Rev 6 to Pump & Valve Inservice Testing
ML20154A563
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 05/06/1988
From:
DUKE POWER CO.
To:
Shared Package
ML20154A532 List:
References
PROC-880506-01, NUDOCS 8805160049
Download: ML20154A563 (133)


Text

. . . . . - . . . - - - - . _ - - - _ - . . - - . - - - . - . . . - - - . _ - - - - - . _ . - - - - - _ _ - . - . . - _ _ .

l 1

i i -

t l l i r 4

1 i

i i t

1 1

DUXI POWER COMPANY i

[ - ,

McGUIRE NUCIJ.AR STATION FUMP AND VALVE INSERVICE TESTING l' t i

UNIT 2 I

RIVISICH #6 1  !

i ,

k 1

4 l

i a

i  :

1 1

t f

i

i DUKE po T.A COMPAXT MCCUIRE NUCLEAR STATION FUMP INSERVICE TESTING FROGRAM ASE SECTION II, SUB8ECTION IVF 4

O The inservice testing of ASME Code Claes 1, 2, asd 3 pumps provided with an emergesey power seurce will be teeted as required by Section XI, Subsection IVP, of the ASE leiler and Pressure Vessel Code 1930 Edities, except where specific writtes relief has been granted by the Ceemissies. A description of the proposed inservice testing program, as well as specific requesta for relief free code requirements determined to be impractical, is described by the,fellowing.

I NOTE: The initials and date of the person or persons responsible 6

for conducting and analyzing the test may be used in place of a signature in the record of tests. Initials shall be construed as signatures to meet the intent of IWP-6240 (f) . {

!. The following are specific requests for relief from certata code requirements.

A) IVF-4120 requires the full scale range of uch instrument to be three times the reference value er less. This was changed from isur times the reference value in the edities of Secties 11 that was in effect prior to unit licensias. 10CFR, secties 50.35e(s)(4) states that design previsions are escluded from the requirement te upgrade to subsequent editions of Secties II. Since say cases where the three-times refereace value criteries is set met would require design changes in instrumentaties, we will continue to apply the O four-times reference value criteries, as interpreted is 3) bel,ew, for instrument accuracy evaluaties.

3) In seve
a1 cases, instavesentation dess set meet the four times reference value criteries. These casas predestaastiv intelve aucties pressure gauges where a larger range is requated to acceGedats varying conditions at the suction of the pump. In all cases where the four-times reference value criterios caanet be met, as instrum st errer evaluaties is performed to deseastrate that the everall accuracy of the differential pressure esasurement is withia
the limits established by IVP. These cases are RER discharge, I auelear service water sucties, and control reos chilled water sucties gages.

l C) Table IVP-3100-1 establishes the parameters that are to be measured. The previous edities of Secties 11 specified that in a fixed resistance system, either AF or Q was to be assaured, act both. The centrifugal charging pumps are tested using fixed resistance j flow paths. with no flow indication provided. The Safety

, Injection Pumps are in a fixed resistance system that does

! ' have a flow gauge available, but unnecessary radiation exposure i and manpower is required to measure the flow. Based on the design change esclusies provided by 10CTR50.55a(s)(4), we vill continue to i

tl apply the criteries that it is not required to measure flew in a l

1 fixed resistance system. The Residual Seat Removal Pumps are in a fixed resistance system that does have a flow gauge available. There

]

i O 1 is no way to adjust flow in the system and the gauge is not auffi-ciently accurate at low flows to provide a precise indication of i flow. For these pumps, a flow will be recorded but will not be used for comparison to any reference values.

McGUTRE - UNIT 2  !.1-1

{ Revision 6 J

D) Table IVF-4110-1 states that vibration esasurement should have an accuracy of g 5%. McCuire has no permanently installed vibration instrumentation. The pertable instruments used to measure vibration have sa uncertainty of i 11%.

E) IVP-3100. Table IkT-3100-1 and IkT-3300 requires the measurement of bearing temperature annually. It has been demonstrated by experience that a bearing temperature rise occurs only minutes prior to bearing failure. Therefore, the detection of possible bearing failure by a yearly temperature measurement is unlikely.

Obtaining these measurements requires a. minimum of one-half hour of pump operation to achieve stable bearing temperatures. The small probability of detecting bearing failure by temperature measurement does not justify the additional pump operating time required to obtain the measurement. Consequently, McGuire does not require cnnual bearing temperature measurements per the ASME Section XI code. ,

9 O

I.1-la McGUIRE-UNIT 2 Revision 6 New Page

l i

l The following Safety Class 1, 2, and 3 pumps (See Attachment #1 for O II.

specific safety class and available instrumentation) will be testes in accordance with the intent of Subsection IWP of the ASME code:

j j

NUCLEAR SERVICE WATER PUMPS (2A, 25)

CONTAINMENT SPRAY PUMPS (2A, 25)

SAFETT INJECTION PUMPS (2A, 28)

MOTOR-DRIVEN AUX. TEEDWATER PUMPS (2A, 25)

TURBINE-DRIVEN AUX. FEEDWATER PUMP (NO. 1)

CENTRIFUGAL CHARGING PUMPS (2A, 28)

COMPONENT COOLING PUMPS (2A1, 2A2, 281, 2B2)

RESIDUAL HEAT REMOVAL PUMPS (2A, 28)

III. The following Safrty Class 1, 2, and 3 pumps (See Attachment #1 for specific safety class and available instrumentation) will be tested in accordance with the intent of Subsection IWP, except for the request for relief for the specific requirements determined to be impractical as described below.

A) PUMP: CONTROL AREA CHILLED WATER PUMPS (CRA-P-1, CRA-P-2)

SATETT CLASS: 3 FUNCTION: To provide chilled water to air bendling units supplying control area air conditioning TEST REQUIREMENTS: 1. Measure pump bearing temperature during inaervice testing.

1 2. Annually run pumps until bearing temperatures stabilize.

l BASIS TOR RELIEF: There is no instrumentation installed to measure i bearing teoperature, and no meaningful data can be j obtained from bearing housing surface temperature measurements.

ALTERNATE TESTING: The inservice testing of the Control Area Chilled 1 Water Pumps will be in accordance with the intent i of Subsection IWP except that bearing temperature j will not be sonitored and subsequently the pumps will not be run annually until bearing temperature stabilizes, w

1 IV. The following Safety Class 1, 2, and 3 pumps are provided with 1 insufficient instrumentation to perform any meaningful testing in accordance with the intent of Subsection IWP and therefore the following j alternate testing sethods, as well as requests for relief from compliance with Subsection IWP, are described by the following.

McGUIRE - UNIT 2 I.1-2

- - -_ .. - - _ - - - _ _ _ _ _ . , ~ - _ _ _ _ . . . _ - , _ _ _ . . -

- . - . - . _ - - . . _ _ . . . . ~ _ , ,

___ ._ _ _ _ _ _ _ _ ._. _ _ _ , _ _ _ _ _ _ _ _ _ _ _ m _ __ _ . _ ._ __.____ _ _. _ _ _ _ __ __ _ _ _ . _ . .--

SAFETY RELATE 3 CLASS I, 2 PLMPS PROVIDED WITN AN ,,

EtERGENCY JER SOURCE p , ,

x U $ e

~

e e" , 5 3  !:r l i - $

s -

h a .  :

: a x ." -

2 I 5' 2

1;'

pggp3 vs e-.

un 2

e o

g sa.

e s4 se

o j

3 NR X X X X(1) X RF X NC-2574-I.! l 6I Nuclear Service Water Pumps (2A, 28) (RN) 3 QU NC-2563-I.I I 6l Containment Spray Pumps (2A, 25) (NS) 2_ E NR X X X X(I) X(3) RR X 4

Residual Heat Removal Pumps (2A, 25) (ND) 2 QU , NR X X X X(I) X(3) RR I NC-2563-1.0 l 6l NR X X_ NR X(1)_ X RR X NC-2562-3.0 l 6l Safety injection Piemps (2A, 23) (NI) _2_ QU NO NR X X X X(I) X RR I NC-2592-1.1 l 6l M/D Aux. Feedwater Piamps (2A, 25) (CA) _3_

3 NO X X X X* X(I) X RF X NC-2592-3.1 l 6l T/D Aux. Feedwater Pump (No. 1) (CA)

Cent. Charging Pumps (2A, 23) (NV) 2 QU let X X int X(1) X RR X NC-2554-3.t l 6l X X X X(I) X RR X NC-2573-I.0 l 6l Component Cooling Pumps (2A1, 2A2 d BI, 2B2) (EC) 3 QU NR Cont rol Area Chilled Water Piamps (CRA-P-1,2) (YC) 3 Qtl IR X X X X(I) X RR X NC-3618-1.0 l 6l 3 Qti NR - -

X X(I) - -

X NC-2609-3.0 D/C Fuel Oil Transfer Pumps (2A, 25) (FD) 3 _gt_I Int - - - - - -

X NC-2609-7.0 D/G Room Sump Pumps (2A2, 2A3, 2B2, 383) (WN)

NS QU Ist - -

X X(1) - - -

NC-2554-1.3 1 Standby Nakeup Pump (t)(NV)

NOTES

1. Vibration to be measured with portable instrumentation (Accuracy +111).

l I

6l 2. DELETED

! 3. Piemp is close coupled, therefore motor liebricant level will be observed.

l l 6l 4. DELETED l IJLEND QU - Qisarterly X - Instrumentation NO - Monthly l

- - Inst ruence. tat inn not availalIc NN - Not rerguired for IWP Compliance ( ) - Note 1 6 NS - flon S.alcty Hel.ated RR - Exempted by Relief Request I.1-4 HeGulHE - l! NIT 2 i

O DUKE PMTR COMPANY MCGUIRE NUCLEAR STATION VALVE INSERVICE TESTING PROGRAM L

Introduction:

The inservice testing of ASME Code categories A, B, C, and D valves will be tested as required by Section XI, subsection IWV, of the ASME Boiler and Pressure Vessel Code 1980 Edition except where specific written relief has been granted by the Commission.

NOTE: The initials and date of the person responsible for the action may be O6 used in place of a signature in the record of tests. Initials shall be con-strued as signatures to meet the intent of IWV-6230.

McCUIRI - UNIT 2 11.1-1 Revision 6

TABLE OF ABBREVIATIONS CLASSIFICATION Duke System ANS Valve Designed for Safety Class Code Design Criteria Seismie Loading Class A Class 1 ASME Section III, 1971 Yes 1 B Class 2 ASME Section III, 1971 Yes 2 C Class 3, ASME Section III, 1971 Yes 3 D Class 2, ASME Section III, 1971 No 2 E ANSI B31.1.0 (1967) No NNS F ANSI B31.1.0 (1967) Yes NNS G ANSI B31.1.0 (1967) No -

H Duke Power Company Specifications No ,

TEST REQUIREMENTS LT - Leak fest MT - Movement Test Q - Quarterly CS - Cold Shutdown RF - Refueling Outage CT - Cycle and time SP - Setpoint PC - Procedure Check VS - Valve Seating O

McGUIRE - UNIT 2 11,2-1

DEFINITIONS OF TESTINC. REQUIREMENTS AND ALTERNATIVES i

Cold Shutdown (CS) Testing vill be performed when the unit is in a i

cold shutdown (Mode 5) whose planned length is  :

of sufficient duration to establish necessary i i

test conditions and to perfore the test. In the ,

1 case of frequent shutdowns, the testing will not #

I be performed more than once per three .(3) months. l l 6

l Testing vill commence as soon as the cold shut-4 down condition is achieved but not later than  !

i 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after shutdown, and continue until e complete or the plant is ready to return to  ;

power. Completion of all valve testing is not I a prerequisite to return to power. Any testing not completed at one cold shutdown will be per- 1 l formed during any subsequent cold shutdowns that I i may occur before refueling to meet the code-

specified testing frequency. Any valve specified to be tested during/at (CS) may be tested during i j Refueling Outage (RF) conditions.

5 6 Cold Shutdown (CS*) Same as (CS) except testing may be performed  !

I prior to and/or after cold shutdown (Mode 5) as specified in alternate testing.

t i f Cycle and Time (CT) Valve will be tested to verify that its stroke

! time is less than the maximum allowable stroke -

1 time specified by McGuire Nuclear Station. l Leak Test (LT) Valve vill be tested to verify that the seat  !

leakage is limited to a specific naximum amount. j

i
Movement Test (MI) Valve will be tested to verify that the valve is ,

j operable and/or the valve moves to the position )

required to fulfill its purpose. No timing is  !

1 involved.

Quarterly (Q) Testing will be performed at least once per i three (3) months.

}

l Refueling Outage (RF) Testing will be performed when the unit is i shut down for refueling (Mode 6). Safety valves j will be tested periodically per the testing schedule defined in ASME Subsection IWV-3510.

I 6 Testing may'be done while in No Mode as well as Mode 6.

) Refueling Outage (RF*) Valve will normally be tested during refueling

' outages, however, testing is not required more

' of ten than once per 24 months per Appendix J to

' 10CTR50. j 1

McG1]IRI - UNIT 2 11.3-1 Revision 6

_ . - ~ .__ _ . _ . . _ .

O Refueling Outage (RFf) Valve will normally be tested on a routine basis via a samplw valve disassembly program (1 valve from a group of identical "tives under similar system conditions). Failure of one valve of the group during a refueling outage vill result in all remaining valves of the group being tested during that outage.

Setpoint (SP) Valve vill be tested to verify that it Will relieve pressure at its specified setpoint.

O O

11.3-2 NCUIRE-UNIT 2 Revision 6 New Page

,f CINERAL RELIIT 1 l 1. TEST REQUIRDENT:

Perform trend analyses on category A and 3 valves

. as described in IW-3417(a) .

BASIS FOR RELIIFs Trend analyses performed on rapid acting valves'does not give reliable indication of valve stroka time deterioration.

TESTING ALTERNATIVE: Trend analyses vill not be performed on valves that normally operate with cycle times of less th.an 5 seconds. Maintenance will be initiated if valve time exceeds max. limit.

6 (CENERAL RELIEF II DELETED)

O .

III. TEST REQUI1 DENT: Laak rate test Category A valves in accordance with '

IW-3420.

BASIS TOR RILIIFt McGuire Tech Specs require leak rate testing in accordance with 10CTR50 Appendix J. The Tech Specs establish the required acceptance criteria, which is 1 more restrictive than that required by IW. In order to eliminate redundant paperwork, all valve leak rate testing vill be conducted as per Appendix J.

TESTING ALTIRNATIVI: Category A valves will be leak tested in accordance with 10C7150 Appendix J.

McGUIRI - UNIT 2 gg,4_t Revision 6

. _ - . _ _ . _ . . . - . . - - . . . - - - . . . _ - - _ _ . _ . - - - _ - _ . _ _ . - - . - - . - . - - . - . _ . - . - _ . - - - _ ~ - .

I

)

i

( SYSTEM: ANNULUS VENTILATION l

)

TLOW DIAGRAMS: MC-2564-1  !

4 I

f 1

i l

J d

I i

I l

i i

I l

I

]

1 4 l 1

I l

< 1 l

4 f

l 4

I 4

4 1

1 1

i I, l, a

F I

i I

i McGUIRE - UNIT 2 11.5-1 4

i l __ . . _ . _ _ .

l l l n _

i t

o 2 o n

a

_ , e e m_

c e

e m

i s

l

_ m __ 5 i i i i i i t t t t t .

I v n ._

I c e e e e e - P V k k k o

k o

s o

r o

r r t

r -. _

u t t t _

l s s s s s .

u k n r . . .

n a x x x x A m a a a a e m s m = .

R _

e. e c

c c

m vc v -

e i e i e e e t ss s s s s .

s s s _

a 0 S

y a5 P1 P 5

1 5

1 2 _ _

e>Ogc :" * .cOee"

=**: ? 2 w* ae -

",c*S 0 ?eco ,eeH TT T f T T Cq LC L Cq Cq y

r

-D_ _ _

o -

t g

e C. X _. _ _ _

a _ - _

C - _ _

e H X _

X I _

v l

V a h I X _ -

" c.2oou 3

3 4

4 C

2 J

H 1 G

1 r

e _

b _ -

m _

u 1 1 1 N 1 I g 4 4 4 4 4 _

6 n 6 6 6 6 _

i 5 5 5 5 5 _

2 2 2 _

w 2 2 a - - -

c C

r C C C _

D M M M M M _

2

.* u B B

\>

B B B T

I

._ N

. U r

e b _ F.

m _ _

u _

N A A A _

0 l 8 '.

B e 1 i 5 6 _ _ _ s v - -

E E

_ _ t l E d' V n V _ -

t V

a V 2 2 2 I 2 _ _ -

l l l l

6 6 6 6

~ _ _ _ _. _ _ _ _ _ _ _ . . _ _ . . _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ . . _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ . . _ _

SYSTDt: AUXILIARY FEEDWATER FLOW DIAGRAMS: MC-2592-1.0 l' MC-2592-1.1 1

I I

l i

1 i

i l

f l -

)

i 1

i l

McGUIRE - USIT 2 11.6-1

l l l l l -

r e e e -

e - e m m m n t m i i i o -

a i t t t 2 i w t e e - s e g d

e m g n

g n i m

i m g n - n 6 i v

e i i t t i i I ' e F t i t t t 1 R t a y e a a e e a r

r r l l r r l c cy e e a c e e p y p p _

y p i

l s c o o c c o o i k . . . . .

x r . .

x x x x u a x x x a a a a a a a A m m m m m m m e m R . . . . .

c c

c c c c c m e e e e e e e e s s s s s s s t

s 0 0 0 y 0 0 2 6 2 6 1 6 1 1

S 1 S S d e>U"E3Q wcO$H C C X

3m$ ?" u*. e" X X X X X T T T T T T T T T T -

C H C C C H C

$En01le u$H C M C y

r D _ _

o g

e C X X X _

t _

a C

e B X X X X X _ X X v ._.

l a A _ -

V _

1 I I l I 4 4 7 6 7 e3Ew2OU G I

I I

J K L C D C G _

g r _

c> -

l m 0 0 0 0 0 0 0 0 0 0 u 1 1 1 1 N 1 1 1

1 1

1 g 2 2 2 2 2 2 2 2 2 2 n 9 9 9 9 9 9 9 9 9 9 i 5 5 5 _ 5 5 5 5 5 5 5 _

w 2 2 2 _ 2 - 2 2 2 2 2 2 .

a - - -

r C C C C C C C C C _ C D H H M H M M H H H _ M l

$O C B _ B _

_ B C C B _ B _

B 2

T I

r N

U e __ -

b _

m C. _ B, .

C.

u _ _

A N A A _ _A .

_ A A A _

0 1 2 6 - 5 4 6 8 7 _ 4 e 6 6 6 6 _ 6 6 5 5 5 _ 5 _

I v - - - _ -

A A

_ G l A A _

A _ A C_ A A A A c a C C C _

_ _. C C C C C C __ M V 2 2 2 2 . 2 2 2 2 2 _ 2 l l l l l 6 6 6 6 6

O es M i

y . y System: Auxiliary Fecilwater e a g '

i 5

u

s u

T

. 4  % S

" y Valve Category g e

%e g e

i a o u o H M e Valve Number Drawing Number o A B C D Remarks .

HC-2592-1.0 X HT X CS* l 6l 2CA-53 B 11 - 7 K-7 CT X 60 sec. max. cycle tiac 2CA-52A.B C MC-2592-1.0 X 4

CT X 60 sec. max. cycle time 2rA-44B C HC-2592-1.0 C-Il X B HC-2592-1.0 C-9 X HT X CS* l 6l 2CA-45 2CA-46B B HC-2592-1.0 D-8 X CT 10 sec. max. cycle time i

HC-2592-1.0 G-8 X CT 12 sec. max. csjcie time l I 6l 2CA-50B B B MC-2592-1.0 11 - 8 X MT X CS* l 6 l 2CA-49 2CA-48A,B C HC-2592-F.0 K-8 X CT X 60 sec. max. cycle time i 60 sec. max. cycle tfee 2CA-40H C MC-2592-l.0 G-14 X CT X

)

2 It NC-2592-1.0 11-14 X MT X CS* l 6 l 2CA-42 - _ . _ __

McGillHE - IINIT 2 II.6-3 Revis".on 6

j l l

r _

e t o a 4i w e e e e e - s e

d e m m i m

i m i m i m -

6. vi e i t

i t t t t t 1 e

F 1 R

e e e e y e e l l l l r l l cy c c c a c c y y y y y i

l s c c c c c c -

i k . . .

x r x

x x x x x u a a a a a A m a a m m m e m m m R . . .

c c

c c c c e

m e e e e e e t

s s s 0

s 0

s 0

s 0

s y 0 2 6 1 1 1 1

S 1 S

$$f. N ?OEP _ C X X E:ge

  • e" T T T T T T T T T T ~

$Se:?a uEH C C M C C N C N C N y D _

r .

o g

t e C X X X X _

a - _

C X e

B X _X X X X v

l V

a A _ _ _

l 4 4 4 0 5 I 1 1 1 1 3 3 4 5

"3jO - - - - - - - - -

1 J K I p B B C C B r

e b 1 1 1 1 m 0 0 0 0 I 1 u 1 1 1

1 1 1 1 N 1 1 1 2

2 2 2 g

n 2

9 2

9 2

9 2

9 5

2 9

5 2

9 5

9 5

9 5

9 5

9 5

i 5 5 5 2 2 w 2 2 2 2 2 2 2 2 a

r C C

M C

M C.

r C

M C

M C

M C

M C

M C

M D M _

B B B C C C C _. C _ C C

_ 2T gNO _ _

I

_ N r

_ U e -

b _ _

m u

B, __ E N B B A B A H _ R 2 8 7 6 8 2 I 0 9 3 1 I 1 8 .

e 4 3 3 1

- - - - _ - _ 'I C

v - - -

A A _ A _

A A A _ A _

c l A A A C C C C M

a C C C C C _ C _

V 2 2 _ 2 2 2 _ 2 2 2 2 l l l 6 6 6

O O U E g j System
Auxiliary Feedwater
g s  : .

l  ? "

4 i 4 a i' A # ~ E l 2 Valve Category j

  • g

, au 8

O A 8 C D H

O 88 H Remarks

! Valve Numlier Drawint Numl>c r .

6l 2CA-7A.C C HC-2592-1.1 8-10 X CT 10 sec. cycle time l 2CA-15A C HC-2592-1.1 D-3 X CT 10 sec. cycle time l

2CA-86A C HC-2592-1.1 C-14 X CT 10 sec. max. cycle tisIne 6l 2CA-Il68 C HC-2592-1.1 G-14 X CT 10 sec. max. cycle time l i

2CA-26 C HC-2592-1.1 I-4 X Ifr i

2CA-27A C HC-2592-1.1 J-5 X CT X 60 sec. max. cycle t'ine 1

6l 2CA-32B C HC-2592-1.1 I- 8 X CT X 60 sec. max. cycle time l 2CA-31 C HC-2592-1.1 I-7 X NT

)

ICA-22 C HC-2592-1.1 I-10 X IfT I _ _ _ _ __ _ __ _

2CA-20A,B C HC-2592-1.8 1-10 X CT X 60 sec. max. cycle time HrCUlHE - UNIT 2 11.6-5 Revision 6 i

e

l l r

e a t -

a 6i s

w e d e - s e

e i m i m Jiv F t t I e

I R y e e r l l a c c i y y l s c c -

i k x r . .

u a x x A m a a e m m R

c c

m e e e t s s s

y 0 0 S 1 1 F F -

$tl:Q at:H R R _

0!?" w* :d X X _

" #! 1lma:H T T f f

Tf -

C C I P y D _

r .

o g _

e C X X _

t a

C _

e B X X _ _

l v _

a A _ -

V _

2 2 4 4 1 1 1 1

55$a - - - -

8 B C G r

e b 1 m 1 1 1 u . . . . .

N 1 1 1 1 g 2 2 2 2 n 9 9 9 9 _

i 5 5 5 5 w 2 2 2 2 a - - - -

r C C C C D H H H H n 3a e

C C C C

. _ 2

_ T I

4 r _ _ it e

s L

i m _ .

u C _ C .

_ E N 1

_ 2 _ 5 6 6 6 _ 6 6 H e 1 1 _ 1 1 l v - - - - it l A A _. A A _

te a C _ C C C V 2 _ 2 2 .

2 i

t l l 4 4

l SYSTEM: Boron Recycle FLOW DIAGRAMS: MC-2556-3.0 f

4 2

>! McGUIRE - UNIT 2 II.7-1 4

_,,rw -

-. .w ,-w e

-..- - -- _--,--.,m__--. .m-. - m , - ,,,c,%-,-,,on

l

_ _ n o

_ 2i

- s

_ 7i e c _ v l e _

1 e c s _ 1 R y 5 _

c 1 e _

R $ .

n s e -

o k m o

r r a

i t

B m _

e n R o

i m t e a t l s o y s S I e:>g Eu0 4 ajmeH F

R F

R _

O e $l" we <eM. X TT TT a EaE1?a ,aeH CL HL y

r o

_D _

g _

e t

a C

_ X C _

B _ -

e _

v _

l V

a A X _ X 5 3 _

a* <,Z ooo - - _

G G _

r e

b _

m 0 0 .

u _

N 3 3 _

g 6 6 _

n 5 5 _

i 5 5 _

w 2 2 _ .

a - -

r C C _.- _

D H H _ _ _

_ _ __ g

" eo B B 2

T I

N r _ _

II e

b m _ _ _

u B _

F, N 0 2 _

6 6 _

e 2 2 _

_. l' v - _ -

G l B _ H _

_ i c

a N .

N

- _ P V 2 2 _ _

l 6

l

, SYSTEM: BREATHING AIR TL0k' DIAGRAMS: MC-2605-3.1 f

McGUIRE - UNIT 2 II,8 1

l n

o

. 2i

- s i

r c

8. vi A e I e s I R g

n 5 i 1 h

t s e a k m A e r i r a t B m e n

_ R o

_ i.

m t e a t l s o y s S I EOE0a& aj:H F F R R O:o$" w* ;d X

",E Su $ ?m ," H T T T T .

CQL MQL y D r -

_ o _

_ g _

_ e C _. X t

_ a C

e v

B

_ l

_ a A X X V

. O 8 <, y 8 o 2 4 _ _

F E _

r _

b e _ _

m 1 I u . . _

N 3 3 g 5 5 n 0 0 i 6 6 w 2 2 a - - _

)

r C C _

I H H _

l

  • ao B _

. B _ 2 T

I

_ _ _ N r _ I I

e _

b m - _

u .

E N B .

._ M 9 0 _

e 4 5 _ '

v - - _ _

8 G

B l B _

a V V __ _

E V 2 2 _ _ ._

l 6

(1ll l

1

! SYSTEM: CHEMICAL & VOLUME CONTROL SYSTEM FLOW DIAGRAMS: MC-2554-1.1 MC-2554-1.2

-MC-2554-1.3

-NC-2554-2.0 ,

MC-2554-3.0 MC-2554-3.1 5

4 4

)

4 l

O f 1

i i

g d

a 4

t i

1 1

4 1

1

McGUIRE - (TNIT 2 1 11.9-1 1

1

..___ -~ __ _ _ ._.. _ __-_ _ _ _

b O system: Chemical and Volume Control O

%  ? a 2 0 S w 3 2

. Valve Category a O ff.

o O

" O S I E" "

Valve Number _ Drawing Number A B C D Remarks HC-2554-1.I J-13 X CT X CS 10 sec. max. cycle time

$ l 2NV-94A C B l 5 l 2NV-9511 B HC-2554-1.1 H-13 X CT X CS 10 sec. max. cycle time l 2NV-12 8 HC-2554-1.2 F-11 X ift 5 l 2NV-21A A HC-2554-1.2 E-3 X CT X CS 60 sec. max. cycle time l 5 l 2NV-22 A HC-2554-1.2 C-3 _ .

X Mr X CS l

2NV-457A B HC-2554-1.2 1-7 X CT isolation time $15 sec.

2NV-458A B HC-2554-1.2 J-7 X CT  ! solation time $15 sec.

2NV-459A B HC-2554-1.2 K-7 X CT Isolation time $15 sec.

6 l 2NV-78 B HC-2554-1.2 J-il X CT X CS 10 sec. max. cycle time l 2NV-IA A* HC-2554-1.2 C-5 X CT X CS 10 sec. max. cycle time 6 l 2NV-2A A HC-2554-I.2 11 - 5 X CT X CS 15 sec. max. cycle clee l IkE - UNIT 2 I . -2

O O l

System: Chemical and Volume Control sa i

3 1 .  :

3 a ~: r2

~

2  % Valve Category u *$" $.

[

3 H

Y 3"

H Valve Number Drawina Number A B C D a - rks 2NV-24B A HC-2554-1.2 D-6 1 Cr 60 sec. max. cycle time 1

1 2NV-25B A HC-2554-1.2 D-7 I .CT 60 sec. max. cycle. time l

HC-2554-1.3 F-12 X CT 30 sec. anax. cycle time 5l 2NV-1013C E l 2NV-1012C E HC-2554-1.3 F-12 X CT 30 sec. max. cycle time

! 6 2NV-844 E HC-2554-1.3 F-4 X Nr l l

j 2NV-1007 B MC-2554-1.3 F-13 X HT I CS i

. 2NV-1008 8 HC-2554-1.3 F-13 X Nr X C3 i

i HC-2554-1.3 F-14 X NT X CS 2NV-1009 B J'

HC-2554-1.3 F-14 X NT X CS 2NV-1010 B II 9-2a l McCulHE - UNIT 2 Revision 6

a l

e e o m m r i i t e e t t n e e m e e e ~ s o m a i m m f g g C i  ! t i i e n n

" t t t i i e e t e e t t I R m

u e e k e e k a a l l l o l l o r r c c r c c r e e o y y t y y t p p V c c s c c s o o s

d k . . . .

n r x

x x x x

x x x a a a a a a a a

, m a m a

m l e m m m m m m a R . . . .

c c c c c c

c c c

i e e e e e e e e m s s s s s s s s e

h 5 5 0 0 0 0 0 0 C 1 1 1 1 1 1

1 1 m 3ug "

e S S S t F S s

y

  1. Y 2" R C C C C S .3 ." X X X X X

~ 5 e" T TT TT r T T T T T

  • aI* 1aau" C LC LN C C C C C C y D r

o g

e C X t

a C

B X X I X X X X e

l v

a A X X V

0 2 1 8 1 8 7 2 8 9

.3ge?j - - - y F F F B B C K K r

e b 0 m 3 3 3 0 0 0 0 u 0 2 3 3 N 1 1 1 2 2 2 -

g 4 4 4 4 4 - 4 4 4 5 4 n 5 5 5 5 5 5 5 5 5 i 5 5 5 2 5 5 5 5 5 w 2 2 2 -

2 2 2 2 2 a - - - C - -

r C C C M C C C C C D M M M M H M H H 2* B B B B B 3 B B B 2

T I

I r H e 1 b C, m C. -

u A A 2 B A 8 A A B N 0 0 2 4 5 E 1

2 9 1 4 4 0 5 4 4 5 4 4 e 8 8 1 1 1 1 1 2 2 v - - - - - - -

V l V V V V V V V V N

a N N W N N N N N V 2 2 2 2 2 2 2 2 2 6 6

~

MC- 2554- 1. 2 VALVE: 2NV-7B CATEGORY: B CLASS: B FUNCTION: Letdown containment isolation. -

TEST REQUIREMENT: Full stroke exercise and stroke time quarterly BASIS FOR RELIEF: Failure of this valve in closed position could result in loss of PZR level control and could result in a plant shutdown.

6 l ALTERNATE TESTING: Valve will be exercised and ticed at cold ehcdcwn. j W

b l* ,$

McGUIRE - UNIT 2 II,9 6 i Revision 6

, , - , - rn -- - , , , - - - . , , - - , , - - - - , ,---_,c, ,,-,.,,n, *,._ ,,--_-,_.,,,w. , _ , , , ,, , . , -nn,.,,, , , . . , , n,,_. ._,n, - , , , , , _ , , . , .,,,_,

MC-2554-1.2 VALVE: 2 NV-1 A, 2 NV-2A CATEGORY: B l

CLASS: A l

FUNCTION: Isolate regenerative heat exchanger l TEST REQUIREMENT: Cycle and time every three months BASIS FOR RELIEF: Failure of this valve in closed position could result in loss of pressurizer level control ALTERNATE TESTING: Valve vill be cycled and timed at cold shutdown I

1 O l C

i l

McGUIRE - UNIT 2 II.9-6a t

l 6

g n

n

- 3o

- i i

l e e e e e e e e 0s 1i m m m m m o m m m i i i i .v o i i i t

i t t t t t I e C t t I R t e e e e e e e e l l l l n l l c

l cy l

c c c c c e c y y y y y n y y o s c c c c c c c c p k . . .

m r . . . . .

x x x o a x x x x x C m a a a a a a a a e m m m m m m m m R . . . . .

m c c

c c c c c c e e e e e e e e e t s s s s s s s s s 0 0 0 0 0 y 0 0 0 S 6 4 6 4 6 6 6 6 Ej{."4 at:H O" a ." m* ."

  • .! aoTa y" H T T T T T T T T C C C C C C C C
  • y D r

o g _

t e

a C_ - -

C B X X X X X X X X e

v l

a A V -

3 7 7 B 8 2 6 1 9

:my8u - - - - - - - -

K K K K E D E D r

e b

m 0 0 0 0 1 1 1 1 -

u . . . . _ .

1 1 N 1 1 1 1 1 1 -

g 3 3 3 3 3 3 3 3 n 7 7 7 7 7 7 7 7 5

i 5 5 5 5 5 5 5 .

w 2 2 2 2 2 2 2 2 -

a - - - - - - - - -

r C C C C C C C C D H H H H H N H M -

C C C C C C _ C C - 2

  • 4o -

. - T!

. _ - N r U e _ _

b _. _

m _

u A B E N A 0

0 3

8 3

8 2

A 6

A 7

B I

8 2

R I

k e v

5 2

5 2

5 5

_ B-8

. CU -

C l C C C C C C _ C _

c .

K K K K a K K K K _

M V 2 2 - 2 2 2 2 _

2 2 _ . _

l 6

!!i!ji4 i! ,< ),;

0 Y System: Component Cooling E OIE B  :  :

0 t o

a e &

$ w A u

% 3u g g Valve Category Drawing Number , A B C Ii' Ressa rks Valve Nmaber 2KC-424B 11 MC-2573-3.1 L-4 X LT X CS Isolation time $40 sec.

CT 2KC-425A B MC-2573-3.1 L-6 X LT X CS Isolation time $40 sec.

CT 2KC-279 R HC-2573-3.1 K-4 v. X L1 X RF MT 2KC-315B B MC-2573-3.1 L-13 X CT Isolation time $30 sec.

2KC-305B B MC-2573-3.1 D-14 X CT Isolation time $30 sec.

MC -2573-3.1 E-12 X X LT X RF 2KC-340 B MT 2KC-338B B MC-2573-3.1 D-12 X LT X CS Isolation time $40 sec.

CT 2KC-320A B MC-2573-3.1 C-10 X LT X CS Isolation time $15 sec.

CT II.10-4 McClllRE - UNIT 2 O O O

l i

l I

l

! SYSTEM: CONTAINMENT AIR RETURN EXCHANGE AND HYDROGEN SKIMMER l

FLOW DIAGRAMS: MC-2557-1.0 l

l

\

i I

1 i

l i

i l

1

)

i I

i 4

McGUIRE - ll NIT 2 II.12-1 4

, - - , , - - ,w,,,-, , , , - - ,...-.a-- , , , , , - .,...---,--n--,-,, --..,-,,,n,

, . , - , , . , -n.,.,en,--,,, ,_,,,n-a,nn,---,._,,-- , , , ,,,,,,,w-n,.,n,---,,--w-.--

l e e m m i i 2 o t t -

e . ~ _

2 i

s g . g g .

_ 1 n . i a c c n n .

v h e e i i .

1 e

c s s t t . I R

a -

a E

x 5 5 r - r _

5 $ ep e

p _

n e e o o -

r s ur k m i m . .

i t e r x x em Rm a

m t t a a i e n n m m .

rk R o o _.

iS e e i i c

c A v v t t a e e n i i a .

t e s s l l s s _

ng s s o o eo a a s s 0 0 6 6 mr nd P P I I iy aI l t 3"h"*

nd on . EH F

R C a ,

" E" X m e" e

t s

y " 5! E" T L

T L

f f

iQL T T CQL T T CQL T T CQ T

CQ

~

S aE6 _

y r

D _

o .

g _

e C X .

t a

C _ _

X X e _B _

l v ,

V a A X _ X X X X

.* a 0 2

1 3 3 _ 3 1

2 1

_ 3 2 1

K K

J

_ 3 J

_ I 1

_. I__

r _ _

ei _

l m 0 0 0 0 0 0 0 u 1 N 1 1 1 1 1 1 g 7 7 7 7 7 7 _

7 ,

n 5 5 5 5 5 5 5 .

i 5 5 5 5 5 _ 5 5 _

w 2 2 2 2 2 _

2 2 .

a - - - - - - -

r C C C C C C C _

D H H H H H _.

H _

H

" 3 B _

B B B B B B

_ 2

. T I

_. N r

e _ .

f I

b _ _ -

m _ _

u -

_ - E N _ A B '

A 8 4 0 0 1 3 e 3 4 3 3 3 I 2 -

v - - - - - - _

X l X X X X X X _.

a V V V V V V _ V M V 2 2 2 2 2 2 _ 2 l

6

SYSTEM: CONTAINMENT PURGE VENTILATION FLOW DIAGRAMS: MC-2576-1.0 I

(

I I

i McGUIRE - UNIT 2 II.13-1 l

. , - , - - . , - - - - - . . , . , , _ - - _ , - . . , - - . . . - , , . . . , , _ , _ _ _ _ _ _ , - _ _ _ , _ - - _ , - - - , , , - , , . . _ __ ,~..,n _ .

l l l l l

n o

i 2 n o

t -

a .

3 i

l

. . . . 1 s i

i c

c c c c c - .

v t

n e e e e e e [

e e s s s s s s - I R

V 3 3 3 3 3 -

3 < 1 e 5 5 5 $

g e e r s e e e e -

u k m m m m m m P r a

i t

i t

i t

i t

i t

i t -

t m n n n e n n o

n o

n o o o -

e R o i i i i i -

i m t t n t t a

t a

t a a a --

i a l l a l l .

l o

l o o o -

t o o s s n s s s s o I I I I I I C

eatC." * * * *
  • F F

F F F F m

e w5uE" R R R R R R t

s *

  • aE" y

S X X X X X X

%u e" T T T T T T T T T T T T

" "o!s?* uEH CQL CQL CQL CQL CQL CQL

~

y D r

o g

e C t

a _.

C e

B _

l v _

a A X X X X X X _

V 6 7 6

- 7 6 7 _.

E:5EoO I I

- K K E E r _

e _

b 0 m 0 0 0 0 0 u 1 1 N 1 1 1 1 g 6 6 6 6 6 6 ._

7 7 n 7 7 7 7 i 5 5 5 5 5 5 _

w 2 2 2 2 2 2 _

a - - - - - _

D r C H

C H

C H

C H

C H

C H

B 1 1

B B B B _

2 a OU _

T I

_ N -

r _ _

I I

e b -

m _ _ _

u E

N B A B A B A 4 6 7 e 1 2 3 _

c"C v

l P V

P V

P V

P V

P V

P V

_ M a 2 2 2 V 2 2 2 _

l l l l l 6 6 6 6 6 6

l l l l l 6

O i l

t n

o a .

3 3s i

n o

. . . . = 3 i i

c c

c c c c = ,v t

e e e e e e g e

n s s s s s g R

e s -

V 3 3 3 3 _. 3 3 $ $

e < 1 $ $

g e e r s e e e u k m m m e i m i m

P r i i i i t t a t t t t t m n n n n n e n n o o e R o o o o i i i i i i m t t t t t n t a a a a a i a l l l a l l o

l o o o o t o s s .

n s s s s I I I o I I I C .

S.uq * * * * *

  • m

.& F F F F F F e .Sua." R R R R R R t

s S

y " " ao." X X X X X X

wa."

au$5aocg r T T T T T T T T T T T T ae." CQL CQL CQL CQL CQL C4L y

r D _ .

o g

e C -

t

_ a _ .

C R

= .

e -

l v

a A X X X X X X V - .

a024uog 6

7 8

9

- - 8 9

D D J J - I I -

r _-

e .

b -

N m

u 0

1 0

1 0

1 0

1

-0 1

0 1

g 6 6 6 6 - 6 6 -

n 7 7 7 7 .

7 7 5

i 5 5 5 5 - 5 e.

w 2 2 2 2 . 2 2 .

a - - - - - - .

r C C C C C C .

D M M M H H _. M

..e~ B B B B - B _ R

- 2

. - T I

N J

r .

t e .

b _ . -

m _ ,

E u R N A H A _ t I

3 l l e

v B

8 P

A 9

0 1

P I

I P

2 1

P 1

P I

li C

r a V V V V _ V 2

_H V 2 2 2 2 . 2 _

l l l l l l

6 6 6 6 .

6 6

! -! ,. 'i , ,, . l 'I j l j ):  !

l l l l l

_ n o

i t

4 o a 3 i

l

. . . 1 s i . . .

i t c c c c c c .

v n e e e e e - e I e

e s s s s s s I R

V 3 3 3 3 3 3 1 e 1 $ $ 5 $ .

g r s e e e e e e -.

u k m m m m m m .

i i P r i i i i t t _-

a t t t t t m -

n e n n n n n n e R o o o o o o i i i i i m i t t n t t t a

t a a a i a a l l a l l l l o o t o o o o n s s s s s s I l I o I I I C -

m 3"  :< F F F F F F t

e - :H R R R R R R s

y  :  :"

X X X X X X S  :"

SD  :" T T T T T T T T T T T T -

CQL C0L CQL CQL CQL CQL u:"

y r '

~U - .

o g

e C t

a .

C e

B .

v l

V a A X - X - X X X X -

8 9 7 6 8 9

.*3 o - - - - - - -

F F B B s B .

r -

e - -

b -

m 0 0 0 0 0 0 u _

N 1 1 1 1 1 I - -

g 6 6 6 6 6 - 6 n 7 7 7 7 7 7 5 5 5 5 5 5

i w 2 2 2 2 2 2 a - - - - - -

r C . C C C C C .

D H .

H H H H H B

B B B B B .

2aO _

2 T

I N

r .

. U e _. ..

b .

m u _ B V.

A B A N A 8 .

5 6 _

7 _

8 4 0 e 1 1 _ 1 1 1 2 . '

v - - _

P

'C l P P _

P P P c a V V _

V V V V M V 2 _ 2

_ 2 2 2 - 2 l l l l l l 6 6 6 6 6 6

l 6

y n a .

3 o r - i p e e e e 4 s m m m m 1 i S i i i i .v t t t t t 1 e _

n 1 R e e e e e m l l l l u

r c c c - c i y y y y a s c c c c t k n r x

x x

x o a a a a a C m m m e m m R . . . .

m c c c c e e e e e t s s s s s

y 0 0 0 0 S 3 3 1 1 F # F F eU 3G* Q cU" H R F R

R R

= $ 3 Y" = l*. 0'" X X X X

" cI* 1?sa u:H T T T T T T T T f

f M C C C N C N y D r

o g

e C X X X X t

a -

C B X X X X e

l v

a A _

.V 2 3 3

  • Re$a 2 1

1 1

4 2

4 2

l I C B C D D C B _

r _

e i _

l _

m 0 0 5 0 0 0 0 0 u

N 1 1

1 1

1 1

1 1

g 3 3 3 3 3 3 3 3 n 6 6 6 6 6 6 6 6 i 5 5 5 5 5 5 5 5 w 2 2 2 2 2 2 2 2 a - - - - - - - -

r C C C C C C C C D H H H M M H M M 2

B B B B B B B 8 m" U _ T

_ I N

1 1 _

r -

c> - _

l m E _

u .

t i _

N _.

8 8 _

l _

3 . 0 B 5 6 2 3 _

l i

e 3 4 _

- 3 I 1 1 1 1 G _

v k _

l S S S S S S S S _ i _

a N N N N N N N N .

V 2 2 2 _ 2 2 2 2 2 _ _

l 6

,I - , l i 2

l l  !.  ;]!  !

l1i

O MC-2563-1.0 VALVE: 2NS-30, 2NS-33, 2NS-16, 2NS-13, 2NS-46, 2NS-41 CATEGORY: C C1 ASS: 3 WNCTION: Open on flow from the Containmeo. Spray Pumps.

TEST REQUIREME.VI: Verify proper valve movement once per three months, IW-352 2.

BASIS FOR RELIEF: Full stroke exercising of these check valves is not practical since there is no external indication of disk movement. Full stroke exercising would require for the pumps and spray nozzles to be activated which would 3 ft9uire a 18r88 8C818 Clean up effort. Provisions for disassembly of these 8 inch valves are not installed, thus subjecting personnel to an extreme hazard due to the valves location up near the containment dome.

ALTERNATE TESTING: These valves vill be tested during rifueling outages by partial stroke exercising the valves using air.

McGUIRE - UNIT 2 11.14-4 Revision 3

SYSTEM: CONTAINMENT VENTILATION COOLING WATER ILOW DIAGRAMS: nc.2Soz.3,9 f

l O .

i l

O McGUIRE - UNIT 2 II.15-1

O System: Containment Ventilation E Cooling Water 0

y  :

% - . t 4 a ~" F*

2* Valve Category u *$ th

2?  ;"

u A C D H "" H Remarks Valve Number Drawing Number B -

5l 2RV-79A B HC-2604-3.0 K-7 X CT Isolation time $30 sec. l LT 2RV-80B B HC-2604-3.0 K-6 X CT Isolation time $30 sec.

6l LT l

2RV-32A B HC-2604-3.0 K-10 X CT CS Isolation time 160 sec.

LT X RF*

2RV-33B B HC-2604-3.0 K-12 X CT CS Isolation time <60 sec.

~

LT I RF*

2RV-130 HC-2604-3.0 J-12 X X HT X RF*

5l B LT g

2RV-778 8 MC-2604-3.0 C-10 X CT CS Isolation time 160 sec.

LT X RF*

HC-2604-3.0 C-12 X CT CS Ir.olation time <60 sec.

5l 2RV-76A B LT I RF*

l IRE - UNIT 2 11.15-2 Revistor

l i

l l

1 I

SYSTEM: DIESEL GENERATOR STARTING AIR ILOW DIAGRAMS: MC-2609-4.0 i

I J

l 1

i t

t I

I L

i l

2 i

I McGUIRE - UNIT 2 11.19-1 ,

l i

i

l l I I l l r -

i A

2- o g

n 9

I s

i i

i t _ .

v r - _

_ 8 e

a ~

3 R t - ,

S .

r s

t o

a r

k r

a c m _

n e _

e H C ~

l ~

e s _

e _

i _ ,

D _ _

5t2 *,Q m

e

  1. g?

t s _

S y o:.g5 _ X X X X X X X

~

X m.j$ _

.$n* g5 T T r T r T T T T T T T C C M M M n g$ C C C C C C y

r o

D _

g _.

_ X X X X e C _

t a _.

C B X X X X X X X X e

l v '

a V _

_A _

$%S g0 2 2 2 2 2 2 2 2 9 9 9 9 K K i f I F E C C K 1 1 F C r

e b

m u

0 0 0 0 0 0_ 0 0 4

0 4

0 0 4 4 0

4 N 4 4 4 4 4 4 4 g 9 9 9 9 9 9 9 9 9 9 9 9 n 0 0 0 0 0 0 0 0 0 0 0 0 i 6 6 6 6 6 6 6 6 6 6 6 6 w 2 2 2 2 2 2 2 2 2 2 2 2 a - - - - - - - - - - - -

D r C H

C N

C H _ CM -

C M

C H

C H

C H _ M

_C C C MM C

M -

."Y C C C C C C C C C C C C 2 I

T N

b r

e U

m u _ _

F.

N _ _ 5 6_7 8 2 1 _

4 3 5 6 8 _

7 1 1 1 1 e

v 6

6 6

6 6

6 6

6- 1 1 , 1 1 r

- - - - c G G G G G G G G V _ G l

_ _ GG C a V V _ V V V V V _

V V M

_ 2V 2 2 2 V V 2 2 2 _ 2 2 2 _ 2 _ 2 l l 1 l l l 6 6 6 6 6 6

l t i

l i

t I

SYSTEM: TEEDWATER l 5

l FLOW DIAGRAMS: MC-2591-1.1 r 4 i

, t I

t I t

}

l fi

.i i

I I

i

'l l

i f

f i

i McGUIRE - UNIT 2.

II.21-1

System: Feedwater

. 3 .

3 5 a  ! "

.4

.  :  :  :: se 3 $ Valve Category  %$ $$ %*

Y O $5 $5 ?&

Valve Number Drawing Number A B C D Remarks -

6l 2CF-26A,B B HC-2591-1.1 11 - 3 X CT X CS Isolation time $ 5 sec. l 6l 2CF-28A,B B HC-2591-1.1 H-6 X ' CT X CS Isolation time $ 5 sec. [

Q 6l 2CF-30A B B HC-2591-1.1 H-9  % CT X CS Isolation time $ 5 sec. l Q

6l 2CF-35A B B HC-2591-1.I H-13 X CT X CS Isolation time 5 5 sec. l Q

6l 2CF-129A,B B HC-2591-1.1 H-1 1 CT 1 CS Isolation time $ 10 sec. l Q

4 2CF- 137A . B HC-2591-1.1 G-2 X CT Isolation Lis*e $ 10 sec. l Q

6l 2CC-1283 8 NC-2591-1.1 11 - 4 X CT X CS Isolation time $ 10 sec. l Q .

- - . - - = = = = = - -

-- .--e . - ~ . . - . . - - - . .-

M E - IINIT 2 I I .21- 2 Revisio

l \ l l l j l l

O l l 6

n 3o

. . . i c

c c c c . . 1 s e e e e e c c

2. vi

_ s s s s s s

e e s 1 e t 0 0 0 0 1R r I 1 1 1 1 5 5 -

e t $ $ $ $ $ $ 5 a _

w s e e e e e e e _

d k m m m m m m m e r i i i i i i i _

e a t t t t t t t _

F n e n n n n n n n o

B o o o o o i

o .

i i i i i i -

m t t t t t t t e a a a a a a a t l l l l l l l s o o o o o o o y s s s s s s s

_ S I I I I I I I l

$U :Q .Sg5 S S S S C L C C l

, e :l" .j$ X X X X hl 1l" g$ T CQ T

C4 T

C4 T

C0 T

C9 T

CQ T

C y

O D

' r

_ o

_ g e C t

a C

B X X X X X X X e

v l

a A -

V l 2 2

.33Og0 5 8 9 I 1 1 9 C H C N H K K r

e

~ _

b _

m 1 1 1 1 1 I 1 N

u 1

1 1

1 1

I 1

g 1 1 1 1

1 1 1

n 9 9 9 9 9 9 9 _.

i 5 5 5 5 5 5 5 _

w 2 2 2 2 2 2 2 a - - - - - - -

r C C C C C C C D H H M M M M M 2

.=U L B B B B B B T

I N

_ _ U r _

e _

b B. B. .

m B

. E O u A B A A A A R N 6 7 5 6 4 4 5 I 3 2 3 2 3 0 0 _

U e 1 1 1 1 1 1 1 ._ G -

v - - - - - - - .

c l F F F F F F F .

M a C C C C C C C V 2 2 2 2 2 2 2 _

l l l l l

_ l l 6 6 6 6 6 6 6 lll lI

= .$4 U = $ System: Feedwater m.

l p

U 5 0 0

3 1 Y Q

a Y .

  • 2 3

. 4 5 o Valve Category U M  %

~

U O $ $ $

Valve Nualeer Drawing Numlier A B C D Remarks .

6l 2CF-106 A,B B HC-2591-I.1 K-5 X CT X CS Isolar. ion time < 5 sec. l Q

X CT X CS Isolation time < 5 sec. l 6l 2CF-lO7 A B B HC-2591-1.I K-2 4

HC-2591-1.1 C-12 X CT 10 sec. max. operating time l 5l 2CF-151B B Q

B HC-2591-1.1 c-Il X CT 10 sec. max. operating time l 6l 2CF-153B Q B HC-2591-I.I c-Il X CT to sec. max. operating time l 6 l 2CF-155B

  • Q .

HC-2591-1.1 G-12 X CT 10 sec. max. operating time l 5l 2CF-1578 B 0

HC-2591-1.1 K-3 X CT X CS 5 sec. max. operating time l 6 l 2CF-17 A,B F Q

0 McCUINF, - UNIT 2 11.21-4 Revision 4

< 3 '

l l

{

l

_ 6 e

m e

m e

m

- - 5o n

i i i - - i t t 1 s t

g g g 2.

,e vi n n n 1R i i i r t t t

_ e a a a

_ t r r r .

a e e e w s p p p

. d k o o o e r e a . .

F m x x x e a a a R m m m m c e c c _

. t e e e .

s s s s .

y .

. S 5 5 5 -

S S S S S

.>w y f..u & oaa4g v 0 S

C S

C C C C C C

, $ .a $co 4.*' $

4 X X X X X X X ay a.u$e.Cp g$ T T T r T T T CQ CQ CQ N M M M

~

y D -

. r -

.- o g X X X X

_ t e C _ - -

a C

e B X X -

v l

_ a A

  • V * -

_ O

_ 3 2 1 0 2 . * -

_ mOoa4 n ego 6 9 1 1 1 1 1 h

K K K F F F F- _

h .

_ r * ,

e _

._ i r

  • m 1 1 1 M -

I u . . . 1 1 I

  • N 1 1 1 1

1 1 1

- - - N' g 1 1 1 - - - - -

1 _

n 1 1 1 -

9 9 9 _ _

i 5 5 5 9 9 9 9 .

W 2 5 5 5 - 5 _-

w 2 2 2 2 2 2 a - - -

r C C C -

_ D M M l C C C C 9 f

M M M - M _

e

~

._ e= U F F F B B B B _ W 2 .

.m

_ m ,i a

_. m p

r _ _

_ e.

e _

.- b m

u N-B. B, B, .

_4 _

2A

_ M A 2 6 8 . .

( 3 5 5 5 5 _ e v

e 2 2

3 1 _ 1, 1 1 _ .

c -

l - F F F F .F F . F .

- C C C M 2C _

a _. C C C . .

_- V- 2 2 2 2 ._ 2 2 . . .

l l l l l l 6 6 6 6 6 6 1-.!l i,

!' !1 ll1 t . . lli ;i. !i  :}.

MC-2591-1.1 2CF-26A.B;2CF-26A.B;2CF-30A.B;2CF-35A.B 6l VALVE:

CATEGORY: B CLASS: B FUNCTION: Provides containment isolation.

TEST REQUIREMINT: Cycle and time valve once per quarter.

BASIS FOR RELIEF: Closure would isolate the Steam Generater feedwater which could result in a severe transient in the Steam Generator chich could result in a Unit trip.

ALTERNATE TESTING: Valve will be cycled and timed during cold shutdowns.

O l

1 1

1 O

McCUIRE - UNIT 2 II,21 6 Revision 6 1 l

l

l l.

MC-2591-1.1 l

6 VALVE: 2CF-20A,B; 2CF-17A.B; 2CF-23A B; 2CF-32A B CATEGORY: B CLASS: F .

RINCTION: Feedwater control.

TEST REQUIREMENT: Cycle and time valve once per quarter.

BASIS FOR RELIEF: Closure would isolate the steam generator feedwater which could result in a severe transiet in the steam generator which could result in a unit trip.

i ALTERNATE TESTING: Valve will be cycled and timed during cold shutdowns.

r i

?

i l

i l

l t

a l

i 6

i i

i

) i.

.l

, )

I  !

i McGUIRE - UNIT 2 II.21-7 l Revision 6 i i

i

_ _ . . - . _ _ _ _ _ . _ _ _ . . _ _ _ _ _ _ _ . _ . _ _ _ _ . . _ , , _ . _ _ _ _ _ _ _ _ _ ~ . _ _ _ _ _ _ _ _ , , _ . , - _ . . . _ _ _ _ . . _ . _ . . . . , _ . .

MC-2591-1.1 6l VALVE: 2CF-129A.B; 2CF-128R; 2rr.127a; 2CF-1265 CATEGORY: B CLAi,S : B

. FUNCTION: Opens to provide startup feedwater supply to the steam generators.

TEST REQUIREMENT: Cycle and time valve once per three months.

BASIS FOR RELIEF: Cycling valve duting power operation could induce unwanted transients in steam generators. This vould result in ar. increase in flow to the e.ain feedwater nozzles causing vibrations in che preheater section

)

of the steam generators. -

ALTERNATE TESTING: Valve vill be cycled and timed during cold shutdowns.

1 l

C I

l l

I l

l 1

O t-McGUIRE - UNIT 2 II,21 8 Revision 6

MC-2591-1.1 l

l .

2CF-104A.B; 2CF-10$A.B; 2CF-106A.B; 2CF-107A.B l 6[ VALVE:

CATEGORY: B I CLASS: B FUNCTION: Provides tempering flow to steam generators.

TTST REQUIREMENT: Cycle and time valve quarterly.

BASIS FOR RELIF.J: Cycling this valve during operation could result in loss of S/G 1evel control and result in a plant trip.

J ALTERNATE TESTING: Valve will be cycled and timed at cold shutdown.

I t

i

[

j i 1

I I i j i

?

,  ?

I 1

I l

J l

I

)

1 l

]

1 j McGUIRE - UNIT 2 11.21-9 Revision 6

MC-2591-1.1 l

VALVE: 2CF-152, 2CF-154, 2CF-156, 2CF-158 CATEGORY: C CLASS: B FUNCTION: Provides tempering flow to the steam generator auxiliary feodwater nozzles.

TEST REQUIREMENT: Exercise valve to prove valve closes to prevent reversal of flow quarterly.

BASIS FOR RELIEF: During normal operation there is constant flow through these check valves to keep the auxiliary feedwater nozzles tempered. Testing these check valves would require supplying the steam generators with cold auxiliary feedwater and thus thermally shocking the nozzles. ,

ALTERNATE TESTING: During cold shutdown, each valve vill be exercised to prove each valve closes to prevent gross diversion of flow.

l l

i 11.21-10 McGUIRE - UNIT 2 Revision 6 New Page

SYSTEM: LIQUID WASTE RECYCLE 6 l FLOW DIAGRAMS: MC-2562-4.0 l

MC-2565-1.0 i MC-2565-1.1 MC-2565-7.0 d

i t

l N

P 1

r 1

.I I

l 1

1 i

i l

)

4 l

1 i

l s

l 'I '5-1 '

i McGUIRE - USI! 2 R'ev'ision 6

_ _ _ _ _ . . _ . ,,__ ____~ _ - _ _ _ .

e 6 l -

c .

y aneog c - l ia e -

- 5sP R . .

c c -

e e e 2.

I ee ivw t s s s IRN a 0 0 W 1 1 d

i u . e e q m m m i

r i i _

L a. t t e n n m o o _

i i m t t e a a _

t l l _

s o o y s s S I I

$u :Q .0u:"

,es"2 ew ." .

eg l~1a."u:" TT TT LC LC O

y r

o _ _

o _

g t

e c _ _ - _

a _

C a .

e l

v . _

a 4 X X _ _

V 3 4 _

E _

u.0v#3

. G _

r _

e b

m 0 0 u

N 4 4 g 2 2 n 6 6 _

i 5 5 w 2 2 _

a C C

r D M M

.2 eea" B A _

. T I

Ht r _ I e _-

b B A _ F.

N9 m 1 2 u 0 0 _.

. N 3 3 I

1 1 U e - -

. _G v L L _

H l

a W 2 2 W _.

V

,  ! ' - , l

,I l -- '

l .

_ e _ 6 _

_ l _ .

.. c n .

2- io y

c e

c

. '5 s .

c 1. vi c c R

e e e e -

s s s 1 e

e s . 1 R .

t 0 s 5 5 0 - 1 1

a 1 5 W $ $

l i

e k

s m

e e m

. e m

e m

i i u r i i t t q a t t i m n n -

L e n n o o .

R i

t o i t

o e

v

_ i t

i t

m a a i a a -

e l l s l l t o o s o o -

s s s a s s P

I I y I I S .

eD y0* 4 .S%eH

  • F R

F R

F R

F R - F R

F R

F R -

eMoa X -

. U 8?" _ _. X .

T -.

T T T T T r T T T T T

.$lusl" $eH C4L C0L L Mq MQL CqL CqL -

y D - .

r - .

~ o g E .

e C X X X .

- t a -

C _.B

=

e v

l _. X _ X .

a X

_ X X X .

_A_ _

V _ _

3 5 2 3

1 4

1 l

I _. 3 1

.~

4$ou J K

J C

J L

K

_ r _

- e _ _

b _ _

- m 0 0 0 0 1 1 _ 1 u . .

_. 5 1 1 1 1 1 N, 1 1

- g 5 5

5 5

5 5 ._ _

n 6 6 6 6 6 6 6 -

-- i 5 2

5 2

5 2

5 2

5 2

5 2

5 2

- w _

. a - _

. r C _. C C C C C . M C D M ._ M M M M M ._

." au B B B F B B N 2 T

I N

_ I r _ _. I e _ _

b _ _ -

_ m E N

u A B 4 6 _ ._ _.

- 4 _

4 5 6 4 4 B A "

e v

6 _

6 2

- L 2

I L

2 I

t L _ L I e

- l I W

I W W W W . W2 M

- V a

2 2 2 2 _W 2 2

- l

- 6 6

l l l e e e l

cy i m

i m

c t t - ti e

. . 5 s g g R c e

c e n n 2. vi I

e s s i i t

s 0 0 t

a t

a I

h a 1 1 r r W $ $ e e p p d s e e o o i k m m u r i i x

x q a t t a

i m a L e n n m m R o o .

i i .

t t c c m a a e e e l l s s t o o s s s 5 5 y I I 1 1 S

$" -Q.RgS F F F F R R R & R

.U s 7" .jS

.j X

T T T T T T T T t T .

.gl 2i* g5 CQL CQL C9L CQL f iQL i

y r

o D

g _

e C X t

a _

C B

e e

v l

a A X X X X X V

5 5 5 5

.*a4gO - -

- 4_ -

J K I n J _

r l

ei _ _

m I 1 0 0 0 u . .

N 1 1 7 7 7 g 5 5 5 5 5 n 6 6 6 6 6 _

i 5 5 5 5 5 w 2 2 2 2 2 a - - - - - _.

r C C C C C _.

D M M H H H _

.*U B B B B B _

2 T

I

_ N r _

U e

s _

i _

m _

u A R _ E N A B 1 2 5 _ N 9 l 2 2 8 I e 3 a 3 3 3

_ I v - - - - - r l L L L L L e a V W V W W H V 2 2 2 2 2 l l l 6 6 5

-- . ~ ~ _ _ _ , _ - . _.- . - = .- . . - _ . . _. . . .

l i

t

?

i

. MC-2565-1.0 l

. i 1,  !

! I e  ;

! VALVE: 2WL-466 [

t

- I l CATEGORY: C

CLASS: F ,

TUNCTION: Prevents steam flow from lower containment to upper  :

containment bypassing the ice condenser in an accident.  !

i- . {

TEST REQUIREMENT
, Full stroke exercise quarter 1'/  !

l

! BASIS FOR RELIEF: The check valve is on a drain line from the VX Fan Pit  !

to lower containment. The valve is located at the end  !

!. of a six inch pipe in lower containment and cannot be

! accessed without radiation exposure and safety related

  • risks. The check valve is normally closed and has no i fluid on the valve.  : }

j ALTERNATE TESTING: The valve will be visually inspected during refueling  !

outages to ensure free movement. (No disassembly will l be required).  ;

I i i

I  !

t c l  !

! 1 1 i i

i 1 i i  !

a i l' i

i i II.25-3a  !

McGUIRE - UNIT 2 Revision 6 l New Page j 1  !

I

i MC-2565-1.1 VALVE: 2WL-24 CATEGORY: A, C l

CLASS: B l

FUNCTION: Provide centainment isolation, TEST REQUIPIMENT: Verify proper valve movement once per three months.

BASIS FOR RELIET: The system design does not provide any indication for verifying valve closure upon flow reversal.

ALTERNATE TESTING: Verified closed by leak test performed in accordance with Appendix J.

1 l

l l

1 i

l l

l l

l McCUIRE - UNIT 2 11.25-4

1 n

4 i SYSTEM: MA.IN STTAM I

l FLOW DIAGRAMS: . MC-2593-1.0 1

i i

s l

l 4

l 1 .

1 i

i i

4 t

r i

l

! i I

.i '

i 1

i 1 t

,1 a

I I

I 1

I I

l McGUIRE - UNIT 2 II.26-1 l

1

l l l l l l l

- n 2 o

- - i 6s c

c c

c

. - c e

c e

c e

c e

_ 2. vi

._. 1 e e e e e s s -

1 R m s s s s s s a

t e 5 5

5 5

5 1

5 1 5 5

S s e e e e e e e e _

m m m m m m -

n k m m i i i i _.

i r i i i i t t t e a t t t t t H m n n n n n n n e i s

o o o o R o o o o i i i i .

i i i i t t t t t .

t t t m

e a a a a a a a a ~

l l l l l l l t l o o o o o o o o s

y s s s s s s s s _-

I I I I I I S I I

-g0* Q.  %$ S S S *S C
  • S C S

C d

C d

C C C C

.N 8Y" e%E X X

_ X X X X X X T T T T T T T T -

m%N* 1Y g5 C C C C C C C C y

r o

D - -

g t

e C _

a .

C e

B X X X X X X X X -

v l

V a A -_

.3 YgO 3

1 3

1 3

1 3

1

- 4 1

3 1

4 1

3 1

- C C K J 1 1 G 1 1 r

es i

m u

0 0 9 0 0 0 0 0 _ .

N 1 1 1 I 1 I 1 1

i g

n 3

9 5

3 9

5 3

9 5

3 9

5 3

9 5

3 9

5 3

9 5 _9 3

5 w 2 2 2 2 _ 2 2 2 2 a

r C C

C C

_ C C

C

_ C - _

D M M M M- M f f _ M _ M I

. 2

."U R B B R B B B _ S _

T -

I N

II -

r_ _ _

c h

E cs _

B R _

i . R .

R -

t l B A l A D A N

. l l l _

A A A 0 A I A 2 _

._M 7 _

e I 9 3 1 5 I 1

_ t v - - - - - - - -

e l M M _ -

M M M _ M _M M a S S - S2 S S _ S S _

V 2 2 2 - S 2 2 _ 2 _ 2 .

l l l l I l l l 6 6 6 6 6 6 6 6

__ - ~ ,

2 i

l

i. -,

i"

, 4 MC-2593-1.0  !

t

{ ,

i

. i 2SM-1AB. 2SM-3AB. 2SM-5AB 2SM-7AB j j

4l VALVE
f i  !

l CATEGORYt 8 j i

J l

i CLASS: B t 4l TUNCTION: Main Steam Isolation Valves (MSIV's) . l l

l l TEST REQUIREXEM Cycle and Time Valves Quatterly.

BASIS FOR RELIET
2SM-1, 3. 5. and 7. MSIV's, cannot be full stroke  !

! 4 exercised during power operation because closure i

.! of these valves would result in unit shutdown. The i plant Tech Specs, do not permit isolation of a steaa '

l l' generator.

6  ;

ALTERNATE TESTING: These valves will be partially stroked quarterly while ,

4l i

in Modes 1, 2. or 3. These valves will be full stroled j and timed at hot shutdown conditions or cold shutdown. I 6 j j

i i {

l 4 t

I i

i i  !

i i i i i  !

}  !

! l

! i 2

I l i

1 1

1 i l i

i i

1 l ~

! McGUIRE - UNIT 2 11.26-3 1 Revision 6 l

i .

- -, e-aw.. ., -e.www.--r- w-*-em ---

-mw em m se ==-=-ee--=.=eeew-- w-+w--m e ne w e n +~5- - r m ww g " <- maw = y 'ipe s -$ -*r-* y w- er w y tt w e ie-- -

MC-2593-1.0 VALVE: 2SM-9AB, 2SM-10AB, 2SM-11AB, 2SM-12AB CATEGORY: B CLASS: B FUNCTION: Main Steam Isolation Valve Bypass Valves (MSIV Bypass Valves).

TEST REQUIREMENT: C):le and Time Valves Qua: 'rly.

BASIS FOR RELIEF: 2SM-9, 10, 11 and 12, MSIV Bypass vsives, can be full stroke exercised quarterly. However, these valves can-not be timed at this f requency since its operation is done utilizing a manual loader.

ALTERNATE TESTING: These valves will be full stroked quarterly and vill be full stroked and timed either in hot shutdown or cold shutdowm conditions.

O O!

McGUIRE - L' NIT 2 11.26-4 Revision 4 New Page i

1

t i

t r

1 i

1 i

l

, SYSTEM: MAIN STEAM SUPPLY TO AUXILIARY EQUIP M / TURBINE EXRAUST j i

', FLOW DIAGRAMS: MC-2593-1.2  !

I l

J 4 i i

l i

.i j

I, t' I J

1 4

)

i i

j 1

.i I ,

}

1

)

1 i i i I

i l

i 1

1 McGUIRE - UNIT 2 II,g7 1 4

i l

n

]

l l y

r - -

at -

2o i s -

. i l u -

i a xh e

m e

m 7s

2. vi u x i i I

e AE t t - _

_ IR ye e e _ .

l l n l pi c c .

p y y ud S u k s c c -

T r . .

m/ a x x -

at m a a en e m m -

t e R -

S mp c c

ni e e -

i u s s aq ._.

HE 0 5

0 5 _

m

  • t ;u * & _

e F 4,% S _

F F t R R s _

y S .

e e$5 _

me%N X X T T _ T T .

.U haa %? C C_ M M y D r

o , .

g _ _ -

t e _C - X X _ _

a ,

C _

X - - _

e _H_

_ - X - _ - - .

v --

l _

a A - -

V -

4 - 2 4 3 -

E;5Io3 _ - - - -

E . F F F _.

r_

e -

l i

m 2 2 2 2 u 1 N I 1 I g 3 1 3 3 _

n 9 0 9 9 - _

i 5 5 5 5 .

w 2 2 2 2 .

a - - - - .

r C C C C .

D H H M M .

eC B _

_ R _ B B - _

2

_ . T I

_. N r

I I

e -

l e - _

m C. .

u H t l _ .

. E.

N A _ A _

e 4 R

4 9

l v

a A

5

- S A

5 A

S 6

A S

-f H

r V 2 2 _ - _

- 2 2 l l l l 6 6 6 6

-=

P MC-2593-1.2 VALVE: 2SA-5, 2SA-6 ,

i CATECORY: C ,

i CLASS: B  ;

i i TUNCTION: 1) Passes steam to supply the turbine driven ,

auxiliary feedwater pump.  !

2) Prevents cross connecting steam generators 28 and 2C.

l TEST REQUIREMENT: 1) Full stroke exercise quarterly.

2) Verify valve prevents reversal of flow quarterly. [

t BASIS FOR RELIEF: 1) None required.

2) System configuration and design do not provide a suitable means to prove the valve prevents reversal ,

of flow. To check this valve on line would risk

  • personnel safety since high energy steam would be  :

involved.

t ALTERNATE TESTING 1) None required. '

i

2) At least one of the two valves will be disassembled '

j and inspected (verified to close) during each  !

j refueling. Both valves vill have been disassembled and inspected after.two consecutive refueling outages.

] Failure of one valve to function properly during a 1 refueling outage will result in the remaining valve j being disassembled and inspected during that outage.  :

0 i

I 1

i I

i l

)

1 4

4 1 i i

! II.27-3 j McGUIRE - UNIT 2 Revision 6

New Page  ;

I j

r

1 1

SYSTEM: MAIN STEAM VENT TO ATNOSPHERE FLOW DIAGRAMS: MC-2593-1.0 MC-2593-1.3 t i

i i

d t

l l

i I

t l .

1, ,

I i

! i 4

i 1 1

l 3

1

, l i

1 i

l 1

I I

4 i

h I

l 1

McGL' IRE - tJNIT 2 II 26-1 i

1 2

l

{

e h

r e

p s

e 2

8 6e i

n o

s

2. vi o m

_ m i 1

t t I e A e R e m o l i

t c t

_ y -

t s c e n k l e r .

V a x c m a y m e m c a R .

e .

c t c e S e s s

n 0 i 0 a 6 6 M

t2 E m 2 E e

t s .: E y

S m E e0" ?E %E T C

P S

P S

P S

P S

P S

T C

P S

P S

P S

y r _D _

o g - _ .

X X X .

X - X t

e a

C 3

- X X C -

X e

v B X l

a _A V _

O 4 5 7 9- - I 2

I 5 5 - 7 - 9

%S S - - - - -

C E

L K K K

- K K E - E - .

r -

I

c. -

m 0 0 0 0 0 0 0 0 0 0 u 1 I 1 I N 1 1 1 1 1 1 g 3 3 3 3 3 3 3 3 3 3 n 9 9 9 9 9 9 9 9 9 9 i 5 5 5 5 5 5 5 5 5 - 5 w 2 2 2 2 2 2 2 2 2 2 a - - - - - - - .

C C r C C C C C C C C .

N M H M M M . H M D M M -

U B B B B B B B B B .

. B 2 T

I

_ - . N

_ I r

I b

e m

u B, _

8, A _

F.

R N A _ -

3 4 _. 5 . 6 _ 7 a 9 0 1 2

e _. 1 l 1 2 2 2 l l8 1 1 1 1 l v - -

t l V V V - V V V V V . V V c V

a S 2

S 2

. S 2

S 2 _

_ S 2

S 2

S 2

S 2

S 2 - S 2

M l l 6 6

, '  : C '

=

.. e l l 6

(N h r

e .

3no p _ i _

s e e 8 s o m m

2. vi _

i i

m t t I e _

t I _

A e R e

_ t o l c

y l

c y _

~ t s c c .

n k . _

e _ r .

x V _ a x a _

m a .

- e m m m

._ a R .

e c c _

. t e e

. S s s _ .

n 0 0 _

i a 6 6 .

M .

o>uoocu32 _

m o a a<," $

e t .

s a u = egE .

y _

S wegE P P T P P P P P T P Ieueotex v t "S S S C S S S S S C S y

r D .

o g _ ._ _

_ X X X

- X X X _

X X e C_ _ -

- t .

a

- X_

- C .

e B X _ _

v _

l a A _ - .

V _

. 0 2 t 2 .

~ a=u4c4ogO

- 1 1 5 6 7 9 I 1

5 _ 6 E E I K K K K K G _ E .

r _

c. _ - .

d 3 3 3 3 3 3 3 _

3 --

a 0 0 . _

- N u

1 1 1 1 1

1 1

I 1

1

_ g n

3 9

3 9

3 9

3 9

3 9

3 9

3 9

3 9

3 9

3 9

i 5 5 5 5 5 5 5 5 _ 5 _. 5 -

- w a

2 2

2 2

2 2

2 2

2 2

C C C C C C M .. CM r C C N M M M M_ C -

- D M M M -

3 B R B 3 8 _ R .

N R . .

R - 2 _

agU _ .

T

- N I

r e

I I

b _ ._ C. .

m _

E u

R. _ _

H. _

R _

._. N _ A A

3 4 l

=

e 2 2 I 2 3 4 5 6 7 ._ R- ll

.- f v V

V V

V V

V V

_ V _ SV _

V

- C c

l a S S

- S S S S 2

S _ S 2 _ 2 2 S

2

-M _

V 2 2 2 2 2 _ _ _ - _

l l

. 6 6 .

l lI l l l I l l t1 ij  !!\l iiflt

o i I i w l i i l I k 1 I is i li C- iac t i l

! iN l l 3  ! i

- I c 4 l-I e i ,

w I i a I e .= l 6 w i.

> 9

' {  !

E

.e m f I

O

- i e +

i i 1

.:: I i 2 I i  !

aATavu2asty i a

[ SuT2sel g sasenbag i j

M Ja}Iag  ;

l '

i i I l'

s2uace2Tnbeg 1 sal g g g g I i

l i

b i m i- - - i i i

i 1

O k

O

>  ; i 9 -4 l

> i i i ,

! i , i

' N i= l i '

sostuip2 coa ,7  ?  ! 7 7 l l i l w i  : ,

4 l 4  ! j g m .

. m. . m. m. ,

2 M

  • l "e "e i l l i a e m m m l ,

e m i t c' e e e e l l

' i

-l e e e c l  ! 1 i N N 3

j i. l ',

N. N. i i t w U U V U l t l

I i

O E E E E I I I > 1 '

\ f l l f 1 l i } l l Sert 3 C m l x m j l l ) '

i , l , 1 .

wl ,

i , ,

, , O l $

I

! l

!  ! I I b l  ! I i 1 j' ,

l ij i i

e T t T

~ .

l I I l'

i th i k i T l l i i , > '

> > l > ' I U

e v. l 4 v. M i -

l

>I N N N l N l i

-l f

1 l

l l

l SYSTEM: MAKEUP DEMINERALIZED WATER FLOW DIAGRA.'S: MC-1601-2.4 1

l l

l i

)

l l

McGUIRE - UNIT 2 II.29-1

l r _

e t

a s 2- o i W d n

9 s d

e o

c _ 2. vi z e 1 e i s -- _ _ 1 R l _

a 5 n

r e

s 1

e i

m _

k r i m _

e a t D m e n p R o u i e t .

k a a l M o s

I m

e t

  • en a Eu * , M *
  • s F F S

y E %S R R a 5.Er E X u.dE ea aoeE " S TT TT .

CL HL .

y D r

o g

e C X ._

t .

a C

B e

v l

a A X X _.

V 9 4 _

ueSo" O-

_ C _

C _

r ei l

m 4 4 u _ _

N 2 2 _

g 1 1 n 0 0 i 6 6 _

w 1 1 . _ . _

a - - _ _ _

r C C _

D M M _ _

B B 2

."U T

I

_ N r _ U b

e _ _.

m _. _. _

u B . _ . F.

i N 5 - 6 _ _

R l . l

_ I e

I I _. t v - _ - _

C l M M _ _

_ c a Y

_ Y _ _ _

_ M V 2 2 _ _ _ _

l 6

SYSTEM: NUCLEAR SAMPLING FLOW DIAGRAMS: MC-2572-1.0 MC-2572-1.1 '

MC-2572-3.0 i

i F

i f

I 1

i t

i i

r i

t I

l i

i I:

i l

t l

i t

I I McGUIRE - UNIT 2 II.30-1  ;

l'

-mmm-w- --m- w y g- - - - - --ew---w- - --a.e, g.-- - -

,,ew%y--+w., -www,-y-v ar-v.-,y-,w,e--*w---- ...y.:--yww-m-wn.-w,w,&a-.,,s.-,w- - -w-----w-we a-w 4-w e-we-e ene'w

I .

g ** System: Nuclear Sampling a : E 2  ?

Q 3

  • l .

. 4 i R

  • g Valve Category g j g U 0 -

0 0 0 Valve Number Drawing Number A B C D Remarks .

B HC-2572-1.0 E-3 X CT RF* Isolation time $15 sec. l 6l 2NH-3A.C Q

LT HC-2572-1.0 J-3 X CT RF* Isolation time 115 sec.

6l 2PH-6A.C B Q

l LT 2NH-78 B HC-2572-I.0 K-6 X CT RF* Isolation time $15 sec.

Q LT 5l l 6l 2NH-26B B HC-2572-I.0 K-9 X CT RF* Isolation time 115 sec. l Q

LT HC-2572-1.0 K-12 CT RF* Isolation time <l5 sec.

6l 2NH-25A.C B X l Q

LT O

~

F . - IINIT 2 Revision

[

l l

d 6

n g - 3 oi n

i .

0 s l c c c c c 3 i p e e e e e v m s s s s s g e _

a 5 3 R S 5 5 5 5 _

1 1 l l 1

r $ $ $ < < _

a e e s e e e e _

l c

k r i m i m

i m i m' i m - _

u a t t t t t N m n n e n n n R o o o o o _

i i i i i m t t t t t _

e a a a a a t l l l l l '

s o o o o o y s s s s s _

I S I I I I e3" e 2 w4$$

~

F F

F F

F F

F R R R R R R R

. I:.# .d$

1

,l T T T T' T T T T T T T T _

.5 :a e" $5 CQL L L C9L CQL CQL CQL _

y D _

r o _

g ~

e C "

t - _

a '

C _

B _

e v

l -

a A X X X X X X X - .

V _

2 3 2 0 1 ~

1 1 1 6 8 1 1 -

u84 oO J I

I 1

1 J J -

r ei l

m 0 0 0 1 1 1 1 u . . . .

N 1  ! 1 1 1 I 1 -

a 2 2 2 2 2 2 2 -

n 7 7 7 7 7 7 7 i

w 5

2 5

2 2 5 5 2

5 2

5 2 - 5 2

a - - - - - - --

r C C C C C C - C D H M M H H H

- H -

2

.$U B B B B B B B --

T I

N I

- I r -

l e

i - -s m C.

i R

_ ' u 0

_ N A 1 B 8 8 B - l 2 2 2 2 5 8 1

- l i

e 2 4 4 7 7 7 _

_ 8 ~G

' v -

M M

- - - - - - - c l H N N H H H - HN M a N 2 2 N N N -

V 2 2 2 2 - 2 l l l

- 6

- 5 6

.J i  !

l i li: 4i 1 :1 ' ll

" System: Nuclear Sampling t

3 i  : :

4 4  ? A S a - F

" y Valve Category ,

  • g u

8 O D H

T a: H

Remarks Valve Numb g Drawing Number A B C 2NH-69 B HC-2572-1.I C-9 X LT RF* Passive 2NH-82A B HC-2572-1.1 E-9 X CT RF* Isolation time $15 sec.

Q LT 2NH-187A B HC-2572-3.0 K-1 X CT Isolation time $15 sec.

Q 2NH-190A B HC-2572-3.0 K-2 X CT Isolation time $15 sec.

Q 2NH-191B B HC-2572-3.0 I-2 X CT Isolation time $15 sec.

Q 2NH-197B B HC-2572-3.0 K-5 X CT Isolation time $15 sec.

Q 2NH-200B B HC-2572-3.0 K-6 X CT Isolation time $15 sec.

Q McGUIRE - UNIT 2 11.30-4 e d -

e

[

SYSTEM: NUCLEAR SERVICE WATER FLOW DIAGRAMS: MC-1574-1.0 1l MC-2574-1.1 l 5l l MC-2574-2.0 MC-2574-2.1

MC-2574-3.0 MC-2574-3.1 MC-2574-4.0 5l MC-2604-3.1 l 5l The valves with a "0" prefix found on drawing MC-1574-1.0 are shared l' ,.

by both units. They are covered under the Unit 1 Inservice Testing Program, and they are presented here for infortnation only.

't J

i ll 1

J h

i P

i-l l

l McGUIRE - UNIT 2 II,31 1  !

Revision 5 l

] .

.,,--w--,,,av e- e, ee---c-----mey --.m.m,,we,,wwn.- ,e.,-ee-

l l

1 l

e System: Nuclear Service Water i

a 8

y a 5  :

E 4 t dE

$ Valve Category  % M $"

O $ $ SQ -

Valve Number Drawina Number ,A B C D Remarks C HC-1574-1.0 J-9 X CT 60 sec. max. cycle time' l

!l ORN-7A 1l ORN-2B C HC-1574-1.6 K-10 X CT 60 sec. max. cycle time l C HC-1574-1.0 K-10 X CT 60 sec. max. cycle time l 1l ORN-3A C HC-1574-1.0 J-lI X CT 60 sec.. max. cycle time l 1l ORN-13A 1l ORN-12A.C C HC-1574-1.0 I-11 X CT 60 sec. max. cycle time l C HC-1574-1.0 1-13 X CT 60 sec. max. cycle time l 1l ORN-14A C HC-1574-1.0 F-13 X CT 60 sec. max. cycle time l 1 l ORN-ISB C HC-1574-1.0 F-12 X CT 60 sec. max. cycle time l

, 6l ORN-4A C C HC-1574-1.0 E-12 X CT 60 sec. max. cycle time l 1l ORN-58 C HC-1574-1.0 G-Il X

  • CT 60 sec. max. cycle time l 1 l ORN-10A C Revis .i 6

f ;IlI))!

l l l l l l l I l  ! l r 6 e n t

a 3- oi W .

e e e e e e e e 3 s e m i m i m i m

i m i m i m

i m 3. vi c i t t t t t t t 1 e i t 1 R vr e e e e e e e e l l l l l l l

e l c cy c c c c c c S y y y y y y y c c c r s c c c c c a k r . . . . . .

e a x x

x x x x x x l

a a a a a a a a c m m m m m m m m u e m N R . . , . . . .

c c c c c c c c e e e e c e e e s s s s a s s s m

e 0 0 0 0 0 0 0 t 0 6 6 6 6 6

.sy 6 6 6 S

$ ," :Q Ign

.$sj 1Ma T T T T T 1 T T "

.y l d':" g* C C C C C 0 C C y D r

o g

e C t

a C X X X X B X X X X e

l v

a

' V A_

1 0 0 6 1 1 1 9 7 7 6

.* a4g3 - - - - - - - -

F G F D J E I F r

e b 0 0 0 0 m 0 0 0 0 u 1 1 1 1 1 1 N 1 1 a 4 4 4 4 4 4 4 4 n 7 7 7 7 7 7 7 7 i 5 5 5 5 5 5 5 5 1 1 1 1 1 1 1 w 1 a - - - - - - - -

r C C C C C C C C D H H H H H H H H

.gu C C C C C C C C 2 T

I N

r U e

hs C.

a

~

A B A 8 A B E-N B 1 2 9 2 0 1 R 1 0 0 8 4 5 5 5 I e 1 3 3 9 1 1 1 1 U v - - - - - - - - C l M N N N N N N c a M R R R R R R R M V O O O O O O O O l l l l l l I l l l 1 1 1 I 1 1 1 1 s 6

.I:I ,il j ' , l 4 i ,;!

i'!i.4

. System: Nuclear Service Water

- 1 a

a r

-  : #2 .

. " g Valve Category " j u*

U O 5 $ SN .

Drawing Number A B C D Remarks Valve Number 2RN-2793 C MC-1574-1.0 C-2 X CT SC sec. max. cycle time l 6l 2RN-299A C MC-1574-1.0 C-2 X CT 60 sec. max. cycle time l 6l .

$l l

$l N-2 X CT 60 sec. max. cycle time l 1 l ORN-147A.C C HC-1574-1.0 H-3 X CT 60 sec. max. cycle time l 6 l ORN-148A ,C C HC-1574-1.0 I

51 F-2 X 60 sec. max. cycle time 1lORN-283A,C C HC-1574-1.0 F-2 X CT 60 sec. max. cycle time 1 l ORN-284B C HC-1574-1.0 l 11.31-4 Revisio IIRE - UNIT 2

l 6

r O_.

_ e n t 5oi

_ a -

s W e e e e e e 1 e e e

m m i m i m

i m i m i m

i m

3. vie c i t

i t t t t t t t I I R i

vr e e e e e e e e l l l l l l e l cy l

c cy c c c c y

c y

S y y y y s c c c c c c c c r

a k . . . . .

e r a x x

x x x x x x l

a a a a a a a a c m m m m m m m u e m m N R . . . . .

c c

c c c c c c e e e e e e e e s s s s s s s s m

e 0 0 0 0 0 0 0 t 0 6 6 6 6 6 s 6 6 6 y

S 3 %E

  • M S S

.S %S C C X X

. N

  • l" .$$

T T T T T T T T T E* 1Y" 3$ C C C M C C C C C .

y D r

o O t C

g e

a C X .

B X X X X X X X X e

l v

a A V

2 2 2 2 2 3 5 9 1 1 1 1 2

.* 3O$O - -

H J

I F

F E

J J L r

e b 1 I 1 1 1 1 I 1 m 1 .

u . . .

1 1

1 1

1 1 N 1 1 1 a 4 4 4 4 4 4 4 4 4 7 7 7 7 n 7 7 7 7 7 5 5 5 5 5 i 5 5 5 5 2 w 2 2 2 2 2 2 2 2 a - - - -

C C C C r C C C C C D M M H H H N M H H

.* U C C C C 'C C C C C 2 T

I N

r

_ U e -

b m E u A B A B R N A A A A O 1 6 2 8 8 0 1 3 8 I 2 6 4 4 4 1 U e 2 1 2 - - - - C v - - -

N N

N N N N c l N N N R R R R M a R R R R R 2

I V 2 2 2 2 2 2 I l

6

g l

r

~ e t 6 a - i W e e e e e e 1 g e m m m m m m 3 i c .

i i i i '. i v i t t t t t t 1 e vr I R e e e e e e l l l l e l l cy c c c S c c y y y y y c r s c c c c c a k .

e r . . .

x l a x x x x x c m a a a a a a u e m m m m m m N R . . . .

c c

c c c c

e e e e e e m s s s s s s e 0 0 0 0 t 0 0 s 6 6 6 6 6 6 y

S

  1. Oy.uN S S

?n.S C C

.,:aa a.5 .

X X T T T T T T T

!0?a .$ C C H C C C C y D r

o g

e C X .

t -

a C

B I X X X X X e

l v

a A V

2 2 2 3

%R2o0 5 4 9 1 1 1

1 G C E B F F L r

e b 1 I 1 m 1 1 1 1 u . . . . .

1 1

N 1 1 1 1 1 g 4 4 4 4 4 4 4 n 7 7 7 7 7 7 7 i 5 5 5 5 5 5 5 w 2 2 2 2 2 2 2 a - - - - - - -

r C C C C C C C D H M H M H H M

  • .U C C C C C C C 2 T

I N

r U e

b -

m A u B E N B B 1 B A 6 R 6 5 0 6 1 3 9 e 2 2 3 1 4 4 2 v - - - -

N N

N l N N N N a R R R R R R R V

_ V 2 2 2 2 2 2 l

2 l

l 6 6 6

O -- -- - - -- - - -

O h ,

System: Nuclear Service Water E. $.

E U S $

%  ? a n a

3 v

a -

E'E g g Valve Category g j g.

U O . $ $ $Q Remarks Valve Number Drawing Number AlB C D C HC-2574-2.0 1-1 X CT 60 sec. max. cycle time l 6l 2RN-166A 2RN-70A C HC-2574-2.0 E-6 X CT 60 sec. max. cycle time

! C HC-2574-2.0 K-7 X CT 10 sec. max. cycle time l 6l 2RN-69A

)

2RN-73A C HC-2574-2.0 1-6 X CT 60 sec. max. cycle time 1

i C HC-2574-2.0 I- 8 X CT 60 sec. max. cycle time l

, 6l 2RN-112A 2RN-II7A C HC-2574-2.0 1-10 X CT 60 sec. max. cycle time 2RN-86A C HC-2574-2.0 D-12 X CT 60 sec. max. cycle time C HC J-12 X CT 60 sec. max. cycle time l l 6 l 2RN-89A

..__. - . _ . _ .. _ _-2574-2.0 _.

j 2RN-140A C HC-2574-2.0 E-14 X CT 15 sec. max. cycle time

. tk GIIIRE - UNIT 2 11.3I-7 Revision 6

e U e System: Nuclear Service Water l . U

. 3 .

  • 1 l 3

?

. O  % SE

$ Valve Category U M %*

U 0  ? E ON Drawing Number A B C D Remarks Valve Nanaber MC-2574-2.1 C-6 X CT 15 sec. max. cycle time 2RN-103A C 6l C HC-2574-2.1 C-7 X CT 60 sec. max. cycle time 2RN-134A MC-2574-2.1 11 - 7 X CT 60 sec. max. cycle time 2RN-137A C C MC-2574-2.1 D-10 X CT 15 sec. max. cycle time l 6 l 2RN-126A C HC-2574-2.1 C-10 X CT 15 sec. max. cycle time 2RN-130A MC-2574-2.1 B-Il X CT 15 sec. max. cycle time 2RN-Il4A C 6l __

Mc (21 ' "

- UNIT 2 11.31-8 Revision

)

/

h , System: Nuclear Service Water i

s .

. 1 "

l 3" l 8

? .

m $ e 0

" .g Valve Category g j g*

U O 5 E SQ Valve Nuc2>er Drawing Number A B C D Reu rks .

C MC-2574-3.0 1-1 X CT 60 sec. max. cycle tima l 6l2RN-170B I

2RN-171B C MC-2574-3.0 F-7 X CT 40 sec. max. cycle time 4

2RN-174B C MC-2574-3.0 I-7 X CT 60 sec. max. cycle time 6 l 2RN-1628 C HC-2574-3.0 J -7 X CT 10 sec. max. cycle time l 6l 2RN-213B C HC-2574-3.0 J-8 X CT 60 sec. max. cycle time l C MC-2574-3.0 1-10 X CT 60 sec. max. cycle time l

6 l 2RN-218B 1 -

2RN-187sl C MC-2574-3.0 F-12 X CT 60 sec. max. cycle time j _. __

2RN-1908 C HC-1574-3.0 J-12 X CT 60 sec. max. cycle time 2HN-2408 MC-2574-3.0 F-13 X CT 15 sec. max. cycle time l 6l i

6 2RN-297B C MC-2574-3.0 L-5 X CT, 60 sec. max. cycle time i McGUIRE - IINIT 2 11.31-9 i Revision 6 ,

. System: Nuclear Service Water 8

- 2 .

1 ?

3" a l .

e a SE

$ $ Valve Category  % M % .',

U O $ $ SQ Valve Number Drawing Number A B C D Remarks .

2RN-204B C MC-2574-3.1 C-5 X CT 15 sec. max. cycle time l

6l 2RN-235B C HC-2574-3.1 E-7 X CT 60 sec. max. cycle time 2RN-238B C HC-2574-3.1 I-7 X CT 60 sec. max. cycle time 2RW-2278 C MC-2574-3.1 E-10 X CT 15 sec. max. cycle time 2RN-231B C HC-2574-3.1 C-10 Y CT 15 sec. max. cycle time 2RN-2158 C HC-2574-3.1 B-ll X CT 15 sec. max. cycle time 61 1

+N N -

- wa w . h -*w-W N mmam_

O

. _ _ _ _ _ _ _ _ ..__-----------__ea ~ ~ _ ., - .

11.38- 10 M4 (* - UNIT 2 Revision

O i

h . Sys teen: Nuclear Service Water i

~

s .

s  ?

5 3 "

Y ."

, . 4 . R0

' " g Valve Category  % M g*

U 0 0 E SQ Valve Numlier Drawing Number A B C D Remarks -

! 2RN-2528 C HC-2574-4.0 E-2 X CT X CS Isolation time $30 sec.

LT 2RN-253A C HC-2574-4.0 C-2 X CT X CS Isolation tiene $30 sec.

! LT ,

2HN-276A C HC-2574-4.0 J-2 X CT X CS Isolation time $30 sec.

' LT 6 l 2RN-2778 C HC-2574-4.0 11-2 X CT X CS Isolation time $30 sec. l LT i

2RN-42A C HC-2574-4.0 R-9 X CT X .CS 60 sec. max. cycle time 2HN-63R C HC-2574-4.0 L-10 X CT X CS 60 sec. max. cycle time 2RN-64A C HC-2574-4.0 L-ll X CT X CS 60 sec. max. cycle time 1

6 _

l' _ _ . _ . _ _ _ . _ _ _ _

, McCUIRE - UNIT 2 11.31-11 Revision 6

O

.I 5 (PACE INTENTIONALLY LEFT BLANK) 4 9

McGUIRE - UNIT ? [1,31-12 Revision 5

~-----s--,,-. . .- - - - - , . . . - - - . . . . . . - - , . - _--,-.n.-----_--,,.-.,..e.-,.--

l SYSTEM: REACTOR COOLANT SYSTEM FLOW DIAGRAMS: MC-2553-2.0 MC-2553-4.0 I

i l

i l

l

\

\

i l

I l

l l

l 4

McGUIRE - UNIT 2 II.32-1 ,

1 l

I

_ _ . _ . _ - _ _ . . _ _ - ~ _ - . , _ . _ - . _ -

!  ! l l l n

2 o

. . . - i t

n c c . o . e e 2 s a e e c - c m

3. vi e s s e  ! e i l

C o

o i t

m i t

e m i t

e.

s 6

0 0 6 0 s t 0

s t e

m_

e I

I e

R 1 h 1 k k r e e e G I

- G 5 I C

I f $ n r

$ o r r 9

o l l c

l c S S e S e e t e t t t s c P m P m m s s c k y y y P m e a r c c c i i t

i i t . ._

e a 5 5 t 5 t v x x n d d d 8 8 8 R

H e n o

c n

o c

n o

c 4

2 '- -

4 e 2 l c

4 2 l e

c i n

o eo i n

m a

e 3.

m_

t y y e e e t t t -

t c

v .

m e s s s a a c a c a c a i c l o l e s e -

t . .

o n o s s s s 0 0 0 t e

t e x t

e a x s s a y a 0 0 P 10 S 2 2 2 S S M S M i I 1

1_ .

$w%cU" * $g5 1 C

S C

.aE a 2 % d $ X X X X X T T T P P r P T TT TT T T r aye0a?E $S C C C S S -

S C CL T C CL C L -

c c_

y r

D - -

o g

e C _ - _

X --

X X X _

t a . _

C _ _ - X X X e

_B X _

X

_ X

_ - X_ x_

v l

e /.

_ X X X V _

0 3 _

_ 0 2 3 5 3 4 1 5 4 9 2 1 3 1

_ " %0$O - - - - - - - - - - l F

F G G G _ K K 1 K T 1 F

1 I E _

r b

e 0 0 0 0 0 m 0 0 0 0 G 0 0 u . 0 0 2 2 2 2 2 2 2 2 2 N 2 2 2

- 2 - 2 - - - - - -

3

_ g 3 3 _. 3 3 - 3  : 3 3 3 3 3 3 5 5 3 n 5 5 5 _ 5 5 3 5 3 5 5 5 5 5 5 5 5 5 5 5 5 5 52 i 5 5 5 5 5 2 2 2 w 2 2 2 2 2 2 2 2 -

a - - - - - 2 - 2 - - - - - - -

r C C C C C - C r C C C C C C D M M M M H M C M C M M M M H M M -

_ L 2

.3U A A _ A _ _ A A A A /_ B A B A B A_ T I

_ _ _ IN

. I r .

e ._

b m_

u_ 8 A 8

_ B B _ A B B A B E -

N_

e 6 4 ._ 3 2 .

2- 2 5

7 3- 2 4

7 4 5

5 5

3 3 3

7 5- 3 1

's -

v _- -

3 3 .

1

_ 3

_ l- C C C C

_ C C C C C C C C N C M -

_. N N N N a-V. .

N 2 _ N 2 ._ N2 _ 2 _

N N 2 2 2 2

N 2 N 2 2 2 N

2 2 N

1 l l l l 6 6 6 6 6

lU _

l l J 6 L . .

_ 3 n

o c c i 2 s t .

e e n s s

3. vi a c e l e' 0 0 1 o s 6 6 1 R

o _

C 0 < <_

1 r <- e e o m m t s e i i c k m t t _

a r i e a t e e H m l l e n c c R o y y

i C C e e s t v v e a . . i i t, l x x s s

s s

s o a a y s H H _

a a S I

_P P

,3 %0

  • 4 3%S F F F F S S R R R C C R

.$8?*%jM X X X X X X TT T T T T_ T T CT CT T T .

. y E* sY* y5 CL C C C C L L PL PL L L .

_ y r

D _

s__

o _ _

g e C _ _

_ X X t _ _

_ a _ _.

C e

B X X X X__ _

v _

l a A X _

. X X X X X X V _

4 G 1 1 8 8 1 9 l 1 1 8 8 6

.*24$O - - - - - - - 7-C -

C D J J D C 1 H 8 1

1 ,

r e

b

- m 0 0 0 0 0 0 0 0 0 0 0 _

u .

N 2 2 2 2 2 4 4 4 4 4 4 _

g 3 3 3 3 3 3 3 3 3 n 5 3

5 5 5 J

5 5 5 5 5 5 5 i 5 5 5 5 5_ 5 5 5 5 5 5 w 2 2 2 2 2_ 2- 2 2 2 2 2 a - - - - - - - - - -

r C C C C 'L _ C C C C C C D H H H H H_ H H H H H H

_ _ . _ 2

.* U B A A A A_ B B B B B B

_ T

_ I

_ _ N

. U r

_ e i

l m C. C. E u A A B A R N B 2 3 C C 5 6 1 2 1 - 9 l Oa _ _

e v

6 5

C 7

2 7

2 2

9 7

2_1- -

9 9 1

C 4

1 C

4 1

C 6

2 C

5 2

C l

i G

c l

C C C C C M

_ a N N N N N N _ N N N N N V 2 2

_ 2 2 2 2 2 2 _ 2 _ 2 2 l l l 6 6 6

MC-2553-4.0 VALVE: 2NC-259, 2NC-261 CATEGORY: A, C CLASS: B FUNCTION: Thermal overpressurization relief.

TEST REQUIREMENT: Full stroke exercise quarterly.

BASISFOR RELIEF: Valves have no indication of closure.

ALTERNATE TESTING: Valves will be verified shut by leah test performed in accordance with Appendix J.

O O

McSUIRI - UNIT 2 II.32-4

MC-2 55 3-2. 0 VALVE: 2 NC-36B , 2NC-34A, 2NC-32B CATEGORY: B 4

CLASS: A FUNCTION: Reactor Coolant System PORV. -

TEST REQUIREMENT: Full stroke exercise quarterly.

BASIS FOR RELIEF: PORV's do not serve a safety related function when unit is at operating temperature and pressure. PORV's protect RCS from low temp. overpressurization.

ALTERNATE TESTING: Valves will be tested in accordance with technical specifications which require cycling of PORV every 18 months.

O

(

1 i

4 i

O ==-*"2 " 32->

t,

MC-2553-2.0 1

6l VALVE: 2NC-272A,C, 2NC-273A,C, 2NC-274B, 2NC-275B l CATEGORY: B CLASS: A FUNCTION: Reactor Vessel Head Ven't TEST REQUIRENENT: Cycle and time every three months.

Opening of any of these valves during power operation l 6lBASISFORRELIEF: could cause a loss of coolant.

ALTERNATE TESTING: Valves will be cycled at cold shutdown.

O I

l McGUIRE - UNIT 2 11.32-6 I Revision 6 l l

l l

l I

~~r - --

i 1

l

  • i b

P MC-2553-2.0 l

l 5l VALVE: 2NC-27C, 2NC-29C l CATEGORY: 5 r

CLASS: A I

  • t FUNCTION: Pressurizer Spray Control i

TEST REQUIREMENT:

Cycle and time valve quarterly.  !

6 BASIS FOR RELIEF: Full opening of either of these valves during normal power operation could cause a low NC pressure ,

reactor trip and safety injection.

6 ALTERNATE TESTING: Valve will be verified operable quarterly by ;.artial  ;

stroking. A change in RCS pressure will indicate  ;

proper valve operation. L 1

i l

i.

I

i I

i l

i  !

i I

6 McGUIRE - UNIT 2 II.32-7 i Revision 6

}

_ _ . - .--, ...___.,.,,___----y - , , , . , , . . , , . _ , , , , - , , , _ _ , , , . . , _ - .__.,_y- ., _ , . , ...-,. ._ ..-, _-- ._e ,.r- , _ -

-..,v,....w.,c, , , - .

4 l

l SYSTEM: REFUELING WATER i

i FLOW DIAGRAMS: MC-2571-1.0

\

L i

l l

1

< l l

i I

I 4

i i

1 i

l i

4 1

i i

}

l i

i

McGUIRI - L3IT 2 II.33-1

o a 3 U e  % System: Refueling Water E, N, ,N _ _. - - .. _. - - _ _ _ _

E U o a M

S. <

en tr S $ w $

2o Valve Category o

e e

e tm e

a o H m a o o Drawing Numlier A B C D Hr.na r k s

  • ylvp_NumJacr 2FW-5 B MC-2571-1.0 C-7 X X LT Passive B MC-2571-1.0 D-8 X LT HF* Passive l 6 l 2FW-4 B MC-2571-l.0 C-2 X LT HF* Passive l 6 l 2FW-13 B MC-2571-1.0 D-2 X LT HF* Passive l 6l 2FV-11 2FV-498 B MC-2571-1.0 F-10 X CT 10 sec. max. ope resting time Q

2FW-33A B MC-2571-1.0 F-Il X CT 10 sec. max. operating time Q

2FV-IA B MC-2571-1.0 F.- I l X CT 10 sec. max. operating time Q

H HC-2571-1.0 0-11 X CT 10 sec. max. operating iime 2FW-32H Q

et

- ,I i l ll.

l l O -

I 6

m a

r - l e e

. 3 s t m 3i a i . - v W t _

I a

_ I H g e _

n l i

c l y e s c u k f r .

e a x R m a _

e m .

R

. e m c v e e i t s s s s y 0 a S 3 P S F F .

e 3 ** :4 SgS C R R

. $ :l* tjE X s X

$j~1?" gS T CQ T

MQ T

L T

N y D _e _

r _

o C

g _ _

t e

a C _ X _ X _ X - _ _

C _ .

e v

B X _ _

l V

a A X _

L 2 1 3 _ _

1 1 5

.:30gO - - -

C F C 1 r _

b e _

m 0 0 0 0 .

u _

N 1 I 1 1 .

g 1 1 1 1 . _

n 7 7 7 7 _

i 5 5 5 5 _ _

w 2 2 2 2 .

a - - - - . _ _

r C C C C _ _ .

D M M M M ._

" U B 8 8 E _

2 T

I r . IN

_ e _ _

I b _

_ m _ _

u _ E N A _ _

H 7 8 3 2 _

e 2 2 6 5 _

1 1

v - - - -

_ Q l

a W 5

W F

v t

W c

.. V 2 2 2 2 _ _

. M l l l 6 5 6

I 1

l i

MC-2571-1.0 VALVE: 2W-27 A CATEGORY: B CLASS: B FUNCTION: Isolates low pressure inj . f rom RWST.

TEST RIQUIREMENT: Full stroke exercise quarterly.

BASIS FOR RELIEJ: Closure of this valve would render all low pressure injection inoperable.

ALTERNATE TESTING: Valve will be cycled and timed during/af ter cold 6 shutdown, but prior to Mode 3 (Hot Standby).

9 1

Oi McGUIRE - UNIT 2 II,33-4  !

Revision 6

SYSTEM: RESIDUAL HEAT REMOVAL SYSTEM FLOW DIAGRAMS: MC-2561-1.0 t

i l

l 1

l l

i 1

l 4

.i I

McGUIRE - UNIT 2 I I , 3I.- 1 i

m U e System: Residual IIcat Removal i  : -

O a e j a a 0

- a - #2

e 2o Valve Category o

a a 0au U O . _

E S SN Valve Number ., _ _ _ Drawing Number __ A B C_ _ D_ Remarks .

6l 2ND-1B A HC-2561-1.0 1-13 X CT X CS 60 sec. max. cycle time l LT 2ND-2A,C A HC-2561-I.0 H-53 X CT X CS 60 sec. max. cycle time l 6l LT 2ND-4B B MC-2561-1.0 E-12 X CT 60 sec. m.sx. cycle time 2ND-19A B HC-2561-I.0 H-12 X CT 60 sec. max. cycle time 2HU-23 B HC-2561-1.0 J-8 X MT X RF 5l l HC-2561-1.0 D-8 X NT X RF

$l 2ND-8 B 2ND-18 B MC-2561-1.0 F-7 I CT 60 sec. max. cycle time 2ND-33 B HC-2561-1.0 11 - 1 X CT 60 sec. max. cycle time NC-2561-1.0 B-9 X CT 10 sec. max. cycle time 2ND-618 B B HC-2561-1.0 L-9 X GT 10 sec. max. cycle time 2ND-68A H. - 8 ~ 'E - UNIT 2 11.34-2 Revisic

._ _ ______ ( -- . - _ _ . _ _ _ _ _ _ _ _ _ . v __

e

.  ?.

' -

  • 8 g , y System: Residual Neat Removal I U 0 _

e e e e

m

s. a u o e a u o e <:

w a E o as w sa:  %

,c4 v e

" g Valve Category g **

g a o e e e

,4 o a sa: e, u

i Va lve Numiner_. _

Drawing Numiser _

A B C D Remarks -

. 2 Nil-71 B HC-2561-1.0 C-4 X MT X RF i

2ND-14 8 MC-2561-1.0 D-3 X CT 60 sec. max cycle time

. 2ND-70 B HC-2561-1.0 K-3 I NT X RF I

B MC-2561-1.0 K-3 X CT X CS 10 cec. max. cycle time l 6 l 2ND-58A 1

]

i 2 Nil-29A B MC-2561-1.0 J-3 X CT 60 sec. max. cycle time I

l 6 l 2 Nil-15B B HC-2561-1.0 E-3 X CT X CS to sec. max. cycle time l l _ _ _ _ . _ _ _ _ _ _ ___ __ _ --

l 6 l 2ND-30A B MC-2561-1.0 1-3 X CT X CS 10 sec, cax. cycle time l 1

I 60 sec. max. cycle tisme

2ND-34 B MC-2561-l.0 C-5 X CT 1 _ _ - _ _ _ - . _ _ _ . _ . _ _ - _ _ _ - _ _ _ _ - _ -_

i

. _ _ . . . _ _ _ _ _ _ _ _ _ _ . _ . . . ~ _ _ _ _ . _ , _ _ _ . _ _ _ . _ _ _ _ _. ._ - _ _ . _ _ _ . . _ _ _ _ _ _ _ _ _

e4 4

i wcuanr. - imir 2 11.34-3 i

Revision 6 l

l 1

O MC-2561-1.0 5l VALVE: 2ND-15, 2ND-2A.C l CATEGORY: A CLASS: A FUNCTION: Provides suction for Residual Heat Removal Pumps during normal cooldown.

TEST REQUIREMENT: Verify proper valve movement every three months.

3 ASIS FOR RELIEF: These valves have been provided with an interlock which prevents their opening when the Reactor Coolant System pressure is greater than 385 psig. .

ALTERNATE TESTING: Valves will be cycled during cold shutdowns. Valves will 6 be leak tested in accordance with Technical Specifications.

1 l

1 1

McGUIRE - UNIT 2 11.34-4 Revision b I

4 l

l

)

. 1 MC-2561-1.0 l

VALVE: 2ND-70 CATECORY: C 1

CLASS: B i

FUNCTION: RRR to SI Suction Check. '

TEST REQUIREMENT: Full stroke exercise quarterly.

]'

3 ASIS FOR RELIEF: 2ND-70 cannot be full stroked during power operation or cold shutdown since the only full flow path is into ,

2 the RCS and this can only be performed during refueling '

6l outages, The miniflow forl  !

. ND Pump 2A does not pass through 2ND-70 so it cannot'6e 5 partial stroked during power operation or cold shutdown. l l 1

5 ALTERNATE TESTING: 2ND-70 will be full stroke exercised at refueling. i i

t f

1  !

t l

1  ?

! I l >

i 1

z 3

l J McCUIRE - UNIT 2 II,34 5 l Revision 6 i

)

i

. . - . ,.-. -. . _ , , , - - . . - . . - . - . - . . _ . . , . . - . - - _ _ . . - . - - - - - -, -- . . _J

O MC-2561-1.0 1

5l VALVE: 2ND-58A i CATEGORY: B CLAS3: B FUNCTION: Pre *. ides suction to the Centrifugal Charging Pumps from the Residual Heat Removal System.

TEST REQUIREMENT: Cycle valve every three months.

BASIS FOR RELIEF: Due to interlocks in the Safety Injection System and the actual Residual Heat Removal System design, it is impossible to test these valves without rendering both trains of Residual Heat Removal and both trains of Safety Injection inoperable during operation.

ALTERNATE TESTING: Cycle and time at cold shutdown.

4 i

l l

O!

McCU1RE - e m 2 11.3,.s l Revision 5 l l

MC- 2561-1. 0 ,

l

\

VALVE: 2ND-71 1 CATEGORY: C CLASS: B TUNCTION: RER to SI Suction Check. .

TEST RIQUIRDENT: Full stroke exercise quarterly.

BASIS FOR RILIEF: Valve cannot be full stroked at power since the only )

full flow path is into the RCS and this can only be done at refueling.

6l 2ND-71 cannnt be partial stroked during power since

the required valve lineup would render both trains l of safety injection inoperable. During cold shutdown,  ;

both SI pumps are tagged out to prevent a low tempera- .

ture overpressurization.  :

ALTERNATE TESTING: Valve vill be full stroked at refueling. j O l 1

l l

3 1

I l McGUIRE - UNIT 2 11.34-7 Revision 6

(-(

l j

'l . _ _ _ _

_ _ _ _ . _ _ . _ _ _ _ _ . _ _ . _ _ _ . . , _ ~ . _ _ . _ _ . _ _ _ _ . _ _ _ _ _ _ _ , _ _ _ _ _ . , _ _ . . _ _ _ _ . . .

O MC-2561-1.0 VALVE: 2ND-8, 2ND-23 CATEGORY: C CLASS: B FUNCTION: Prevents reverse flow through the ND Pumps TEST REQUIREMENT: ' Full stroke exercise quarterly BASIS FOR RELIEF: 2ND-8 and 2ND-23 cannot be full stroked during power operation since the only full flow path is into the RCS and the ND Puaps cannot overcome RCS pressure.

ALTERNATE TESTING: Valves will be full stroke exercised at refueling and partial stroked quarterly.

4 O

McGUIRE - UNIT 2 11.34-8 i Revision 5 New Page ),

MC-2561-1.0 VALVE: 2 ND-15B. 2ND-30A CATEGORY: B 1 CLASS: B FUNCTION: ND Heat Exchanger Outlet Crossover Block Valves TEST REQUIREMENT: Cycle and time valve quar'terly.

BASIS FOR RELIEF: One of the ECCS safety analysis assumptions is that each train of ND can supply flow to all four cold legs.

If either of these valves fails closed during testing, then only two cold legs could be supplied by each train of ND. This would make both trains of ND inoperable.

ALTERNATE TESTING: Cycle and time at cold shutdown. ~!

O

)

i 11.34-9 O McCUIRE - UNIT 2 . Revision 6 New Page J

. , , - . . - . - , - r-.. , - ~

SYSTEM: SAFETY INJECTION FLOW DIAGRAMS: MC-2562-1.0 MC-2562-2.0 MC-2562-2.1 MC-2562-3.0 MC-2562-3.1 MC-2562-4.0 O

McGil IRE - UNIT 2 II.35-1

.--.........-.-., - - . - - - - - . . . - - - - - . ....... . . - - - - _ ~ . . . _ - - _ . - - - _ . . - _ _ . - - . - - - . . - - . . . . - - - - . . . . . . . . . .

", j System: Safety Injection c e <o y a c .. - .- - . . _ . _ . . . .

3 1 "

l 2 Y .

oc  % c

$ "E Valve Category u .% U S o E T E U 8'

  • Va lve Numlier Drawing Numlier A B C D Hemarks __ _ _

B MC-2562-1.0 11 - 1 2 X CT X CS 11 sec. max. cycle time l 6 l 2NI-9A E MC-2562-1.0 C-12 X CT X CS 11 sec. max. rycle time l 6 l 2NI-108 2NI-12 B 11C-2562-1.0 G-9 X MT X RF 2NI-15 A HC-2562-1.0 K-7 X rfT X RF 2NI-17 A MC-2562-1.0 I-4 X MT X RF 2NI-347 A MC-2562-1.0 I-4 X MT X RF 2NI-19 A HC-2562-3.0 F-4 X MT X RF A MC-2562-1.0 F- 5 X tif X RF l 6 l 2NI-348 2NI-21 A MC-2562-1.0 C-7 X MT X RF 2Ni-349 A MC-2562-1.0 C-7 X MT X RF l

II U-2 tt t 'ti l H E - UN I T 2 e

Revision 6

  1. G

e

  • y fystem: Safety injection a a e l

l

~

= 6 3 1cr e sm:

4 E e ee v4 M en C Zo Valve Category ,

  • g e e a .

--4 o e e e u o H d H Remarks Valve Number Drawing Number A B C_ D .

2NI-354 A MC-2562-1.0 K-7 X NT X RF 4l ___ _ _

t i

2NI-4318 B MC-2562-2.0 J-4 X CT X CS 60 sec. max. cycle time A

l 2NI ~/D A MC-2562-2.0 H-13 X X LT X CS NT NF 2NI-71 A NC-2562-2.0 H-14 X X LT X CS Si nr l MC-2562-2.0 X CT X CS 60 sec. max. cycle time l i 6 l 2NI-430A R F i _ _ _._

2NI-59 A HC-2562-2.0 D-13 X X LT X CS ,

f i nr nr t

1 2NI-60 A MC-2562-2.0 D-14 X X LT X CS 4

wr;  ;

j 'I II 35-3 McClliHE - IINIT 2 Revisisin (,

i

l i l l

- n n .

4 o o - i i .

c 5

3 s

t c i c e e v -

_ e s s I -

j n 5 0 I

h

_ i 1 1 y

t s e e e k m m f r i i a a t t S m e n n R o o

i i

- t m t e a a t l l s o o y s s S I I

_

  • A *

$ 9 2 FU:" F F SF S FS FS F

_ R R CR C RC RC R

a a 3:[ _ X X X X X 4

TY TT TT Tr TT TT TT hi aa u:" CL NL LN Ln NL ML CL

_ y D

_ r

_ o .

g _

_ e C X _

X X X X

_ t _

_ a .

_ C _ _

e v

B _

_ l a A X X X X X X X V

5 3 3 _ 3 8 8 I

I

" S 8" - - - - -

C K K C

_ C C F

_. r _

e e

_ l m 0 0 I 1 1 1 1 u . . . . .

N 2 2 2 2 2 2 2

_ g 2 2 2 2 2 2 2 n 6 6 6 6 6 6 6 i 5 5 5 5 5 5 5 w 2 2 2 2 2 2 2 a - - - - - - -

r C C C C C C C D H H H H H H H

_ 2

" B 9 A A A A B T

I N

l l

r e

i l

m _ _ _

E u H

. N A 7

8 1

_ 2 3 4 A

5 l

i t

~

e 4 4 8 _ 8 9 9 9  ;

t v - - - - _ - - - c l I I _ I I _ I I I M

a N N _ N N N N N V 2 2

_ 2 2 _ 2 2 2

_ l l I l 6 s 6 6 6

~

3 d System: Safety Injection

. U, $ - _ .

. a -

0 $ $ &

w 3

ac l  %

c

  • j 3

e 2o Valve Category , ,

- e.n a. m.

Va l ve Numtee r o Drawing _ Numiner 3 A B C D H " H Remarks -

6 l2NI-968 3 MC-2562-2.I E-13 X CT Isolation time $10 sec. l LT RF*

i i

l 2NI-436 B FIC-2562-2.1 G-Il X X MT X RFA Passive 4 LT l

a 2NI-3348 B MC-2562-3.0 L-Il X CT io sec. max. cycle time j 2NI-3338 8 MC-2562-3.0 L-12 X CT 10 sec. max. cycle time B. MC-2562-3.0 L-14 X CT to sec. max. cycle time l l 5 l 2NI-332 A

2NI-1368 B MC-2562-3.0 C-14 X CT 10 sec. max. rycle time a

l 2NI-103A B flC-2562-3.0 I-14 X CT 10 sec. max. cycle time 6 l 2Ni-ioi MC-2ss2-3.0 r-i 3 x Mr x l

)

B

_ _ . . _ . _ _ _ _ _ . . _ _ _ _ . _ ____.~._____ --. _ _ _ _ _ _ _ ._ .t . - - _ - . _ _ _ _

w cuine - uNir 2 1,.3s_s j,

1 Nevisiant 6

?

0 U System: Safety Injection E O e E  !

E

? a A B - E E 2 Valve Category u 3  !!

S o E I E Va l ve Numine r Drawing Numlier V

A B C D " " " Remarks 2NI-Io0B B HC-2562-3.0 F-13 X CT X CS 10 sec. max. cycle time 2NI-1358 B HC-2562-3.0 E-14 X CT 10 sec. max. cycle time 2NI-Il4 B HC-2562-3.0 I-9 X MT 2NI-IISB B NC-2562-3.0 11 - 9 X CT 10 sec. max cycle time 2.41-147A B. MC-2562-3.0 G-il X CT X CS 10 sec. max. cycle time e

2NI-144B B HC-2562-3.0 G-9 X CT 10 sec. max. cycle time 2NI-143 B HC-2562-3.0 F-9 X MT 2NI-116 B HC-2562-3.0 J-9 X HT X RF 2Ni-148 B HC 2562 3.0 D9 K MT X RF 2NI-il8A Il MC-2562-3.0 11 - 7 X CT 10 sec. max. cycle time 11.35-6 e

e e

&cosur - tiNIT 2

fy [%

( )

(

x )

'v.___.___.______________.______,______

\ /

_____ v4-_. __ _ _ _ _ _ _ _________________________

", g System: Safety Injection c e e u g. - - - - - _ _ . _ _

m u 8 3 3 's Q n v x 0 eE s. E

'd Valve Category o

  • g

< 0 .. S e E u U H H Remarks -

Valve Nneteer Drawing Numiner A B C D 2NI-150n B HC-2562-3.0 E-7 X CT 10 sec. max. cycle time 6l 2NI-120n B HC-2562-3.0 J-7 X CT Isolation time $10 sec. l I.T RF*

2NI-121A 11 NC-2562-3.0 J-6 X CT X CS Isolation time $10 sec. l 2l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6l 2NI-122il H HC-2562-3.0 K-4 X PC Passive l 2NI-128 A HC-2562-3.0 1-4 X X LT cs 6l NT X RF 2NI-134 A 11C-2562-3.0 II-4 X X I.T CS 6l X CS NT

--m.+.*--h_ "db-'

  • W-e W _ _M

,em .4 e__. e. _-

6l 2NI-129 A HC-2562-3.0 I-3 X X I.T NT x CS cs 2NI-124 FIC-2562 - 3. 0 I- 3 X LT cs 6l A X flT X RF 1

McCUIRE - IJNIT 2 3 g , y,_ 7 Revision 6

?

O U System: Safety injection e O E n a s. - --

e e e E U S U

? A 3 a -  ?

E 'E. Valve Category o O U I 5 0 "

e E Valve Numi,cr Drawing Numl>cr A B C D Remarks -

2NI-126 A HC-2562-3.0 J-2 X X LT CS l 6l ffT X CS l

2NI-IR3R R tlc-25 f ' -3. 0 G-3 X CT X CS 20 sco. max. cycIc time l 2l _ _ _ _ _ _ _ _ _ __.

2NI-152n H MC-2562-3.0 D-6 X CT X CS 20 sec. max. cyric time l 6l _ _

HC-2562-3.0 D-4 X X Nr X RF 6l 2NI-159 A I.T CS l

flC-2562-3.0 B-3 X X MT X RF l 6l 2NI-160 A LT CS flC-2562-3.0 D-3 X X Mr X RF l 6j 2NI-756 A LT CS HC-2562-3.0 D-2 X X MT X EF 6l 2NI-157 A l LT CS 2NI-125 A tlc-2562-1.0 I-3 X X LT CS l 6l ffT X CS II.15-8 ft (E - IINIT 2

, p,.y g s g ,9-

+8

._ . . _ - - - - - . . - . . . ._. _. - _ _ _ _ _ _ - _ _ _ ._. ._ . = - ..

}

^

f l System: Safety Injection n 5 m a 3 3 2 "

? Q a =

e .T: -

a .

,e Zo Valve Category u a a Ua a <> e e e Valve Number "

Drawing Number " A R_ C D Remarks l

l .

.I i -

i 2NI-162A B MC-2562-3.1 X-II X CT X CS 10 sec. max. cycle time i,

i l 6l 2NI-171 A MC-2562-3.1 J-7 X X MT X RF l LT CS 6l 2NI-169 A MC-2562-3.1 J-6 X X MT X RF l I.T CS t 6l 2N!-167 A MC-2562-3.1 J-5 X X NT X RF l l 1.7 CS l,

2NI-165 A MC-2562-3.1 J-3 X X MT X RF l l

6l LT CS l

2NI-173A 5 MC-2562-3.1 1-12 X CT X CS 10 sec. max. cycle time l 2l i _ _ _

]

j 6l 2NI-175 A PIC-2562-3.1 J-R X X MT3 X CS l I.T CS

) . _ _ _ .

I HrCllINE - IINIT 2 II Y'-9 Revir.lon 6

l l l l 1 I s

n o i i

e e e s t m m m i c i i i v

e t t t w e j w R n e e e -

I l l l -

cy c c y y y - -

c c t s c e - k -

f r . . .

a a x x x S m a a a e m m m -

R m

e c

e c

e c

e

. t s s s -

s y 0 0 0 S 1 6 6 SS S SS SS F F

$ y0 * & aSg CC C CC CC R t J

,U* e* .j X X _

_ X X X X T T T T

=gyu$ " g TM1 T. C HIT. T H1T. C C y D r

o .

g -

e C X X X t

a -

C .

s B X X X e

v -

l V

a A X X X _

w 2 _ 7 8 2 2

= 034w 8 1

1 1

1 1 F F D D D r

e s

i m 1 1 1 1 1 1 u . . . . . .

N 3 3 3 3 3 3 g 2~ 2 2 2 2 2 n 6 6 6 6 6 6 i 5 5 5 5 5 5 w 2 2 2 2 2 2 a - - - - - -

r C C C C C C D H l f H H M H ma A R A A 8 B r _ _

e n ._

i .

m u 8 8 A .

N 6 8 0 I 4 5 7 7 8 8 8 8 e 1 1 1 1 1 1 m v - - - - - -

l 1 I I I I I V

a 2

N N 2

N 2

N 2

M 2

N 2 .

s l l l l 1 l

6 2 6 6 6 6

l ._

i 1

. 4 l m. -

c .

o

. m -.

.U E$=

a i

. e

, e m tus ne w

I e

m th i

OAT 2eusesty Suissel l

l s2sonbet ;eitou 1

s2..o m s ,2sez

- l i I I I o

e I

.e v l

" l l l  !

r e at i >

i

  • i I

se2euTpsoe3 l l I l

, I

  • 1 4

I i

{

1 E

S

= i i l

o .
O  ;

} I l '

1 . l essto

\ ~

I u i  ; ,

t E i i -

! 1 l l i . . I 2 I

! f I

! 3 4 i , t l > , R. i 31  ! l l l l l lN 1 l I .. _ , _*. _ _ _ _ _ - _ .

_ _ _ _ . _ _ - - . .. _ -._.. _ -.. _ _ _ . _ _ . _ _- _ _l

N h

O' e E o 1. -

0v l$ 7 . - -

g ame #

_7

.x e o a no.e n,.

W g

.te h

M EAT 2stus2Ty Suissel  ;

s'3senbei ;sTI'1 sauses2Tnboy 2nel 1

m -

.e 4

I V

W W

  • \

4 4 l

I sostulpaco3 w '

b l 1

I l an e 1 3

0 .

m i

I N

ss 13 Is tE t I t

1 1 W I ,f I

f

~

15 f

= ~ ~ - _ _

h h h h &

i 1

i

~

MC-2562-1.0 i

VALVE: 2NI-12 CATEGORY: C CLASS: B 4 l FWCTION: Provides safety injection flow path. }

TEST REQUIRDENT: Full stroke exercise quarterly.

] BASIS FOR RELIEF: Full or partial stroke during power operation would result in thermal shock to injection nozzles. Valve '

I cannot be stroked during shutdown due to possible low I temperature overpressurization.

i l ALTERNATE TESTING: Valve will be full stroked at refueling, j i

l

> l 4 )

l 1

l

! 1 l

i i 1 4

i 4

i i  :

I

'l I I

l

)

McGUIRE - UNIT 2 II.35 15 Revision 4

MC 2562-2.0 VALST.: 2NI-430A, 2NI-431B e

CATEGORY: B CLASS: B Supplies nitrogen to low pressure PORV's durine blackout.

6l FUNCTION:

TEST REQUIREMENT: Cycle time quarterly.

6 BASIS FOR RELIEF: The piping downstream of these valves is not seiwie (non-safety). If a valve fails open and there is a loss of integrity on the non-safety piping, a cold leg accumulator will be - d - "operabic.

ALTERNATE TESTING: Valves will be cycle timed at cold shutdown.

O O'

McCUIRE - UNIT 2 11.35- 16  :

Revision 6 <

_ . - - - . - . - . . ~ . - . . . _ . - - - . _ . _ . . . . - . _ . - _ . - . . . . . - . ..

I: .;

1 j

., i l MC-2562-2.0  !

l 8

VALVE: 2NI-48 l

CATEGORY: A, C l CLASS: B i

FUNCTION: Prevides containment isolation.  ;

i i

{ TEST REQUIREMENT: Full stroke exercise quarterly. j

! I t

i BASIS FOR RELIEF: Valve has no indication of closure.  !

l. .

i

! ALTERNATE TESTING: Valve will be verified shut by leak test performed j j in accordance with Appendix J. >

I i t I [i 4

l!

f f

4 I

j L  :

I l l

l k'

i i

}

l i

il J

i 1

l t

M:GUIRI - UNIT 2 II.35-17 I

MC-2362-2.0 MC- 2362- 2.1 VALVE: 2NI-81, 2NI-70, 2NI-39. 251-93 CATEGORY: A, C CLASS: A FUNCTION Opens on flow from the NI cold leg accumulator to the Reactor Coolant System.

~

TEST RIQUIRLMINT: Verify valve opens when' Reactor Coolant System pressure decreases below Sefety Injection System pressure.

BASIS FOR RELIEF: Valves cannot be full or partial stroked during power 6l operation since the accu =ulator pressure is % 600 psi l and cannot over.. t RCS pressure. During cold shutdown exercising these va.ves could result in a lov temperature overpressurization of the RCS.

ALTERNATE TESTING: Valves vill be partial stroked during cold shutdowns, but not more often than once per nine months. Valves 6

vill be full stroked at refueling. Valves will be leak tested in accordance with Technical Specifications.  !

)

i McGUIRE - UNIT 2 11.35-18 Revisicn 6 j l

\

MC-2562-2.1 VALVE: 2NI-436 i

CATEGORY: A, C CLASS: B l TLHCTION: Provides containment isolation.

TEST REQUIREMENT: Full stroke exercise quarterly.

BASIS FOR RELIET: Valve has no indication of closure.

ALTERNATE TESTING: Valve will be verified shut by leak test performed i in accordance with Appendix J.

i l

l i

i i

I l

i i

I t McGL' IRE - LHIT 2 II.35-19 1

MC-2562-2.0 MC-2562-2.1 VALVI: 2N1-82, 2NI-71, 2NI-60, 2NI-94 CATEGORY: A, C C1. ASS : A TUNCTION: Opens on flow from the NI System to the Reactor Coolant System.

TEST RIQUIRDENT: Verify valve opens when Reactor Coolant System pressure decreases below Safety Injection System pressure.

BASIS FOR RILIET: Valves cannot be full or partial stroked at power since a driving head to force the valves open does not exist.

ALTERNATE TESTING: Valve vill be full stroked during cold shutdowns, but no m re often than once per nine months. Valves vill be leak 6

tested in accordance with Technical Specifications.

9

(

l l

l McGUIRE - L3IT 2 11,35-20 9

Revision 6

MC-2562-3.0 s .

VALVE: 2NI-128, 2NI-159, 2NI-160, 2NI-156, 2NI-124, 2NI-157 CATEGORY: C CLASG: B

~

FUNCTION: Provide containment isolation.

TEST REQUIREMENT: Verify proper valve movement once per three months.

BASIS FOR RELIEF: Valves cannot be full or partial stroked during power operation since the safety injection pumps cannot discharge into the RCS at operating pressure. During cold shutdown, these valves cannot be full or partial stroked since this could result in low temperature overpressurization. ,

l 6 ALTERNATE TESTING: Valves will be cycled open during refueling. Valves will be leak tested in accordance with Technical Specifications.

p

(

l i

l O

e McGUIRE - UNIT 2 II.35-25 Revision 6

MC-2562-3.0 VALVE: 2NI-129, 2NI-125, 2NI-134, 2NI-126 1

CATEGORY: C CLASS: A ,

1 FUNCTION: Opens on flew from the NI to NC Systed, l l

TEST REQUIREMENT: Verify valve opens on flow from safety injection pumps 1 once per three months. l l

BASIS FOR RELIEF: The discharge pressure of the safety injection pumps l (1520 psig) is not sufficient for opening the valve to the l Reactor Coolant. System (2235 psig) during power operation. I RHR pumps, also, do not develop enough discharge pressure to overcoce RCS pressure at power operation.

l ALTERNATE TESTING: Valve vill be full stroke exercised during cold l shutdowns, but not more often than once per nine months.

6 Valves will be leak tested in accordance with Technical Specifications.

C O

Q^

McGUIRE - UNIT 2 II.35-26 Revision 6

l l

MC-2562-3.1 VALVE: 2NI-162A Safety Injection Pumps Cold Leg Inj. Header CATEGORY: B CLASS: B a

FUNCTION: Provides isolation of Safety Injection Pumps from cold  !

legs during hot leg recirculation.

TEST REQUIREMENT: Cycle and time valve quarterly.

BASIS FOR RELIEF: Failure of valve in closed position would completely isolate both trains of safety injection during the initial injection phase. l ALTERNATE TESTING: Valve will be cycled and timed at cold shutdown.

l i

e e

l McGUIRE - UNIT 2 11.35- 27

+-----*s-:,-.- - ,,.e , ,

1 1

i MC-2562-3.1 VALVE: 2NI-165, 2NI-167, 2NI-169, 2NI-171 CATEGORY: A, C CLASS: A i l

~

FUNCTION: SI discharge check valves. l l

TEST REQUIREMENT: Full stroke exercise quarterly. '

i BASIS FOR RELIEF: Valves cannot be cycled during power operation since the SI pu=ps cannot overcone RCS pressure to pemit i flow through the valves. During cold shutdowns I exercising these valves could result in low tempera-ture overpressurization.

6 ALTERNATE TESTING: Full stroke exercise at refueling. Valves will be leak  !

tested in accordance with Technical Specifications.

l 1

C I

1 9

L McGUIRE - TJNIT 2 II,35 28 Revision 6

MC-2562-3.1 VALVE: 2NI-180, 2NI-181, 2NI-175, 2NI-176 CATEGORY: A, C CLASS: A FUNCTION: Openr, on flow from the ND or NI to NC System. ,

TEST REQUIRE.ENT: Verify valve opens on flow from NI or ND System to the NC System once per three months.

BASIS FOR RELIEF: The discharge pressure of the NI and ND Pumps is not sufficient for opening the valve to the Reactor Coolant System during power operation.

ALTERNATE TESTING: Valve will be tested for proper movement during cold shutdowns, but not more often than once per nine months.

6 Valves will be leak tested in accordance with Technical Specifications.

O i

l l

O l McGUIRE - UNIT 2 II.35 29 Revision 6

, - - - - - _ . , , - _ . , . . - - , , . , _ . . -..,-,.,,-,,.,....,,v , - . - - - -

O MC-2563-3.1 5l VALVE: 2NI-1848, 2NI-185A l

CATEGORY: B CLASS: B FUNCTION: Isolate the containment sump (2NI-184 isolates train B, i 2NI-185 isolates train A). These valves also provide an alternate source for suction to the Residual Heat Removal Pumps.

BASIS FOR RELIEF: Due to interlocks in the Safety Injection System and the actual Residual Heat Removal design, it is impossible to test these valves without rendering both trains of Residual Heat Removal and both trains of Safety Injection inoperable. During cold shutdowns, the RHR pumps are required for decay heat removal.

ALTERNATE TESTING: Full stroke exercise during refueling. 1 l

l l

1 l

l l

9 McGUIRE - UNIT 2 II.35-30 Revision 5

i l

l l

%s i

1 3l MC-2 5 62-3.1 ll

3) VALVI: 2NI-1833 l!

CATEGORv: B  !

i CLASS: B l

FUNCTION: Isolates ND flow to the hot legs. '

t TEST RIQUIRIMENT: Cycle and time valve quarterly.  !

BASIS FOR RELIEF: The valve is normally aligned for safety injection with i power removed, as required by McGuire Technical Specificatic:  !

4.5.2. Cycling the valve with the plant in operation requires that the power be restored to the valve and moved from the event-initiation position. The valve is required for align- i O ment for hot-leg recirculation following an accident. It is requiredtoautematicallyactuateoninitiationofasafetyeven{

net i

The past test history of the valve is very goed.

ALTERNATE TESTING: Cycle and time the valve at cold shutdown.

I l

l i

l i

l l

1

)

l O' McGUIRI-UNIT 2 II.35-30c

( Revision 3

\

\

O I

l l

i 6  !

(PAGE INTENTIONALLY LEFT BLANK)

)

l O'

l

'l l

l l

McGUIRE - UNIT 2 II.35-31 Revision 6 l

_ ____,_ ____ _ _ _._ ___.___ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _