ML20199G972

From kanterella
Jump to navigation Jump to search
Partially Withheld Ltr Re Recipient Concerns in Mechanical/ Electrical Area of Plant Const.Technical Review Team Evaluation of Concerns Complete.Recipient Requested to Contact J Zudans or Author for Feedback Interview
ML20199G972
Person / Time
Site: 05000000, Comanche Peak
Issue date: 01/15/1985
From: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To:
AFFILIATION NOT ASSIGNED
Shared Package
ML17198A302 List: ... further results
References
FOIA-85-299, FOIA-85-59, FOIA-86-A-18 NUDOCS 8607030036
Download: ML20199G972 (3)


Text

_ _ _ _ _ _ _ _ _ __

s 4&Et Gyg

,, y.

'o, UNITED STATES

... g %

NUCLEAR REGULATORY COMMISSION i.;g,* ' d.'.,5 v

WASHINGTON O.C.20555 rdy s.

a

,,, u y

~~

JA7f 15 1925 UO NUT DISCLOSE w

x

~.. 4 J'W.

'.ya CrXJ.kl2%'...!'%%q,j e}

m

- ThTs' is in regard to your concerns with respect to the construction of the Comanche Peak Steam Electric Station which were initially raised in the Mechanical / Electrical area.

The NRC Technical Review Team has completed evaluation of your concerns and is prepared to discuss their findings with i

you.

l l

It is important that our technical reviewers have e1 cpportunity to talk with you as soon as possible.

Please call me or Mr. John Zudans, collect at (301) 492-7903, so that we may arrange to provide you with a feedback l

. interview.

Your cooperation is greatly appreciated.

l Sincerely,

\\

$An, W l

Comanch, Peak reject cc:

J. Zudans DO NOT D SCLOSE t

8607030036 860623 PDR FOIA (i"(.

Q*. !'h.

GARDE 86-A-18 PDR j" j y lg [' ?).j ',.,,

r0 0

-=

C DU NOT DtSCLOSE

~

This is in regard to your concerns with respect to the construction of the Comanche Peak Steam Electric Station which were initially raised in the Mechanical / Electrical area.

The NRC Technical Review Team has completed evaluation of your concerns and is prepared to discuss their findings with you.

It is important that our technical reviewers have an opportunity to talk with you as soon as possible.

Please call me or Mr. John Zudans, collect at 1

l (301) 492 7903, so that we may arrange to provide you with a feedback interview.

Your cooperation is greatly appreciated.

Sincerely, l

V. S. Noonan, Director Comanche Peak Project cc:

J. Zudans DO NO-~ D SC_OSE l

FC

CP:IRT
0IR:TRT l...: ~ ave..'....:..____

5 k'

ME:vk.w.Yibf :VNoonn[

n w __. :...,

c_..:.

ATE :1//Y/85

1//5/85

/

OFFICIAL RECORD COPY i

l I

-- i

=~

ar.

L ' 3 - 2. ":

"' " " ~ " h

v Document Name:

Requestor's ID:

~

DEDIR02 Author's Name:

Zudans 1/10 pf Document Comments:

concerns CP

(

1 l

l

\\

i 1

-.._-,_