Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20055E2841990-05-30030 May 1990 Final Response to FOIA Request.App C Record Encl & Available in PDR ML20246D8951989-08-18018 August 1989 Forwards Safety Evaluation Re Dispute Between Case & Util on Acceptability of Jul 1982 RCS Cold Hydrostatic Test ML20247Q4001989-07-27027 July 1989 Advises That Recipient 890713 Motion to Reopen Record Withdrawn,Per 890725 Request.W/Certificate of Svc.Served on 890729 ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245D0521989-06-16016 June 1989 Informs of Understanding of Dispute Between Case & Texas Utilities Electric Co,Including Issues Involved in Dispute & Update on NRR Plans for Resolution.Summary of Understanding of Dispute Encl ML20244B1211989-06-0909 June 1989 Partial Response to FOIA Request for Documents.Forwards App E & F Documents.App E Documents Also Available in Pdr.App F Documents Partially Withheld (Ref FOIA Exemptions 5,6 & 7). App G Totally Withheld (Ref FOIA Eexemption 7) ML20245J9461989-04-25025 April 1989 Partial Response to FOIA Request for Records.App B & C Records Available in Pdr.App D Documents Provided to Requestor But Not Publically Available Since Related to Oia Investigation Re Allegations by Client ML20247G6141989-03-28028 March 1989 Advises of Plans to Resolve Case Dispute W/Util Re RCS Cold Hydrostatic Test for Plant Conducted & Recorded in 1982,per Case 890313 & 17 Ltrs.Public Meeting Will Be Held in Arlington,Tx to Assure That NRC Understands All Info ML20235G1771989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) IA-88-524, Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6)1989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) ML20206H0921988-11-17017 November 1988 Partial Response to FOIA Request for Documents.Forwards App F Documents.App F Documents Also Available in PDR ML20206H5971988-11-14014 November 1988 Responds to Appeal of Partial Denial of FOIA Request for App F Documents.Request Approved in Part & Denied in Part. Portions of Documents 1,3,5,23,25 & Attachments to Document 20 Withheld (Ref FOIA Exemption 5) ML20206H4941988-11-10010 November 1988 Final Response to FOIA Request for Documents.Forwards Documents Listed in App a ML20206E7741988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App B.Documents Being Placed in Pdr.App a Documents Also Available in Pdr.Documents Listed in App C Totally Withheld (Ref FOIA Exemption 5) ML20195G1951988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents & Records Available in Pdr.App D Documents Also Available in PDR ML20206C1801988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl IA-88-152, Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl1988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl ML20205E9561988-10-0505 October 1988 Final Response to FOIA Request for Documents.Forwards App B Documents.Apps a & B Documents Also Available in PDR ML20151W5631988-08-16016 August 1988 Forwards Memo to Jg Partlow Re Mutually Agreed Upon Interpretation of Certain Provisions of Joint Stipulation in Proceeding.W/O Encl.Related Correspondence ML20196H0571988-06-23023 June 1988 Forwards Draft Pages from Ofc of Inspector & Auditor Rept 86-10, Allegations of Misconduct by Region IV Mgt Re Comanche Peak Steam Electric Station, Per Attached List.W/O Encls.Related Correspondence ML20195E8821988-06-15015 June 1988 Third Partial Response to FOIA Request for Documents.App C, E,F & G Documents Encl & Available in Pdr.App D Documents Available in Pdr.Portions of Records Subj to Request Withheld (Ref FOIA Exemptions 4,5,6 & 7) ML20155C3731988-05-25025 May 1988 Advises of Projected Schedule for Issuance of NRC Ssers Re Collective Significance & Evaluation Repts,Per . Next Rept on Cable Trays Should Be Issued on 880624 & Sser Re Environ Activities Anticipated on 880630 ML20155C3071988-05-24024 May 1988 Advises That NRC Counsel Will Not Be Executing Nondisclosure Statement,Per NRC Manual Chapter Governing Treatement of Protected Info by NRC Employees,Per Recipient ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20148J7801988-03-25025 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-27 & 50-446/87-20.App B Documents Encl.App a Documents Available in PDR ML20150C7341988-03-15015 March 1988 Final Response to FOIA Request for Documents.App I Documents Encl & Available in Pdr.App J Records Totally Withheld (Ref FOIA Exemption 5) ML20150C1241988-03-14014 March 1988 Final Response to FOIA Request for Documents.Forwards App F Documents.Apps E & F Documents Available in PDR ML20147E4681988-03-0202 March 1988 Partial Response to FOIA Request.App C Documents Encl & Available in Pdr.App D Documents Re Insp Repts 50-445/85-07 & 50-446/85-05,Ofc of Inspector & Auditor Rept 86-10 & ASME Code Hydrostatic Test Encl & Available in PDR ML20147D7651988-03-0101 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-23 & 50-446/87-17.Forwards App B Document.App a & B Documents Available in PDR ML20196B2161988-02-0505 February 1988 Responds to Appeal of Denial of FOIA Request for Documents Listed on App C,Per Dh Grimsley .Encl Documents Listed on App Also in Pdr.Documents Partially Withheld (Ref FOIA Exemptions 5 & 7) ML20147B3821988-01-13013 January 1988 Final Response to FOIA Request.App H Documents Re Correction to Ofc of Inspector & Auditor Rept Encl & Being Made Available in PDR ML20147C0281988-01-12012 January 1988 Final Response to FOIA Request for Documents Re Safeteam Program.Forwards App I & J Documents.App H & I Documents Available in Pdr.Other Records Available in Pdr.App J Documents Partially Withheld (Ref FOIA Exemption 6) IA-87-634, Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr Dtd 8712101988-01-11011 January 1988 Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr Dtd 871210 ML20147A8261988-01-11011 January 1988 Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr ML20237A5081987-12-10010 December 1987 Partial Response to FOIA Request.Forwards App G Documents. Documents Also Available in PDR ML20236X5841987-12-0808 December 1987 Final Response to 871106 Appeal of Dh Grimsley 871027 Denial of Documents for FOIA Request Re Keppler to Counsil on Facility.Listed Document Partially Released & Encl.Stated Documents Withheld (Ref FOIA Exemption 5) ML20236V6351987-12-0202 December 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Stello 871021 Memo Establishing Comanche Peak Rept Review Group & Notes of Stello Meeting W/Involved Individuals.Info Withheld (Ref FOIA Exemption 6) ML20236V7221987-12-0202 December 1987 Provides Details of How NRC Will Make Documents Available to Parties Once Sser Issued Re Project Status Rept.Procedure Should Obviate Necessity for Any Party to File for FOIA Request or Production of Documents.Related Correspondence ML20236S4271987-11-19019 November 1987 Further Response to Appeals of FOIA Request for Records Re Evaluation of issue-specific Action Plan Re Plant.Documents I.2.b & I.10 Addressed in Responses to FOIA 86-A-203 & 86-A-204 & Contained in Other Documents Available in PDR ML20236Q5511987-11-17017 November 1987 Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR IA-87-684, Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR1987-11-17017 November 1987 Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR DD-87-17, Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 8711171987-11-17017 November 1987 Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 871117 ML20236P2581987-11-13013 November 1987 Advises of Tentatively Scheduled 871209 Public Meeting in Dallas,Tx to Discuss NRC Review of Corrective Actions Described in Util 870625,0820,28,0908 & 23 Ltrs.Comments Requested by 871201 for Inclusion in Agenda ML20236L7401987-11-0909 November 1987 Partial Response to FOIA Request for Documents Re Implementation of Piping Generic Technical Issue Resolution.Forwards Documents Listed in App A.App a Documents Available in PDR ML20236K0871987-11-0404 November 1987 Response to Appeal of Denial of FOIA Request for Documents Re Insp Rept 50-455/87-07 & 50-446/87-06.Documents Listed in Encl App Will Continue to Be Withheld (Ref FOIA Exemption 5) ML20245D0621987-11-0303 November 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Ofc of Investigations Investigation 4-84-050.Forwards Portions of Transmittal Memo Listed on App.Remaining Documents Continue to Be Withheld (Ref FOIA Exemptions 5) ML20236G6301987-10-30030 October 1987 Final Response to FOIA Request for Documents,Including V Stello 870414 Memo Re Comanche Peak Rept Review Group.Encl App B Documents Also in Pdr.App B & C Documents Partially & Completely Withheld (Ref FOIA Exemption 5) ML20236J9541987-10-29029 October 1987 Final Response to FOIA Request.App a Documents Re Mgt of Allegations Already Available in Pdr.App B Document Encl & Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) ML20245C4291987-10-29029 October 1987 Partial Response to FOIA Request Re Plant.App a Records Available in Pdr.App B Records Encl & in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5).App D Documents Partially Withheld (Ref FOIA Eexemption 6) ML20236D8821987-10-27027 October 1987 Partial Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Documents Encl & Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) 1990-05-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
Text
.
p*,*" %g ~~
- e. .s NUCLEARRg LTR COMMISSION W^suunarou, l' .
12 W Docket Nos. 50-445/50-446 Ms. Billie Pirner Garde Director, Environmental Whistleblower Clinic ;
Government Accountability Project IN RESPONSE REFER l 1555 Connecticut Avenue, NW, Suite 202 TO FOIA-85-59 I Washington, D.C. 20036
Dear Ms. Garde:
This is in further response to your letter dated January 21, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), ,
records related to the NRC Comanche Peak Task Force established in l March, 1984.
By letter dated April 17, 1986, we informed you that Appendix F records numbered I through 37 were being placed in the NRC Public Document Room (PDR) for public inspection and copying. This letter is to inform you that we are now placing in the PDR the Appendix F records numbered 38 1 i
through 212, which consist of box 5 in the QA/QC category. '
Portions of the records numbered 134, 135, and 137 are being withheld from public disclosure pursuant to Exemption (5) of the F0IA (5 U.S.C.
552(b)(5)) and 10 CFR 9.5(a)(5) of the Commission's regulations. The withheld portions contain the advice, opinions, and recommendations of the staff concerning potential violations. The nonexempt portions of the Appendix F records numbered 38 through 212 are being placed in PDR file F01A-85-59 under your name.
The Appendix F records numbered 135, 138, 139, 140, 141, and 142 contain l l deletions without invocation of an F0IA exemption in accordance with the I agreement reached between you and the NRC staff at a meeting held on May 8,1985, concerning your pending FOIA requests pertaining to the
, Comanche Peak Technical Review Team activities. This agreement was summarized in a letter to you from Joseph M. Felton, dated May 15, 1985.
The information that has been deleted consists of names and other identifying information concerning allegers, interviewees, and other l individuals.
8605230007 PDR FOIA 860512 CARDE05-59 PDR
l Ms. Garde _
Pursuant'to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld is exempt from production or
, disclosure and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the~
undersigned and Mr. Harold R. Denton, Director, Office of Nuclear Reactor Regulation.
i This denial may be appealed to the Executive Director for Operations '
within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Executive Director for Operations, U.S.
Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."
A separate set of the released records is being made available for public inspection and copying at the Local Public Document Room (LPDR) located at the University of Texas Library, 701 South Cooper Street, Arlington, Texas. Additional boxes of records in the QA/QC category are currently under review and will be placed in the PDR and LPDR in the coming weeks.
Sincerely,
/M) &
Donnie H. Grimsley, Director Division of Rules and Records p Office of Administration i
f' i
Enclosure:
As stated
_ ~ ;_
'RE: FOIA-85-59 APPENDIX F Box 5 - QA/QC DATE PAGES i
r, 38. 1-28-82 Brown & Root Drawing #RC-1-052-015-C41K Revision 4 3
- 39. 12-20-83 Brown & Root Drawing #BRHL-CS-1-RB-038A Revision 2 1
- 40. 5-10-84 Historical File 44 41, 5-18-84 Attachment 1 - Documentation Check List 52 9, Package Mark No. RC-1-052-015-C14K Rev. 4
- 42. No Date Texas Utilities Generating Co. Memo to Hanger Package FROM: A. Vega
SUBJECT:
Hanger No. RC-1-052-015-C41K 21
- 43. No Date Hanger No. # RC-1-052-015-C41K 24
- 44. 1-19-82 Brown & Root Drawing #RC-1-052-020-C41K 1 Reyision 7
- 45. 7-5-83 Brown & Root Inc. Quality Assurance Department Non Conformance Report (NRC) CPSES-35-1195 NRC No. # M8178 19
- 46. 12-5-83 Attachment 1-Documentation ' Checklist Package Mark No. RC-1-052-020-C41K Revision 7 38
- 47. No Date Brown & Root Drawing # BRHL-CS-1-RB-038A 1
- 48. No Date Texas Utilities Generating Co. Memo To: Hanger Package From: A. Vega
Subject:
Hanger No. RC-1-052-020-C41K 1
- 49. No Date Hanger No. RC-1-052-020-C41K 20 File No. 17.1.55.13
- 50. '8-22-80 Brown & Root No. SI-090-006-C41K 1 Revision 5
- 51. 4-7-81 NPS Industries, Inc. TUGC0 P0#CP-0046A.1 ASME Documentation Checklist 61 52, 9-22-81 Brown & Root Dwg. #SI-1-090-006-C41K Revision 5 1
- 53. 1-16-84 Attachment 1 - Documentation Checklist Package Mark No. SI-1-090-006-C41K 44 Revision 5
- 54. 6-11-84 Partial-QI-QAP-11.1-28 Revision 25 2
- 55. 10-6-84 Support / Hanger Inspection Data Sheet 2 2
- 56. No Date NPS Industries Inc.
Dwg. #60-11393 1
- 57. 8-19-82 Manufacturer's Transmittal Form for Component Supports File Loc. 17.1.55.13 7
- 58. 6-28-83 Brown & Root Dwg #BRHL-WP-1-RB-005A Revision 2 11-3-83 Attachment 1 -
Documentation Checklist Package Mark No. RC-1-035-700-C41R Revision 1 16 l
- 59. 6-11-84 Partial - QI-QAP-11.1-28 2
- 60. .10-8-84 Brown & Root Dwg #RC-1-035-700-C41R Rev. 1 1
- 61. No Date Drawing - No Title 1
?
- 62. 8-18-83 Brown & Root Dwg #BRHL-CT-1-SB-008 Revision 2 1
- 63. 9-7-83 Brown & Root Dwg #BRHL-CT-1-SB-007 Revision 3 1
- 64. 9-7-83 Brown & Root Dwg #BRHL-CT-1-5B-006 Revision 5 1
- 65. 10-2-84 Inspection Summary 3
- 66. No Date Inspection Summary 4
- 67. No Date Safeguards 81dg - BRHL 1 3
- 68. 7-16-81 Brown & Root Dwg #CT-1-013-013-532K-Rev. 2 13
- 69. 9-1-82 Texas Utilities Services - Memo T0: Bill Cromeans, Q. C.
FROM: Renee Gustafson
SUBJECT:
Comanche Peak Steam Electric Station Hanger Mark Number Change 18
- 70. 3-18-83 Brown & Root Inc. CPSES Job-35-1195 No. #QI, QAP-11.1-26 3 i 714 10-13-83 Attachment 1 - Documentation Checklist Package Mark No. CT-1-SB-008 SP0OL I'TT-4 5
- 72. 10-13-83 Attachment 1-Documentation Checklist Package Mark No. CT-1-013-013-532K 14
- 73. 5-15-84 Support / Hanger Data Sheet 2 e 74. 10-2-84 Hanger No. CT-1-013-013-S32K File No. 17.1.48.13 19
- 75. 11-14-80 Brown & Root Dwg# T/04802 21
- 76. 11-14-80 Brown & Root Dwg#.CT-1-013-014-S32R Revision 4 2
- 77. 11-14-80 Bro'vn & Root Dwg# CT-1-013-014-532R Revision 4 2
- 78. 4-12-83 Partial Job 35-1195 2 QI-QAP-11.1-28 4
- 79. 10-5-83 Attachment 1 - Documentation Checklist Package Mark No. CT-1-013-014-S32R4 16
- 80. 9-20-84 Support / Hanger Inspection Data Sheet 1
- 81. 9-24-84 WASP #P-84-0088-CT Work Package Index 4
- 82. No Date Hanger No. CT-1-013-014-S32R 26 File No. 17.1.48.13
- 83. 10-14-81 Brown & Root - Dwg#CT-1-013-010-S22K Revision 3 2
- 84. 10-14-81 Brown & Root Dwg# CT-1-013-010-S22K Revision 0 36
~
- 85. 6-11-84 Partial Brown & Root, Inc. CPSES Job 1 35-1195
- 86. 7-20-84 Brown & Root, Inc. Quality Assurance Dept.
Nonconformance Report (NCR)
CPSES-35-1195 3
- 87. 7-20-84 Documentation Package Index 26
- 88. 8-30-84 Support / Hanger Inspection Data Sheet 1
- 89. 10-2-84 Hanger No. CT-1-013-010-S22K File No. 17.1.48.13 39 I
- 90. No Date Drawing - No Title 1
- 91. 10-9-81 Brown & Root Dwg. #CT-1-013-004-5325 Revision 6 1 5
4 I. -
I -
! 92. 10-24-83 Attachment.1 - Documentation Checklist Package Mark No. CT-1-013-004-S3256 41
- 93. 10-24-83 Attachment 1-Documentation Checklist Package Mark No. BRP#CT-SB-08-IS0-SP00L#4 4 l
- 94. 9-15 84 Support / Hanger Inspection Data Sheet 1 i
! 95. 2-6-85 ASME Code Data (Class 2) 1 i
i
- 96. 3-18-81 Atlas Testing Laboratories, Inc.
Pacific Scientific Co.
, Order No. 52495/ Stamp No #N1936 36 l
L
- 97. 7-27-81 Brown & Root Dwg #CT-1-013-012-S32K
. Revision #5 1
- 98. 3-21-83 Addendum A-Report No. IT-523 Final Inspection Checklist 3 PSCO 1801103-07 46
- 99. 5-26-83 NPS Industries, Inc.
, TUG 0 P0 #CP-0046A-1 ASME Documentation Checklist 16 100, 8-15-83 Brown & Root Quality Assurance Department Nonconformance Report (NCR) CPSES-35-1195 18 101. 9-0-83 Attachment 1 - Documentation Checklist Package Mark No. CT-1-013-012-S532K 5 13 102. 6-11-84 Partial Brown & Root CPSES Jcb 35-1195-QI
-QAP-11.1.28 3 6
l l
l '6 l
l c____________-____-_
103. 8-30-84 Support / Hanger Inspection Data Sheet 1 104. 10-3-84 Support / Hanger Inspect' ion Data Sheet ,
1 105. 10-3-84 Hanger No. CT-1-013-012-S32K 25 106. 11-20-80 Brown & Root Dwg#CT-1-005-004-S22K Revision 3 2 107. 12-4-81 i Inspection Item Removal Notice #113188 3 108. 7-9-83 Brown & Root Quality Assurance Department Nonconformance Report (NCR) CPSES-35-1195 NCR No, M-7821 26 109. .8-26-83 Attachment 1 - Documentation Checklist Package Mark No. CT-1-005-004-S22K 3 19 110. 9-7-83 Brown & Root Dwg# BRHL-CT-1-5-B-006 Revision 5 1 111. 6-11-84 Partial - QI-QAP-11.1-28 1 112. 9-15-84 Support / Hanger Inspection Data Sheet 1 113. 9-17-84 Hanger No. CT-1-005-004-S22K 10 114. 9-17-84 Hanger No. CT-1-005-004-S22K 30 115. 07/22/81 Brown & Root Dwg #CT-1-013-011-S22R 1 116. 11-10-81 CPSES Bolt Location & Embedment Measurements 10 117. 8-5-83 Attachment 1 - Documentation Checklist 10 l
7
118. 7-20-84 Attachment 5 - Table 3 1 119. 10-3-84 Support / Hanger Inspection Data Sheet 2 120. No Date Hanger No. # CT-1-103-011-S22R 26 121. 10-30-81 Brown & Root Dwg No. CT-1-006-003-S22K 1 122. 12-22-81 Material Identification Log CT-1-006-003-S22K 3 i
123. 7-26-82 Attachment 10- Documentation Checklist
- Package Mark No. CT-1-006-003-S22K Original 30 124. 1-11-83 Modification per IRN H 009885 1 125. .5-16-83 Partial Brown & Root CPSES Job 35-1195 QI-QAP-11.1-28 1 126. 7-29-83 Attachment 1 - Documentation Checklist 4 Package Mark No. CT-1-006-003-522K4 10 127. 9-7-83 Brown & Root Dwg. #BRHL-CT-1-SB-007 Revision 3 1 128. 1-10-84 Comanche Peak Steam Electrical Station Inspection Report #RI-01251 1 129. 7-27-84 Brown & Root Dwg #BRP-CT-1-SB-007 1 130. 9-14-84 Support / Hanger Inspection Data Sheet 1 131. 9-18-84 Hanger No. CT-1-006-003-S22K 11 8
132. 9-18-84 Hanger No. CT-1-006-003-S22K 27 133. No'Date Production Release #77774 'l 134. 5-31-85 Comanche Peak SSER 11 APP 0-2 352 135. No Date File 1 - USNRC Memo: To Vince Noonan FROM:
H. Livermore,
Subject:
Request for Publication of SSER #11 SSER Attached 473 136. May 85 File 2 - Safety Evaluation Report Related to the Operation of Comanche Peak Electric 1 Station, Units 1 & 2 NUREG-0797 Supplement
- 11 345 137. 10-9-84 SSER Rev. 2 AQH-1. AQW-13, CP2 4 138, 3-14-84 SSER-AQ-44,AQ-128 Revision 4 7
) 139. 3-15-85 SSER - Revision 3-QA-88 Category Sc 2 140. 19-85 SSER - Revision 5 _ AQ-129-AQH-16/CP4 4 141. 3-19-85 SSER - Rev. 2AQ-55 & AQ-78 13 142. '6-1-85 SSER 11-APP-0-2 SVP 114 143. 10-3-84 SSER AQ-99 Rev. 4 3 144. 10-4-84 SSER Rev. 1 AQ-72 AQ-103 CP8 6 145, 10-5-84 SSER AQ-9 Rev. 3 CPS 2 l
g 146. '10-5-84 SSER AQ-111/CP4 4 9
147. 10-5-84 SSER AQ-10,5/ CPS-Rev. 2 4 148.- 10-8-84 SSER Rev. 2 AQ-127/CP6 5 149. 10-8-84 SSER Rev. 2 -AQ-4/CP2A 3 150. 10-9-84 SSER - Rev. 3 CP2 QA/QC Category 3 151. 10-9-84 SSER - Rev. 3 AQ-15 and AQ-89/CP5 4
' 1
- 152.- 10-10-84 SSER - Rev. 2 .QA-CP8 8 153, 10-11-84 SSER Rev. 4 AQ-54/AQ-65 10 l
154. 10-11-84 Allegation AQ-16/CP3 Revision 3 5 l
155. 10-11-84 SSER - Draf t 3 - AQ-17-AQ-107, AQE-9 8 156. 10-24-84 SSER - Rev. 3. AQ-43, AQ-47, AQ-51/CP5 4 P
157. 10-24-84 SSER Draft 4 - AQ-19 CP5 5 158, 10-24-84 SSER Rev. 2 AQ-25 CP4 3 159. 10-25-84 SSER Rev. 1 - AQ-41 CP6 4 160. 11-16-84 SSER Rev. 1 - AQ-112/CP4 4 161. 11-16-84 SSER Rev. 2 3 162. 1/85 SSER-Rev. 2-AQ-110 3 l
l 10
c 163. 1-8-85 NRC Letter to M. D. Spence
. FROM: Darrell G. Eisenhut l
Subject:
Comanche Peak Review Attachment 3 29 164. 1-8-85 NRC Letter to M. D. Spence l FROM: Darrell G. Eisenhut )
Subject:
Comanche Peak Review Attachment 3 27
, l 165. 2-12-85 SSER - Rev. 3 AQ-53/CP4 3 166. 2-21-85 SSER - Rev. 3 AQ-90/CP6 4 167. 2-22-85 SSER - Rev. 3 - AQ-21, 22, 119 CPS 6 168. .2-28-85 SSER - Rev. 3 AQ-40/CP1 3
. . 1 169. 2-28-85 SSER - Rev. 4 CP3 QA/QC Category 53 2 l
) 170. 2-28-85 SSER - Rev. 1 AQ-38 4 171. 2-28-85 SSER - Rev. 4 AQ-73/ CPS 3 1
! 172. 2-28-85 SSER Draft 4 - AQ-130 3 173. 2-28-85 SSER - Rev. 3 - AQ-5-CP2A 3 1
174. 2-28-85 SSER Rev. 4 AQ-131 CP5 2 l
175. 3/85 SSER Rev. 3 - AQ-52, AW-37 9 l 176 3-12-85 SSER - Rev. 2 AQ-70/ CPS 3 1
177. 3-12-85 SSER - Rev. 2 - AQE-41 3 I
I 11
.. - _-- - . ., _ _ . , , - _ _ - , . - . - - . , . . - . . ~ , - _ , . _ - , , , . _ - , . . - -
l 178. 3-13-85 SSER - Rev. 3. AQ-46/CP2A 5 179. . ~3-13-85 SSER - Rev. 2 - AQ-61/CP4 2 ,
- 180. 3-13-85 SSER - Rev. 3 - AQ-12, 13, 14/CP4 5 I
181. 3-13-85 SSER - Rev. 3 - AQ-133/CP1 6 f
182. 3-13-85 SSER - Rev. 4. - AQ-98 CP4 2 i
183. 3-14-85 SSER - Rev. 2 - AQ-135 - CP8 13 s
184 3-14-85 SSER - Rev. 5 AQ-68-AQ-82/CP4 6 185. 3-15-85 SSER - Rev. 2 QA/QC Category SD 22 186. 3-15-85 SSER - Rev. 3 AQ-6-AQ-126 CP2 5 187. 3-18-85 SSER - Draft 6 - AQ-113-CP8 3 188. 3-19-15 SSER Rev. 5 -AQ-91 CP2 4 189. 3-19-85 SSER - Rev. 2 AQ-7 & AQ-83 CP4 2 190. 3-19-85 SSER - Rev. 3 AQ-45 CPI 4 191. 3-19-85 SSER - Rev. 4 AQ-75, AQ-76, CPS 3 a 192. 3-19-85 SSER - Rev. 2 AQ-49, 74, 125 CP6 6 s
193. 3-19-85 SSER Draft 3 AQ-137 3 .
194. 3/20/85 SSER - AQ-50 Rev. 2 29 b
12
.~
195. 3-21-85 SSER - Rev. 3 AQ-102/CP4 6 196. 3/23/85
. SSER - AQ-132/CP4-Rev. 1 5 197. 3-25-85 SSER - Rev.-2 AQ-6, 69, 122 3 198. 3-25-85 SSER - Rev. 3 -AQ-121/CP4 9 199. 5-21-85 SSER 11 APP P Duplicate 60 200. 5-29-85 CPSSER 11 TC Duplicate 52 201. 5-31-85 Comanche 11 APP 0 Cat 8 SUP 37 202. 5-31-85 Comanche 11 APP 0 A2 Cat 7 Sup 33 203. .5-31-85 SSER AQ-5 Suppressed 35 204, 5-31-85 AQ-68 & AQ-82 SUPP 39
) 205. 6-1-85 CP SSER 11 TC 13 206. No Date SSER - QA/QC-2, Document Control 5 207. No Date SSER - QA/QC Category 7, QA Scope 3 208. No Date SSER - Rev. 3, AQ-23 etc. 9 209. No Date SSER-AQ-77, 79, 138 CP9-Rev. 1/CP2 17 l 210. No Date QA/QC SSER Conclusions 6 211. No Date Generic Impact Levels 2 l
212. No Date No Title - Handwritten Notes 1 13
Docunont Name:
COM PEAK SSER 11 APP 0-2
[
Requestor's ID:
LAVERNE Author's Name:
Poslusny/Livermore Document Comments:
5/31/85 (Attachment 2) KEEP THIS SHEET WITH POCUMENT fo.g.S't 0- 3 5 %va 0-)s-/
O as 9
f1A-85-5g t
YI Y$4 imme )
\ ', *
\.
GO)(ERNMENT ACCOUNTADILITY PROJECT
, 1335 Connecticut Avenue. N.W.. Suite 202 Washington. D.C. 20036 ,
(202)232-8550 G:85 :104 January'21, 1985
/
FREEDOM OF INFORMATION ACT REQUEST fiiEdUuM OF INFORMAll0N ACT. REQUESI Ofrector Fora-d-47 kd4, h/~M-g Office of Administration Nuclear Regulatory Commission Washington, D.C. 20555 To Whom It May Concern:
Pursuant to the Freedom of Information Act ("FOI A"), 5 U.S.C. 5 552, the Government Accountability Project (" GAP") requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview re-ports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, computer runoffs, any other data compilations, interim and/or final reports, status reg ports, and any and all other records relevant to and/or generated in connection
. with the overview, ragulation and investigation of the Comanche Peak Nuclear Plant by any person, branch, or department of the NRC since January 18, 1985.
This request includes all agency records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual Appendix 0211 Parts 1. A.2 and A.3 (approved October 8,1980) whether they currently exist in the NRC official, " working," investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, supra, and covered by this equest have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implementtheaction(s).
GAP requests that fees be waived, because " finding the information can be con-sidered as primarily benefitting the general public," 5 U.S.C. 5 552(a)(4)(a).
GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents of government accountability. Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens ,
Clinic is currently assisting several citizens groups, local governments and -
intervenors in the central Texas area concerning the construction of the Comanche Peak nuclear power plant. .
51ALSVAW AfP
m
birector '
Office of Administration ,
Page Two We are requesting the above information as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed 'jusitfication of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S.
977 (1774).
3 We look forward to your response to this request within ten days,
' Sincerely,
'LW Billie Pirner Garde Citizens Clinic Director e
P I
l i