_
Vital Equipment / Area Guidelines Study: Vital Area Committee Report Final Report U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation
,p' "' ce,,
a
{; 5V Q>h'..jl\\
R88 'leR?8 1170 R PDR
I A
mm NOTICE Availability of Reference Materials Cited in NRC Publications Most documents cited in NRC publicat'ons will be available from one of the following sources:
- 1. The NRC Public Document Room,1717 H Street, N.W.;
Washington, DC 205b5
- 2. The Superintendent of Documents, U.S. Government Printing Office, Post Office Box 37082, Washington, DC 20013 7082
- 3. The National Technical Information Service, Springfield, VA 22161 l
Although the listing that follows represents the majority of docunients cited in NRC publications, it is nnt intended to be exhaustive.
Referenced documents available for inspection and copying for a fee from the NRC Public Docu-r,.<nt Room include NRC correspondence and internal NRC memorands; NRC Office of Inspection and Enforcement bulletins, circulars, information notices, inspection and inwt@ tion notices; Licensee Event Reports; vendor reports and correspondence; Commission papers; and applicant and licensee documents and correspondence.
The following documents in the NUREG series are available for purchase from the GPO Sales Program: formal NRC staff and contractor reports, NRC-sponsored conference proceedings, and NRC booklets and brochures. Also available are Regulatory Guides, NRC regulations in the Code of Federal Regulations, and Nuclear Regulatory Commission issuances.
Documents avcilable from the National Technical Information Service include NUREG series reports and technical reporti, prepared by other federal agencies and reports prepared by the Atomic Energy Commission, forerunner agency to the Nuclear Regulatory Commission.
Documents available from public and special technical libraries include all open literature items, such as books, joumal and periodical articles, and transactions. Feders/ Register notices, federal and state legislation, and congressional reports can usually be obtained from these libraries.
Documents such as theses, dissertations, foreign reports and translations, and non NRC conference proceedings are available for purchase from the organization sponsoring the publication cited, f
Single copies of N RC draft reports are available free, to the extent of supply, upon written request to the Division of information Support Services, Distribution Section, U.S. Nuclear Regulatory Commission, Washington, DC 20555.
Copies of industry codes and standards used in a substantive manner in the NRC regulatory process are maintained at the NRC Litrary, 7920 Norfolk Avanue, Bethesda, Maryland, and are available l
there for reference use by the public. Codes and standards are us"ally copyrighted and may be purchased frc Ti the originating organization or, if they are American National Standards, from the American National Standards Institute,1430 Broadway, New York, NY 10018.
NUREG-1178 Vital Equipment / Area Guidelines Study: Vital Area Committee Report Final Report Manuscript Completed: March 1986 Date Published: February 1988 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 f,....y, 4
ABSTRACT A study was conducted by the staff to (1) re-evaluate the guidelines and bases used to determine what are the vital equipment and areas to be protected against radiological sabotage in nuclear power plants and (2) to recommend revised guidance. On the basis of this study, the staff has recommended a revised vital equipment / area protection philosophy: to protect as vital the reactor coolant pressure boundary and one train of equipment that would provide the capability to achieve and maintain hot shutdown.
To implement this overall protection philosophy, the staff also has recommended new analysis assumptions or guidelines to identify the specific equipment and areas in each plant that require protec-tion as "vital".
NUREG-1178 iii i
CONTENTS P. aSe
- ABSTRACT...............................................................
iii
- FOREWORD..............................................................
vii EXECUTIVE
SUMMARY
ix
- MEMORANDUM TRANSMITTING VITAL AREA COMMITTEE FINAL REPORT..............
xi 1.
INTRODUCTION.......................................................
1-1 2.
OBJEClIVES.........................................................
2-1 3.
BACKGROUND OF LICENSING PRACTICES FOR PHYSICAL PROTECTION OF POWER REACTORS AGAINST SAB0TAGE....................................
3-1 4.
BASIC STUDY PREMISES...............................................
4-1 5.
SCOPE AND METHODOLOGY..............................................
5-1 6.
STUDY RESULTS......................................................
6-1 6.1 Proposed Vital Equipment / Area Protection Philosophy and i
Analysis Assumptions..........................................
6-1 6.2 Impact on Licensed Plants.....................................
6-17 7.
RECOMMENDATION.....................................................
7-1 APPENDICES A
ED0 Memorandum of May 1, 1985 Establishing the Vital Equipment / Area Guidelines Study....................................
A-1 B
Review Guideline 17 and Regulatory Guide 1. 29......................
B-1 C
Action Pl an Memorandum of July 1, 1985.............................
C-1 0
Summary of Briefings to Vital Area Committee.......................
D-1 E
Current LANL Vital Equipment / Area Analysis Assumptions.............
E-1
- These sections were not included in VAC study transmitted by March 5, 1986 Memorandum, but are being added to that Memorandum in the present publication.
CONTENTS (Continued)
APPENDICES (Continued)
Page
- F (1) Disposition of Comments Received on the Draft Vital Equipment / Area Guidelines Study and (2) Comments Received on the Draft VAC Report......................
F-1
- G Implementation Considerations for Revised Vital Equipment / Area Guidelines..........................................
G-1
- H Proposed Generic Letter of Transmittal for Final VAC Report........
- Appendices F, G, and H were not included in VAC study t ansmitted by March 5, 1986 Memorandum, but were Enclosures 2, 3, and 4, respectively, to that Memorandum.
NUREG-1178 vi
FOREWORD On May 1,1985, the Executive Director for Operations directed the staff to initiate a study to re-evaluate the existing guidelines and bases used to determine what are the vital equipment and areas to be protected against radiological sabotage in nuclear power plants and to recommend revised guidance as necessary. A Vital Area Committee was established to conduct the study.
This report documents the study and its results.
Vital Area Committee Frank J. Miraglia, Chairman Director, Division of Pressurized Water Reactor Licensing-B Office of Nuclear Reactor Regulation Robert F. Burnett, Member Director, Division of Safeguards Office of Nuclear Material Safety and Safeguards Frank P. Gillespie, Member Acting Director, Division of Accident Analysis Office of Nuclear Regulatory Research James G. Partlow, Member Director, Division of Inspection Programs Office of Inspection and Enforcement
\\
NUREG-1178 vi!
EXECUTIVE
SUMMARY
This report presents the results of a study (1) to re-evaluate the guide-lines and bases used to determine what are the vital equipment and areas to be protected in nuclear power plants and (2) to recommend revised guidance.
The study we established by the Executive Director for Operations (E00) on May 1, 1985, t address questions that had been raisec about the validity and consistency of past and current criteria for identifying equipment that must be protected against radiological sabotage, and to consider recent research on this subject.
The E00 designated two staff groups to carry out the study:
a Vital Area Comittee (VAC) and a Management Policy Review Group (MPRG).
The VAC conducted the study, while the MPRG provided broad policy direction and guidance to the VAC and approved its study plans and products. The VAC was chaired by Frank J. Miraglia, NRR; its members included Robert F. Burnett, NMSS; James G.
Partlow, IE; and Frank P. Gillespie, RES.
The MPRG consisted of Victor Stello, DEDROGR; Harold R. Denton, NRR; and John G. Davis, NMSS.
On the basis of the study, the VAC has recomended a revised vital equipment /
area protection philosophy: to protect as vital the reactor coolant pressure boundary and one train of equipment -- with its associated piping, whter sources, power supplies, and instrumentation -- that provide the capability to achieve and maintain hot shutdown.
To implement this overall protection philosophy, the VAC also has recommended revised analysis assumptions or guide-lines, to be applied on a case-by-case basis, to identify the specific equipment and areas in each plant that require protection as "vital". These analysis assumptions are as follows:
(1)
For ourposes of protection against radiological sabotage, the primary coo. Ant pressure boundary consists of the reactor vessel and reactor coolant piping up to and including a single, protected, normally closed isolation valve or protected valve capable of closure in interfacing systems.
(2) Any transient or event that causes significant core damage will result in an attendant 10 CFR 100 release.
(3) One train of equipment (with the associated piping, water sources, power supplies, controls, and instrumentation) that provides the capability to perform the functions (reactivity control, decay heat removal, and process monitoring) that are necessary to achieve and maintain hot shutdown for a minimum of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from the time of reactor trip should be protected as vital.
In addition, the major components of the reactor coolanc makeup system and associated support equipment necessary to achieve this goal should be protected as vital.
NUREG-1178 ix
(4) The control room and any remote locations from which vital equipment can be controlled or disabled (such as remote shutdown panels, motor control centers, circuit breakers, or local control stations) should be protected as vital areas.
(5) Only the power mode of reactor operation and hot standby (for PWRs) need be considered as long as all equipment designated as vital for power operation is maintained as vital in other modes.
(6) Off-site power is unavailable.
(7) Random failures do not occur simultaneously with an act of radiological sabotage. However, the saboteur can take advantage of the unavailability of equipment during maintenance. Thus, whenever any components or systems normally protected as vital are inoperable for any period of time, appropriate compensatory measures (such as stationing guards at alternate locations) must be taken to ensure that the capability to reach hot shutdown is maintained.
(8) Breaks in multiple main steam lines that cannot be isolated lead to 10 CFR 100 releases.
(9) Cable runs in trays and conduit need not be protected as vital unless cables necessary for safe shutdown capabiiity are individually identifiable and the identification is reasonably accessible.
However, cable terminals or junctions and areas such as cable spreading rooms, through which large numbers of cables pass, must be protected.
(10) Saboteurs may use explosives in amounts that they can carry.
(11) No credit is gi en for equipment not located in vital areas.
(12) Following the start of a refueling outage, the spent fuel pool should be protected as vital long enough to ensure that sabotage to the pool cannot result in a 10 CFR 100 release.
(13) The backup supporting power supply of the Central Alarm Station (CAS) is essential for continuous operation of CAS in the event of loss of nortnal power.
The VAC believes that the application of the recommended protection philosophy, with its implementing analysis assumptions, will contribute to the overall program designed to provide a high degree of assurance against radiological sabotage.
MEMORANDUM TRANSMITTING VITAL AREA COMMITTEE FINAL REPORT On March 5, 1986, the Chairman of the Vital Area Committee (VAC) sent a memo-randum (see next page) notifying the recipients that the VAC had completed its study effort and was enclosing its final report.
That report, its appendices A through E, and background material (appendices F, G, and H) that accompanied the issuance of March 5, 1986, are now being issued as NUREG-1178.
The March 5th memorandum cites two references:
(1) Memorandum from William J. Dircks, "Vital Equipment / Area Guidelines Study," dated may 1, 1985, and (2) Memorandum from Frank J. Miraglia, "Vital Equipment / Area Guidelines Study Action Plan," dated July 1, 1985.
These are reproduced here as appendices A and C, respectively.
The March 5th memorandum also refers to "Enclosure 1" (the text of this report and appendices A through E), "Enclosure 2" (Appendix F), and "Enclosure 3" (Appendix G).
Appendix H contains the proposed generic letter of transmittal for the final VAC report; this was designated as Enclosure 4 to the March 5th memorandum.
1 i
NUREG-1178 xi
.,a agg h
UNITED STATES
!y i
NUCLEAR REGULATORY COMMISSION 3 g],,,(A l WASHINGTON, D. C. 20555
+. '. '..
March 5, 1986
'+
MEMORANDUM FOR:
Victor Stello, Jr.
Acting Executive Director for Operations Harold R. Denton, Director Office of Nuclear Reactor Regulation John G. Davis, Director Office of Nuclear Material Safety and Safeguards FROM:
Frank J. Miraglia, Chairman Vital Area Comittee
SUBJECT:
VITAL AREA COMMITTEE FINAL REPORT
References:
(1) Memorandum from William J. Dircks, "Vital Equipment /
Area Guidelines Study," dated May 1, 1985 (2) Memorandum from Frank J. Miraglia, "Vital Equipment /
Area Guidelices Study Action Plan, dated July 1, 1985 In accordance with references (1) and (2), the Vital Area Comittee (VAC) has completed its study effort. The Comittee's final report is provided for,our review and action as Enclosure 1.
The VAC has considered all the coments received from the cognizant Headquarters Offices and the Regions on the draft report. provides those coments and discusses the Comittee's disposition of them. discusses the Comittee's considerations and recomendations con-cerning implementation of the revised vital equipment / area guidelines.
Finally, is a proposed generic letter for transmitting the VAC report to industry.
If you agree with the contents of the report and the supporting documents pro-vided herein, we recomend that you consider providing Enclosures 1 and 2 to the cognizant Headquarters Offices and the Regions for their information prior to issuing the report publicly.
NUREG-1178 xiii l
\\ -
~.
___ We are available to meet with the MPRG to discuss the report or the other enclo-sures to this memorandum.
T f2%
Frank M
, Chairman Vital Area C ittee
Enclosures:
As stated cc:
R. Burnett J. Partlow F. Gillespie i
1 I
i l
i a
NUREG-1178 xiv
1.
INTRODUCTION Definitions of vital equipment / areas have been evolving since 1978.
The topic has been addressed in several studies done by the staff of the Nuclear Regulatory Commission (NRC), as well as in NRC-sponsored research programs. These studies and recent staff evaluations of physical security plans have raised questions about the validity and consistency of the assumptions and criteria being used to determine vital equipment and areas.
For this reason, on May 1, 1985, the Executive Director for Operations (EDO) established a committee (1) to re-evaluate the guidelines and bases used to determine the equipment and areas to be protected as vital and (2) to develop and recommend revised assumptions and guidance.
The E00 designated two staff groups to carry out the study: A Vital Area Committee (VAC) and a Management Policy Review Group (MPRG). The VAC was given responsibility for actual conduct of the study, while the MPRG was to provide broad policy direction and guidance to the VAC and to approve the study plans and products.
The VAC was chaired by Frank J. Miraglia, NRR; its members included Robert F. Burnett, NMSS; James G. Partlow, IE; and Frank P. Gillespie, RES.
The MPRG was composed of Victor Stello, DEOR0GR; Harold R. Denton, NRR; and John G. Davis, NMSS. A copy of the E00 memorandum establishing the study is included as Appendix A to this report.
Section 2 below gives the objectives of the study.
Section 3 traces the evolution of vital equipment-related regulations, guidance, and practice.
Section 4 gives the justification for the assumptions used by the VAC in evaluating the specific vital equipment assumptions, Section 5 discusses the scope and methodology of the study, and the study results are detailed in Section 6.
Recormendations are given in Section 7.
The appendices provide additional background material.
NUREG-1178 1-1
l l
l 2.
OBJECTIVES The objectives of the study were (1) to perform a structured evaluation of existing and proposed vital equipment / area assumptions, criteria, and guidance and (2) to develop a compr hensive and consistent set of recommended assumptions for deterr ning equipment and areas to be designated ar, vital in nuclear power plants.
Both the assumptions and the rationale supporting them were evaluated individually and collectively for complete-ness and technical adequacy.
Based on this evaluation, the principal objective of the Vital Area Committee was to develop and recommend revised assumptions and guidance, with rationale and justification for the revisions.
The assumptions and guidance were to satisfy ti.e following criteria:
(1) Consider all conditions of normal operation, anticipated operational occurrences, transients, and accidents of the types presently con-sidered in the design-basis analysis of nuclear power plants; consider outage conditions and activities to the extent that loss of oper-ational functions and capabilities during outages impacts vital equipment and areas.
(2)
Be readily and uniformly applicable by safety / safeguards analysts in identifying vital equipment and areas on a case-by-case basis.
(3) Have the concurrence of all cognizant NRC Offices.
NUREG-1178 2-1
3.
BACKGROUND OF LICENSING PRACTICES FOR PHYSICAL PROTECTION OF POWER REACTORS ~AGAINST SABOTAGE Sabotage protection for power reactors was first addressed in a February 1967 Comission Order directing Florida Power and Light Company to address industrial sabotage protection at tb Turkey Point plant.
In October 1971, the Comission published guidance for licensees in Safety Guide 17. "Protection of Nuclear Power Plants Against Industrial Sabotage."
This initial security program was significantly upgraded in March 1977, with the publication of 10 CFR 73.55, which applied to approximately 50 operating reactors and about 25 appifcations for operating licenses.
In 1977-78, in addition to the several Regulatory Guides already in existence, the NRC staff developed 23 review guidelines (Branch Technical Positions) and 3 NUREG reports for use as guidance for power reactor applicants / licensees and as acceptance criteria by reviewers. One such document, NUREG-0416, was a workbook that gave step-by-step procedures for licensees / applicants to show how they proposed to meet each regulatory requirement. At the conclusion of each NRC staff review, the reviewer prepared a Security Plan Evaluation Report. All approved plans covered all the functional requirements of 10 CFR 73.55(b) through (h). However, implementation of the functional requirements varied.
Review Guideline 17. "Definition of Vital Areas," published in January 1978, stated that essentially all safety-related equipment must be con-sidered vital, and that the systems listed in Regulatory Guide 1.29, "Seismic Design Classification," should be considered vital. Applicants /
licensees had to provide a sound technical basis for any deviation from this list. Review Guideline 17 also suggested tha vital areas be separated into two categories: Type I (successful sabotage could be accomplished by sabotage activities within single area) and Type II (successful sabotage could be accomplished only by acts of sabotage in multiple areas, such as damage to various items of accident mitigation equipment).
Because there was no regulatory basis for requiring an additional level of protection for Type I areas, no practical use was made of this distinction.
A copy of Review Guideline 17 and Regulatory Guide 1.29 are included as Appendix B to this report.
In 1978, NRC contracted with the los Alamos National Laboratory (LANL) to p-ovide a site-specific vital equipment / area analysis for each reactor.
This analysis was to be used by the NRC staff to validate the vital area identification provided by licensees in their approved plans.
During the initial implementation phase of 10 CFR 73.55, eight separate teams i
reviewed licensees' vital area identification and security plans.
As a NUREG-1178 3-1
result of some uncertainty as to what constituted vital equipment, review results varied, 'and the staff recognized that the initial review findings i
might require revision. This possible need for revision was documented in the staff's safety evaluation reports and, in some cases, in license conditions, by the following statement or an equivalent: "The identification of vital areas and measures to control access to these e eas, as described in the plan, may be subject to amendments in the future."
By the end of 1979, the staff had physical security plans for all operating power reactors, and, to a great extent, these plans had been implemented.
However, at many sites, licensees were using compensatory measures for parts of the system that had not been installed or that were not functioning properly.
The compliance of licensees of operating plants with Review Guideline 17 can be sumarized as follows:
(1) Review Guideline 17 calls for all safety-related equipment to be protected as vital.
(2) The first units of any plants licensed since 1980 satisfy this guidance.
I (3) About two-thirds of the physical security plans approved by the NRC staff probably do not completely satisfy Review Guideline 17 but meet it to varying degrees.
During its review of Duke Power Company's proposed vital area program for i
the Catawba plant, the staff used LANL's modeling assumptions as a technical basis for evaluating the adequacy of protecting the plant's standby shutdown facility, which was an alternative to protecting certain other safety-related equipment. The staff had previously approved this standby shutdown facility protection strategy for the McGuire and Oconee plants.
This strategy calls for a hardened facility with separate ac and de power, reactor controls, and cabling. It relies on the normal auxiliary feedwater system for emergency heat removal and a charging pump for primary water make-up.
In the course of this review, a number of questions surfaced concerning LANL's modeling assumptions.
To address these concerns, the VAC was established to review the vital area identification process in general, and the modeling assumptions specifically.
NUREG-1178 3-2
4.
BASIC STUDY PREMISES The Vital Area Committee adopted three premises for its study:
l (1) To protect the health and safety of the public from acts of ra 'io-logical sabotage, the NRC requires physical protection syster for nuclear power plants. The design basis threat for radiological sabotage, defined in 10 CFR 73.1(a), based on an extensive study of known adversarial characteristics, provides the bases for the design of security systems that will provide an adequate and prudent level of security at nuclear facilities.
(2) Conformance with the requirements of 10 CFR 73.55(b)-(h) provides high assurance of protection against the design basis threat, recognizing that the Conunission is considering improved access control relevant to 10 CFR 73.55(d). 10 CFR 73.55 requires each licensee to have the capabilit requirements of paragraphs (b)y of meeting the specific detailed through (h). The Statement of Considerations for the rule states: "Compliance with the detailed requirements should essentially satisfy the general performance requirements stated in the rule in 173.55(a)" (42 FR 10838, February 24, 1977). Other Commission notices of public record issued in t
conjunction with other rulemaking proceedings essentially repeat this conclusion (42 FR 11201, February 28, 1979 and 44 FR 47759, August 15,1979). Although the rule allows licensees and applicants to propose alternatives to paragraphs (b) through (h) that would be equivalent in meeting the performance objective, none have done so.
(3) Successful radiological sabotage results in doses in excess of : hose defined in 10 CFR 100.
The 10 CFR 100 criteria are intended to serve as a benchmark for the analysis of major events, that is, those events that pose a potential health hazard (a significant release of radioactivity as a result of a major accident or radio-logical sabotage).
Eouipment not designated and protected as vital is considered vulnerable to non-radioingical sabotage. This study does not address non-radiological sabotage.
1 NUREG-1178 4-1
5.
SCOPE AND METHODOLOGY The study was carried out by the members of the Vital Area Committee (VAC) with supporting staff assistance from NRR, NMSS, RES, and IE.
Throughout the study, the VAC met periodically with the Management Policy Review Group (MPRG) for guidance and approval.
The scope of the study included the following:
(1) a review of all current regulatior.s, guidance, definitions, assump-tions, and criteria related to determining vital equipment and areas (2) a detemination of the present status of the application of the items in (1) to various vintages of plants to establish what staff practice has been and is with respect to approving designated vital equipment and areas (3) identification of any deficiencies, ambiguities, inconsistencies, or other problems in the present regulatory approach (4) a review and evaluation of recent and current staff proposals, proposed rules, etc., as they relate to vital equipment and areas, such as protection of event-mitigating capabilities and their support facilities (e.g., water sources, pumps, switchgear, and cable runs) constraints on the vital island concept and compartmental-ization requirements determination of an acceptable final state (hot or cold shutdown),
the required duration of that state, reliance on outside assistance, and consideration of normal equipment repair capabilities provisions for compensating for vital equipment out of service for maintenance credit for plant-specific features and capabilities, such as feed-and-bleed relevant infomation, data, and recomendations from recent staff and contractor studies, as well as from operational experience relevant to vital equipment and areas metheds used to protect critical equipment for other purposes, such as fire protection.
NUREG-1178 5-1
i I
The VAC study and its results address light water reactors only. Other types of reactors will be considered on a case-specific basis, as appropriate.
The VAC conducted the study in accordance with an action plan that had been approved by the MPRG.
(A copy of the approved action plan is included as Appendix C to this report.) The VAC independently evaluated all relevant documentation. This review was augmented by 13 briefings (The briefings by staff members and contractors on 16 study-)related areas.
are summarized in Appendix 0 to this report.
The subjects of the briefings and organizations presenting them were as follows:
Current practices for vital equipment area reviews - NMSS Vital equipment and vital area analyses - LANL Vital area criteria for the Regulatory Effectiveness Review Program
- NMSS The Safeguards Insider Rules - NMSS Vital Equipment Detennination Research Study - RES/LANL Current definitions and assumptions on vital areas - NRR 10 CFR 50, Appendix R Fire Protection - NRR Generic Issue A-29, "Nuclear Power Plant Design for the Reduction of Vulnerability to Sabotage - NRR Vital area inspection program - IE Vital area inspection program:
implementation and critique of current assumptions and suggested changes - Regions I and II USI A-45, "Shutdown Decay Heat Removal Requirements" - NRR Precursor Studies of Risk Analysis of Several Known Safeguards Events - RES Nuclear Power Plant Damage Control Measures - RES Equipment Requiring ?rotection Under Various Condition Assumptiers -
NHSS Selected Vital Equipment Assumptions - LANL USI A-44, "Station Blackout" - NRR i
NUREG-1178 S-2
6.
STUDY RESULTS 6.1 Proposed Vital Equipment / Area Protection Philosophy and Analysis Assumptions On the basis of its review and evaluation of relevant background informa-tion, data, and operational experience, the VAC developed an overall vital equipment / area protection philosophy or goal: to protect as vital the reactor coolant pressure boundary and one train of equipment --with the associated piping, water sources, power supplies, controls, and instrumentation -- that provide the capability to achieve and maintain hot shutdown.
Implementation of this philosophy would protect a set of safety-related components rather than protecting all safety-related components.
It is derived from and is consistent with Appendix A to 10 CFR 100 and Appendix R to 10 CFR 50. Appendix A to 10 CFR 100 defines those structures, systems and components to be. protected from the effects of earthquakes; the staff uses this to identify equipment to be protected in design basis events. Appendix R to 10 CFR 50 addresses fire protection.
The proposed philosophy also builds on the existing defense-in-depth safeguards approach, which consists of a protected boundary, detenntning specific equipment and areas to be protected as vital, access authorization (minimizing the number of people with access to vital equipment), and an assumed shutdown capability.
In summary, protecting as vital the reactor coolant pressure boundary and one train of equipment (with associated piping, water sources, power i
supplies, and instrumentation) that provide the capability to achieve and maintaH hot shutdown represents an approach to safeguards protection that is consistent both with the existing regulations for ensuring safety under design basis earthquake and fire conditions and with the current approach to safeguards protection.
Application of this philosophy will contribute to the overall program designed to provide a high degree of assurance against radiological sabotage, j
After developing this protection philosophy, the VAC re-examined, individ-i ually and collectively, 16 vital equipment / area assumptions currently used by LANL, and their bases.
These assumptions provide the principal guidance used by safeguards analysts to identify equipment and areas that require protection against successful radiological sabotage.
(The LANL assumptions are listed in Appendix E.)
This reexamination was based on the three premises defined in Section 4 above.
In brief, they are (1) The design-basis threat of radiological sabotage is defined in 10 CFR 73.1(a).
NUREG-1178 6-1 i
I
(2)
Conformance with the requirements of 10 CFR 73.55(b)-(h) provides high assurance of protection against the design-basis threat.
(3) Successful radiological sabotage results in doses in excess of those defined in 10 CFR 100.
After re-evaluating the current analysis assumptions, in light of the VAC protection philosophy and these three assumpt;ons, the VAC developed the revised set of assumptions discussed below. Application of these assumptions might result in designation of vital equipment different from that recomended in NUREG-0992, "Report of the Committee to Reviaw Safeguards Requirements at Power Reactors," dated May 1983, which was that several specific plant areas or equipment items be protected as independe9t vital islands.
6.1.1 Assumption 1 For protection against radiological sabotage, the primary coolant pressure boundary consists of the reactor vessel and reactor coolant piping up to and including a single, protected, normally-closed isolation valve or protected valve capable of closure in interfacing systems.
Rationale Protection of the primary coolant pressure boundary, as defined, ensures that a saboteur cannot cause a loss-of-coolant accident (LOCA). Thus, this protection precludes the need to protect LOCA-mitigating equipment.
Protection of a single valve is an adequate barrier for this purpose. Manual action to close a protected valve in an interfacing system is acceptable if that action can be taken i
in time to prevent an unrecoverable condition. Any valves upstream of a protected valve need not be protected if their failure will not result in a LOCA.
6.1.2 Assumption 2 Any transient or event that causes significant core damage will result in an attendant 10 CFR 100 release.
Rationale This is a conservative approach that assumes that, except for a temporary loss of water and/or heat removal capability, the core must be kept covered with water and decay heat removal capability must be maintained to preclude core melt.
If these conditions are not met, core melt is assumed.
No credit is given for the protec-tive or mitigating capabilities of the pressure vessel or the con-tainment. Thus, coie melting is assumed to result in doses in excess of those defined in 10 CFR 100.
NUREG-1178 6-2
6.1.3 Assumption 3 One train of equipment (with the associated piping, water sources, power supplies, controls, and instrumentation) that provides the capability to perform the I
functions (reactivity control, decay heat removal, and process monitoring) that are necessary to achieve and maintain hot shutdown for a minimum of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from l
the time of reactor trip should be protected as vital.
In addition, the major l
components of the reactor coolant makeup system and associated support equipment l
necessary to achieve this goal should be protected as vital.
Rationale Reactivity control is necessary to achieve and maintain suberitical reactivity conditions in the reactor.
Decay heat removal is necessary to remove decay heat generated in the core during hot shutdown.
Pro-cess monitoring is necessary to provide direct readings of the process variables needed to perform, control, and monitor the reactivity con-trol and decay heat removal.
Fcr those plants where an 8-hour hot shutdown capability without primary system maktup or alternate power sources cannot be demon-strated, the major components of those systems necessary to support reactivity control, decay heat removal, and process monitoring also must be protected as vital.
For example, an alternate power source, such as a diesol generator, might be necessary to provide power for process monitoring instruments and for other equipment required for j
achieving and maintaining hot shutdown.
Primary makeup water might i
be necessary to compensate for coolant leaked through the main reactor coolant pump seals and/or for operation of the power-operated relief valves.
Examples of equipment needed to perform these functions include, but are not limited to, the following:
NUREG-1178 6-3
reactivity control control rod scram components and systems (PWRs andBWRs) decay heat removal turbine-driven auxiliary feedwater pump, including control, water source (e.g., condensate storage tank), and main steam safety valves (PWRs) turbine-driven high pressure core injection (HPCI) pump, reactor core isolation cooling (RCIC) pump, isolation condenser, including auto start, control, and safety-relief valves (BWRs) process monitoring pressurizer pressure and level, steam generator pressure and level, reactor coolant hot and cold leg temperature (PWRs) reactor pressure and level, suppression pool temperature and level (BWRs) reactor coolant makeup charging pump, including water source and motor and reactor coolant pump control center (PWRs) seal cooling support functions diesel generator, including switchgear, cooling, startup, and controls (PWRs and BWRs) battery (PWRs and BWRs) service water ump and motor control center (PWRs and BWRs component cooling water pump and motor control center (PWRs) 6.1.4 Assumption 4 The control room and any remote locations from which vital equipment can be controlled or disabled (such as remote shutdown panels, motor control centers, circuit breakers, or local control stations) should be protected as vital areas.
Rationale Because the equipment necessary to ensure hot shutdown following a sabotage-initiated transient can be controlled from either the control i
room or local areas, both must be protected as vital, j
i NUREG-1178 6-4 1
6.1.5 Assumption-5 Only the power mode of reactor operation and hot standby (for PWRs) need be considered as long as all equipment designated as vital for power operation is maintained as vital in other modes.
Rationale Equipment identified as vital from an analysis of the power or hot standby modes of reactor operation also encompasses that necessary to protect against radiological sabotage in other modes. Therefore.
l plant-specific analyses of other modes are not necessary for "ital l
equipment detennination.
Consideratioa was given to a possible exception in the cold shutdown mode, since the cold shutdown decay heat removal (DHR) system, also referred to as the residual heat removal (RHR) system, is not required to be protected as vital for the power or hot standby modes. Because of the size of the decay heat removal (DHR) system piping (16-inch diameter) and the capacity of the residual heat removal (RHR) system pump (5500 gpm), the DHR system could drain the reactor vessel to hot leg level in less than 11 minutes in case of a DHR LOCA or uncontrolled containment spray. Without injection flow to the pressure vessel, the water level in the vessel would drop to the top of core from the hot leg level in about 15 minutes, and to the mid-point of the core in about 36 minutes. Therefore, the capability of isolating a damaged DHR system from the primary coolant pressure boundary during the cold-shutdown mode is required.
This capability would be ensured by protecting the primary coolant pressure boundary, which includes the first isolation valve.
Additionally, normal procedures routinely require more than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to bring a PWR to cold shutdown after reactor scram. After reactor shutdown, decay heat rapidly decreases and is less than 0.5%
at the end of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Thus, after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of cold shutdown, less than 100 gpm of injected water is required to remove the remaining decay heat.
This relatively small flow of water can be obtained from alternate water makeup sources - - such as the high-pressure injection system or the charging system, which already is protected. Thus, the time when significant fuel damage can be realistically caused is very limited.
NUREG-1178 6-5
Further support for this assumption is based on a recent NRC study that evaluated 130 total loss-of-DHR events in U.S. PWRs between 1976 and 1983. The durations of these events (before corrective actions were taken) ranged from less than 1 minute to 2} hours.
- However, because of timely corrective actions taken by the operators, no serious damage resulted from any of these events.
6.1.6 Assumption 6 Off-site power is unavailable.
Retionale Off-site power is transmitted by facilities outside the areas pro-tected and controlled by the licensee.
Therefore, the licensee can-not protect against the external assault defined in the design basis threat. This assumption is compatible with the basic premise that equipment not designated and protected as vital is vulnerable to damage and is not available.
6.1.7 Assumption 7 Random failures do not occur simultaneously with an act of radiological sabotage.
However, the saboteur can take advantage of the unavailability of equipment during maintenance. Thus, whenever any components or systems normally protected as vital are inoperable for any period of time, appropriate compensatory measures (such as stationing guards at alternate locations) must be taken to ensure the capability to reach and maintain hot shutdown.
Rationale The likelihood of a significant random equipment failure occurring simultaneously with a successful radiological sabotage act is very small, probably in the same order as the occurrence of an accident beyond the design basis. Although a saboteur might wait for such an event before initiating a sabotage act, this situation would require the saboteur to be in a continuous state of total readiness for in-definite periods, which seems unlikely.
However, a planned maintenance outage is usually of significant duration and a saboteur can readily learn of the plans for such outages well in advance of their occurrence, i
allowing the saboteur time to implement successful radiological sabo-tage. Thus, radiological sabotage during unplanned equipment outages is less likely than during planned maintenance outages.
HUREG-1178 6-6
6.1.8 Assumption 8 Breaks in multiple main steam lines that cannot be isolated lead to 10 CFR 100 releases.
Rationale The design-basis main steam line break is the unisolable double-ended rupture of a single main steam line upstream of the main steam line isolation valves. A licensee's analysis of this design-basis event must show that the main steam line break mitigating systems can pre-vent core damage resulting from both the positive reactivity increase caused by the overcooling transient and the loss of steam generator tube integrity.
It is conservatively assumed that these mitigating l
systems cannot prevent core damage if a multiple main steam line break beyond the design basis were to occur. Therefore, three options are available to licensees:
(1) protect all main steam lines, up to and including the main steam line isolation valves, as vital; (2) protect all main steam lines, as in (1) above, except the one covered by the design-basis main steam line break, and protect as vital the mitigating systems for that line; or (3) provide analyses demonstrating that sabotage-induced multiple steam line breaks are acceptable and protect as vital the required mitigating equipment and systems.
6.1.9 Assumption 9 Cable runs in trays and conduit need not be protected as vital unless cables necessary for safe shutdown capability are individually identifiable and the identification is reasonably accessible However, cable tenninals or junctions and areas such as cable spreading rooms, through which large numbers of cables pass, must be protected.
Rationale Generally, it is not feasible for a saboteur to identify individual cables in cable trays.
In some very few instances where individual cables in trays and conduits are tagged or labeled with coded identifications, such tags or labels are not readily accessible and significant effort would be required to trace the code to the actual cable identity.
Thus, even in such cases, positive identification of specific individual cables is considered to be very difficult and unlikely.
However, for facilities with such individually identified cables, justification will be required for not protecting the cables as vital.
NUREG-1178 6-7
1 Most licensees, however, have prepared documentation which identifies cable routings and locations.
Therefore, a saboteur might not be able to identify a specific cable among many in a tray, but he could know that a certain cable is within a specific tray.
Protecting all cable trays throughout their entire routings
- uld be contrary to the objective of minimizing access to vita equipment, because designating large portions of the plant as vital greatly increases the number of personnel with access to vital areas. The approach that cable runs in trays and conduit need not be protected requires the acceptance of some degree of cable vulnerability.
However, damage control can compensate for the loss of cable more readily than it can compensate for the loss of vital equipment served by these cables.
6.1.10 Assumption 10 Saboteurs may use explosives in amounts that they can carry.
Rationale This assumption provides for consideration of protecting, as vital, massive pieces of equipment (reactor pressure vessel, water tanks) that could otherwise not be damaged by individuals using conventional tools and thereby would not warraht protection as vital equipment.
Determination of which equipment needs to be designated vital is insensitive to the specific amount of explosives that individuals can carry (see Assumption 11).
Implementation of the assumption to determine which equipment needs to be designated vital does not require the analyst to consider specifically how much explosives can be used by the adversary.
The goal <as to bound the problem by characterizing an amount that could be carried, consistent with the design basis threat, and not require a vehicle.
6.1.11 Assumption 11 No credit is given for equipment not located in vital areas.
Rationale Because some single plant areas contain either a common element, the major elements of an essential system, or elements of multiple essential systems, and because a saboteur is assumed to have whatever knowledge is required, once a saboteur enters such an area, there are no impediments to the successful completion of the radiological sabo-tage action.
Therefore, it is assumed that if a saboteur gets into a single area containing several pieces of equipment, the saboteur can disable or manipulate all of the equipment in that. area.
NUREG-1178 6-8
6.1.12 Assumption 12 Following the start of a refueling outage, the spent fuel pool should be proo tected as vital long enough to ensure that sabotage to the pool cannot result in a 10 CFR 100 release.
Rationale Protection of the spent fuel pool for the specified period of time immediately following refueling precludes damage to the spent fuel that would result in unacceptable releases.
6.1.13 Assumption 13 The backup suppc.* ting power supply of the Central Alarm Station (CAS) is essential for continuous operation of CAS in the event of loss of normal power.
Rationale The CAS is designated a vital area.by 10 CFR 73.55(e)(1).
Its backup supporting power supply must be protected to assure continuous CAS operation (1) to provide timely indication of an unauthorized attempt to enter a vital area, (2) to detect unauthorized penetration of the protected area, and (3) to assure a means of communicating with the local law enforcement agencies.
6.2 Impact on Licensed Plants Generally, implementation of the proposed vital equipment /at a protection philosophy and analysis assumptions would have a greater impact on facilities licensed before 1980 than on those licensed since then.
The VAC estimates that the licensees of about one-third of the operating U.S. nuclear power reactors would not have to protect any equipment beyond that now protected.
Licensees of the other two-thirds of th~e U.S. operating reactors might be required to classify additional equipment as vital.
This equipment would range from e few items in some plants to many in others.
NUREG-1178 6-9
7.
RECOMMENDATION The Vital Area Committee recommends that the proposed vital equipment / area protection philosophy and analysis assumptions presented in Section 5.1 of this report be adopted and implemented.
However, satisfaction of the requirements and assumptions of Review Guideline 17, issued in January 1978, should continue to be acceptable as an alternative to this revised guidance. The Committee believes that these assumptions represent a comprehensive and consistent approach to determining equipment and areas to be designated as vital in nuclear power plants and that their applica-tion will contribute to the overall program designed to provide a high degree of assurar:ce against radiological sabotage.
E
}
J NUREG-1178 7-1 1
APPENDIX A E00 MEMORANDUM OF MAY 1, 1985 ESTABLISHING THE VITAL EQUIPMENT / AREA GUIDELINES STUDY 6
6 P
l l
l l
l l
h i
l i
l l
1 d
i i
i
[
1 4
1 b
J 1
1 1
i i
i i
l l
/,$** ***%\\
UNITsD STATIs NUCLEAR REGULATORY COMMISSION
{ (,, j WASHINGTON. o, C. 20955 D..M RAY 011985 MEMORANDUM FOR: Victor Ste11o Deputy Executive Director for Regional Operations & Generic Requirements Harold R. Denton, Director Office of Nuclear Reactor Regulation John G. Davis, Director Office of Nuclear Material Safety & Safeguards Frank J. Miraglia, Deputy Director Division of Licensing, NRR Robert F. Burnett, Director Division of Safeguards, NMSS James G. Partlow, Director Division of Inspection Programs l
Frank P. Gillespie, Director Division of Risk Analysis & Operations RES FROM:
William J. Dircks Executive Director for Operations
SUBJECT:
VITAL EQti!PMEhT/ AREA GUIDELINES STUDY The vital area definition process has been evolving since 1978 and has been addressed in several studies.
Recent evaluations of licensees' physical security plans and site visits have raised questions about the validity of some of the assemptions and criteria used in the current vital equipment /
area determination process.
In view of the uncertainty involved with the vital equipment / area guidelines, a need exists to reevaluate the bases and guidelines used to de.termine the equipment and areas to be protected as vital. Therefore, I am establishing a study effort to respond to this need. The participants, responsibilities and milestones are outlined broadly in the. enclosure "Charter, Membership and Action Plan for Vital Equipment / Area Guidelines Study." This approach j
will ensure coordination and consistency and bring together expertise in
]
both the safety and safeguards perspectives, j
i l
NUREG-1178 A-1 i
2 The study should be completed and a final report issued within about eight months.
Eps$WWiamiOltet William J. Dircks Executive Director for Operations
Enclosure:
As stated cc: Thomas E. Murley, Administrator, Region I J. Nelson Grace, Administrator, Region II James G. Keppler, Administrator, Region III Robert D. Martin, Administrator, Region IV John B. Martin, Administrator, Reg!on V i
l i
1 I
l NUREG-1178 A-2 l
ENCLOSURE CHARTER, MEMBERSHIP AND ACTION PLAN FOR VITAL EQUIPMENT / AREA GUIDELINES SWDY Objective i
This study is intended to cover the entire spectrum of NRC safeguards rules, guidance, contractor data, etc., as they pertain to vital equipment / area rules, guidelines and assumptions. A consistent, logical approach to identi-fying vital equipment / areas for subsequent protection is to be developed.
Consideration shall be given to conditions of nonnal operation, including anticipated operational occurrences, and those transients and accidents of the types presently considered in the design basis analysis of the plant.
Consideration shall also be given to outage activities to the extent that loss of operational functions and capabilities impact vital equipment and areas.
!!. Background I
The vital equipment / area guidelines currently in use have evolved as
]
follows:
o o 10 CFR 7.2 defines in general tenns equipment and areas that must be protected as vital.
3
~
o "Definition of Vital Areas," Revision-1, Review Guideline No.17 1
January 23, 1978 addresses in general tenns the structures, systems and components that should be protected as vital.
It also classifies vital equipment / areas into two general categories -- Type I and Type 2
l i
o The LANL Vital Area Analysis Assumptiors are utilized by LANL under a technical assistance program to indep6ndently identify vital equip-j ment / areas at power reactors.
o A Working Group te Improve Vital Area Determination Techniques report of August 12, 1982, concluded that the techniques in use, subject to recoemended modification, provide a reasonable appnach, from a safe-guards perspective, to identifying vital areas and acsipment.
It was recoemended that a research project be initiated to further refine and improve the program. The research project is not yet coq 1ete.
o NtipEG-0992, M y 1983, prepared by the Comittee to Review Safe-1 guards Requirements at Power Reactors, endorsed the vital island i
concept and further identified 3 elected items of equipment that should be independently protected as vital at all power reactors.
NUREG-1178 A-3 i
i
____,,r.,
2-o The Proposed Insider Rule, published for public comer.t bn August U, 1984 would provide fe-the grouping of vital areas into "vital islands" and require protect',n of vital equipment only to the extent necessary to interrupt sabota e paths.
v III. Organization Two groups are estabitshed to carev out the study: A Vital Area Comittee and a Management Policy (eview Group.
The Vital Area Comittee is chaired by Frank J. Miraglia, NRR.
Its other members are Robert F. Burnett, HMSS; James G. Partlow, IE; and Frank P. Gillespie, RES.
The Management Policy Review Group is composed of Victor Stello, DEDROGR; Harold R. Denton, NRR; and John G. Davis, NMSS.
IV. Responsibilities A.11tal Area Comittee o Recomend a proposed Action plan with milestones and specific milestone schedules.
o Reexen.Ine all existing and proposed requirements, assumptions, guide-lines and their base for deterviining vital equipment and areas; either validate or modify tim appropriately.
o Recnmend a clear, consistent and comprehensive set of guidelines for determining vital equipment and areas.
o Obtain and integrate necessary supporting expertise in the form of input to the study effort and coments on drafts, from the line organizations represented on the Comittee, as well as from other Headquarters Offices, the Regions and contractors, as appropriate.
o Interact directly with the Management Policy Review Group as necessary to obtain guidance, direction and concurrence, o Prepare draft reports with recomendations and supporting bases for Management Policy Review Group review and approval.
B. Management Policy Review Group o Approve the Action Plan, its milestones and schedules, o Meet periodically, as necessary and appropriate, with the Vital Ares Comittee to provide broad policy direction and guidance for the conduct of the study and to discuss the study status, plans, progress and problems.
o Approve and issue the final report to the EDO.
NUREG-1178 A-4
l
, V.
Preliminary Action Plan j
The following proposed Action Plan broadly delineates the major tasks and milestone schedule for accomplishing the specified effort.. It will be further refined by the Vital Area Comittee and approved by the Manage-ment Policy Review Group.
(1) Initial meeting of the Vita. Area Comittee to fonnalize the approach, identify needed resources and develop the schedule.
Target Date: Week 0 (2) Vital Area Comittee and supporting staff meet in working sessions to develop preliminary recomendations with rationale and justifica-tion.
Interacts with other Offices and staff and with the Management Policy Review Group as necessary and appropriate.
Preliminary recomenda-tions presented to the Management Policy Review Group.
Target Date: Week 17 (3) Management Policy Review Group reviews preliminary findings and provides guidance /recomendations to the Vital Area Comittee.
Target Date: Week 20 (4) Vital Area Comittee integrates recommendations into draft vital equip-ment / area guidelines report. Draft report completed.
Target Date: Week 25 (5) Draft report circulated for coments and concurrence from all cognizant Offices. Coments/ concurrence received.
Target Date: Week 30 (6) Vital Area Comittee prepares final report for Management Policy Review Group approval. Management Policy Review Group submits final report 4
to the EDO.
Target Date: Week 36 l
1 l
I NUREG-1178 A-5 I
i
APPENDIX B REVIEW GUIDELINE 17 AND REGULATORY GUIDE 1.29 3
1 l
/I * *' % g umrao :TATes NUCLEAR REGULATORY COMMISSION
{
j WASHINGTON, D. C,20666
\\...../
JAN 2 31378 MEMORANDUM FOR:
Reactor Safeguards Licensing Branch t
Members, DOR FROM:
Robert A. Clark, Chief Reactor Safeguards Licensing Branch, DOR
SUBJECT:
DEFINITION OF VITAL AREAS, REVISION 1 -
REVIEW GUIDELINE NO. 17 Enclosed is Review Guideline Number 17, i.e., the revised definition of vital areas.
t'hkha..
Robert A. Clark, Chief Reactor Safeguards Licerising Branch, DOR
Enclosure:
As stated i
1 "l
NUREG-1178 B-1
L i
DEFINITION 0F i
VITAL AREAS AND EQUIPMENT j
Revision 1 I,
i A.
Applicable Sections of 10 CFR 73 73.55 (c)(1):
"The licensee shall locate vital equipment only within a vital area, which in turn, shall be located within a protected area such that access to vital equipment requires passage through at least two i
physical barriers of sufficient strength to meet the performance requirements of paragraph (a) of this section. More than one vital 4
area may be located within a single protected area."
}
)
73.2 (h):
"Vital area means any area which contains vital equipment within a structure, the walls, roof, and floor of which constitute physical i
i barriers of construction at least as substantial as walls as described inparagraph(f)(2)."
73.2 (1):
"Vital equipment means any equipment, system, device, or material failure, destruction, or release of which could directly or indirectly i
endanger the public health and safety by exposure to radiation.
I Equipment or systems which would be required to function to protect i
j public health and safety following such failure, destruction or release are also considered to be vital."
l NUREG-1178 B-2 4
y-.
.v y
, y
B.
Assumptions and Definitions In the application of these regulations to a typical LWR plant, the following considerations and assumptions are made:
1.
Paragraph 73.55 (c) requires vital equipment to be enclosed by two barriers.
The combination of barriers, in con. junction with other components of the security system, must provide a sufficient delay to an intrusion to meet the performance require-mentsof73.55(a).
2.
To "endanger the public health and safety by exposure to radiation" requsres a significant off-site release of radioactivity.
For LWR's the following sources of significant quantities of radio-activity should be considered:
a.
The reactor core, 1
b.
Spent fuel, Radwaste systems, if the total radwaste inventory is greater c.
than nxC, where:
n is the ratio of the applicable dose guideline of 10 CFR 100 to the dose computed for accidental releases in Chapter 15 of the FSAR, and e
istherelease(curies)assumedintheaccidental i
release calculation of the FSAR.
{
3.
Vital Areas fall into two general categories:
a.
Type I vital areas, i.e., those areas wherein successful sabotage can be accomplished by compromising or destroying NUREG-1178 B-3 l
the vital systemsM or components located within this area.
(By definition, an area containing systems or components whose failure or destruction results in a direct release is a Type I vital area.)
b.
Type II vital areas, ie., those areas which contain systems or components whose failure or destruction would lead to successful sabotage only in conjunction with additional sabotage activity in at least one other, separateE vital area.
(Safety related equipment designed to mitigate the l
consequences of failures of other systems usually falls into this category.)
4.
When classifying vital equipment as Type I or II, the following assumptions apply:
a)
The concurrence of violent natural phenomena with a security contingency need not be considered.
b)
Random (accidental) failure of equipment concurrent with a j
security contingency need not be considered.
However, a security contingency during routine or planned outages of equipment, as permitted by the technical specifications, must be considered.
1/ "System" refers to all components, mechanical and electrical, includ, ing piping, cabling, power supply, and other support systems to carry out the design function provided by the system.
i i
2f For the purpose of this discussion, a vital area may be considered "separate" if it is separated from the area under consideration by l
a barrier or distance sufficient to delay the saboteur's access long enough to demonstrate intcrception and engagement by the security rtisponse force.
NUREG-1178 B-4 4
c)
Loss of off-site power must be assumed since it is impractical to protect transmission lines against sabotage.
C.
Discussion The definition of vital equipment, 73.2 (1), includes equipment whose failure would lead to a direct release, as well as equipment required to function for the protection of public health and safety following a postulated sabotage attack.
This is analagous to the definition of safety-related equipment, which includes primary fission product barriers, as well as the systems required to mitigate the consequences of a breach of the barrier. Therefore, essentially all safety related equipment must be considered vital.
In order to avoid duplication of safety analyses, the systems listed in Reg. Guide 1.29 should be considered vital.
It should be noted that a facility which provides sufficient delay time to pemit interruption of the external threat of 1(a)(1) at all vital area barriers, and for which adequate protect',n against the insider threat of l(a)(2) is provided for all vital areas would meet the requirements of 73.55 without the designation of any Type ! Vital Areas.
In practice, however, it is to the licensee's advantage to segregate vital areas into Type I and II, in order to take credit for the fact that a saboteur could not achieve successful sabotage in Type II vital areas without penetrating additional barriers.
NUREG-1178 B-5
D.
Review Guidelines
)
1.
All systems listed in Reg. Guide 1.29 as "Seismic Category I" are considered vital.
(A sound technical basis must be pro-2 vided by the licensee for any deviation from this list.)
2.
Type ! Vital Areas should be identified by the licensee, using the definitions and assumptions listed in B.
If Type ! Vital Areas are not identified by the licensee, the list provided in the Appendix may be used as guidance.
3.
High assurance protection against the external and internal threat must be provided for all Type I Vital Areas.
This i
requires a demonstration that any external Type I vital j
barriers provide sufficient delay to the extertial threat j
(l(a)(1)) to permit a timely engagement by the armed response force, and appropriately restricted access controls, controls j
of activity, or other methods of protection against the insider, a
l to meet the internal threat (l(a)(2)).
For Type II Vital Areas, 1
a combination of multiple barriers, each of which meets the l
requirements of 73.2(f)(2) or its equivalent, and the associated individual access controls, provides high assurance protection against the external and internal threat.
1 i
1 l
l 1
l NUREG-1178 B-6 j
=-,--
. =
Appendix SAMPLE LIST OF TYPE I VITAL AREAS 1.
2.
Containment electrical and piping penetration areas 3.
Control room 4.
Cable spreading room 5.
Primary shutdown system (if outside containment) j 6.
All areas associated with one complete decay heat removal system (includingallnecessarysupports cooling, and lubricating systems 4)ystems, e.g., power supply, L
7.
Battery rooms (including battery charger areas) i P
l
{
i
[
5 l
1 1
i E
4 j
NUREG-1178 B-7
Raision 2 U.S. NUCLEAR REGULATORY COMMISSION Febru ary 1976 REGULATORY GUIDE OFFICE OF STANDARDS DEVELOPMENT REGULATf.'RY GUIDE 1.29 SEISMIC DESIGN CLASSlFIC ATION A. INTRODUCTION nuclear power p!anu that thos.;d be des. ped to with-stand the effects of the SSE. f General Deugn Cn erion 2.*Dnign Bues for Protec.
- 3. Digt sloN tion Against Natural Phenornena, of Appendix A.
"Central Deugn Cotens for Nuclear Power Mants," to Afin neewing a St of4pbcat ons for con.
10 CFR Pari 50,"Ucensing of Producuen and Utahaa,
.c'aar pc.ing hensu for boilms and suudon purruu a o; g uon P.ctboes," requires that nuclear power plant on plants, the NRC staff structures. system' and components tmportant to safety pununnd wau has denloped a Q Kgn clauttkauon sysum for be designed to.1thstand the effects of sarthquakes idenufying tacas plant Casturn that shuuld be dengned without lou of capab6bty to perform their safety to =1thstand'A.Wfech of the SSE. Those structures, systerrgwd hm)ir,ents that should be desagned te umam a he 55 oc un an bon onag-AppendJs B,"Quahty Auurance Cntena for Nuclear Po*tt Pla.nis and Fuel Reptoceanns Planu." to 10 CFR
" $Y' CI*#) l' Part 50 estabhthen quabty auurance reqwrements for
.c C. REGULATORY POSITION the deup, construction,and o erstion of nuclear power i
or raattgate the consequences of postulated act h.$ g,g plant structures, systems. and cornponents that prenn,t, gy y
,y, g,
ts of a nuclear power pl.nt, sncludmg their founda.
that ould cause undue nsk to the health and saf(y of tions and supports. are designated as Seistruc Cate:ory I the pubbc. The pertinent requirements of B
and should te designed to withstand the effecu of the apply to all acuvices affeettng the safety 4
iSE and remaan funcuonal The pertinent quabty uons of those structures systems,and co nenu anurance reqwrements of Appendis B to 10 CFR Part 50 should be appbed to. all utivities affecting the Appendat A. **5etsmic and Geologie L stena safety.related functions of these structures.systerns,and for Nuclear Power Mants " to 10 CFR Part 100, "Reactor Site Cntena," requyas that all nuclear power componenu,
.11_the Safe Shutdo.fi
- s. TM nutor chi pnuun boundar'y, planu be designed so tg%M n, systems, and Earthquake (55E) occurs, components importa4to 1 misty remam furicuonal.
These plant featuttp are bse wcenary to ensure (1)
- b. The reactor core and reactor venal mtemals.
the tniegnty of theritactoNoolant preuure boundary.
(2) the capabQttf teht dann the reactor and mamtam
- c. Systems' or portaons of systems that are it m a ufe insidaem codtion. or (3) the capabthty to eequired for (1) emergency core coobng. (2) postacci.
prevent.or tr.Ng6e the consequences of accidents that dent containment heat removal, or (3) pontaccident could roult m pEtecual offsite eaposures comparable to the guidebne exposures of 10 CFR Part 100.
'Tu spitem kundary met.sn an ponions of om erina f u.taon a nd retured to accomp62 LM specifard safety n
connected pipes up to sad ecludes de far et et etacive.ng a This guade ducnbei an acceptable rnethod ofidenu.
.afeir er en f en thai. Ger norren, cesee e capaus fying and claulfymg those features of bght wateracooled of automat c clows e ten me safety fvacuea u tes. eta.
u1.eaC R4 GVtaTCRv GWIOt5 c.****.a
- ~ se.
m e.
t...
e wa
-... -.. ~
- ~;;,8 ---~ ~~~
- e = *~ *-a -+ ~
~-
~
.c..-..-.
- *7.*.r*.*.*.*.' ~ * *.:* ".~.7:*.~ '.*. *".O*:.' *.'." *.*2:
'"--~*~~~~~--~~*a-
,a
.~
~
-~...-......:--
~
~.
' " ~ ~ ~ " * " * * " * " " * ' ' ' " * *
- *::~~1. "*10".l'; :~ 7.* *."*".;; *.'. " *"."."./T!::'
'.:*.".!.!::'..?.7 "!.':'. *.*:7*'*;.*.*:".4*'t.. !*::1";T:."
""*l1."*."". *.* '.*"a' *: " **.T:*.0CC'.".'L***.**'o?
.....~...._.
-..s......
NUREG-1178 B-8
i containment atmosphere. cleanep (e g, hydrogen re-
- n. The control room, meludmg its auociated wtal moral system).
equiprnent, coobng systems for wtal equapment, and hfe support systerns, and any structures or equipment inside
- d. Systems, or portions of systems that are e, outside of the control room whose fadute could result required for (1) tenctor shutdo n, (2) itsidual heat in incapacitating injury to the occupants of the control removal, or (3) cochng C. pent fuel stor p pool, room.8
- e. Those portions of the steam systems of botting wster teactors exten&ng from the outermost contain,
- o. Pnmary and ucondary reactor cor.tunment.
ment isolation valve up to but not incluing the turbine stop valve, and connected piping of 21/2 iniches or
- p. Systems,' other than raioacuve waste manage. t.
larpt norrunal pipe uze up to and including the first ment systems,3 not covered by items 1.a through 1.0 I valve that is either normally clued or capable of above that contain or may contain ra6cactive matettal automatic closure dunng all modes of normal reactor and whose postulated fadute would result in conserva.
operation. The turbine stop valve should be deugned to tively calculated potential offute doses (usng mete-withstand the SSE and maintain its integrity.
orology as presenbed by Regulatory Guide 1.3, "As.
sumptions Used for Evaluating the Potential Radio.
- f. Those portions of the steam and feedwater Icycal Consequences of a 1.ms of Coolant Accident for systems of pressunted water reactors extending from Botting Water Reactors," arid Regulatory Guide 1.4, and incluing the secondary side of steam generators up "Auurnptions Used for Eva!usting the Potental Rado-to and teclu&ng the outermust containment isolation logical Consequences of a 1.oss of Coolant Accident for valves, and connected piping of 21/2 inches or larger Pressurized Water Reactors") that are more than 0.5 rem norrunal pipe uze up to and inclu&ng the first val" to the whole body or its equival:nt to any part of the (melu&ng a safety or rebef valve) that is either normally
- body, closed or capable of automatic closure dunng allmodes of normai reactor operauon.
- q. The Class IE electric systems, incluing tne
- 3. Cochng water, component cooling, and auxaj.
auxiliary systems for the onute electne power suppbes, lary feedwater systems' or portions of these systems, that prowde the ernergency electnc power needed for includmg the intake structures, that are required for (1) functionmg of plant features included in itema 1.s emergency core coobng,(2) postaccident contamtnent through 1.p above, heat remonl (3) postact 'ent contamment atmosphere cleanup,(4) reudual heat removaj from the reactor, or (5) coohng the spent fuel storage pou..
- 2. Those portions of structures, systems, or compo-nenu whuse conunued function is not required but
- h. Coobng water and seal water systeins' or whose failure could reduce the functiorung of any plant portions of these systems that are required for funcuen-featun mum M mms La through Lq akw to an ing of reactor coolant system components important to unacceptable safety lew) should be deugned and con.
safety.such as reactor coolant pumps.
structed so that the SSE would not cause tucn failure.
- i. Systems' or port ons of systems that are re-J. Setstruc Category I deugn requirements should quired to supply fuel for emergency equipment, extend to the first senmic restraint beyond the defined boundaries. Those portions of structures, systems, or
- j. All elecinc and mechanical dences and circuitry components that forminterfaces between Seamic Cate.
between the process and the mput terrrenals of the gory I and non Seismic Category I features should be actuator systems mvolnd in generating unnals that deugned to Seismic Category t tequarernents.
stuttate protectivt action.
- 4. The pertment quahty auurance requirements of L Systems' or portions of systems that are required fot (1) momtorms of systems important to Appen&x B to 10 CFR Part 50 should be apphed to all safety and (2) actuauon of systems important to safety, act nties affecting the safety related funcuons of those poruons of structures, systems,and components coveied I. The spent fuel storage pool structure,includmg under Regulatory Posiuons 2 and 3 abow.
the fuel racks.
- Lanes indacate substanuve changes from pronous mue.
The reactivity control systems, e 3., corttrol s wheren practacat, structures and eguemeni.neis rame rrt rods, control rod drives, and boron injecuon system, could possibly ca uw such inrvrne 6houte be relocated or separated to the entent requeed to elAnunate this possNaty.
'Specafic guidance en estamic requirements fes raisoecuve =aste
'$.e footnote 1 p.1.29 l.
management systemsis undet devolerment.
1.29 2 NUREG-1178 B-9
t APPENDIX C r
ACTION PLAN HEMORANDUM OATED JULY 1, 1985 I
1 l
4 I
1 I
i 1
I t
i
.i 1
)
l.
'g UNtTED STATES NUCLEAR REGULATORY COMMISSION i
.f msmorow o.c.rosu
'+..,,,*
July 1, 1985 MEMORANDUM FOR:
Victor Stello, Deouty Executive Director for Regional Operations and Generic Requirements Farold R. Denton, Director Office of Fuclear Peactor Regulation John G. Davis, Director Office of Nuclear Material Safety ard Sefecuards FROM:
Frank J. Miraglia, Chairman Vital Area Committee
SUBJECT:
VITAL EQUIPMENT / AREA Gll!DELINES STilDY ACTION PlfP
References:
1.
Mercrandun from William J. Dircks, "Vital Equipment / Area Guidelines Study," dated May 1, 1925, 2.
Menorandum from Frank J. Miraglia, "Vital Eouipment/ Area Guidelines Study Ac, tion Plan," dated May 21, 1985.
3.
Pemorandum from Frank J. Miraglia, "Vital Equipment / Area Guidelines Study Revised Action Plan," dated June 17, 1985.
Based upon discussions at our meetings with the Management Policy Review Group on June 4 and June 25 and further consideration by the Vital Area Comittee, we have redified and finalized the action plan to reflect your guidance and recomendations. We plan to proceed with the study in 6ccordance with this action olan, whicn is enclosed, unless you direct us otherwise.
We will reet with you again in late July to review our progress and status.
Frank J. Miraolia, Chaiman
Enclosure:
Vital Area Cemittee As stated cc w/enclesure:
T. Murley, Administrator, Region !
J. Nelson Grace Adninistrator, Region II R. Burnett, Director, Division of Safeguards, NMSS, J. Pertlow, Director, Division of Inspection Programs IE F. Gillespie. Director, Division of Risk Analysis and Operations, RES NUREG-1178 C-1
J ENCLOSURE i
i VITAL E0VIPF.NT/ AREA GilTDFLIFES STUDY l
ACTION PLAN l
Objectives of Study Develop a cceprehensive and consistent set of recomended assumptions, perfomance criteria and guidance, in a report to the EDO, for detemining vital enttiperent/ areas in nuclear power plants. The assumptions and guidance l
should:
1.
Consider conditions of normal operation, including anticipated i
operational occurrences, and those transients and accidents of the types presently considered in the design basis analysis of nuclear power -
plants; 2.
Consider outage activities to the extent that loss of cperational functices and cepabilities during outages impacts vital equipment; l
3.
Re readily applicable to identification of required vital eeuiptrent and areas on a case-by-case basis; and 4.
Have review and concurrence of all cognizant offices.
1 Preliminary Rasic Assumptions The Vital Area Comittee (VAC) has established the followico basic assur:ptions at the inception of the study.
These assumptions will be reexamined and I
changed, if necessary and with MPRG approval, as the study proceeds.
1.
The design basis threat of radiological sabotage is as defined in 10 CFP 73.1(a).
{
2.
Confomance with the recuirements of 10 CFP 73.55(b)-(h) provides j
high assurance of prntection against the design basis threat. This recognizes that the Cnrr.ission is considering improved access control 7
relevant to 10 CFR 73.55(d).
4 l
3.
Successful radiological sabotage results in doses in excess of those i
defined on 10 CFR 100. The study will consider protection against radic1ccical sabotage only and will not address non-radiological sabota ge.
j Scope of Study l
The Vital Area Committee (VAC) will:
3.
Peview all regulations, guidance, definitions, assumptions and criteria currer+.ly in effect related to detemination of vital equipment and i
l areas; NUREG-1178 C-2 l
. ?.
Detemine the present status of the application of the items in (H ebeve to various vintages of plants to establish what staff practice has been and is at present w'th respect to approving designated vital eouir-rient and areas; 3.
Identify any deficiencies, ambiguities, inconsistencies and other problems in the present regulatory approach;-
4 Reviev end evaluate recent and current staff proposals, proposed rules, etc., as they relate to and impact vital equipment and areas.
For exar:ple, this would include the following-a.
Protection of event miticeting capabilities and their support facilities; e.g., water sources, pumps, switchgear, cable runs; b.
Constraints on vital island concept and compartmentalization requirer'ents,
c.
Acceptable final state (hot vs. cold shutdown), recuired duration of that state, reliance on outside assistance, and consideration of j
nomal equipment repair capabilitiest
)
d.
Provisions for compensating for vital equipment which is out cf l
service for maintenance; e.
Credit for plant-specific features and capabilities such as feed-and. bleed; i
f.
Information, data and recorrendations from recent staff and j
contractor studies as et 1 as operational experience relevant to 1
vital equipment and areas; and g.
Methods used te protect critical equipment for other purposes, such as fire protection.
i Study Methodology 1
The followino approach is plerned for Vital Area Comittee information and i
data acquisition and assessment:
1.
Independent VAC review and evaluation of all relevant decurentation; and 2.
A series of briefings to the VAC by staff and NRC contractnrs, as j
outlined in Attachment 1 (note that these briefings have been errpleted),
1 i
Schedule i
The attached floure (Attachment 2) shnws the milestones and target dates for the first phase of the study which will produce preliminary recomendations to the Management Policy Review Group (MPRG).
The balance of the study will involve obtaining necessary concurrences of the recomendations and preparing j
a report, t
s.
j NUREG-1178 C-3
-l 9
._..__,--,-v
- ~ ' ~
ATTACHMENT 1 BRIEFING SCHEDULE FOR VITAL AREA COMMITTEE Session 1 - Ptau P1, lePF, 10:00 a.m. Room ??42 Air Richts Current practices for pre-licensing vital area reviews - NMSS LANL vital area analyses - LANL Vital area criteria for RER reviews - l' MSS Sumery of Insider Rule - NMSS Session ? - May 30, 1985, 9:00 a.m. Room P-42? Phillips RES/LANL vital area study - LAFL Evaluation of current definitions and assumptions on vital areas - FPP/DSI Appendix R. Fire Protection - NRR/DSI Generic Issue A-29, "Nucleer Power Plant Design for the Reduction of Vulnerability to Sabotage - NRR/DSI Vital area inspection program - IE Vital area inspection procram implementatfor eed critique of current j
assumptions and suggested changes - Recions ! & I!
Session 3 - June 6, 1985, 9:00 a.m. Room P 422 Phillips UST A-45, "Shutdown Decay Heat Removal Requirements" - NRR/ DST Review of "Precursor Studies of Pisk Analysis of Several Known Safeguards Events" - RES Peview of "Nuclear Power Plant Damage Control Measures" - RES NUREG-1178 C-4 1
5 Schedule For Initial Phase of Study
=
Week of Actfvity M
June July August September 6 13 20 27 3 10 17 24 1 8 15 22 29 5 I? 19 76 7 9 Initial VAC Meetino e
Finalize Study Action Plan e
W RG Approves Actice Plan Revfew of Pelevant Documentation Briefings to VAC Develop Assumption and Guideline Reconsmendations Preliminary Reconsnendat1ons Presented to MPRC VAC Meetings with MPRG e
e e
e VAC Working Sessions eeoe,,
APPENDIX 0
SUMMARY
OF BRIEFINGS TO THE VITAL AREA COMMITTEE i
I i
l 1
l 1
I f
In a series of 13 briefings delivered to the Vital Area Committee (VAC) between May 21 and September 12, 1985 NRC staff members and contractors from the Los Alamos National Laboratory (LANL) augmented the VAC review to determine what vital equipment and which vital areas in nuclear power plants required protection against radiological sabotage.
Each of 11 briefin individual subject.
Two of the briefings (Briefing 6 and 10)gs discussed an discussed 3 and 2 subjects, respectively.
Each of the briefings is sumarized br aw.
1.
Current Practices for Vital Equipment / Area Reviews D. Kasun (NMS$j, M3y 21, 1985 This briefing)gave the history of the review of vital equipment as defined in 10 CFR 73.2(1 and Review Guideline 17, which require that essentially all safety-related equipment be considered vital.
Some of the early plans protected only Type I equipment and areas (those where a single successful act of sabotage could lead directly to a 10 CFR 100 release). Other plans did not identify LOCA-mitigation or emergency power as vital.
Many plans did not specify onsite water sources as vital.
Because of such variability in applica-tion of the guidance, NRC contracted with LANL in 1978 to perform a vital area program review.
From 1980 to 1983, NRC required applicants to follow Review Guideline 17, essentially without deviation, except that during this period, the rtaff accepted vital equipment designations approved prior to 1980 on first units for subsequent units at multi-unit sites.
Since June 1983, all plans for plants being licensed have been in full compliance with Review Guideline 17, which means that essentially all safety-related equipment is protected as vital.
The SER is used to identify safety-related systems and components and applicants' pitis are required to demonstrate that this equipment is located in vital areas.
Other relevant current practices require that barriers to vital areas be solid and substantial, and completely enclose the vital equipment.
Seismic Category I reinforced concrete water tanks inside protected areas are accepted as is.
Accessible openings are not pemitted.
Devitalization of certain areas is pemitted when the reactor is in the cold shutdown condition.
However, the control room, containment, alarm stations, and emergency power, water, and RHR equipment necessary to main-tain the reactor in a safe shutdown condition are not devitalized.
The spent fuel pools are normally classified as vital areas.
2.
Vital Equipment / Area Protection History and Assumptions R. Haarman (LANL) May 21, 1985
)
The development of the Los Alamos National Laboratory (LANL) vital area program and its implementation were outlined.
The SETS Code, developed by Sandia National Laboratory, and the generic fault trees were described.
Both were developed for use in the vital area analysis program.
NUREG-1178 D-1 i
f 3
1 The LANL vital area analysis involves a preliminary detailed review of the FSAR. The site is then visited by a Los Alamos team for further specific 4
review. The field data are reduced into computer input and used to tailor the generic fault tree to the site-specific data. A computer analysis is then l
conducted using the SETS and fault tree techniques to define the minimum equipment required to be protected as vital. After a review and check for l
l accuracy and consistency, the results are submitted to the staff.
j 3.
Vital Area Criteria for the RER Program t
B. Mendelsohn (NMSS), May 21, 1985 The objectives of the Regulatory Effectiveness Review (RER) program were outlined.
They are to:
(1) validate the LANL vital area analysis, (2) assess implemented security system effectiveness, (3) assess contingency response capabilities, guards issues, and (6) guards interfaces, (5) identify potential generic safe-(4) assess safety / safe validate the regulatory base.
4 The process of the RER involves a preliminary analysis of site data, followed i
by an onsite review and a documentation of the results. The post-review phase involves identification of needed changes to LANL finalization of 1
draft vital area definitions, review by NRR and transmittal of the findings 3
1 to the licensee for consideration and appropriate action.
Program concerns were identified with respect to the regulatory basis, i.e.,
i the ambiguity of the 10 CFR 73.2 definition of vital equipment and the implemen-tation of the minimum protection set under the current rule.
The use of RER reports by licensees as bases for 10 CFR 50.54 security plan changes and the possibility of diminished security effectiveness if too much equipment is designattd as vital equipment were also identified as program concerns.
1 Suggestions for changes to the LANL vital area modeling assumptions were also made.
]
l 4.
The Safeguards Insider Rules J
P. Dwyer (NMSS), May 21, 1985 The components, access authorizations, pat-down search, and miscellaneous a
amendments of the current Safeguards Insider Rulemaking package were presented and discussed. The "vital island" concept also was discussed.
Some of the stated advantages of the vital island concept include:
reduced obstacles to emergency access / egress and protection of co-located vital equipment using existing comon barriers.
As a result of public coment and other considerations regarding the Safeguards l
Insider Rules, the following actions have been planned or taken:
(1) the NUMARC proposal for an industry-regulated access authorization program is j
being considered by the Comission as an alternative to the rulemaking and (2) l the vital island concept was deleted from the Miscellaneous Amendments pending I
completion of the vital equipment / area study and the recommendations of the 1
Vital Area Comittee, i
HUREG-1178 0-2 1
5.
The Vital Equipment Determination Research Study P. Pan and A. Neuls (LANL), May 30, 1985 The categorization and status of the following 12 research topics were discussed.
(1)
Identifying individual safety-related cables (2) Disabling complete cable trays (3) Disabling systems needed during shutdown or refueling conditions (4) Discbling sensor systems, instrumentation and non-safety-related control syste:ns (5) Treating spatially extended systems and components (i.e., piping, elec uical distribution, and hesting, ventilation, and air con-ditioning(HVAC) systems)
(6) Scenarios involving air tystems (7) Disabling electrical equ'.pment by grounding or lifting of grounds (8) Relating best-estimate r,nalyses of plant responses te systems failures tc the corresconding Final Safety Analysis Report (FSAR,;
analyses (9) Effective inclusion of random events, such as anticipated trans-ients, in fault-tree methodologies (10)
Possible system failures after which stable hot shutdown cannot be maintat W. indefinitely (11)
Considering the use of non-safety-related equipment, unanalyzed procedures, or operator ingenuity to recover from system failures (12)
Reactor protection system vulnerability Of these 12 research topics, LANL considers only the first one resolved.
The LANL analysis of the cable identification assumption 6nalysis included reviews of plant documentation and interviews of plant, construction, and vendor personnel at several operating plants. The results show that, with very few exceptions, +.he individual cables cannot be identified in cable trays, and that the issue of cable identification has no impact on current fault tree modeling of ast.umptions.
LANL is still reviewing the remaining eleven vital area topics.
NUREG-1178 0-3
a i
i t
i 1
6.
(a) Current Definitions and Assumotions on Vital Areas i
(b) 10 CFR 50, Appendix R, Fire Protection (c) Generic Issue A-29, "Nuclear Power Plant Design for the Reduction of Vulnerability to Sabotage J. Wermiel and A. Singh (NRR), May 30, 1985 The discussion included an approach to identifying vital equipment which pro-tects the reactor coolant pressure boundary and one train of equipment needed for achieving hot shutdown, assuming loss of offsite power. This approach was 3
explained in the context of the 10 CFR 50, Appendix R, post-fire safe shutdown requirements, wherein hot shutdown is to be achieved independent of postulated fire damage in any plant area.
Additional considerations were discussed pertaining to vital areas, including:
(1) Alternate or remote shutdown panels should always be considered as vital equipment since shutdown capability independent of the control room must be j
available and (2) when a vital component is inoperable for maintenance for longer than a few hours, a backup component should be available and temporarily protected as vital in order to maintain one train for shutdown at all times.
I Generic issue A-29, which is evaluating various system designs, plant layouts
)
and safeguards alternatives for effects on reducing vulnerability to sabotage in new and old plants was also discussed.
7.
The Vital Area Inspection Program l
L. Bush (IE), May 30, 1985 r
The inspection procedures for identifying vital eg'.ripment/ areas are primarily based upon the comitments contained in the licensws' security plans.
The inspectors verify through onsite inspections that the equipe.ent and arec+
designated as vital are afforded the level of protection required by the
{
approved security plans and the regulations.
j IE is in the process of developing a training program for regional inspection staff personnel in the methodologies used in the identifying vital systems, j
equipment, and areas requiring protection.
8.
The Vital Area Inspection Program:
Implementation and Critique of Current Assumptions and Suggested Changes a
T. Martin and G. Smith (RI); K. Barr (RII), May 30, 1985 3
1 j
The various approaches to protecting vital equipment / areas taken by licensees j
in Regions I and 11 were discussed. The number of areas in nuclear power 1
plants designated as vital ranges between 3 and 22.
Enveloping areas with some compartmentalization are generally used.
It was suggested that consideration be given to protecting only certain key vital areas in conjunction with use of the "two-man" rule.
NUREG-1178 C-4 l
i
l i
'l i
l Concerns were discussed about lack of consistency in ideatifying vital equipment /
l areas at recently licensed plants. On a generic basis, Region II agreed with the vital island concept contained in the proposed Safeguards Insider Rules J
package.
This approach, along with a more stringent access authorization i
program, would go a long way toward resolving the Region !! concerns.
1 9.
USI A-45, "Shutdown Decay Heat Removal Requirements"
(
)
A. Marchese (NRR), June 6, 1985 i
The specific objectives of this unresolved safety issue (USI) resolution program, i
j which were outlined, include:
(1) determination of the safety adequacy of decay j
heat removal in existing nuclear power plants for achieving both hot shutdown and cold shutdown; (2) evaluation of the feasibility of alternative methods for improving decay heat removal, including diverse alternatives dedicated to decay heat removal; (3) assessing the value and impact of the most promising alterna-tive methods; and (4) developing a plan for implementing new licensing require-i ments for decay heat removal, including developing a comprehensive and con-i sistent set of decay heat removal requirements.
l Some general findings have revealed that co-locating redundant safety equip-l ment and support systems in relatively large open compartments,nrovides a l
variety of opportunities for adverse insider activities.
}
Some sabotage countermeasures were discussed, ranging from procedure changes i
and equipment modifications to independent decay heat removal systems. A l
summary of European experience provides evidence that, in the long run, it is i
l more economical to construct an independent dedicated system than to make pece-meal changes throughout the plant.
10.
(a) frecursor Studies of Risk Analysis of Several Known Safeguards Events (b) iuclear Power Plant Damage Control Measures I
i P. Ting (RES), June 6, 1985 l
Eleven safeguards events selected by NMSS were discussed from an accident l
sequence precursor standpoint to provide an estimate of the contribution of these deliberate acts to the susceptibility of operating power reactors to severe core damage.
All 11 events, as reported, were considered benign from the standpoint of I
potential severe core damage.
Information concerning intent of the person causing each event is unknown, and hence the likelihood of additional deliberate acts as a part of each event cannot be estimated.
The main objectives of damage control measures for sabotag)e mitigation are:
(1) to restore or maintain a functional capability and (2 to extend time avail-1 able to restore a capability lost as a result of sabotage.
Some of the damage l
control measures considered included using existing systems in normal or alter-nate modes of operation, i.e., required equipment in-place and system-level design changes.
Conventional damage control measures were not considered.
i NUREG-1178 D-5
Some examples of types of systems-level design changes considered for PWRs and BWRs include:
System Modification High-pressure coolant Modify for suppression pool feed-and-bleed injection (BWRs) cooling Safety injection Cross-connect to substitute for systee (PNRs)
AFW system Some conclusions drawn from the review of the research projects indicate that:
(1) Damage control is not a stand-alone safeguards measure for sabotage mitigation but can be an effective part of an integrated safeguards system.
(2) Many desige features to facilitate damage control are not included in current plants.
(3)
Systems used for damage control must be protected as vital.
11.
Eguipment Requiring Protection Under Various Condition Assumptiont J. Wermiel (NRR); B Mendelsohn and D. Kasun (NMSS), August 1, 1985 In support of the Vital Area Comittee's evaluation of the current vital equip-ment / area analysis assumptions, supplementary briefings by NRR and NMSS staff were made in a number of areas related to system response to sabotage.
NRR identified the equipment in one train needed for hot and cold shutdown.
For cold shutdown, only certain RHR-related equipment is needed beyond that required for hot shutdown.
It was also noted that there is no difference between equipment needed to maintain hot shutdown for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and that required to maintain shutdown for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> except for additional water supply.
NRR commented on the effects of total loss of all ac (station blackout) and de power on the ability to achieve and maintain safe shutdown. The major impacts would be:
inability to monitor plant status (loss of de power), and inability to provide reactor coolant pump seal cooling and primary makeup (loss of ac power).
NRR stated that because of 10 CFR 50, Appendix R, fire protection require-ment!, licensees have catalogued and documented power, control, and instrumer,.
tation cable runs 50 that those associated with vital equignent are more readily identifiable than was the case before the Appendix R requirements existed.
NUREG-1178 D-6
Finally, NRR indicated agreement with the assumption that a loss of offsite power is the bounding transient with respect to challenge of safety systems in a PWR, NMSS identified specific pieces of equipment requiring protection as vital in recently licensed PWRs and BWRs.
These include auxiliary shutdown panels, en though they might not be safety-related, and vital water sources, including
.istribution systems.
NMSS also discussed the implications of station blackout to a 10 CFR 100 release following a sabotage event and reaffirmed that a source of 125-volt de control power cnd 120-volt ac instrument power are assumed necessary for safe shutdown in the RER vital area validation program.
12.
Selected Vital Equipment Assumptions P. Pan and O. Cameron (LANL), August 8, 1985 LANL representatives cognizant of vital equipment-related technical assistance efforts sponsored by both NMSS and RES briefed and participated in discussions with the VAC on the rationale for implementing several of the currently used analysis assumptions.
The following points were made regarding the assumptions discussed (see Appendix E).
(1) Assumption on core melt - LANL's modeling assumes that the core must be kept covered with water and decay heat removal capability must be main-tained to preclude core melt and an attendant 10 CFR 100 release.
(2) Assumption on identification of cables in cable trays - LANL reiterated its earlier position that, on the basis of LANL studies, plant visits, and discussions with utility personnel, it is normally not possible to identify individual cables in cable trays.
However, in satisfying 10 CFR 50 Appendix R requirements, licensees have prepared documentation that identifies cable routings and locations.
Therefore, although a saboteur might not be able to identify a specific cable among e ny in a tray, the saboteur could know that a certain cable is found in a specific tray.
It was noted that destroying or disabling of power, control, or instrumen-tation cables to vital components is unacceptable and, if such cables are determined to be vulnerable, they would have to be protected.
It was also noted that by indiscriminate 1y destroying an entire cable tray, the saboteur might also be eliminating cables necessary to the success of the act of sabotage.
(3) The VAC proposed draft assumption on disabling valves and other equip-ment - This is essentially covered by the assumption which states that if a saboteur gets into a single area, he or she can disable all equipment in that area.
By making a few minor changes to the latter assumption, this one can be deleted.
A related point was made concerning diver-sionary flow. That is, if a pipe that comes off a vital pipe line is destroyed and if a pipe that is destroyed is of significant size rela-tive to the main pipe, essentially the main pipe has been destroyed.
NUREG-1178 D-7
(4) Assumption on operating modes - Although in most cases, vital equipment identified for sabotage acts during full-power operation would include as a subset vital equipment needed for other modes, such as shutdown or re-fueling, this needs to be verified on a case-by-case basis to be sure.
- Also, it was noted that some licensees may devitalize certain components and systems during colo shutdown and refueling so that compensetory measures might be needed.
(5) The VAC-proposed draft assumption on check valves - It was noted that all check valves should be considered invulnerable to sabotage from remote locations because:
(a) check valves (except motor-operated) cannot be manipulated and, therefore, can be considered an integral part of the pipe, and (b) it is easier for a saboteur to achieve his/her purpose by destroying the pipe.
13.
USI A-44, Station Blackout A. Rubin (NRR), September 12, 1985 The Committee was briefed on the status of the Station Blackout USI, which involves loss of all offsite and onsite ac power, because of its relevance to identification of equipment and systems required to achieve and maintain hot shutdown.
The proposed technical resolution to this USI would require plants to cope with a loss of all ac power either for 4 or 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, depending c7 the reliability of their power grid and their onsite emergency power supply. The critical items are the coolant pump seals, ana Iicensees would be required to demonstrate that leak rates thro!gh the seals during the blackout period remain low enough to preclude core uncovery.
On the basis of this briefing, the Committee concluded that the results of these USI analyses, demonstrating self-sufficiency for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> in the absence of any ac power, are relevant to the identification of equipment required to be protected as vital.
NUREG-1178 D-8
APPENDIX E CURRENT LANL VITAL EQUIPMENT / AREA ANALYSIS ASSUMPTIONS l
Current ass;mptions made by analysts at the los Alamos National Laboratory about sabotage involving vital equipment and vital areas in a nuclear power plant include:
1.
A 10 CFR Part 100 release is the successful sabotage criterion.
2.
A significant core melt wil probably lead to a breach of the reactor vessel and containment and subsequently will result in a 10 CFR 100 release, ba:,ed on three modes of failure (see WASH-1400):
steam explosion containment overpressure China syndrome 3.
The use of explosives is included in the analysis. All types of explosives, inci'Jding shaped charges, are assumed to be available to the saboteur, and the staff assumes the saboteur has the necessary skills to use them.
The amount of explosives is assumed to be what can be carried on an individual's back.
(
4.
The licensee cannot take credit for availability of offsite power.
This assumption is based on the fact that offsite power is transmitted by facil-ities outside the protected area and hence, is completely vulnerable to outside assault. Note that there are scenarios in which it is to the saboteur's advantage to maintain offsite power and, in all these cases, the 3
automatic scram features are included.
Therefore, it is the NRC staff por.itw that protecting these features as Type I Vital is adequate protection.
5.
If the saboteur gains accest to those areas where the reactor protection system (rod scram equipment) can be disabled, a fuel melt incident will This assumption infers an initiating event that requires a plant oc:ur.
The vast number of areas where these initiating events can be caused has motivated the NRC to adopt the position that protection of the rc,d scram as Type ! Vital obviates the need to protect those areas where the events can be initiated.
6.
If a saboteur gets into a single area containing several pieces of equip-trent, he can disable all of the equipment in that area.
7.
The saboteur is assumed to be knowledgeable of all scenarios, which infers that staff analysis is extremely conservative.
However, there are some cetails of the plant that are not practical to determine or are too diffi-
- c. ult to verify in the field, as the routing of cables in cable trays and conduit.
It is usually difficult for maintenance personnel to identify cable runs However, identification of terminal boxes and junction points is a practical task, hence cable junctions are identified in the analysis.
Furthermo'e, there are scenarios for which the saboteur needs power to perform f,abotage successfully, so the indiscriminate cutting of cables (hence the protection of all cable trays) would not be to the saboteur's advantage.
NUREG-1178 E-1
8.
The code does not go into detail on exactly how the saboteur disables equipment; the code assumes the saboteur has sufficient knowledge of motors, pumps, motor control centers, etc. to disable the system.
9.
The analysis is performed assuming the reactor is in the operating mode, and other conditions (such as shutdown and refueling) are subsets of the operating mode.
10.
Check valves located inside the containment are considered "safe" from sabotage caused by a saboteur located outside the containment.
- 11. The saboteur cannot take credit for random failures or the concurrence of violent natural phenomena with sabotage; however, it is reasonable to assume the saboteur can take advantage of equipment unavailable on planned outages.
Therefore, Technical Specification requirements for operation with minimum equipment are considered.
- 12. The licensee need only consider maintaining the plant at hot shutdown conditions.
Primary system leaks are considered on a plant-specific basis.
- 13. Obviously, in many of the assumptions, certain judgments must be made re-garding damage control measures that can be taken by the licensee on a site-specific basis; however, the NRC staff's guidance has been very conserva-tive and does not usually permit the licensee damage control credit.
- 14. An important assumption made in determination of area boundaries is that for flexibility of analysis only, the st=tff considers any area that has l
four walls, a ceiling and a floor to be an area.
Where motor control centers or electrical racks could be separately protected, they are also considered as areas, 15.
Loss of all ac power (station blackout), plus loss of de power for instru-ments and critical equipment, will lead to fuel melt (NMSS staff position).
- 16. A bounding transient (PWR) is considered to be loss of offsite power.
This has been assumed to be tne most significant transient in that it disables the reactor coolant pumps and shuts off feedwater to the steam generators.
A comparison of transients in a plant probabilistic risk analysis showed that the equipment required to protect against this transient includes all, or nearly all, of the equipment demands of other transients. This places almost total reliance on mitigation systems (auxiliary feedwater) to remove the decay heat. On a generic basis, how-ever, this transient places no demands on primary loop inventory control.
A research group has been reviewing the needs for primary inventory control to protect against radiological sabotage.
HUREG-1178 E-2
APPENDIX F*
DISPOSITION OF COMMENTS RECEIVED ON THE DRAFT VITAL EQUIPMENT / AREA GUIDELINES STUDY AND COMMENTS RECEIVED ON THE DRAFT VAC REPORT l
l l
i
- Designated "Enclosure 2" in March 5, 1986 memorandum transmitting Vital Area Committee Final Report.
Disposition of Coments Received on the Draft Vital Equipment / Area Guidelines Study The draft VAC report was transmitted on October 21, 1985, with a request for coments to:
Director, Office of Nuclear Reactor Regulation (NRR)
Director, Office of Nuclear Materials Safety & Safeguards (NMSS)
Director, Office of Inspection & Enforcement (IE)
Director, Office of Nuclear Regulatory Research (RES)
Administrator, Region I (RI)
Administrator, Region II (RII)
Administrator, Region III (RIII)
Administrator, Region IV (RIV)
Administrctor, Region V (RV)
In response to that request, coments were received from each addressee.
The original coments are attached as an appendix to this sumary discussion of their disposition.
The Vital Area Committee carefully considered each coment and the disposition of each coment is discussed below.
Each comment was accommodated by modifying the report appropriately or a reason given for not doing so.
The coments are referenced by the assumption number in the draft report, use of the abbreviations indicated above and the pages/ items in the Appendix to this sumary.
Assumption 1 l
Comen t:
Suggested that a definitive statement be madt that the containment building, or drywell in a BWR, be vital.
Also suggesteu that there may be a conflict between this assumption and assumption #11, which allows the saboteur multiple actions on all vital equipment in a single area.
(RII, Page 2)
Response: We agree that, as a practical matter, protection of components of the primary coolant pressure boundary as vital would be accomplished by licensees protecting containments (drywells in the case of BWRs) as vital areas.
Since this is a logical result 'f the assumption, a change in the assumption is not considered necessary.
There is no conflict with assumption #11 in that sabotage in a vital area is assumed to be precluded.
Coment: Stated that the steam generator tube walls are not considered a part of the primary system boundary and, therefore, should be explicitly included for protection as vital since steam generator tube ruptures may be irsdirectly caused by malfunctions in non-safety related systems.
(RES,Page12)
Response
The entire steam generator, including the tubes, are part of the primary system pressure boundary and protected as vital.
NUREG-1178 F-1
Assumption 2 Coment: Questioned whether the threshold of successful radiological sabotage should be lowered to meet 10 CFR Part 50.72 or 10 CFR Part 20.403 criteria instead of 10 CFR Part 100.
(RIV, Page 8, Item 3)
Response: The 10 CFR Part 100 release threshold is conservative and appropriate, particularly since it is the same offsite dose threshold utilizea in other accident evaluations.
Comment:
Questioned whether the rationale that no credit for protective or mitigating capabilities of the pressure vessel and/or containment is appropriate, and whether they should be given the same credit as they receive in design basis accidents.
(RIV, Page 9, Item 4a.)
Response: The standard for acceptable protection is prevention of a 10 CFR Part 100 release. Credit is given for anything within vital areas providing such protection, including the reactor vessel.
Assumption 3 Coment:
Recomended that certain equipment be considered for addition to the typical list of equipment requiring protection.
Also proposed that the words "continuously operable" be added to the assumption, or require two redundant trains of vital equipment since vital equipment in some plants (e.g., auxiliary feedwater pumps) may not be required to be operable by technical specifications.
Further noted lack of an 8-hour diesel fuel oil capacity, which is a concern if the diesel is required to be vital.
(RII, Pages 2 & 3)
Response
No additions have been made to the list of equipment i the assumption 1
as it only provides examples of necessary equipment and is not all-inclusive.
Assumption #7 covers the concern over the words "continuously operable" by requiring vitalization of a backup when any vital component is inoperable.
The need for protection of an 8-hour capacity of diesel fuel oil will be resolved on a case-by-case basis depending on the reliance placed on the diesel.
Coment: Stated that some portions of decay heat removal systems may not be safety-related and thus not maintained operable. Also questioned reliance on a single train of vital equipment.
(RIII, Page 5, Item 3)
Response: The decay heat removal systems to be utilized for sabotage protection are covered by the tech specs; therefore, their operability status is known and the systems are suitably maintained. Also refer to the response to the previous coment.
Coment:
Pointed out the need for additional flexibility to implement changes in the vital areas required by this assumption based on differences in plants.
(RIV, Page 9, Item Ab.)
Response
The assumptions will be applied on a case-by-case basis; therefore flexibility is provided.
NUREG-1178 F-2
Coment:
Suggested that this assumption be made clearer and more definitive, and cited examples of concerns regarding implementation.
(NMSS, Pages 14 & 1F)
Response: More definitive guidance which addresses the specifics in the points raised here will be developed by the staff as part of the implementation plan for applying the. revised vital equipment assumptions.
The vital equipment selected by the licensees will be reviewed against this guidance on a case 4-case basis to confirm that it satisfies the assumptions.
Assumption 4 Coment: Questioned why the control room and associated cable spreading rooms were not identified as vital. Suggested that the one vital operable train for removing decay heat be capable of operation from the control room and not rely on local operation in normally unmanned remote vital areas. Cited an example.
(RII, Page 3. Item 4)
Response: Assumptions #4 and #9 have been reworded to address the first part of this comment. As part of the decay heat removal capability for mitigation of a sabotage-induced transient, each licensee must address the means provided for starting and controlling required pumps.
In the example cited, the licensee must demonstrate that a feasible and protected means of starting the turbine-driven auxiliary feedwater (AFW) pump is provided and can be accomplished in accordance with the revised assumptions.
This might mean that the automatic start capability of the turbine-driven AFW pump will require protection as vital.
This issue will be addressed on a case-by-case basis.
Coment:
Suggested that some examples of-locations from which vital equipment could be controlled or disabled be added to the assumption.
(RV, Page 10)
Response: Assumption !4 has been reworded to address this coment.
Coment:
Suggested that the word "disabled" may be more correct than "controlled" in the assumption.
(NMSS, Page 15)
Response: Assumption #4 has been reworded to address this comment.
Assumption 5 Coments:
Stated that assumptions #5 and #7 appear to contradict each other with regard to operating mode and equipment unavailability and that assump-tion #5 does r,ot take into account multiple maintenance outages on vital equipment or unique valve alignment.
(RII, Page 5, Items 1 & 4) Suggested that conditions other than the power mode be considered since sabotage during such conditions can cause a DBA or 10 CFR Part 100 release.
Stated that much greater flow rates are required after shutdown than indicated in the rationale.
Stated that rationale is misleading in that, under certain conditions, significant core damage can occur a long time after shutdown.
(RIV,Pa that assumption include "hot standby".
(RES, Page 12)ge 9, Item 5) Suggested
Response
Revised wording of the rationale responds to the above coments.
NUREG-1178 F-3
l
+
Assumption 7 Comments: Stated that, based on experience, concurrent random failures should be considered with a sabotage event.
(RII, Page 4) Recommended that redundant trains be protected as vital in order to avoid reliance on appropriate compensa-tory measures when vital equipment is unavailable.
(RIII, Page 5, Item 5)
Requested that the terms "appropriate compensatory measures," radiological sabotace" and "single failure criteria" be further defined.
(RIV, Page 9 Item 6) Questioned the assumption as not considering undetected failures and noted that not all Class IX accidents are of low likelihood.
(RES, Page 12)
Response: These comments questior.ed the advisability of allowing for the pro-tection of single train, given that 100% reliability of the protected train, if callea upon in a casualty situation, cannot be assured.
The Committee's view is that the recommended approach is consistent with NRC policy concerning the operability of important equipment.
For example, fire protection requirements are predicated upon the assumption that any one train of equipment needed for safe shutdown will be available following a postulated fire.
Similary, Limiting Conditions for Operation (LCOs) allow continued operation for varying periods of time even though normally available redundant equipment is temporarily not available.
While it is acknowledged that absolute reliability of the single protected train cannot be assured, the recommended approach is consistent with established policy.
This matter was discussed with the Management Policy Review Group during a status meeting prior to completion of the Committee Report.
Suitable flexibility in required protection for one train should be permitted on a case-by-case basis.
In practice, some plants may find it easier to protect redundant trains.
However, it should be up to the individual plant to determine how protection for a secondary train will be achieved when the primary vital equipment is unavailable.
Assumption 9 Comments: Recommended that the cable spreading room be protected as a separate vital area.
(RIII, Page 6, Item 6) Stated that the assumption may not be valid since IEEE Standards recommend cable identification.
(RES, Page 12)
Response: Assumption 49 has been reworded to address these comments.
Ass _umotion 10 Comnent: Recomended that a design basis amount of explosives be specified.
(RES, Page 12)
Response
Determination of which equipment needs to be designated vital is insensitive to the specific amount of explosives that individuals can carry in light of Assumption 11, which states that no credit is given for any equipment not located in vital areas.
Implementation of the assumption to determine which equipment needs to be designated vital does not require the analyst to consider specifically how much explosives can be used by the adversary.
NUREG-1178 F-4
=~
The goal was to bound the problem by characterizing an amount that_could be carried, consistent with the design basis threat, without requiring a vehicle.
Assumption 12 Comment:
Requested that a.more specific definition of a 10 CFR Part 100 threat from the spent fuel pool be provided based on storage of other highly radio-active components / equipment in the pool.
(RIII, Page 5,. Item 2)
Response: 0ther than spent fuel, the VAC can identify no other components /
equipment stored in the spent fuel pool which, when damaged, would cause a 10 CFR Part 100 release as defined for radiological. sabotage.
Comment:
Noted that safeguards stat? might.not be able to determine how long the spant fuel pool must be protected as vital.
(RV, Page 10)
Response
The determination of required duration can be calculated on a case-by-case basis by the appropriate plant staff.
Coment:
Recomended that the assumption be clarified by adding "following the start o7 a refueling outage" and by noting in the rationale that average environ-mental conditions can be assumed for the offsite dose calculations.
(NMSS, Page 15)
Response: The assumption has been reworded as suggested.
The Comittee considered the suggested change in the rationale to involve an unnecessary level of detail.
General Coments Coment:
Recomended that the protection philosophy mention the need for pro-l tection of certain portions of the electrical power supplies and control and instrumentation for the one train of vital equipment.
(RI, Page 1) i
Response
The proposed addition was made to the vital equipment / area protection l
philosophy and analysis assumptions.
Coment:
Suggested that additional flexibility may be required for implementing the protection philosophy.
(RIV, Page 8, Item la) Suggested an additional section that addresses HTGR facilities.
(RIV, Page 8, Item ib.)
Response
Part a.
The report provides for any implementation flexibility that mig 1t be recuired; no changes are necessary.
Part b.
The report has been revised to state that HTGR facilities will be treated separately and that this report considers LWRs only.
Coment:
Suggested a clarification with regard to protection of one or both trains, particularly if the status of one train is unknown.
(RIV,Pa (Item 2c.)ge 8, Item 2a.)
Requested a better definition of a vital area.
Requested that the revised report be provided for coments again.
(Item 2 d.)
Requested a better definition of "a set of important safety-related components".
(Item 2e.)
NUREG-1178 F-5
l
Response
Item 2a. Assumption #3 does state that one train of equipment will be protected as vital.
Assumption #7 has been reworded to address compensatory measures to assure that one train is always available as necessary.
Item 2c. This is defined in 10 CFR 73.2(1)(h).
Item 2d.
The VAC has solicited, received and addressed comments on its draf t report in accordance with the E00's directive of May 1,1985. Any further review of the report would be at the discretion of the E00.
Item 2e. For clarification, additional safety-related components have been added to the assumptions as appropriate.
Comment:
Certain assumptions result in vulnerabilities comparable to those in the design basis envelope, and therefore, lead to Class IX events.
(RES, Page 11)
Response
Assumption #7 has been reworded to address this comment.
Comment:
Requested that the report indicate whether or not credit could be given for feed-and-bleed in site-specific cases.
(NMSS, Page 15)
Response
The implementation plan to be developed by the staff will indicate that credit can be taken for any mear,s of decay heat removal (including feed-and-bleed) for mitigation of a sabotage-induced transient provided that (1) all necessary equipment for that means is protected as vital, and (2) an acceptable analysis demonstrating the adequacy of the proposed method in accordance with the revised assumptions is provided.
This issue will be rev'ewed on a case-by-case basis.
Comment:
Stated that further measures are needed to assure the equivalence of redundant protected trains.
(IE, Page 17)
Response: Assumption #7 has been reworded to address this comment.
The response to the comments on Assumption #7 also 3pplies to this comment.
I NVREG-1178 F-6
l i
1
{
1
{
1 APPENDIX TO APPENDIX F NUREG-1178
g.asco 8
'o UNITED STATE'S
~,%
NUCLEAR REGULATORY COMMISSION f
REGION I o,
j 631 PARK AVE NUE
%....*/
KING OF PRUS$1A, PENNSYLVANI A 19406 NOV 19 IED MEMORANDUM FOR:
Frank J. Miraglia, Chainnan Vital Area Comittee FROM:
Thomas E. Murley Regional Administrator, RI
SUBJECT:
VITAL EQUIPMENT / AREA GUIDELINES STUDY -
VITAL AREA COMMITTEE DRAFT REPORT Your memorandum of October 21, 1985, requested review of the subject report.
We have completed our review and offer the following coments for your consideration.
We believe that the three premises which formed the basis for the protection philosophy are sound and that the objective of the study to develop a coniistent, logical approach to identify vital equipment / areas for subsequent I
protection has been achieved.
Further, the revised set of analysis assumptions appear to be well founded and support the vital equipment / area protection philosophy which is espoused.
We note, however, that the statement of the philosophy fails to mention the need for protecting as vital, certain portions of electrical power supplies and control and instrumentation for the one train of equipment that will provide the capability to achieve and maintain hot shutdown.
Finally, with regard to the conclusion concerning the impact of implementation on licensed plants, it is our view that these guidelines would be welcomed by licensees, since it should provide most licensees with the option of reducing the current number of vital areas.
Thank you for the opportunity to review the draft report.
We found that it reated the issues very well and we support the Comittee's efforts.
Thomas E. Murley Regional Administrator cc:
V. Stello, EDO R. Burnett, SG F. Gillespie DRA0 J. Partlow, DQASIP H. Denton, NRR J. Davis, NMSS J. Taylor, IE R. Minogue, RES Regional Administrators, RII, RIII RIV, RV NUREG-1178 _ _ - _ _... _
i UNiliO Gli.*,1 L p*
NUCLEAR REGULATORY COMMISSION g^
REGION H I
1e1 MARIETTA STREET,N.W.
I ATLANT A.0EoRGI A 30323
\\,.....
NOV 2 0 885 MEMORANDUM FOR: Frank J. Miraglia, Chairman Vital Area Committee FRCM:
J. Philip Stohr, Ofrector Division of Radiation Safety and Safeguards
SUBJECT:
VITAL EQUIPMENT / AREA GUIDELINES STUDY V1TAL AREA COMMITTEE DRAFT REPORT
(
REFERENCE:
FRANK J. MIRAGLIA MEMORANDUM, DATED OCTOBER 21,1985)
The Region II staff has reviewed the reference memorandum in its entirety, while putt 4*g special emphasis on Section VI. A as requested. The following staff comments are provided as they relate to the proposed vital equipment / area protection philosophy and analysis assumptions:
1.
Executive Summary Ve concur with the philosophy of the Vital Area Committee (VAC) to protect as vital the reactor coolant pressure boundary and one train of equipment with associated piping and water sources that provide the capability to achiese and maintain het shutdown, which would be provided on a case-by-case for each plant.
2.
Assumpti..n 1 j
This appears to require, as a practical matter, that the containment building, or drywell in a BWR, be vital, which appears necessary. We suggest that a definitive statement be made to that ef fect. Additionally, there seems to be a conflict between this assumption and assumption #.11 which allows the saboteur multi-actions on all vital equipment in a single area.
Assumption #1, on the other hand, protects a single piece of equipment and, contrary to the attributes of the design threat ( use of explosives, para-military training, etc.) precludes the "insider" from causing a LOCA.
3.
Assumption 3 We concur with the assumption and rationale. However, under the typical list of equipment the following additions should be considered:
(1) Reactivity control - Boration capability, including co. trol and n
boration source.
(2) Decay heat removal - Power operated relief valves (Steam (. nerator/PWR).
e Suppression pool cooling (RHR suppression pool cooling mode /BWR).
CONTACT:
K. P. Barr FTS 242-5612 NUREG-1178.
NOV 20 885 Frank J. Miraglia 2
(3) Process instrumentation - Source range flux instrumentation.
Level instrumentation for all tanks used.
(4) Reactor coolant makeup (PWR)
Charging pumps or h4 t pressure 9
injection pumps (pressurizer power operated r-ief valves may be required to reduce pressure to allow use of h h pressure injection pumps).
(5)
Reactor coolant system pressure control Charging pumps or pressurizer heaters (PWR).
Safety relief valves or depressurization system valves (BWR).
(6) Support functions - Diesel generator (PWR and BWR), fuel supply and tank.
Additionally, with respect to assumotion #3, Region II proposes the words
-eentinuously operable be used,or else require two redundant trains.
Some of.,the equipment considered vital and used to hold in hot shutdown is not required by Technical Specifications to be operable at all times during full power operation. An example is auxiliary feed pumps.
If only one of three installed auxiliary feed pumps becomes inoperable, typically power-operation may continue. If that pump is the designated vital pump, sabotage-protection is gone.
One could put out special action statements on vitat equipment but a better solution is to simply require one train to be continuously operable. The licensee would then probably make all redundant equipment in the opposite train vital.
In any case we must ensure that at least a single operable train is available.
One problem that many plants have is they do not have n 8-hour capacity of diesel fuel oil in the day tank in a vital area.
This should be clearly required under support functions.
4.
Assumption 4 Why not include control room and associated cable spreading rooms?
Some licensees have the control room only vital but a single act of sabotage in the cable spread area can render the main control room blind and useless.
Therefore, the cable spread rooms must be vital also.
Possibly, this ts-covered under assumption 10, but we should be more specific.
As a related comment, the one vital operable train for removing decay heat should be capable of operation from the control room without an individual present in the normally unmanned remote vital area.
As an example, some licensees now take credit for local manual operation of a turbine driven auxiliary feed pump. However, in the midst of a serious security intrusion, it is not clear that a member of the plant staff can get to :the pump to operate it locally.
Therefora, the equipment should be operable from the control room.
-3*
Frank J. Miraglia 3
NOV 20 S85 5.
Assumption 7 We cannot ignore previous experience that random failures L po occur simultaneously with the reliance upon safety related equipmeat The recent random failures of under voltage reactor trip assemblies st b. C. Cook highlight the random failures during operational emergencies. We believe that the same random failure possibility exits whether or not a sabotage event occurs.
While the above comments have been the result of Safeguards, Reactor Projects I
and Reactor Safety personnel, Ken Barr of my Safeguards staff is the Region II l
point of contact for this effort.
P ili Stohr l
-4
/gn* *84g UNITED STATES C.
NUCLEAR REGULATORY COMMISSION
[:
k REGION lli f
799 ROO$tVELT ROAD e
j cor~ couv~. itu~Ois..in NOV t 51985 MEMORANDUM FOR:
Frank J. Miraglia, Chairman, Vital Area Committet
~
FROM:
Jack A. Hind, Director, Division of Radiation Safety and Safeguards, Region III
SUBJECT:
VITAL EQUIPMENT / AREA GUIDELINES STUDY - VITAL AREA COMMITTEE DRAFT REPORT As requested in your October 21, 1985 memorandum, we have reviewed the document on the above subject and have the following comments:
1.
Page 111 & iv - Assumotions 5 and 7 - These two assumptions appear to contradict each other. Assumption a states that only the power mode of I
operation should be considered while assumption 7 indicates that the unavailability of equipment may be exploited by the adversary.
2.
Page iv - AssumotimLU - Many facilities store other highly radioactive components /equipiii ns in the spent fuel pool which continuously poses a 10 CFR Part 100 threat to the public health and safety. A more specific definition of what constitutes a 10 CFR Part 100 threat from the spent fuel pool should be included as part of the report.
3.
Page 17 - Assumotion J._- Some portions of the decay heat removal systems may not be -s.iety-re ia 6vu equipment.
The dependence on nonsafety-related equipment, which may not be adequately maintained, as the single train to maintain hot shutdown appears to provide a lesser degree of protection than if both trains were protected as vital.
4.
Page 19 - A.ssumotion 5 - The rationale, although logical, does not take into accouns multiple JTntenance outages on vital equipment and/or unique valve alignments during maintenance / refueling outages that could be exploited to cause the reactor to drain in other than operation modes.
5.
Page 21 - Assumption,7.- What will be "appropriate compensatory measures" to assure untinuTi., of the hot shutdown capability? The description of compensatory measures used, on this assumption, appears to logically indicate that when the "primary train" is disconnected or taken out of service the "secondary train" then becortes "vital." We believe that this "floating" vital area concept could lead to an unacceptable level of risk NUREG-1178 5-
Frank J. Miraglia 2
NOV 1 5 1985 of system failure.
Consequently, we recomend that the "secondary" system should continue to be protected as vital.
a 6.
Page 23 Assumption 9 - The cable spreading room presents i sabotage threat because "all cables are located in this room and a "single" action could remove the entire control capability from the control room without the need to enter the control room at all. This room should be protected as a separate vital area.
Should you or your staff desire to discuss these coments, please contact D. A. Xers at FTS 388-5766 or J. R. Creed at FTS 388-5643.
[
ek A.
nd, Director ivision of Radiation Safety and Safeguards cc:
H. R. Denton, NRR J. G. Davis, NMSS J. M. Taylor, IE R. B. Minogue, RES T. E. Murley, RI J. N. Grace, RII R. D. Martin, RIV J. B. Martin, RV NUREG-1178
[
UNITED STATES O\\
NUCLEAR REGULATORY COMMISSION
$.'. @ )
o
- 'g'
, j j REQioN IV I
8 g',. 4 e 011 RYaN PLAZA DRIVE. SUITE 1000 s
ARUNGTON. TEXAS 70011 NOV 251985 MEMORANDUM FOR:
Frank J. Miraglia, Chairman Vital Area Conutirttee FROM:
Robert D. Martin, Regional Administrator, RIV
SUBJECT:
VITAL EQUIPMENT / AREA GUIDELINES STUDY - VITAL AREA COMMITTEE DRAFT REPORT This is in response to your subject inemorandum dated October 21, 1985.
Members of my staff have reviewed the Draft Report and their connents are l
attached for your consideration.
We appreciate the opportur.ity to connent on this important matter.
Should you have any questions regarding our comments, please contact either Doyle l
Hunnicutt, FTS 728-8137, or Larry Yandell, FTS 728-8108.
H
}
Robert D. Martin Regional Administrator cc:
H. R. Denton, K8R l
J. G. Davis NMSS J. M. Taylor IE R. B. Minoque, RES X. E. Murley, RI J. N. Grace, RII J. G. Keppler, RIII J. S. Martin, RV NUREG-1178 i
ATTACHMENT COM ENTS ON VITAL EQUIPMENT / AREA GUIDELINES STUDY VITAL AREA COMMITTEE DRAFT REPORT 1.
Section VI.
Study Results, entire section - General Connenh a.
Additional flexibility may be required to implement changes that may occur or that may have significant impact on some utilities or one category of power plants (examples: NSSS for BWR vs. NSSS for B&W PWR).
b.
This draft appears to address only light water cooled nuclear power plants.
Should there be an additional section or paragraph that would address HTGR facilities? Should there be provisions for custom reviews of certain plants or plants under certain circumstances (examples: very poor performance histories, accidents and/or incidents that could easily have affected the health and safety of the public, and/cr problems identified by the licensee or NRC)?
2.
Section VI.
Study Results, page 12.
a.
Should clarify whether both trains or, as a minimum, one train must be available. Specify how to assure one train is available, if the other train status is unknown or not verified.
b.
The assumptions and the rationale for these assumptions appear to be comprehensive and logically presented, c.
An improved definition of what constitutes a "vital area" is needed.
d.
The resised edition of this draft should be presented for coments at the earliest date possible.
It is assumed that the draft report will receive the standard publication and time limits as similar publications (NRC Comission, utilities, general public and other interested parties).
e.
The philosophy of a set of important safety-related components should be more precisely defined.
3.
Section VI.
Study Results, page 14.
a.
Should the threshold of successful radiological sabotage be lowered to meet 10 CFR Part 50.72 or 10 CFR Part 20.403, instead of 10 CFR Part 1007 t
NUREG-1178 8-y-raw
-i,
- + -,--viw wwew
,m-rw
,v-r--+-
-w w--w-
=---me'-,
-evw 9,,_
--w-re--
-v---e,,,--
=
w w
e
Attachment (Continued) 4.
Section VI. Study Results, page 16 Is the rationale that no credit for protective or mitigating a.
capabilities of the pressure vessel and/or containment consi.dered mop _roff_iata2_.Should this rationale permit same allowance aTs DA or other acceptable standard?
b.
Assumption 3 - same comment as 1.a. above.
5.
Section VI. Study Results, page 19.
a.
C her plant conditions can cause DBA and/or 10 CFR Part 100.
The "vital areas" study should incorporate other postulated conditions, b.
The time period when large (several thousand gallons of water per minute) are required is not included as a significant item.
The second paragraph of the RATIONAL! could mislead some public reviewers with the indication that only a small quantity (less than 100 gpm) of water is required after about 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> shutdown
- time, c.
The statement at the end of the second paragraph. "There is a very limited time span during which any significant damage can be caused" is not appropriate and is very misleading. Significant damage can be caused for a long time (greater than a month) under specified conditions.
6.
Section VI. Study Results, Page 21 The term "appropriate compensatory measures are required" should a.
be further defined.
b.
The rationale does not address fully the sabotage issue. The term "successful radiological sabotage" should be defined. A "successful radiological sabotage" could easily be panic caused by a small (Less than limits stated in 10 CFR Part 20) release with media and rumor inputs to the general public.
c.
The rationale of "single failure criteria" should be further defined and covered in this document.
p
]o, UNITED STATES
'h NUCLEAR REGULATORY COMMISSION
{
g REGION V o,
c 1450 MARIA LANE,5UITE 210
/
WALNUT CRE E K, CALIFORNI A sd596 NOV 8 1985 MEMORANDUM FOR: Frank Miraglia, Chairman, Vital Area Committee FROM:
D. F. Kirsch, Deputy Director Division of Reactor Safety and Projects
SUBJECT:
VITAL EQUIPMENT / AREA GUIDELINES -
V'TAL A. TEA COMMITTEE DRAFT REPORT The subject draft report, forwarded to Region V under cover memo, dated October 21, 1985, has been reviewed. Overall we find the study better thaa nost we have read. It appears that the committee has developed a j
comprehensive and consistent set of recommended assumptions.
If the l
intent is for the safeguards staff to use the proposed vital equipment /
area protection philosophy and analysis assumptions without reactor j
safety staff holding their hands, then the following comments are in order:
Assumption 4:
Some examples would be helpful, e.g., remote shutdown panel, MCC, circuit breakers and local control stations.
Assumption 12:
It is clear to the reactor staff how to determine "long enough", but the safeguards staff have no idea of how to make that determination.
Should you have any questions, contact T. Young or D. Schuster at FTS 463-3853 or 463-3780 respectively.
Y kr.
D. F. Kirsch. Deputy Director Division of Reactor Safety and Frojects cc:
D. Schuster NUREG-1178 10 -
w.
,,m.
y 7
o ncy),
/
UNITED STATES
'rq(j NUCLEAR REGULATORY COMMISSION '
y l
W ASHINGTON. D. C. 20555 s,
NDY 8 585 MEMORANDUM FOR: Robert B. Minogue. Director Office of Nuclear Regulatory Research FROM:
Demetrios L. Basdekas Electrical Engineering. Instrumentation & Control Branch Division of Engineering Technology. RES
SUBJECT:
VITAL E UIPMENT/ AREA GUIDELINES STUDY CRAFT REPORT RES-85-1933)
Bill Morris asked me to review the subject draft report and provide you with my conenents with focus ~on Section VI.A "Proposed Vital Equipment / Area Protec-tion Philosophy and Analysis Assumptions."
I have reviewed the report and ry conenents are:
)
There are some good, prudent conservatisms contained in several proposed assumptions and they reflect the understandable concern about the issue of sabotage. A few assumptions, however leave potential "windows of vulnerability" which, by and large, correspond to the imperfections of 8
the design basis envelope, that may be responsible for Class IX events.
My primary concern on the issue of sabotage has been related to (1) an insider with knowledge of how the neering drawings and records and (plant works and access to relevant engi-2) t characteristi s of "control systems not required for safety", which nonethe-less may havrimportant safety implications considering the fact that :ts a rule, have no redundancy or diversity and other desirable characteristics associated with safety grade systems.
As an example, our review of the Oconee-1 control systems
- has determined that certain failures in the Inte-grated Control System (ICS) "hand swer" circuitry result in a core melt unless the operator correctly diagnoses the problem and takes corrective actions within 30 minutes. Considering the fact that the attention of the operator during such a sequence would be heavily taxed by a number of distractions, the chances of recovery may not be acceptable.
If a knowledgeable "insider" further degrades the information available in the control room, he may be successful in a sabotage attempt.
I do not know if the ICS "hand power" circuitry is located within a vital area or not.
If it is, then the concern is taken care of by the proposed assumptions; if it is not, then it appears that we may have a safeguards problem in plants with such a design. This is just one example I wanted to use as an illustration of the problem. We should not assume t1at it is the only one.
- MUREG/CR-4047. Section 3.2.3.1 "Loss of ICS Hand Power."
NUREG-1178 Additional coments on specific proposed assumptions follow:
e Assumption 1 The steam generator tube walls are act considered to be part of the primary system boundary. This sht td be reconsidered in view of the fact that steam generator tube ruptures may be indirectly caused by malfunctions in not safety related systems.
e Assumption 5 It may be prudent to consider including "hot standby."
e Assumption 7 There may be a weakness in this assumption in that it does not consider undetected failures.
Furthermore, the statement contained in the firsf.
sentence under "Rationale" p. 21 is. pot universally true. Not all Class IX accidents are necessarily of low likelihood.
o Assumption 9 This assumption is based in part, on the conclusion that "it is not possible to identify individual cables in cable trays." % understanding of our own identification requirements along with reconenended industry practice, as recently codified in IEEE Stds 804/1983 and 6W/1984 would indicate that this ccaclusion may not be correct,particularly for newer plants.
e Assumptio7i 10 It is stated as part of this assumption that "The amount of explosives is assumed to be what adversaries can carry." Thi; is too vague and a "design basis amount" could be specified.
I am well aware of the technical and policy related complexities of this issue and I believe that the Vital Area Comittee perfonned a gallant attempt to i
address them. There is some room for important details to be addressed and I wish I had more time to delve into them with focus on the safeguards implications of control systems because of their obvious potentiki to affect the safety vector of the plant.
Finally, in reiterating my initial part of my discussion Criterion 1 of Section II, Objectives, p.3, embodies the primary weakness of some of the proposed assumptions; namely, that it restricts their scope to "the design ba'is analysis of nuclear power plants." And we know that the design basis en ilope has been repeatedly shown to have significant "windows of vu trability."
12 -
i I
One of my long standing recoemendations has been to examine the sabotage aspects of control systems design, installation and maintenance.
I hope sometime soon our resource availability will allow us to do that.
l If I can help any further. let me know.
i kJh. ?"b' Demetrios L. Basdekas Electrical Engineering Instrunentation and Control Branch Division of Engineering Technology RES NUREG-1178 L _.....
/j a ncg'c UNITED STATES 3 g,j NUCLEAR REGULATORY COMMISSION w Asmoton. o. c. rosss NOV 25 BIE MEMORANDUM FOR:
Frank J. Miraglia, Chaiman Vital Area Comittee FROM:
Robert F. Burnett, Director Division of Safeguards, MiSS
SUBJECT:
VITAL AREA COMilITTEE DRAFT REPORT The following coments from iny technical staff are submitted in response to your memorandum of October 21, 1985:
It would be helpful if the Committee could make.Assumotion 3 clearer and more definitive, either in the assumpt' ion itself or in its supporting rationale.
The rationale for Assumptions 3 and 4 in the October 1,1985, memorandum from the Vital Area Comittee (VAC) to the Management Policy Review Group (MPRG) anticipated that licensees' analyses and demonstrations in response to the Station Blackout (USI A-44) proposal would be j
available to aid in detemination of what additional major components and associated support functions were riecessary.
Also, the VAC had discussed reasons why extensive service water piping would not need to be vital, but the draft rationale lacks guidance on this.
It is suggested that some default positions be developed, and added to either the rationale or the assumptions, to prov.je guidance on the need for Reactor Coolant Pump (RCP) seal cooling and for support functions such as Heating, Ventilation and Air Conditioning (HVAC), service water piping, diesel generator Whether conservative fuel supplies, and DC battery (duration.FSAR) analyses or best-estimate Final Safety Analysis Report analyses are preferred for vital area decisions should also be addressed.
The following are some examples the Committee may wish to consider:
Absent licensee analyses, restoration of RCP seal cooling within four hours of reactor trip will be assumed to be necessary to achieve the goal of Assumption 3.
Absent best-estimate analyses to the contrary, HVAC systems need not be protected as vital.
_ _ - _ MV35 %
Absent analyses to the contrary, diesel generator cooling will be assumed essential for diesel generate operation.
Pages 9 and 10 state that the study scope included credit for plant-specific features such as feed-and '.eed.
h would be helpful if the report indicated wheuer or nol credit could be given for feed-and-bleed in site-specific cases where the ifcensee has submitted an acceptable analysis that shows that it can be used to safely mitigate sabotage-induced transients.
The period of time that the fuel pool neods to be vital and the degree of conservatism to be used in calculation of that time period could be clarified by changing, Assumotion I?
to read "following the start of a refueling outage" and by noting in the rationale that, in keeping with Assumption 7, average environmental conditions can be assumed for these calculations.
(It is not likely for sabotage to be timed to coincide with extra e environmental conditions.)
In the list of equipment in the accumation 3 rationale, "auto start" and "condensate storage tank" (CST) should be deleted. Manual start can be acceptable and the CST is not always a vital water source.
In,Assumotion.A. the use of the word "disabled" may be more correct than "controlled."
If the location can be used to prevent ifcensee control of the equipt nt, that location need not be protected as vital.
In sune plants it would suffice to protect the location of the switch that transfers control from the control room to the rernote shutdown panel.
(The :ontrol rocrn will, of course, be vital either way the assumption is written.)
We recognize that the staff will have to develop an additional layer of guidance and acceptance criteria to implement the assumptions. Accordingly, they would appreciate any suggestions the Committee might have concerning their preliminary ideas as reflected in the following:
The VAC intended "reactivity control function" in fssumotian 3 to equate only to reactor trip and to
~
not mandate 1nclusion of other reactivity controls (such as safety injection through boron injection tanks).
NUREG-1178 - _ - _
- - -. - 20V 251985 In Assumotion 9. "areas through which large numbers af
' cables pass" means only areas that are cable vaults or cable spreading areas for safety-related cables and does not require other areas in which redundant trains
~
of safety-related cables may be located to necessarily be vital.
Recerrnendation 1.c of the Safety / Safeguards Committee Report, NUREG-0992, is superceded by the new assumptions.
Assumption 5 does not mean all vital equipment can be devitalized curing cold shutdown.
Other than as necessary to protect the primary coolant pressure boundary and one train of equipment for hot shutdown, no equipment within containments must be protected as vital (for example, equipment within the secondary contairunents for BWR's).
Robert F. Burnett, Director Division of Safeguards, M4SS 4
1 NUREG-1178 i
/
'e UNITED STATES
~, '
Te NUCLEAR REGULATORY COMMISSION 5
WASHINGTON D. C. 20655 s
DEC 0 5198S MEMORANDUM FOR:
Frank J. Miraglia, Chairman Vital Area Committee FROM:
James M. Taylor Director Office of Inspection and Enforcement
SUBJECT:
'/ ITAL EQUIPMENT / AREA GUIDELINES STUDY-VITAL AREA COMMITTEE DRAFT REPORT This is in response to your memorandum of October 21, 1985 which requested coments/ concurrence on the subject draft report. We have reviewed the draft report and agree with the overall philosophy to protect as vital the reactor coolant pressure boundary and one train of equipment to assure achieving and maintaining hot shutdown. However, in view of our experience with the performance of safety systems when called upon in a casusit) situation, we believe that further measures are needed to assure the equivalence of redundant protected trains. This is particularly important since one of the assumptions upon which this philosophy is based is that random failures are assumed not to occur simultaneously with an act of radiological sabotage.
A me M.
rector fice of Inspection and Enforcement
Contact:
R.
Sin h, IE (x24149 cc:
Y. Stello. EDO H. R. Denton, NRR J. G. Davis, HMSS R. B. Minogue, RES T. E. Murley, RI J. N. Grace, RII J. G. Keppler, RI!!
R. D. Martin, RIV J. B. Martin, RV R. F. Burnett, NMSS F. P. Gillespie, RES J. G. Partlow, IE NUREG-1178 APPENDIX G*
IMPLEMENTATION CONSIDERATIONS FOR REVISED VITAL.
EQUIPMENT / AREA GUIDELINES I
i I
i i
l F
l i
4 1
i j
i a
.I l
1
- Designated "Enclosure 3" in March 5, 1986 memorandum transmitting Vital Area i
4 1
Committee Final Report.
4I NUREG-1178 i
i
Implementation Considerations For Revised Vital Eouipment/ Area Guidelines The Comittee considered various methods for implementing its findings, including rulemaking, Safety Evaluation Report (SER) staff positions, and follow-up staff reviews.
The Committee's conclusions and recomendations with respect to these options are discussed below:
A.
Rulemaking No change in the rules is necessary to implement the assumptions because the definition of vital equipment now contained in 10 CFR 73.2(1) is broad enough to include the equipment that may be designated as vital under the Comittee's assumptions.
The very broad tems of the definition allow essentially any safety-related equipment or systems to be designated as vital. The Comittee's assumptions fall within the scope of the current definition and protection of vital equipment based upon them would satisfy the standards of 10 CFR 73.55 and be acceptable.
B.
SER Staff Positions l
In the initial implementation of 10 CFR 73.55, applicants' and licensees' designations of vital equipment and vital areas were accepted in order to assure that functional security systems were in place promptly at operating reactors. However, the licensees and applicants were advised that the NRC staff intended to conduct a subsequent evaluation and analysis of th?se designations. Almost without exception, the SERs prepared in conjunction with initial security plan reviews contain language designed to place the licensee or applicant on notice that staff acceptance of the initial vital equipment and vital area designations was conditional.
In the interim l
between the initial security plan reviews and the independent staff vital equipment and vital area evaluations for individual power plants, Review Guideline 17 (issued in January 1978) has been relied upon by the staff for approving security plans.
Review Guideline 17 reflects a prudently conservative approach to security plan reviewt warranted by the absence of more precise guidance. At the same time that Review Guideline 17 was being used as staff guidance for security plan reviews, Los Alamos National Laboratory (LANL) was tasked to conduct vital area studies which related directly to longer-range imolccnentation strategy and are consistent 1
with the staff's original position and intentions as expressed in the SERs.
C.
Follow-Up Staff Confimatory Reviews As stated above, the NRC staff, through statements contained in the SERs, had advised licensees that it would conduct follow-up confimato y vital area analyses at future dates.
With contractor assistance from LANL, NRC comp"ed sabotage fault tree analyses to provide a technical basis for identifying the vital equipment (and areas) in each operating plant.
What remains to be done is final verification of vital equipment locations and safeguards actually in place to determine what revisions, if any, are needed in each licensee's protection plans.
This can be done effectively and efficiently in conjunction with the ongoing Regulatory Effectiveness Review (RER) Program. These reviews are currently scheduled at the rate NUREG-1178 G-1
2 of 18 reactor units per year through early l'191. The schedule could be structured to assure that plants whose initial vital area analyses occur. ed early in the ieplenentation phase of 10 CFR 73.55 are considered early in the RER follow-up confirmations.
l The Committee considered the possibility of establishing a special staff capability in the Division of Safeguards to conduct vital area confirma-tory reviews on an accelerated schedule.
Experience has shown that three trtined technical staff personnel, plus supervision and secretarial support, art! required to perform 18 vital area validation reviews per year.- This is the present capability. Any appreciable acceleration of the schedule wotild require a sizeable increase in staff.
In view of this, and the fact that plants whose physical security plans were approved after 1979 generally satisfy the revised assumptions, the Committee does not believe that an accelerated schedule is necessary or advisable.
D.
Implementation Recommendations
\\
The following actions are recommended to implement the revised analysis assumptions:
1.
1: sue a Generic Letter to notify all power reactor licensees that the NRC has finalized its vital ar:ra assumptions. The Generic Letter will also point out that confirmatory analyses of licensee designations of vital areas, using the revised assumptions, will be accomplished through the Regulatory Effectiveness Review (RER) Program.
2.
Continue the original plan to perform follow-up vital area analyses as stated in the SERs. These an61yses will be done in conjunction with the ongoing RER program; each RER report will contain a vital area designation chapter for this purpose.
3.
Provide licensees with the RER analyses, as they are completed, and request that proposed changes be made or that justification be submitted for not instituting changes required to conform with the revised assumptions. For reactor units where RERs have already been conducted (approximately 20), the staff will revise the vital area chapters of th: RER reports where necessary, consistent with the final approved vital arda assumptions and 1
forward them to the licensees for their review and response as soon as practicable. Additional site visits by LANL should not be required to revise the RER reports, although in some instances, brief visits by staff may be advisable.
4.
If backfit is appropriate at this stage, it wGl be treated in accordance with the backfit rule on a case-by-case basis.
It is recognized that resulting backfits would be spread over an extended period.
It cannot be stated 0.t this time how many backfit actions would be required.
NUREG-1178 G-2
. T..
Follow-On Actions A second level of licensing acceptance and review criteria will be developed to implement the recommendations of the Vital Area Committee Report.
These criteria will be formulated by the NMSS staff and coordinated through appropriate management levels of NRR.
NMSS will also revise and coordinate with NRR Section 13.6 of the Standard Review Plan (NUREG-0800) to incorporate by reference the new review criteria.
r i
)
l i
NUREG-1178 G-3
l l
APPENDIX H*
PROPOSED GENERIC LETTER OF TRANSMITTAL FOR FINAL VAC REPORT
- Designated "Enclosure 4" in March 5, 1986 memorandum transmitting Vital Area Committee Final Report.
l Generic letter of Transmittal for VAC Report T0: ALL POWER REACTOR APPLICANTS AND LICENSEES
SUBJECT:
VITAL EQUIPMENT / AREA ANALYSIS GUIDELINES (Generic letter No. 86-
)
l Publication of 10 CFR 73.55 by the Commission in March of 1977 significantly upgraded the protection level of power reactors against radiological sabotage.
By late 1979, physical security plans reflecting these regulations had been re-viewed, approved and largely implemented for all power reactors operating at that time.
However, because its position and guidance on vital equipment and area definitions were still evolving, the staff recognized that subsequent con-firmation of its initial findings in this regard would be necessary and that changes might be required as a result of such confimation.
This recognition has been reflected in the staff's Safety Evaluation Reports to date by either the following or a similar statement:
"The identification of vital areas and measures to control access to these areas, as described in the plan, may be subject to amendments in the future."
The staff has new fomalized its guidance on the bases and analysis assumptions to be used in detemining the equipment and areas which must be protected as vital in nuclear power plants.
This guidance is identified and discussed in NUREG-1178, "Vital Equipment / Area Guidelines Study-Vital Area Committee Report " dated March, 1986. A copy of this report is enclosed for your infomation.
We plan to use these guidelines in our confimatory analysis of your currently-implemented vital equipment / area protection program.
- However, satisfaction of the requirements and assumptions of Review Guideline 17, issued in January, 1978 as an alternative to these guidelines, will continue 3
to be acceptable.
The results of our confimatory analysis will be provided to you through the ongoing Regulatory Effectiveness Review (RER) Program.
If your facility is among those which have already had an RER, you will be receiving the results of our confimatory analysis as soon as practicable.
NUREG-1178 H-1
. We believe that most of the nuclear power plants reviewed and licensed since Ja":ary 1980, as well as some licensed earlier, will be found to satisfy the r-ised analysis assumption guidelines.
Such licensees and applicants may, at their option, retain their current vital equipment and area designations or take advantage of the flexibility provided by the refined analysis assumptions.
In the interim, we recommend that you review your vital equipment / area program with respect to the finalized guidance.
This letter is for information only and does not require any response. Should you have any questions concerning this matter, please contact Donald J. Kasun, Office of Nuclear Material Safety and Safeguards (301-427-4771).
Sincerely, Victor Stello, Jr.
Acting Executive Director for Operations
Enclosure:
As stated i
i l
NUREG-1178 H-2
u vea m ia m o.,co
. -iroar -.. a-,
.,r,oc. -,,~,..~,
g,,oa==
I"*,"3#,
BIBUOGRAPHIC DATA SHEET NUREG-1178 Sei1%$1mVCTeo4S ON tw movins.
3 Titti.%o sveT TLi a Le avi sta%E Vital Equipment / Area Guidelines Study:
Vital Area Committee Report
.o.1
...o
,co m rio Final Report l
o*i-viaa
' 'w'"o"'i' March 1986
.o.v.
iroat avio l
r 0,1.
February 1988 7.. AFoAWe%Q omo&%4.Teo% hawi Aho waste 44 aoomais #,.cgee te coni a,nosicT;1&sa ^vvoma whit %v,*sim Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC P0555
.. msoa,~2 o. oi~ e.1,0
.....so...o~o.oo iu,,.e, <, c,
i,.... o, roa,
Same as 7a above.
Technical
.....oo co.... o,,.~.,
12 $V,,LiviNT AR Y NOTil l
l 13 A851m.cf s200 eares er ses; A study was conducted by the staff to (1) re-evaluate the guidelines and bases used to determine what are the vital equipment and areas to be protected against radio-logical sabotage in nuclear power plants and (2) to recommend revised guidance. On the basis of this study, the staf t has recommended a revised vital equipment / area protection philosophy:
to protect as vital the reactor coolant pressure boundary l
and one train of equipment that would provide the capability to achieve and maintain hot shutdown. To implement this overall protection philosophy, the staff also has recommended new analysis assumptions or guidelines to identify the specific equipment and areas in each plant that require protection as "vital."
t 1
7,*,.gt;r -
.. oocwis t.s.s,.........o os onc a.,vo.
4 i
Nuclear Power Plants Physical Security Unlimited Sabotage Physical Modifications Vital Areas Vital Equipment
' ' " c "" '" c "* 'c^ ' *'
Vital Area Barriers
. eist... se,i i cioviavi Unclassified i Taq reports Unc1assified o ~ ~.. o... m
.....c.
1 j
UNITED STATES sesaat eov a-ctcss uit NUCLEAR RE'ULATORY COMMI SION
" 5'"jst!P' "'*
WASHINGTON, D.C. 20555
,,,oa % o u OFFICIAL BUSINESS PEN ALTY FOR PRfVATE USE. $300 120553078877 1 1AN1RS11S US NRC-0A1M-ADM DIV 0F PUB SVCS POLICY & PUB MGT HR-POR NUREG
'n - 5 3 7 WASHINGTON DC 20555