
(
g ep y,
.A%
mm t
40 D-a e
e g
p
!D k
u l
.---.-,-__.-w.
l i
Condition of CR-3 E1 m
l
~
at Startup l
f t
FPC Performance Indicators Goal at Startup Current Status Achiese Target j
l CR-3
- i. ORGANIZATIONAL READINESS I
f 9
A. Restart Issue Closure 0
114 December f
B. MCAP 11 Restart item Closure 0
5 Nosember I
O. Self-identified Precursors 60 % or Greater December D. Self-identified Violations 33 % or Greater 35.7%
Achiesed II. SYSTEM READINESS l
A. Correctise Maintenance 200 Open Work 188 Achiesed
=
Requests or Less l
B. Temporary Modifications 5 or Less Installed 6
Nosember
~
C. Requests for Engineering 204 '-r Less Open 338 Nmember Assistance D. Restart Modifications 0
61 December E. Systems Remaining to be 0
0 Achiesed l
i, Accepted by Operations lit. OPERAT!ONS READINESS l
A. Control Board Deficiencies 10 or Less 0
Achiesed B. Operator Work Arounds 7 or Less 12 Nmember C. Operating Procedures 25 Comments or Less 11 Achiesed D. Emergency Operating Incorporate issues 56 No sember
[
Procedures frr,m 8 C.A.L Design issues
-0 Approval Steps E. Abnormal Procedures 15 Comments or Less 79 Nmember 10/31/97 39 i
~~
Cond't'on of CR-3 m
b" 57 at Startup i'
4
.v~.
4 FPC CR-3 performance indicators o
.. Startu.
Current Status Achieve Tarinet IV. REGULATORY READINESS A. License Amendments 0
6 Noseenber and Tech Spec Sulunitials I
B. Other NRC Restart Submittals 0
9 Noseenber C. Total 1997 Commitments 0
134 l
D. Submittal Quality Index of 5 or Greater 6.4 Ongoing i
-)
V.
COMMUNICATIONS P.F.ADINr_as t
l l
~
A. Employee Suneys Improve Results improsing Results Achieved B. Community Leaders Meet Prior to Startup Complete Achiesed l
C. State & Federal Officials / Staff Meet Prior to Startup Complete Achiesed D. Opportunity to Tour Plant Elected Officiais and Staff Consplete Achieved Imited to Tour I
E. Open Communication Editorial Boards, Inteniews, and Complete Achiesed j
with Media Mho Plant Tours Conducted for Those Cover CH-3 Routinely l
l 10/31/97 l
40
'l m.-
-e e
,w in Orgam.zational Readm. ess w$.7
- w Restart Issue Closure gWe.
4
{
I FPC 200 -
CR-3 i
180 -
i o
g 160 -
~\\
-j S
140 -
\\
2
\\
120 >
ce
\\
g 100 -
N
" Additi ""
80 -
\\
+0
(
Closed
\\
5 60 -
Goal = 0 l
E 40 -
- *o" 3
--*-- Actual
\\
l Z
20 -
,[
[
\\
~~
=
Action Plan 0
N
+
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 1
i 10/31/97 41
Organizational Readiness m$P MCAP II Restart Item Closure D
r-4 l
FPC i
Goal = 0 CR-3 25 -
%.workoff
~ Actual m
E 20 -
-e-Action Plan E
c i 15 -
o y
5 "n
0 10 -
N N
i 5-N i
0 e
+
m Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec t
1997 10/31/97 42 1
Organizatioraal Readiness
-)-g ;w Self-dentified Precursors j
c.
FPC i
CR-3 Actud { Rolling Average) l
_ 100 -
~
8 90 _
-*-Goal = 60% or Greater
-*- Actual (Monthly) 70 -
{
6 0,.
___m j
g j
g 50 -
g 40 -[
i i
30 -
l 20 -
1 j
10 -
t O
l l
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec l
1997 10/31/97 43
Organizational Readiness n-Wgjgp Self-Identified Violations i
g-p FPC CR-3 CNational (Average) 100,
Goal = 33% or Greater 2
90 -
S Q 80 -
- Actual (Average)
~,
s.
3 !
70 -
Q 5 60 -
5 s 50 -
Z o oE
~
mA
,o 3 30 3 L-f
- 7
~
p g S 20 -
10 -
O, l,-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 10/31/97 44
..m..
..m.
i i
l l
l System Readiness Corrective Maintenance i
i i
FPC CR-3 i
1000 -
i 900 -
tn
^ l 8
800 -
l 700 -
a:
\\
i 600 -
y g
0 500 -
3 mincoming
\\
l 400 -
t Completed f
~
Goal = 200 or Less
\\
g 300 -
j 200 -
h
-o workoff c
5 100 -
~ Actual 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 10/31/97 i
45 t
I
1 i
System Readmess I
E'-
~
Temporary Modifications FPC CR-3 Goal = 5 or Less Prior to Heat Up j
10 -
--o workoff 9-
~ - ^ * * " * '
D t
8 N
7
~
~
~
i
- o. c E.9 6 -
l G ~
H 05-t a
oE
\\=
m u 4-g i
i G O t
.o 3 3-N E
s 2-l z
i l
1-l l
0 i
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 10/31/97 46 i
L
l f
System Readiness E~
Requests for Engineering Assistance (REAs)
FPC CR-3 i
800 -
700 -
l y 600 -
g E500
~
N 400 -
N M2 2.As Received N
m c-3REAs Closed E
5 200_
Goal = 200 N
3
- 'Workoff 100 -
- Actual m
Action Plan l
O i
i i
i i
i i
i i
i Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec i
1997 10/31/97 47 i
i I
l en' System Headiness l g)s Restart Modifications j
Lw FPC 1
CR-3 70 -
- c. Goal = 0 Prior to Heat Up 60 -
- Actual
=t 5 m 50 -
-e-Action Plan M C 40 -
O,o g g 30 -
compiete j
E O
Design 90 %
2 20 - "
in Field 50 %
Z Field Complete 02 %
4 Field Complete 0
m,.
,=
a
,m i
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec l
1997 10/31/97 48
l l
l i
""~~
Operations Readiness
^
l g;w Control Board Deficiencies C
i FPC CR-3 I
l w
25 -
-Goal = 10 or less at Start Up i
- Actual i
-m 20 -
O 2o l
i
- 3 C
l O.g*
15 -
l o$
l jQ 1 0,.
EM 3 0 t
i zm 5-
^
0 1
t i
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec t
1997 10/31/97 49 t
I i
}
Operations Readiness l
g-)7Lv Operator Work Arounds 4
l l
l FPC i
CR-3 i
Goal = 7 or Less Prior to Heat Up j
o
--o Workoff 35 -
-Actual j, 30 -
me i c 25 -
[
i Oo g g 20 -
m j,3 u
~ 'g 15 -
!S 10 -
\\
z
+
5-
~N N
i 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 10/31/97 50 l
c
Regulato87 Readiness l
l 38,i Submittal Quality C
FPC CR-3 8_
---Quality Index i
-*- Goal x
7_
e
'C3 i
5 S-l
.N
/
5 i
3
/
~
3 O
4-j y
3-E 2-
.o i
3
<n 3
0 l
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 10/31/97 51
R~
Regulatory Readmess gj$;w Total 1997 Commitments c
FPC CR-3 200 -
i p 180 -
^
e 160 -
N E
N
.g 140 -
g l
g 120 -
s I
i j 100 -
j ugumReceived g
80 -
actosed g
l Goal = 0
- 5 60 _
N
.c
--o Workoff E
40 -
-Actual N
5 20 -
Action Plan h
O 9
i i
i i
i i
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 l
10/31/97
)
52
Communications Readiness FPC 4
CR-3 l
Positive Community Meetings:
j
- Crystal River Held
- Inverness Held j
- Beverly Hills Held j
- Inglis/ Yankeetown Scheduled
- Crystal River Planned l
Local Civic Organization Briefings
- United Way, Kiwanis, Lions Club, Rotary Clubs i
l Improved Communication Effectiveness i
10/31/97 53
1 Communication Effectiveness Indicators
{
C3 A re a I m A rea II l
m A rea Ill m A rea IV C3 A re a V 100-
~
Area V 60-A re a IV 40-A re a III 20-
~
~
A rea II
)
0 j
t.
2.e ses AreaI l
2':::
l Area I - My direct supervisor keeps me informed.
j Area II - I understand critical restart issues.
Area III - I understand safety regulations and standards.
j Area IV - I know what is expected of me and how I fit into the " big picture" Area V - Support communications materials enhance my understanding of CR-3 issues.
l i
10/31/97 j
54 j
1
l
~ r Preparing for the Next j
m.
l S.Rf, Twenty ears y
l V_-
FPC l
CR-3 i
i l
First Long Term Plan Development l
Technical Issues Being Resolved i
Performance Indicators Show Improved Performance Organizations Understand Vision for 2000+
10/31/97 55
i i
"~' M Preparing for the Next i
! 38*5 Twenty Years e
i i
{
CR-3 i
i
- Increasing Margin
- Reducing Operamr Burden Resolving Long Term Issues
- Improving Reliability i
- Improving Performance
\\
10/31/97 56
\\)!Ii!
s t
n e
m e
ta t
S gn id u
l cn o
C 5
Fb C-7 9
3
/
1 7 O,
PR 35 FC
/
0 1
llll i
ll1 ll 1
1
!l
'!i
USQs Status / Resolution i
TOTAL POTENTIAL USQs 22 i
RESOLVED 13 1
SUBMITTED 5
1 1
l REMAINING 4
i i
w eavguso star es
}
USQs m
~~
Status / Resolution Issue Resolution Status Boron Precipitation Mitigation - Hot Leg injection Potential USQ - implementation of Hot Leg injection (not a Open - due 11/7 g
restart requirement)
Seismic Qualification of Waste Gas / Liquid / Solid Pipe Potential USQ - quahfication of piping to meet the seismic Open - due 11/7 requirements is being reviewed Control Complex - Leak Test Results Potential USO - test methodology and dose calculation Open - due 11/7 currently under review RB Cooler /SW System Overheating Potential USQ - addressing the SW system temperature limit Open - due 11/24 and ultimate heat sink Boron Precipitation - Incorporation of Gaps (LAR 223)
USQ - credit for hot leg nozzle gaps as a passive method Submitted - 10/31 together with active methods and decision matrix for boron precipitation prevention EDG Fan Upgrade - fans under capacity (LAR 216)
USO - requires NRC review and approval prior to startup Submitted - 8/26 Letdown Line Rupture - manual operator action in place of USQ - requires NRC review and approval pricr to startup Submitted - 9/9 l automatic (LAR 218)
EDG Protective Trips - insta:lation of ove voltage trips could USQ - requires NRC review and approval prior to startup Submitted - 9/12 result in trip of EDG (LAR 219)
AHF-1C - this modification makes control logic changes to Not a USO for instartation, however, use of it will be due to Submitted - 10/4 FJ1ow use of AHF-1C by providing interlocks with its MCC-reliability of circuitry being modified and use of operator 3AB transfer switch (LAR 217) actions. Modification will be made but not tumed over until LAR approved.
EOP operator actions Not a USO - no new USQs were identified Resolved M OAvf 4J50 ptrv 03g
c-USQs Y EN_-.
=m-
~g Status / Resolution
%~nd V'.)
Issue Resolution Status HPI Cavitating Venturi Flow Test Not a USQ - FPC dete:Wned that attemate approach would be Resolved developed for insta!!at on in Refueling Outage 11 R Main Steam Line Break Not a USQ - reanalysis with original assumptions performed Resolved RWP Cyclone Separator Fouling - strainers instatied upstream Not a USO - new strainer tested and no clogging resulted Resolved might have clogged resulting in a loss of RWPs HPl Pump Recire. Line - MAR 96-11-02-01, proposes to instal!
Not a USO - actions idenbfied for operator action were Resolved an attemate manual recirculation line from HPI discharge header concluded to be equivaient to existing actions and the RB (operator action)
MUV-31 (Pressurizer Level Control Valve) control logic response Not a USQ - design change is like for like reciacement Resolved during transient conditions - replacement of some parts HPI Nozzle Cycles - planned change in methodology reflected in Not a USQ - change not implemented; submitted with FSAR R23 Resolved FSAR increated allowable thermal cycles from 11 to 80 letter, will correct FSAR back to 11 from 60 and maintain approved methodology AHFL - 1/2 testing not in compliance with FSAR Not a USO - FPC wdl comply with testing requirements Resolved MUV MAR 97-02-17-01 HPI autoclosure, add automatic Not a USQ - action is an aid to the operator, no credit for actions Resolved closure upon receipt of 1500* RCS low pressure signal in DBA analysis; this is reflected in SBLOCA submittal Remote shutdown panel fuses as originally intended to be Not a USO - revised design Resolved installed would not extinguish MCR lights on failure CT protectors addition could reduce availability of bus Not a USO - overall bus availability determined no discemible Resolved impact ADV capacity does riot meet FSAR values (301,000 lb/hr vs.
Not a USO - ADVs had overcapacity and can perform function Resolved 419,700 lb!hr) with existing intemals; action is to clarify FSAR information and resolve ambiguity regarding ADV actual capacity HPl isolation Criteria Not a USQ Resolved
NRC RESTART LICENSING SUBMITTALS 1030 97 l
4 1 sinc Submittal Date Restart License Amendments I.
Small llreak LOCA Analysis - TSCRN 210 Complete 6/14/97 a.
TSCRN 210 (SBLOCA)- Supplement I (Fuel Storage, Appendix D)
Complete 9/25/97(N)(R) 2.
Decay lleat - Flow Instrument Removal L4R 220 Complete 6/26/97 Supplemental Response (re: Boron Precipitation 9/12/97 fetter)
Complete 10/31/97 (NXR) a.
3.
Appendix R Thermo Lag Resolution Schedule (Letter to Address Complete 7/26/97 (N)
Appendix R n.
(111.0 Reactor Coolant Pump Oil Cooling) Potential Exemption 11/7/97 (N)(R)
Withdrawal / Revision - When "A" Pump is in Compliance b.
Exemption Request fbr Lube Oil Remote Fill Line Complete 9/5/97 (N) 5.
Low Temp Over Pressurization (LTOPs)- Code Case N 514 Exemption Complete 4/7/97 6.
LTOPs TSCRN 213 a.
15 Efrective Full Power Years (EFPY) License Amendment Complete 7/18/97 b.
30 EFPY License Amendment (not needed until cycle 12)
Resolved (N) c.
Supplemental Infbrmation Complete 9/12/97 (N) d.
RAI Complete 9/5/97 (N) e.
Revision 1 (including response to RAI dated 10/7/97)
Complete 10/25/9?(NXR) 7.
Letdown Rupture Line (USQ)- L4R 2/8 Complete 9/9/97 (R) 8.
Integrated Leak Rate Test, Appendix J Option B - 7NCRN J/2 Con.p[ete 2/1/97 9.
Integrated Leak Rate Test Appendix J. Option B, Rev. I Complete 5/1/97 4
- 10. Appendix J. Option B - Additional Information Complete 8/l1/97 (N)
- 11. System Readiness Review (Potential License Amendment)
Resolved
- 12. License Condition Amendment (if needed)
Resolved Items 13 32. Potential USQ Submittals
- 13. Emergency Diesel Generator Protective Trips During Engineered Safety Complete 9/12/97 (R)
Actuation and Loss of Offsite Power - L4R 219
- 14. IIPI Analysis (Without Cavitating Venturis)
Resolved 6/14/97
- 15. IIP! Pump Recire Resolved Page1
-e>,ss---a.->w,,#
,.ymyw..-
m-.,,p.,
ygs-9qv4
,g-,y-
-,--g g
e p-
-+--,.g imm-7 7
m -c-s-
---a-e
-ew-we,.e,,e
--ee-m---
mm.
e
--9
-it,-we-y
--i.---,t--,<,.-.
u
\\
\\
hng Submittal Date
- 16. liigh Pressure injection Nozzle Cycles (Contained in the FSAR R.23 Resolved 7/3/97 Letter, and not a USQ)
- 17. Air llandling Filter l/2 Testing Requirements Resolved l
- 18. hiakeup Supply Valve (h1UV 27)- Add Automatic Closure upon Receipt Complete 6/14/97 of #1500 Signal
- 19. liDG Fan Upgrade - L4R 2/6 Complete 8/26/97 (N)
- 20. Atmospheric Dump Valve (ADV) Design Capacity Resolved' (N)
- 22. Remote Shutdown Panel Added Components Resolved" (N)
- 23. RW Cyclone Separator I ouling Resolved
- 24. h1UV-31 Control Logic Resolved
- 25. CT Protectors Resolved'(N)
- 26. htSL11 Resolved (N)
- 27. IIPI Cavitating Venturis Special Test Resolved' (N)
- 28. AliF-1C Fan Auto Transfer - L4R 2/7 Complete 10/4/97 (N) 29 lloron Precipitation Mitigation - 110t Leg injection a.
Incorporation of Gaps as Passive Method - L4R 223 Complete 10/31/97 (N)(R) b.
Ilot Leg injection - L4R 225 110/97 (N)(R)
- 30. CCllE Leakage / Dose Methodology 11/7/97 (R)
- 32. WDTs Piping Seismic Qualification TIlD (N)
' fi. Once Through Steam Generator (OTSG) License Amendment 211, R1 Complete 3/27/97 a.
OTSG, License Amendment 211, Resubmit Sholly Notice Complete 5/1/97 (N) b.
OTSG Response to Additional Infom1ation Request from NRC Complete 8/19/97 (N) c.
Revision 1 to License Amendment 211 Complete 8/20/97 (N)
- 34. OTSG License Amendment -IGA Growth Tube Plugging Information Complete 10/1/97 (N)
(Submit Prior to Restart)- L4R 22/
' information lener to NRC 90 (C)
- Information lener to NRC 8'19 (C)
' informanon lener to NRC 9/17 (C)
Page 2
i lung bubmittal Date
Complete 7/29/97
)
- 37. CCilE Surveillance TS (Submit Prior to Restart). MR 222 11/24/97 6
h
- 38. EDO Surveillance Testing - Exigent License Amendment TSCRN 215 Completc 8/4/97 (N) i a.
TSCRN 215. Revision 1 Complete 8/16/97 (N)
- 39. 500 kV ilackfeed Tech Spec Change (not needed before restart)
Resolved (N)
Licensing Restart Submittals (Non-License Amendments) 1.
13oron Precipitation Letter Compicte 9/12/97 2
Appendix R lssues a.
Independent Assessment Summary Complete 7/3/97 b.
Appendix R - Revise Response to Address 72 hr. Cold Shutdown Complete 8/29/97 (N) t (NRC RAI 7/7/97) c.
Appendix R - Thermo Lag Ampacity (NRC RAI)
Complete 7/3/97 (N) d.
Appendix R - NRC Information Notice 9218 (!!ot Shorts)
Complete 9/l8/97 (N)(R) e.
Appendix R - Submit Description of hsues Related to Restan Issue Complete 9/25/97 (N)
D ll to Support NRC Plans for Close-out (NRC RAI 7/7/97)
~
3.
System ReMiness Review - Summary Report l1/5/97 l
2 4.
Generic Letter 96 Summary Report Complete 9/5/97 5.
FSAR Revision 23 - USQ Review Complete 7/3/97 i
6.
Generic Letter 96 Summary Report Complete 10!!7/97 (R) 7.
Tendon Surveillance Report (if needed) 11/1/97 (R) 8.
hiaintenance Rule Structural 13aseline - Walkdown Summary Report Resolved (R)
(combine w/ ltem 3) 9.-
Integrated Safety Assessment of Current Outage hiodifications -
1I/29/97 (R)
- Summary Report
- 10. FSAR Rev. 24 Upgrade 12/4/97
- 11. Restan Request Letter 12/1/97
- 12. RCS Attached Piping - Respond to NRC 4/7/97 Letter Complete 10/30/97 (NXR) a.-
Program Plan for Fatigue Analysis
- 13. Loss of DC Power, Failure h1 odes and Effects Analysis - Summary Complete 9/24/97 (R)
Report I-Page 3
.n-W w-m-,v e me.
- ~ + -
,--~e-
-w n, v-
-w a-
,w-&-,,m
-mm
-.,w,,v~.,m, 9-~,n,a.,--
,,--g
-~s-w o w y,n e---g,
-p---w+
Issue Submittal Datt
- 14. FSAR Rev. 24/25 Upgrade Program Description Complete 7/17/97 (N)
- 15. 50.54(0 Letter to Address Discrepancies (if needed)
Resolved (N)
- 16. Review of implementation of Liceme Conditions Complete 5/20/97 a.
Supplement to Address Additional Condition - Closed (IR 97-08)
Resolved (N)
- 17. Submittals to Support SBLOCA TSCRN 210:
a.
Letter to Confirm Calculations (EDG Loading,13 lock Valve Complete 9/25/97(N)(R)"
Cycling)
I b.
Letter to Confirm EOPs do not Result in a USQ Complete 9/25/97(N)(R)"
c.
Submit Draft EOPs 3 and 8, AP 770 Complete 8/4/97 (N)
- RAI for EOPs 3,8 and AP 770 Complete 9/17/97 (N) d.
Submit Proprietary and Non-proprietary Version of LilLOCA Complete 9/2/97 (N)
Analysis of Record C mplete 9/25/97(N)(R)"
e.
EDO Testing Plan
- 18. 1.icensing liasis for Dynamic Loads Initial Response (Pipe Whip) to NRC 4/10/97 Letter Complete 6/5/97 (N) a.
b.
Supplemental Response (re: Jet Impingement)
Complete 9/29/97 (N) c.
NRC RAI re: Jet Impingement (10/9/97) 11/10/97 (N)(R)
- 19. Low Pressure injection - hiission Time Complete 5/15/97
- 20. Appendix R - Atmospheric Dump Valve 30 Day Response Complete 4/30/97
- 21. System Readiness Review Plan Complete 3/27/97
- 22. EUP/AP Operator Action Commitment Date Change Complete 3/25/97
- 23. GL 96-06 Letter regarding Service Water Fittings Complete 4/30/97
- 24. ash 1E Section XI - Code Case Relief Request Complete 3/24/97
- 25. h1 CAP ll, Rev. 2 Complete 4/25/97
- 26. ITS Bases Submittal Complete 4/18/97
- 27. Letter on Pressure Locking re: EFV-12,-32,-33 (Supports SER for GL 95-Complete (N) 8/l1/97 07)
Complete (N) 8/1/97 29 Temporary Waiver of Compliance for CCllE hiodifications (FSAR Resolved (N)
Requirement)
- 30. Submit FPC Plan for llPI Nozzle Oconee issue Complete 10/30/97 (N)(R)
- 31. IWE/lWL Supplemental Response Requested by the NRC Complete 10/30/97 (N)(R)
Page 4
r litus Submittal Date
- 32. PILR Revision Complete 10/11/97 (N)
Complete 10/29/97 (N yl'.)
- 34. Letdown Line Rupture. RAI 11/5/97 (NXR) 35, NRC RAI EDO Trips not flypassed IsfR 2/9 11/5/97 (N)
(N) New (R) Revised
" Consolidated with TSCRN 210 Supplement Complete 9/25/97 0