ML20149J490

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1988
ML20149J490
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/31/1988
From: Mike Williams, Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
WM-88-0041, WM-88-41, NUDOCS 8802230082
Download: ML20149J490 (7)


Text

_. -__ _ __ -

f ttachment to WM 88-0041 g

Page 1 of 6 WOLF CREEK NUCLEAR OPERATING ODRMRATICN 10LF CREEK GENERATING STATICN K NIELY OPERATING REM RP E NIH: January YEAR: 1988 Docket No.: 50-482 Facility Operatirg License No.: NPF-42 Report No. 35 i

Prepared by:

Merlin G. Willi m s

  1. 0 8802230082 880131 d. A. -[ / 3 PDR ADOCK 05000482 R DCD s..,

r -. . _ . ,

Attachment to WM 88-0041' 'i

,- Page 2 of 6 The folicwing report highlights the operating experience of Wolf Creek l Generating Station for the mcnth of January, 1988. 'Ihis report -is being provided pursuant to Technical Specificaticn 6.9.1.8.

I. SU41ARY OF OPERATItG EXPERIEtCE Criticality was achieved on January 1, ending the annual refueling cutage. After low power physics testing was ccmplete, the unit was sychronized with the grid on January 5. A normal post-refueling power ascension culminated with the unit at 130 percent pcwor on January 8.

A failure of the reactor vessel o-rings caused the unit to be shutdwn on January 21; with Mode 6, Refueling, being entered on January 25, for o-ring replacement.

II. MAJOR SAFETY RE1ATED MAINITNANCE ACTIVITIES

1. Replaced the diaphracyns on two Steam Generator Blowdcwn isolation valves.
2. Replaced the Reactor Vessel Level Indication System spool piece and fittings.
3. Replaced a px.enticmeter in cne power range Nuclear Instrumentation channel.
4. Replaced scme galled fittings on one Auxiliary Feedwater flow indicator.
5. Replaced a card in the Ers31 neered Safety Features Actuatico System.
6. . Replaced a card in a pressurizer pcwer operated relief valve controller.

Wolf Creek Generating Station Mcnthly Operating Report January 1988 Page 1 of 5

Attachment to WM 88-0041 Page 3 of 6

, OPERATING DATA REFORT DOChTT No. 50-482 WOLF CREEK GENERATING STATION WOIE CREEK NUCLEAR OPERATING CORIOPATION DATE 02-01-88 CMPIETED BY M. Williams TELEPHONE 316-364-8831 OPERATING STA'IUS

1. Reporting Period: January, 1988 Gross Hours in Reporting Period _ 744
2. Currently Authorized Power Level (W t): 3411 Max. Depend. Capacity (W e-Net): 1128 Design Electrical Rating (We-Net): 1170
3. Power Level to Which Restricted (If Any)(Mwe-Net): N/A
4. Reasons for restriction (If Any): N/A This Mcnth Yr to Date Cunulative
5. Number of Hours Reactor was Critical 498.8 498.8 15 % 5.3
6. Reactor Reserve Shutdown Hours 0.0 0.0 250.3
7. Hours Generator on Line 385.6 385.6 15558.7
8. Unit Reserve Shutdcwn Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated ( MI) 1,216,547 1,216,547 50,642,901
10. Gross Electrical Energy Generated (WH) 421,830 421,830 17,610,721
11. Net Electrical Energy Generated (M1) 395,394 395,394 16,765,860
12. Peactor Service Factor 67.0 67.0 75.5
13. Reactor Availability Factor 67.0 61.0 76.7
14. Unit Service Factor 51.8 51.8 73.7
15. Unit Availability Factor 51.8 51.8 73.7
16. Unit Capacity Factor (Using MDC) 47.1 47.1 70.3
17. Unit Capacity Factor (Using Design We) 45.4 45.4 67.8
18. Unit Forced Outage Rate 38.6 38.6 6.0
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):

None.

20. If Shut Dtun at End of Report Period, Estimated Date of Startup: 02-17-88 Wolf Creek Generating Station Monthly Operating Report January 1988 Page 2 of 5

E Attachment to WM 88-0041  !

Page 4 of 6 1

> AVERAGE DAILY UNIT ECWER IEVEL DOCKET NO. 50-482 WOLF CREEK GENERATIN3 STATION ,

WOLF CREEK NUCLEAR OPERATING 00RPORATION  !

DATE 02-01-88 COMPIRIED BY M. Willians TELEPHONE 316-364-8831 MOmi January, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVFSAGE TAILY POWER LEVEL (M9e-Net) (MWe-Net) 1 0 17 1154 2 0 18 1145 3 0 19 1154 4 0 20 1130 5 7 21 988 6 311 22 0 7 659 23 0 8 1095 24 0 9 1142 25 0 10 1145 26 0 11 1145 27 0 12 1145 28 0 13 1147 29 0 14 1148 30 0 15 1153 31 0 16 1154 l

l Wolf Creek Generating Station l Monthly Operating Report )

January 1988 i Page 3 of 5 ]

1

Attachment to WM 88-0041 Page S of 6 LNIT SHITEDOWN AND POWER RETXJCPIONS DOCKET NO. 50-482 WOLF CREEK GENERATING STATION.

WOLP CREEK NUCLEAR OPERATItC CORPORATION-DATE 02-01-88 00MPIEPED BY M. Williams REPORT MONI11 January, 1988 TELEPHONE 316-364-8831 TYPE ME'I110DS SHlfITDC F: FORCED DURATION REASON DOWN 'ITIE RFACIOR CORRECP1VE ACPIONS/COPMENTS No Date S: SCllEDULED (HOURS) (1) OR RETXX'ING POWER (2) 1 880101 S 115.9 C 4 Refueling outage.

2 880121 P 242.5 A 2 Reactor vessel o-ring leakage.

SIDMARY:

(1) REASON: A: EQUIPMENP FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) ME'IHOD: 1. MANUAL B: MAINTENANCE OR TEST P: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPIAIN) 3. ALT 10MATIC SCRAM D: REGUIA'IORY RESTRICPION H: OTHER (EXPLAIN) 4. OIllER (EXPIAIN)

Wolf Creek Generating Station:

Monthly Operating Report January 1988 Page 4 of 5

Attachment to WM 88-0041 Page 5 of 6 i ELF CREEK NUCLEAR OPERATING CORPOPATION  ;

WOLF CREEK GENERATING STATION UNIT NO. 1 MONIH January,1988 SUTRRY OF OPERATING FXPERIENCE l

Listed below in chronological sequence is a stunary of operating experiences for this month which required loa 3 reduction or resulted in significant non-load related incidents.

1%TE TIME EVENT January 01, 1988 0000 Unit in Mcde 2, Startup.

0240 Reactor critical.

January 05, 1988 0914 Unit in ibde 1, Power Operatico.

1950 Synchronized with grid.

January 08, 1988 0630 Unit at 100 percent pwer.

January 21, 1988 1901 Cortmenced reducing power, ,

2129 Manual reactor trip frtxn 25 percent power. Unit in Mode 5, Hot Standby.

January 22, 1988 0935 Unit in Mxle 4, Hot Shutckwm.

1720 Unit in Made 5, Cold shutdown.

January 23, 1988 1359 Unit in Mode 6, Refuelirg.

l Wlf Creek Generating Station ;

enthly Operating Repart '

January 1988 Page 5 of 5

, - =

. qc n.,

l l

I W$LF CREEK NUCLEAR OPERATING CORPORATION sert D. wkhors  !

Proeneontand February 15, 1988 VM 88-0041 l

1 U. S. Nuclear Regulatory Conunission ATTN: Document Control Desk ,

Washington, D. C. 20555  !

Subject:

Dooket No. 50-482: January, 1988, Monthly l Operating Report i

I Gentlemen:

Attached is the January, 1988, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

I Very truly yours, Bart D. Withers President and Chief Executive Officer BIW/11k Attachment J' 00: B. L['hrtlett (NRC), w/a R. D.~ Martin (NP.C), w/a P. V.'.0'Connor (NRC), 2 w/a l 1

jy f P.O. Box 411/ Burtngton, KS 66830 / Phone: (316) 364-8831

. . . _ , _ _ n6

. - - -._ - - --. - - - - - . _ . _ _ . - _ _ - - - - , . - - . -