Partially Withheld Assessment of Allegation AQ-117 to Allegation Category Qa/Qc 5A, Repair,Rework & Maint Re Duplicate Paperwork on Flange Travelers Indicating Lack of Communication Between Depts
ML20198D432
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/07/1985
From: Livermore H, Watson V
NRC, NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To:
Shared Package
ML20198C597 List: ... further results
References
FOIA-85-59, FOIA-85-89 NUDOCS 8605230268
Download: ML20198D432 (2)


Text

__

1.

Allegation Category:

QA/QC 5A, Repair, Rework, and Maintenance 2.

Allegation Number:

AQ-117 3.

Characterization:

It is alleged that duplicate paperwork on flange travelers indicates a lack of communication between departments.

4.

Assessment of Safety Significance:

The NRC Technical Review Team (TRT) reviewed the flange travelers identified in the alleghtion and found that they did contain duplicate information, although it did not involve mate-rial of safety significance.

The duplication was verified by both vault paperwork and the Brown & Root (B&R) traveler coordinator.

The paperwork in the vault shows that flange travelers MP-83-2389-F-1000 and M-83-2389-I-1000 were voided, and flange travelers MP-83-2389-G-1000 and MP-83-2389-H-1000 contain essentially the same information; they differed only in the stated reason why the flange required rework.

The voided travelers were voided for valid but unrelated reasons, and the duplicate travelers identified in the allegation were issued the same day. All flange travelers are basically duplicates of each other in that they contain standardized steps to assemble and disassemble the flange; they differ only in the flange number and in the reason why the flange required rework.

This duplication occurred during a turnover period between B&R piping and Texas Utilities Electric Company (TUEC) start-up departments, because of the poor communication between these two groups.

Construction manage-ment, having recognized this duplication problem, now processes all flange travelers through a single control point, the paper flow group (PFG).

Other construction operation travelers for such items as valves, pumps, piping, and motors are also being coordinated by the PFG.

The PFG has added the needed assurance that duplicate work orders are not being pro-cessed. A TRT review of recent construction operation travelers could not detect any additional duplication since the PFG took control.

5.

Conclusion and Staff positions:

The TRT concludes that the duplicate travelers did indicate a lack of communication between B&R piping and TUEC start-up department.

However, a B&R traveler coordinator did detect the problem and was able to prevent duplicate work on flanges, indicating that they have an effective check and balance system.

In a meeting with the alleger on December 10, 1984, the TRT presented the results of t'he assessment of the allegation and the TRT's conclusion.

There were no major items of disagreement and no new concerns or allega-tions were identified.

(

5 7.

Attachments:

None.

Reference Documents:

1.

150 DP-Y-AB-003.

M h3diliiifiosid ~ ~ 7 PDR FOIA 0-139 GARDE 85--89. _.

PDR m

2.

Flange travelers:

MP-83-2389-F-1000, MP-83-2389-G.1000, MP-83-2389-H-1000, arid MP-83-2389-I-1000.

3.

A-1, Statement #2 and Interview with alleger A-1, p. 80.

4.

Meeting with A-1, December 10, 1984, p. 87.

8.

This statement prepared by:

//1%, (Al,G),Af c /g/pf C Watson, TRT Ddte' '

Technical Reviewer Reviewed by:

Ettaci A_

[o-7~TCf

' Herbert Livermore, Date Group Leader Approved by:

Vincent Noonan, Date Project Director 0-140