Notifies That Phase II of Sep,Including Evaluation of 11 Older Operating Facilities,Discussed W/Commission on 771109. Commission Approved Recommended Program & Implementation of SEP Started.Rept Re Objectives & Schedule Encl.W/O Encl
ML20196G089
Person / Time
Issue date: 11/30/1977
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
NRC
Shared Package
ML20196F442 List:
References
FOIA-87-854 NUDOCS 8803040353
Download: ML20196G089 (1)


Text

>o W.K v.g

]

NOV 3 01977 1

NOTE TO: Those on Attached List FROM:

D. Eisenhut, Assistant Director for Operational Technology, 00R

SUBJECT:

SYSTEMATIC EVALUATION PROGRN4 Phase 11 of the Systenatic Evaluation Program, SEP, which includes evaluation of eleven of the older operating facilities was discussed with the Coanission on November 9,1977. .The Comission approved l the recomended progran. Implementation of the SEP has been started. The licensees of the eleven plants were briefed on the program at a r'eeting on November 17, 1977.

Enclosed for your information is a copy of our report to the ACRS which describes the purpose, objectives, review concept and schedule for perfoming the evaluations.

r - . . :. . a u v
i. a.:: utr D. Eisenhut, Assistant Director for Operational Technology .

Division of Operating Reactors Enelne.. ..

O i

I.

l C a f MO229

' '054 PDft L------__--.

g

~~-- (

WC 31 10 '

f 3, DOR Dennis L. Ziemann, Chief, Operating Reactors Dranch HEMORANDUM POR:

J. Carl Stepp, Chief, Geosciences Branch, DSE l FROM:

SUMECI:

CE0 SCIENCES BRANCH INVOLVEMENT IN T EVALUATION PROGRAM (SEP) f the role to be This memorandum is written to state my understanding eview responsibilities l with myoBranch.

i played by the Ceosciences Branch in the 'SEP, i to ass gn r vithin ny Branch and to establish points of coordinat on h are Dr. Leon  ;

Personnel assigned to the SEP from the Geosciences Dr. Reiter Branc is ,

Ruiter, Seismologist and Mr. A. T. Cardone, Ceologist.He is to be

' designated lead reviewer. 1 contact with DOR in routine review matters and the LLL consultants in dan oping site speciMr. Cardone i will be responsil various sites under review. ,>

$ developing the geology of the sites asin needed establishingto evaluate {

i response spectra.

position as Section Leader for Coologyh and Seismologythan >

the norm the review methodology and resolving matters ot er review issues. to be  !

We understand that site specific design response d without spectraspecific are developed for each site consistent with site geology anAs a first requiree>

defining site constraint by current criteria.which is seceptable to DOR m deriving the site spectra specific response spectra. eed upon.

without delay, since a realistic schedule forcannot be Dr. Reiter and j

I have allocated one man year of ef fort to the SEP Original Signed by J. C. Ste pp J. Carl Stepp, Chief Geosciences Branch Division of Site Saf ety and j Environmental Analysis t