ML20198D445
Text
.
I 1.
Allegation Category:
QA/QC 5A, Repair, Rework, and Maintenance 2.
Allegation Number: AQ-131 3.
Characterization:
It is alleged that electrical boxes were shipped to Comanche Peak Steam Electric Station (CPSES) in a damaged condition or were damaged and then repaired by unauthorized personnel.
4.
Assessment of Safety Significance:
The NRC Technical Review Team (TRT) reviewed the testimony of the allecer and the invoices associated with this allegation.
The electrical equipment was sold by RLS Industries, Inc. to Tyson Building Co. This company was fulfilling the conditions of Subcontract CP-0712, which was issued for construction of four nonsafety-related buildings at CPSES (an administration building annex, two combustible-material storage buildings, and the operations support center).
The TRT learned that the electrical boxes in question were located in the floor of the administration building annex.
Tyson Building Co. was under contract to build the administration annex and, therefore, was responsible for completing this work.
The repair work involved filling in the floor around the boxes and replacing the floor tile. The TRT determined by observation that the electrical boxes, which distribute 120-volt power to the telephone lines throughout the center of the building, have never been damaged.
5.
Conclusion and Staff Positions:
Based on the evidence reviewed, the TRT concludes that this allegation cannot be substantiated. The electrical boxes were not damaged, as alleged, and only the floor around the boxes and the tile covering the boxes were repaired.
In addition, this electri-cal equipment is nonsafety-related and is installed in a nonsafety-related area.
The TRT was unable to contact this alleger to discuss its findings and conclusions.
(
(
7.
Attachments:
None.
Reference Documents:
1.
NRC' allegation review case number 4-84-A-49, April 3, 1984.
2.
Texas Utilities Service Inc., Subcontract #CP-0712.
"s50523055 B60512~~
7
~
-PDR -FOIA.
I
_9ARDE85-99_..
. P DR...,
.. _)
0-143
8.
This statement prepared by:
f/Acww Y. h, 6/6/f5 V. Watson, TRT Date' Technical Reviewer Reviewed by:
1A24M t H. Livermore, Date Group Leader Approved by:
Vincent Noonan, Date Project Director 0-144