05000302/LER-1998-013, Forwards LER 98-013-00,discussing Personnel Errors That Resulted in Surveillance Procedures Not Verifying Certain Valves to Be in Correct Position Once Every 31 Days as Required by ITS SRs

From kanterella
(Redirected from ML20198E124)
Jump to navigation Jump to search
Forwards LER 98-013-00,discussing Personnel Errors That Resulted in Surveillance Procedures Not Verifying Certain Valves to Be in Correct Position Once Every 31 Days as Required by ITS SRs
ML20198E124
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/16/1998
From: Roderick D
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198E129 List:
References
3F1298-03, 3F1298-3, NUDOCS 9812230345
Download: ML20198E124 (1)


LER-2098-013, Forwards LER 98-013-00,discussing Personnel Errors That Resulted in Surveillance Procedures Not Verifying Certain Valves to Be in Correct Position Once Every 31 Days as Required by ITS SRs
Event date:
Report date:
3022098013R00 - NRC Website

text

. . . _ . . - . .- - -

l- .

. Flgrida l

Power CORPORATION 1 Dec N 3 l , Oper4ng Ucense No. DPR 72 l

. December 16,1998 l

I 3F1298-03 l

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Licensee Event Report (LER) 50-302/98-013-00 I

Dear Sir.

Please find enclosed Licensee Event Report (LER) 50-302/98-013-00. This LER discusses personnel errors that resulted in Surveillance Procedures (SPs) not verifying certain valves to be in their correct position once every 31 days as required by improved Technical Specification (ITS) Surveillance Requirements (SRs). This report is being submitted pursuant to 10CFR50.73(a)(2)(i)(B).

If you have any questions regarding this submittal. please contact Mr. Larry McDougal, Manager, Nuclear Regulatory Compliance, at (352).563-4988. l

'ncerely, D. L. Roderick Director Nuclear Engineering and Projects DLR/dwh Enclosure xc: Regional Administrator, Region 11 Senior Resident inspector g{

NRR Project Manager V

i i l

i 9812230345 981216 '

PDR

/f)

! ADOCK 05000302 S pog_

CRYSTAL river ENERGY COMPLEX: 15760 W. Power Line Street

  • Crystal River, Florida 34428-6708 * (352)795-6486 A Florida Progress Company