Notifies That Phase II of Sep,Including Evaluation of 11 Older Operating Facilities,Discussed W/Commission on 771109. Commission Approved Recommended Program & Implementation of SEP Started.Rept Re Objectives & Schedule Encl.W/O Encl
ML20196G089
Person / Time
Issue date: 11/30/1977
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
NRC
Shared Package
ML20196F442 List:
References
FOIA-87-854 NUDOCS 8803040353
Download: ML20196G089 (1)


Text

>o W.K v.g

]

NOV 3 01977 1

NOTE TO: Those on Attached List D. Eisenhut, Assistant Director for Operational FROM:

Technology, 00R

SUBJECT:

SYSTEMATIC EVALUATION PROGRN4 Phase 11 of the Systenatic Evaluation Program, SEP, which includes evaluation of eleven of the older operating facilities was discussed with the Coanission on November 9,1977..The Comission approved l

Implementation of the SEP has been the recomended progran.

The licensees of the eleven plants were briefed on the started.

program at a r'eeting on November 17, 1977.

Enclosed for your information is a copy of our report to the ACRS which describes the purpose, objectives, review concept and schedule for perfoming the evaluations.

r -

.. :.. a u v a.:: utr i.

D. Eisenhut, Assistant Director for Operational Technology Division of Operating Reactors Enelne....

O i

I.

l f MO229 C

a

'054 PDft L------

g

(

~~--

WC 31 10 '

f 3, DOR Dennis L. Ziemann, Chief, Operating Reactors Dranch HEMORANDUM POR:

J. Carl Stepp, Chief, Geosciences Branch, DSE l

FROM:

CE0 SCIENCES BRANCH INVOLVEMENT IN T SUMECI:

EVALUATION PROGRAM (SEP) f the role to be This memorandum is written to state my understanding o eview responsibilities i

played by the Ceosciences Branch in the 'SEP, to ass gn r i

with my Branch.

vithin ny Branch and to establish points of coordinat on h are Dr. Leon Personnel assigned to the SEP from the Geosciences Branc Dr. Reiter is Ruiter, Seismologist and Mr. A. T. Cardone, Ceologist.He is to be designated lead reviewer. contact with DOR in routine review matters and the LLL consultants in dan oping site speciMr. Cardone will be responsi 1

i various sites under review.

developing the geology of the sites as needed to evaluate in establishing

{

position as Section Leader for Coology and Seismologythan the norm response spectra.

i h

the review methodology and resolving matters ot er review issues.

to be We understand that site specific design response spectra are d without specific developed for each site consistent with site geology anAs a first requiree>

constraint by current criteria.which is seceptable to DOR m defining site specific response spectra.

deriving the site spectra without delay, since a realistic schedule forcannot be eed upon.

Dr. Reiter and I have allocated one man year of ef fort to the SEP j

Original Signed by J. C. Ste pp J. Carl Stepp, Chief Geosciences Branch Division of Site Saf ety and j

Environmental Analysis t

-hh m

y-c

-W i

Dennis L. Ziemann

-2 ole 21 1077 L