1.
Allegation Cateoory:
QA/QC 5A, Repair, Rework, and Maintenance 2.
Alleoation Number: AQ-61 3.
Characterization:
It is alleged that supervisors told welders to weld-up a " gouged" hole rather than wait for the authorization that follows the engineering disposition of a discrepant condition.
4.
Assessment of Safety Significance:
The allegation concerning a " gouged" hole is addressed in Mechanical and Piping Category 1, allegations AW-38 and AQW-24.
In this assessment, the NRC Technical Review Team (TRT) examined the programmatic controls use to address weld repairs of this type.
The TRT found that specific written procedures define the criteria which determine when defects require major, minor, or inprocess welding repairs.
These procedures also included tables defining the required inspections for each type of weld fabrication.
The TRT found that welders were trained in the contents of the construction and welding procedures and that this training was updated as each procedure was revised. The TRT also found that weld technicians supervise the welding and serve as the first, unofficial, weld inspectors. Quality control personnel then inspected the welds and accepted them or identified defects requiring major or minor repairs.
Repair process sheets, which define the operational steps for making the repairs, were then generated for each weld repair.
5.
Conclusion and Staff Positions:
Based on a review of the applicable re-quirements governing weld repairs and on interviews with welders, the TRT concludes that this allegation is not substantiated.
The allegation that supervisors told welders to perform unauthorized repair is not addressed in this assessment and will be an open item to be followed up by the NRC staff.
In a meeting with the alleger on March 5, 1985, the Mechanical and Piping Group presented the results and conclusions of the assessments of AQ-61, AW-38, and AQW-24.
7.
Attachments: None.
Reference Documents:
1.
CP-CPM-6.9D, Rev. 6, " Welding and Related Processes," paragraph 3.19.
2.
CP-CPM-6.9G, Rev. 6, " Documentation for ASME Welding and Installation Activities," paragraph 3.3.3.
3.
Brown & Root weld procedure specifications 88023, 88025, and 11032.
5230282 860512 FOIA
~
L9ARDE85-99.-_. P DR. _.
0-147
.s
4.
AQ-61: 'A-4 Testirrony, March 7, 1984, pages 10-18.
5.
A-4 meeting March 5, 1985, pp.94-102 and 171.
8.
This statement prepared by:
hp h fij. (1)M
(,//,/8S V. Watson, TRT Dat'e '
Technical Reviewer Reviewed by:
owca b 7- $ 5 Herbert Livermore, Date Group Leader Approved by:
Vincent Noonan, Date Project Director l
l l
l l
l 0-148
(