Environ Assessment & Finding of No Significant Impact Re Util 831116 Request for Exemptions from Certain Requirements of 10CFR50,App R Relative to Fire Protection Program
ML20155F873
Person / Time
Site: Pilgrim
Issue date: 09/16/1987
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151H280 List:
References
FOIA-88-198 NUDOCS 8810130407
Download: ML20155F873 (4)


Text

,

i 7590-01 UNITED STATES NUCLEAR REGULATORY CO* fS$10N BOSTON E01 SON COMPANY DOCKET N0. 50-293 ENVIRONMENTAL ASSESSMENT AND FINDING OF N0 SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Comission (the Comission) is considering issuance of exemptions from certain requirements of 10 CFR Part 50. Appendix R, to the Boston Edison Company (BECo/licensec) for the Ptigrim Nuclear Power Station located at the licensee's site in Plymouth Cvunty, Massachusetts.

ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action The proposed action would grant exemotions from certain requirements of Appendix R of 10 CFR Part 50. Specifically, exemptions were requested from Section Ill.G.2.a to the extent that it requires:

Separation of redundant trains of residual heat removal (RHR), auto-a.

matic depressurization system (A05), core spray and energency diesel generator fuel oil transfer pump cables located in Fire Zones 1.1., 1.6/1.8, and 1.30A, respectively, by 3. hour fire rated barriers, b.

Strvetural steel in the torvs compartment fonning a part of or supporting the fire barrier between redundant trains of safe shutdown components in Fire Zone 1.30A and Fire Zones 1.9 and 1.10 to be protected to provide fire resistance equivalent to that required of the barrier.

Stevetural steel in the steam tunnel forming a part of or supporting c.

the fire barrier bet.een Fire Zone 1.32 and Fire Zones 1.11 and 1.12 to be protected to provide fire resistance equivalent to that required of the barrier.

Need for the Proposed Action To meet the requirements of Subsection ll!.G.2 of Appendix R, one train of cables and equipment necessary to achieve and maintain safe shutdoom shall te raintainee free of fire da age.

Be10130407 000907 PDR FOIA JOHNSON 80-198 PDR

U90-01 2

Subsection Ill.G.3 of Appendix P requires that for areas where alternative or dedicated shutdown capability is provided, fire detection and a fixed fire suppression system shall also be installed in the area, room, or zone under consideratio.i.

The proposed action is needed to allow the licensee to complete less costly i

rodifications including rerouting of power cables out of the fire zones of concern, and to employ existing fire protection features.

This will provide-the level of fire safety which is equivalent to that achieved by compliance with the technical requirements of Section !!!.G of Appendix R.

Environmental Imacts of the Proposed Action The proposed exemptions would I,rovide an equivalent level of fire safety i

such that there is no increate in the risk of not achieving safe shutdcwn at the Pilgrim Station. Consequently, the probability af achieving safe shutdewn has not been decreased and the post-accident radiological releases would not i

be greater than previously detemined nor do the proposed exemptions otherwise af fect radiological plant effluents. The proposed exerptions do not affect i

plant nonradiological effluents and will have no other environevntal impact.

Therefore, the Cosmission concludes that there are no signifit, ant radiological or nonradiological environmental impacts associated with the proposed exemtions.

Alternatives to the Proposed Action l

since the Commission has concluded there is no measurable environmental impact associated w'.th the proposed exemptions, other alternatives need not be evaluated. The principal alternative to the exemptions would be to require i

rigid compliance with the Section !!!.G.2 requirements.

Such action would not l

enhance the protection of the environment and would result in unjustified costs for the licensee.

l i

..__.__m

7590 01 3

Alternative Use of Resources This action does not involve the use of resources not considered previously in the Final Environnental Statement related to the operation of Pilgrim Nuclear Power Station.

Agene.*s and Persons Consulted The NRC staff reviewed the licensee's requests and did not consult other agencies or persons.

1 FINDING OF NO SIGN!FICANT lhPACT The Comission has determined not to prepare an environmental imaet statement for the proposed exemptions. Based upon the foregoing environmental assessrent, the NRC staff concludes that the proposed action will not have a significant effect on the quality of the human environment.

i For further details with respect to this proposed action, see the l

licensee's letters dated Nr eder 16, 1983 Supplemented on Deceder 27, 1984, l

July 28, and Neveder 14, 1986, and April 21 and August 4,1987 These letters are )ve'lable for public inspection at '.he Comission's Public Document Roor,1717 H Street, NW, Washington, D.C. and at the Plymouth Public Library,11 North Street, Plynouth County, Massachusetts, l

Dated at Bethesda, Maryland this )(,

day of

/9f7

)

FOR THr NUCLEAR RE ULATORY C(eN15510N i

V es Acting Director Project Directorate 1-3 Division of Reactor Regulations I/I!

i l

i a

e l

i I

7590 01 3

Alternative Use of Resources This action does not involve the use of resources not considered j

previou!)y in the Final Environmental Statement related to the operation of i

Pilgrim Nuclear Power Station.

Agencies and Persens Consulted h

The NRC staf f reviewed the licensee's reuuests and did not con 591t other agencies or persons.

FINDING OF W SIGNIFICANT !MPACT i

j The Comission has determined not to precare an environmental inpact l

{

statenent for the proposed exemptics.

Based upon the forecoing environrental assessrent, the NRC staff concludes that the troposed action will not have a i

significant ef fect oa the Gality of the human environment.

i l

i For further details with respect to this proposed 4ction, see the 1

licensee's letters dated Noverter 16, 1983 supplemented on Decerter 27, 1984, l

i

)

July 28, and November 14, 1986, and April 21 and August 4, 1987 These l

1etters are available for public inso+ction at the Comission's '1blic l

i l

Document Room,1717 H $treet, W. ?:shington. 0.C. and at the P1) mouth Public l

Library,11 North Street, Pl>wouth County assachusetts, 4

Dated at Bethesda, Maryland this /, g day of f,.

/- _

/g77 i

I FOR THE NUCLEAR R IA ATORY CONM!$510N i

is

}

l Victor Nerses Acting Director Project Directorate 13 Division of Reactor Regulations I/11 i +c :PDI.3

FDI.3 AC I /FDI.3:

.....:.... 4 W..::

}AME:

ok:Im RWes1 man

Y s

J ATE :09

/87 209/14187

09//k/87 i

W FICIAL M(nRD CUFT Y

)

- -