Letter Sequence Other |
|---|
TAC:44137, (Approved, Closed) TAC:44305, (Approved, Closed) TAC:45948, (Approved, Closed) TAC:46019, (Approved, Closed) TAC:46091, (Approved, Closed) TAC:46307, (Approved, Closed) TAC:49135, (Approved, Closed) TAC:49677, (Approved, Closed) TAC:49899, (Approved, Closed) TAC:51093, (Approved, Closed) TAC:51243, (Approved, Closed) TAC:52404, (Approved, Closed) TAC:52841, (Approved, Closed) TAC:53675, (Approved, Closed) TAC:54364, (Approved, Closed) TAC:55356, (Approved, Closed) |
|
MONTHYEARML20198A3351985-10-31031 October 1985 Conformance to Reg Guide 1.97,RE Ginna Nuclear Power Plant Project stage: Other ML17251A6291986-04-0101 April 1986 Advises That TAC 49341 Re Review of 821122 Response to NRC Request on Radiological Consequences of Steam Generator Tube Rupture Closed Out.Review Being Conducted Under TAC 49899. Completion Targeted for 861015 Project stage: Approval ML17251A6401986-04-0909 April 1986 Forwards Request for Addl Info Re 841130 Submittal Concerning Electrical Isolation Devices Used in Spds. Response Requested within 45 Days Project stage: RAI ML17251A6381986-04-14014 April 1986 Requests Addl Info for Review of Conformance to Rev 3 to Reg Guide 1.97 Re Emergency Response Capability.Response to Open Issues Requested within 60 Days of Ltr Receipt.Resolution of Items Targeted for 870123 Project stage: Approval ML17251A6921986-06-19019 June 1986 Forwards Response to M Fairtile Re Aspects of Reg Guide 1.97 Identified in Section 6.2 of Suppl 1 to NUREG-0737.Concerns Expressed in 860414 Technical Evaluation Rept & Equipment Qualification Per Reg Guide 1.97 Addressed Project stage: Other ML17261A5271987-06-18018 June 1987 Forwards Request for Addl Info Re Proposed Snubber Tech Spec,Per Results of Review & Discussions W/Region I Representatives Project stage: RAI ML20245C2561987-07-31031 July 1987 Conformance to Generic Ltr 83-28,Item 2.2.1-Equipment Classification for All Other Safety-Related Components: Ginna, Final Informal Rept Project stage: Other ML20151R6161988-04-20020 April 1988 Forwards Table Listing Status of Current Licensing Actions on Plant.Table Will Be Revised to Reflect Changes in Dates for Completion &/Or New Issues That Need Licensing Reviews Project stage: Other ML17251A4651989-04-24024 April 1989 Advises That 830422,1221 & s Re Reactor Coolant Pump Trip Setpoint Development Acceptable,Per TMI Action Plan Item II.K.3.5 & Generic Ltr 85-12.Issue May Be Subj of Onsite Verification Project stage: Other ML17251A4671989-05-0303 May 1989 Grants Interim Approval of Inservice Testing Program for Pumps & Valves During pre-1990 Transition Yr.Program Should Be within Guidelines of Generic Ltr 89-04 Project stage: Other ML17251A4951989-05-18018 May 1989 Advises That 830318 & 871224 Requests for Amend to License DPR-18,increasing Iodine Activity Limit,Temporarily Withdrawn.Nrc Understands That Methodology in WCAP-11668 Will Be Further Developed Project stage: Other ML17251A5241989-05-30030 May 1989 Forwards Amend 37 to License DPR-18 & Safety Evaluation. Amend Revises Tech Specs to Reflect Testing Requirements for Snubbers That Ensure Structural Integrity of Sys Following Seismic or Other Event Initiating Dynamic Loads Project stage: Approval ML17250A9331989-08-17017 August 1989 Forwards SER Accepting Licensee 870604 Response to Generic Ltr 83-28,Item 2.2 (Part 1), Equipment Classification Programs for All Safety-Related Components. Technical Evaluation Rept Also Encl Project stage: Approval ML17250B0561989-11-15015 November 1989 Forwards Sser Re Sep/Structural Upgrade Program.Based on Review,Audit & Insp,Nrc Concludes That Evaluation & Resolution of Plant SEP Topics III-2,III-4.A,III-6 & III-7.B Acceptable Project stage: Other ML17261A9951990-02-20020 February 1990 Forwards Request for Addl Info Re Open Issues on Conformance to Reg Guide 1.97,Rev 3, Emergency Response Capability. Requested Info Covers Type a Variables,Neutron Flux, Containment Isolation Valve Position & Quench Tank Temp Project stage: RAI ML20058C8581990-09-30030 September 1990 Conformance to Reg Guide 1.97:Ginna Project stage: Other 1988-04-20
[Table View] |
Forwards Table Listing Status of Current Licensing Actions on Plant.Table Will Be Revised to Reflect Changes in Dates for Completion &/Or New Issues That Need Licensing Reviews| ML20151R616 |
| Person / Time |
|---|
| Site: |
Ginna  |
|---|
| Issue date: |
04/20/1988 |
|---|
| From: |
Stahle C Office of Nuclear Reactor Regulation |
|---|
| To: |
Kober R ROCHESTER GAS & ELECTRIC CORP. |
|---|
| References |
|---|
| TAC-44137, TAC-44305, TAC-45948, TAC-46019, TAC-46091, TAC-46307, TAC-49135, TAC-49677, TAC-49899, TAC-51093, TAC-51243, TAC-52404, TAC-52841, TAC-53675, TAC-54364, TAC-55356, NUDOCS 8804280044 |
| Download: ML20151R616 (4) |
|
Similar Documents at Ginna |
|---|
|
Text
,.
w April 20,1988 i.
i Docket No. 50-244 Mr. Roger W. Kober, Vice President Rochester Gas & Electric Corporation 89 East Avenue Rochester, New York 14649'
Dear Mr. Kober:
SUBJECT:
LICENSING ACTIONS ON GINNA In accordance with my discussions with P. Wilkens of your staff and comnfitments by my supervisor to you, the enclosed table lists the status of current licensing actions on Ginna. Target dates are.shown for RGE and NRR staff. As necessary, the table will be revised to reflect any changes in the dates for completion and/or new issues that need licensing reviews.
We would be pleased to meet with RG&E on a periodic basis to review our progress. Please contact me if you have any questions.
Sincerely, Original signed by:
C. Stahle, Project Manager Project Directorate I-3 Division of Reactor Projects I/II
Enclosure:
As stated cc: see next page DISTRIBUTION:
D6cket"Eile, NRC & Local PDRs, PDf-3 r/f, SVarga, BBoger, RRushbrook, 0GC, EJordari! JPartlow, ACRS(10), RWessman, XCowgill, CMarshall, BHodges, SICB, WRegan, FRosa, GBagchi, CChens, LCunningham, JCraig 0FC :PDI-3
- DIR/FDI-3
..y........:.....
NAME :CStphie mw :RWess 6 DATE :04/#$/88
- 04/jn/88 0FFICIAL RECORD COPY h$k DO O
4 P
Mr. Roger W. Kober Rochester Gas and Electric Corporation R. E. Ginna Nuclear Power Plant cc:
j Harry H. Voigt, Esquire Mr. Bruce A. Snow, Superientendent LeBoeuf, Lamb Leibv and MacRae Nuclear Production 1333 New Hampshire Avenue, N.W.
Rochester Gas & Electric Corporation Suite 1100 89 East Avenue Washington, D.C.
20036 Rochester, N.Y. 14649-0001 Ezra Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector R.E. Ginna Plant c/o U.S. NRC 1503 Lake Road Ontario, New York 14519 Stanley B. Klimberg, Esquire General Counsel New York State Energy Office Agency Buildina P Empire State Plaza Albany, New York 12223 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Supervisor of the Town of Ontario 1850 Ridge Road Ontario, New York 14519 Ms. Donna Ross Division of Policy Analysis & Planring New York State Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223
Enclesure GINNA LICENSING ISSUES TARGET DATES NO. SUBJECT TAC.
NRC LIC AC
'RGE COMMENTS NO.
RAI SER TS/L
RESPONSE
- 1. Procedures Generation Pack.
44305 6/30/88 8/30/88
- 2. Inadequate Core Cooling 44137 5/15/88 6/15/88 T.S. Request of 9/24/87 part of item
- 3. Technical Support Center 45948 8/88 Region I Review
(
l
- 4. Operational Support Center 46019 8/88 Region I Review
- 5. Emergency Operations Center 46091 8/88 Region I Review 8/88 Region I Review
- 6. Meteorological Data 46307 5
- 7. SEP-Structural Upgrade 54364 5/88 Meeting anticipated in June
- 8. IST 49135 5/88
- 9. Reactor Coolant Pump Trip 49677 4/30/88 Telecon Discussion Needed
- 10. Increase Activity Coolant 49899 6/30/88 To re Submit-Addit.
Information
- 11. Regulatory Guide 1.97 51093 5/30/88 Additional Info.
Needed
- 12. SPDS 51243 5/88 Audit Report and SER needed
- 13. Hydraulic Snubber List 52404 4/30/88 Meed Region I SER
- 14. Equipment Classification (2.1) 52841 9/30/88
- 15. Auto Actuation (4.3) 55356 6/30/88
- 16. Equipment Class 2.2 53675 9/30/88
- TARGET DATES NO. SUBJECT I TAC.
NRC RGE COMMENTS-NO.
P.A!
SER TS/L
RESPONSE
- 17. Post Trip Review (1.2) 53592 9/88 l
- 18. Preventative Maint. (4.2/3) 53912 4/88
- 19. Reactor Trip System (4.5.2/3) 53935 9/30/88 l
- 20. Op. Reactor Review (50.62) 59098 9/30/88 4/88
- 21. Loss of RHR (GL87-12) 66222 To be determined
- 22. SG Snubber Replacement 66351 4/15 9/15/88 5/18/88 License Amendment Needed
- 23. Steam Binding (GL.)
(88-03) 67239 5/25/88
- 24. Revise Cont. Pressure 60035 10/30 12/16/88 1/15/89 9/30/88 Re-submittal -
Held NRC Review
- 25. Upper Plenum Injection 07739 12/88 Re-anaysis Required No firm schedule
- 26. Mini-Purge 674?8 5/30/88
- 27. Organization Charts 67425 5/30/88
- 28. Extend License Date 67427 6/30/88
- 29. P-10 Interlock 54370 5/30/88 Re-Submit Info.
Region 1 Review
- 30. Use of TSG Battery 53311 4/30/88 Withdraw Request
- 31. Containment Spray Pump 4/11/88 Withdraw Request
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _