MONTHYEARML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20246D9051989-08-31031 August 1989 Staff Evaluation of Dispute Between Case & TU Electric on Acceptability of Jul 1982 RCS Cold Hydrostatic Test ML20238A7261987-09-0303 September 1987 Partially Withheld Rept of Interview W/W Clements Re Internal Investigation Into Allegation of Intimidation of QA Audit Group NUREG-1257, Review of Issues Raised by Oia Rept 86-10 Concerning Comanche Peak Steam Electric Station:Rept of Comanche Peak Rept Review Group1987-03-31031 March 1987 Review of Issues Raised by Oia Rept 86-10 Concerning Comanche Peak Steam Electric Station:Rept of Comanche Peak Rept Review Group ML20238A9231987-03-0606 March 1987 Rept Review Group Task 1 Review Group Rept ML20238A7821987-03-0303 March 1987 Rept by 766 Task Group to Comanche Peak Rept Review Group ML20238A8831987-02-27027 February 1987 Rev 1 to Comanche Peak Rept Review Group Task 2 Rept for 870120-0227 ML20238A7191987-02-26026 February 1987 Draft Rev 1 to Comanche Peak Rept Review Group Task Group 3 Rept of Safety Significance ML20238A6671987-02-18018 February 1987 Draft Rev 0 to Comanche Peak Rept Review Group - Task Group 3 Rept ML20238B4951987-02-17017 February 1987 Draft Rept by 766 Task Group to Comanche Peak Rept Review Group ML20238B3521987-02-13013 February 1987 Draft Comanche Peak Rept Review Group Task 1 Rept ML20238A6091987-02-11011 February 1987 Draft Rev 0 to Comanche Peak Rept Review Group Task 2 Rept for 870120-0210 ML20215C8221986-12-11011 December 1986 Partially Withheld Rept of Investigation Re Allegations of Misconduct by Region IV Mgt W/Respect to Plant ML20207A9801986-10-30030 October 1986 Evaluation Supporting Util 840925 Submittal Re Lesser Separation Between Class 1E & Certain non-Class 1E Circuits. Analysis Provided Justifies Lesser Separation Between Circuits ML20211M2371986-02-13013 February 1986 Morning Rept:On 860212,bomb Threat Received at Util.Nuclear Engineering Bldg Evacuated.Personnel Returned to Work Following Site Security Search.Corporate Security Investigating Matter IA-86-208, Morning Rept:On 860212,bomb Threat Received at Util.Nuclear Engineering Bldg Evacuated.Personnel Returned to Work Following Site Security Search.Corporate Security Investigating Matter1986-02-13013 February 1986 Morning Rept:On 860212,bomb Threat Received at Util.Nuclear Engineering Bldg Evacuated.Personnel Returned to Work Following Site Security Search.Corporate Security Investigating Matter ML20210K9741986-01-24024 January 1986 Status Briefing Re Comanche Peak Technical Review Team Program Plan,Fsar Review & Allegations to Enable Completion of All Sser Sections ML20134A7571985-10-31031 October 1985 Rept of Review & Evaluation of Allegations of Intimidation & Harassment of Employees at Comanche Peak Steam Electric Station,Units 1 & 2 ML20215F0901985-10-29029 October 1985 Rept of 851029 Reinterview W/J Marshall Re Involvement W/Mgt Analysis Co Rept ML20133C7271985-09-30030 September 1985 Rev 2 to Staff Evaluation of Comanche Peak Response Team Program Plan:Detailed Comments/Concerns ML20199E6571985-09-27027 September 1985 Population Items List, Fuel Pool Liner ML20199E3031985-09-26026 September 1985 Rev 1 to Population Description, Large Bore Pipe Welds/ Matl ML20199G7091985-09-25025 September 1985 Population Items List, Large Bore Pipe Welds/Matl. Related Info Encl ML20199E6401985-09-13013 September 1985 Population Items List, Small Bore Piping & Instrument Tubing/Piping Welds/Matl ML20199E6321985-09-0606 September 1985 Population Items List, Concrete Placement ML20199E6441985-09-0505 September 1985 Rev 0 to Population Items List, Mechanical Equipment Installation. Related Info Encl ML20199E6261985-08-21021 August 1985 Rev 0 to Population Items List, Piping Sys Bolted Joints/ Matl. Related Info Encl ML20199E5861985-08-17017 August 1985 Rev 2 to Population Description, Field Fabricated Tanks ML20199E6811985-08-14014 August 1985 Rev 0 to Population Items List, Small Bore Piping Configuration ML20199E5731985-08-14014 August 1985 Population Items List, Liners ML20136G4131985-08-0909 August 1985 Rev 2 to Staff Evaluation of Comanche Peak Response Team Program Plan ML20199E5601985-08-0909 August 1985 Rev 0 to Population Description, Mechanism Equipment Installation. Related Info Encl ML20199E2951985-08-0808 August 1985 Population Description, Liners ML20215F1711985-08-0505 August 1985 Rept of 850730 Interview W/R Tolson in Dallas,Tx Re Withholding of 1978 Mgt Analysis Co Rept ML20215F1051985-08-0505 August 1985 Rept of 850802 Interview W/R Spangler in Dallas,Tx Re Knowledge of Mgt Analysis Co Rept ML20199E5541985-08-0505 August 1985 Population Description, Concrete Placement ML20215F0991985-08-0505 August 1985 Rept of 850802 Interview W/D Anderson in Dallas,Tx Re Knowledge of 1978 Mgt Analysis Co Rept ML20215F0541985-08-0505 August 1985 Rept of 850802 Interview W/Ss Palmer in Dallas,Tx Re Knowledge of 1978 Mgt Analysis Co Rept ML20215F0051985-08-0505 August 1985 Rept of 850802 Interview W/Tw Rose in Dallas,Tx Re Involvement W/Mgt Analysis Co Rept ML20210D4591985-07-31031 July 1985 NRC Plan for Review & Audit of Applicants Program for Assuring Design & Const Adequacy of Comanche Peak Steam Electric Station ML20199E5291985-07-30030 July 1985 Rev 1 to Population Items List, Large Bore Pipe Supports - Rigid. Related Info Encl ML20199E6141985-07-29029 July 1985 Rev 0 to Population Items List, Field Fabricated Tanks. Related Info Encl ML20199E6511985-07-23023 July 1985 Rev 1 to Population Description, Large Bore Pipe Supports - Nonrigid. Related Info Encl ML20199E5381985-07-23023 July 1985 Rev 1 to Population Description, Large Bore Pipe Supports - Rigid ML20199E6691985-07-22022 July 1985 Population Description, Fuel Pool Liners. Related Info Encl ML20199E2321985-06-26026 June 1985 Rev 0 to Population Description, Small Bore Piping & Instrument Tubing/Piping Welds/Matl ML20199E2401985-06-26026 June 1985 Population Description, Piping Sys Bolted Joints/Matls ML20199E2681985-06-26026 June 1985 Rev 0 to Population Description, Large Bore Pipe-Welds/ Matl ML20199E2821985-06-26026 June 1985 Rev 0 to Population Description, Large Bore Piping Configuration ML20199E2491985-06-25025 June 1985 Rev 0 to Population Description, Small Bore Piping Configuration 1993-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
.
- 1. Allegation Category: QA/QC 2, Document Control 2, Allegation Number: AQ-105
- 3. Characterization: It is alleged that after the FSE-00159 cable tray hanger drawings were switched from the civil / structural engineering group to the document control center (DCC), the drawings were not accompanied by logs that showed outstanding design changes against the drawings.
- 4. Assessment of Safety Significance:
The NRC Technical Review Team (TRT) established the period during which shift of control of generic FSE-00159
-fabrication and detailed assembly drawings occurred and reviewed the method of control before, during, and after this period. The TRT also determined which cable tray hanger components were fabricated during the period of transfer and reviewed the quality records associated with these components.
The TRT made this review to determine if the documents within the control of the civil / structural engineering group before the transfer, and within the control of DCC after the transfer, were current and accurate and avail-able to the craft personnel for performing work.
The TRT established that transfer of the FSE-00159 drawings commenced on December 23, 1983, and was completed on January 3,1984. The TRT determined that the drafting supervisor, civil / structural engineering group, super-vised the packaging of original drawings and their delivery to the DCC.
f Approximately 7000 drawings for Unit I were microfilmed during a 2 week effort, and these drawings were not checked out until microfilming and filing were completed. Based on the contents of the transmittal, the computer-based "DCC Current Drawing List" index was updated to reflect the latest revision of the FSE-00159 drawings at the time of transfer. If it became necessary for the FSE-00159 drawings to be revised by drafting during the period of processing the master into the DCC program (due to receipt of an approved Gibbs & Hill sngineering drawing revision), the revision was held in abeyance until the master drawing was returned to drafting. The revision was then processed in accordance with procedure ECP-10, " Cable Tray and Hanger Installation."
The TRT found that after control of the FSE-00159 drawings changed from the civil / structural group to the DCC, the logs identifying documents af-fecting the drawings did not accompany them. Such documents were design changes, such as component modification cards (CMCS) and design change authorizations (DCAs). The reason for the lack of logs was that the l FSE-00159 drawings depicted generic or typical configurations of an elec-l trical tray hanger. Callouts for the location and type of hanger to be installed on a cable tray were identified on the cable tray support plan drawing (for example, G&H drawing No. 2323-EI-0713-01-5, Cable Tray Support i
Plan, el 792-feet, 0 inches and 790 feet, 6 inches, Awx. and Electrical Construction Buildings). When a typical hanger could not be erected in the field in accordance with the FSE-00159 drawing; its configuration was changed to meet that location's needs using a DCA or CMC. The design change was then posted against the applicable support plan location, not the FSE-00159. Therefore, no " accompanying logs" to the FSE-00159 were neces-sary. The TRT found this practice to be acceptable.
8605230103 PDR FOIA 060512 CARDE85-89 PDR 0-71
To verify that the FSE-00159 drawings were adequately controlled by DCC, the TRT sampled 200 drawings to ensure that the computer data base, the drawings held by DCC, and the master drawings held by the drafting super-visor all were at the same revision level. The TRT found that all drawings were at the same level of revision. The TRT also reviewed FSE-00160,
" Cable Tray Hanger Index," an uncontrolled, cross-reference index of the hanger number, the FSE-00159 drawing revision number, and other cross-referencing information of concern to the drafting supervisor. The TRT found 7 errors in the 200 hanger drawings sampled. These errors were minor in nature.
The TRT reviewed all Brown & Root material requisitions for Comanche Peak ..
Steam Electric Station (CPSES) for the period of December 23,1983, to January 10, 1984, to establish which cable tray hanger components were fabricated and whether the proper revision of FSE-00159 drawings was used for the erection, fabrication, and construction of the cable tray hanger components. The TRT determined that no components were fabricated during the period December 23, 1983, to January 3,1984.
The TRT reviewed the operation travelers retained as permanent records in the CPSES vacit. These travelers served as the fabrication / installation inspection checklists for the work accomplished using the above fabricated components. The TRT detected no errors in the controlled document packages issued to craft personnel.
- 5. Conclusion and Staff Positions: Based on the assessment of the allegation, and a sample of FSE-00159 drawings under DCC control, the allegation was substantiated. However, the " accompanying logs" for FSE-00159 drawings were not necessary. The design changes were to a particular hanger in a unique loc ~ation and were not against the generic FSE-00159 drawing. There-ore, logging design changes against the cable tray support plan drawing is the accepted method of incorporating design changes. Accordingly, this allegation has generic implications.
The concerns and issues of this allegation came from an unknown source; therefore, no exit interview was conducted.
(m
- 7. Attachments: None.
c Reference Documents:
- 1. Document Control Procedure DCP-3, "CPSES Document Control Program,"
Revision 18, and superseded revisions.
- 2. Texas Utilities Services, Inc. Instruction CP-EI-40-3, " Instruction for Control of Design Documents," Revision 0.
- 3. Texas Utilities Services, Inc. Instruction CP-EI-4.6-7, " Field Struc-tural Engineering Group Instruction for Processing CMCs," Revision 2 and superseded revisions.
- 4. Texas Utilities Services, Inc. Instruction CP-EI-4.0-4, " Field Struc-tural Engineering Group Design Control Instruction," Revision 3 and superseded revisions.
0-72 y
_ ~
, 5. Texas Utilities Generating Company Instruction No. QI-QP-11.10-2,
" Cable Tray Hanger Instruction," Revision 27 and superseded revisions.
- 6. Texas Utilities Generating Company Instruction No. QI-QP-11.10-5,
" Cable Tray Hanger Reinspection," Revisicn 10 and superseded revisions.
- 7. Brown & Root Inc., CPSES Procedure No. CP-CPM 6.3, " Preparation, Approval, and Control of Operation Travelers," Revision 11 and superseded revisions.
- 8. Brown & Root Inc., CPSES Procedure No. ECP-10, " Cable Tray and Hangers Installation," Revision 8 and superseded revisions.
- 9. Texas Utilities Generating Company report " Records and Records Retrieval," dated June 29, 1984.
- 10. A-5 Interview of April 3, 1984, pp. 79-91.
- 11. A-5 Interview of August 1, 1984, pp. 79-84.
- 8. This statement prepared by: _b~
a 6!d V. Wenczel O Date
.TRT Reviewer Reviewed by: 4aca.y 4 V3 H. Livermore Date Group Leader Approved by:
V. Noonan Date Project Director 6
0-73
a This page intentionally left blank 0-74