Forwards Table Listing Status of Current Licensing Actions on Plant.Table Will Be Revised to Reflect Changes in Dates for Completion &/Or New Issues That Need Licensing Reviews
ML20151R616
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/20/1988
From: Stahle C
Office of Nuclear Reactor Regulation
To: Kober R
ROCHESTER GAS & ELECTRIC CORP.
References
TAC-44137, TAC-44305, TAC-45948, TAC-46019, TAC-46091, TAC-46307, TAC-49135, TAC-49677, TAC-49899, TAC-51093, TAC-51243, TAC-52404, TAC-52841, TAC-53675, TAC-54364, TAC-55356, NUDOCS 8804280044
Download: ML20151R616 (4)


Text

,.

w April 20,1988 i.

i Docket No. 50-244 Mr. Roger W. Kober, Vice President Rochester Gas & Electric Corporation 89 East Avenue Rochester, New York 14649'

Dear Mr. Kober:

SUBJECT:

LICENSING ACTIONS ON GINNA In accordance with my discussions with P. Wilkens of your staff and comnfitments by my supervisor to you, the enclosed table lists the status of current licensing actions on Ginna. Target dates are.shown for RGE and NRR staff. As necessary, the table will be revised to reflect any changes in the dates for completion and/or new issues that need licensing reviews.

We would be pleased to meet with RG&E on a periodic basis to review our progress. Please contact me if you have any questions.

Sincerely, Original signed by:

C. Stahle, Project Manager Project Directorate I-3 Division of Reactor Projects I/II

Enclosure:

As stated cc: see next page DISTRIBUTION:

D6cket"Eile, NRC & Local PDRs, PDf-3 r/f, SVarga, BBoger, RRushbrook, 0GC, EJordari! JPartlow, ACRS(10), RWessman, XCowgill, CMarshall, BHodges, SICB, WRegan, FRosa, GBagchi, CChens, LCunningham, JCraig 0FC :PDI-3

DIR/FDI-3

..y........:.....

NAME :CStphie mw :RWess 6 DATE :04/#$/88

04/jn/88 0FFICIAL RECORD COPY h$k DO O

4 P

Mr. Roger W. Kober Rochester Gas and Electric Corporation R. E. Ginna Nuclear Power Plant cc:

j Harry H. Voigt, Esquire Mr. Bruce A. Snow, Superientendent LeBoeuf, Lamb Leibv and MacRae Nuclear Production 1333 New Hampshire Avenue, N.W.

Rochester Gas & Electric Corporation Suite 1100 89 East Avenue Washington, D.C.

20036 Rochester, N.Y. 14649-0001 Ezra Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector R.E. Ginna Plant c/o U.S. NRC 1503 Lake Road Ontario, New York 14519 Stanley B. Klimberg, Esquire General Counsel New York State Energy Office Agency Buildina P Empire State Plaza Albany, New York 12223 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Supervisor of the Town of Ontario 1850 Ridge Road Ontario, New York 14519 Ms. Donna Ross Division of Policy Analysis & Planring New York State Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223

Enclesure GINNA LICENSING ISSUES TARGET DATES NO. SUBJECT TAC.

NRC LIC AC

'RGE COMMENTS NO.

RAI SER TS/L

RESPONSE

1. Procedures Generation Pack.

44305 6/30/88 8/30/88

2. Inadequate Core Cooling 44137 5/15/88 6/15/88 T.S. Request of 9/24/87 part of item
3. Technical Support Center 45948 8/88 Region I Review

(

l

4. Operational Support Center 46019 8/88 Region I Review
5. Emergency Operations Center 46091 8/88 Region I Review 8/88 Region I Review
6. Meteorological Data 46307 5
7. SEP-Structural Upgrade 54364 5/88 Meeting anticipated in June
8. IST 49135 5/88
9. Reactor Coolant Pump Trip 49677 4/30/88 Telecon Discussion Needed
10. Increase Activity Coolant 49899 6/30/88 To re Submit-Addit.

Information

11. Regulatory Guide 1.97 51093 5/30/88 Additional Info.

Needed

12. SPDS 51243 5/88 Audit Report and SER needed
13. Hydraulic Snubber List 52404 4/30/88 Meed Region I SER
14. Equipment Classification (2.1) 52841 9/30/88
15. Auto Actuation (4.3) 55356 6/30/88
16. Equipment Class 2.2 53675 9/30/88

- TARGET DATES NO. SUBJECT I TAC.

NRC RGE COMMENTS-NO.

P.A!

SER TS/L

RESPONSE

17. Post Trip Review (1.2) 53592 9/88 l
18. Preventative Maint. (4.2/3) 53912 4/88
19. Reactor Trip System (4.5.2/3) 53935 9/30/88 l
20. Op. Reactor Review (50.62) 59098 9/30/88 4/88
21. Loss of RHR (GL87-12) 66222 To be determined
22. SG Snubber Replacement 66351 4/15 9/15/88 5/18/88 License Amendment Needed
23. Steam Binding (GL.)

(88-03) 67239 5/25/88

24. Revise Cont. Pressure 60035 10/30 12/16/88 1/15/89 9/30/88 Re-submittal -

Held NRC Review

25. Upper Plenum Injection 07739 12/88 Re-anaysis Required No firm schedule
26. Mini-Purge 674?8 5/30/88
27. Organization Charts 67425 5/30/88
28. Extend License Date 67427 6/30/88
29. P-10 Interlock 54370 5/30/88 Re-Submit Info.

Region 1 Review

30. Use of TSG Battery 53311 4/30/88 Withdraw Request
31. Containment Spray Pump 4/11/88 Withdraw Request