|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G1521999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With ML20212A0251999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With ML20210R5741999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Wolf Creek Generating Station ML20210R5921999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20209H0821999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20210R5871999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1021999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1071999-04-30030 April 1999 Revised MOR for Apr 1999 for Wolf Creek Generating Station ML20206P8261999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Wcgs.With ML20210R5841999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Wolf Creek Generating Station ML20205Q0761999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Wolf Creek Generating Station.With ML20207K5991999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Wolf Creek Generating Station.With ML20199E6531998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Wolf Creek Generating Station.With ML20198D7321998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Wolf Creek Generating Station.With ML20195D1791998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Wolf Creek Generating Station.With ML20154L4591998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Wolf Creek Generating Station.With ML20151W1491998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Wcgs.With ML20237B0841998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Wolf Creek Generating Station ML20236P3441998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Wolf Creek Generating Station ML20236P3481998-05-31031 May 1998 Corrected Page of MOR for May 1998 for Wolf Creek Generating Station ML20249A0171998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Wolf Creek Generating Station ML20247H0901998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Wolf Creek Generating Station ML20216F6101998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Wolf Creek Generating Station ML20216G1971998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Wolf Creek Nuclear Operating Corp ML20202H0721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Wolf Creek Generating Station ML20198P1931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Wolf Creek Generating Station ML20197J0321997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Wolf Creek Generating Station ML20199C7081997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Wolf Creek Generating Station ML20211N7161997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Wolf Creek Generating Station ML20216H9561997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Wolf Creek Generating Station ML20210M4401997-07-31031 July 1997 Monthly Operating Rept for July 1997 for WCGS ML20148L8781997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Wolf Creek Generating Station ML20141H7541997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Wolf Creek Generating Station ML20137W5021997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Wolf Creek Generating Station ML20147E5931997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Wolf Creek Generating Station ML20134M9821997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Wolf Creek Generating Station ML20133M3991996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Wolf Creek Generating Station ML20132C0871996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Wolf Creek Generating Station ML20134L7281996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Wolf Creek Generating Station ML20128N0301996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Wolf Creek Generating Station ML20134C1291996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Wolf Creek Generating Station ML20134C1371996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Wolf Creek Generating Station ML20116M5431996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Wolf Creek Generating Station ML20116M5471996-07-0808 July 1996 Revised Monthly Operating Rept for June 1996 for Wolf Creek) Generating Station ML20134C1321996-06-30030 June 1996 Revised Monthly Operating Rept for June 1996 for Wolf Creek ML20115F1211996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Wolf Creek Generating Station ML20112J1781996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Wolf Creek Generating Station.W/Undated Ltr ML20115F1251996-04-30030 April 1996 Monthly Operating Rept Revisions for April 1996 for Wolf Creek Generating Station ML20117D7701996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Wolf Creek Generating Station ML20107D8971996-03-31031 March 1996 Monthly Operating Rept for March 1996 for WCGS 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G1521999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With ML20211N0161999-09-0202 September 1999 Safety Evaluation Supporting GL 95-07 to License NPF-42 ML20212A0251999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With ML20217P6451999-08-30030 August 1999 Requests Commission Approval to Publish Encl Pr,Rg & SRP & to Issue Encl Ltr to Parties of Wolf Creek Transfer Proceeding Re Disposition of Existing Antitrust License Conditions in Event OL Transfer Approved ML20210R5741999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Wolf Creek Generating Station ML20210J1561999-07-29029 July 1999 Rev 0 to Wolf Creek Generating Station,Unit 1 Pressure & Temp Limts Rept ML20210R5921999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20209H0821999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20195D5261999-06-0202 June 1999 Safety Evaluation Approving Proposed ISI Program Alternative for Limited Reactor Vessel Shell Weld Exams & Relief Request from Requirements of ASME Code,Section XI ML20210R5871999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1021999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1071999-04-30030 April 1999 Revised MOR for Apr 1999 for Wolf Creek Generating Station ML20206P8261999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Wcgs.With ML20196L3401999-04-30030 April 1999 Rev 1 to WCGS Cycle 11 Colr ML20210R5841999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Wolf Creek Generating Station ML20205Q0761999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Wolf Creek Generating Station.With ML20207K5991999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Wolf Creek Generating Station.With ML20207K9761998-12-31031 December 1998 Annual SER 14,for Period 980101-1231, for WCGS ML20199E6531998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Wolf Creek Generating Station.With ML20195C0011998-12-31031 December 1998 Ks City Power & Light Co 1998 Annual Rept & Financial Statements as of 981231 & 1997 for Ks Electric Power Cooperative,Inc ML20195B9901998-12-31031 December 1998 Western Resources Annual Rept for 1998 ML20198D7321998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Wolf Creek Generating Station.With ML20195H9801998-11-17017 November 1998 Safety Evaluation Supporting Proposed Changes to WCGS Radiological Emergency Response Plan ML20195E7591998-11-10010 November 1998 WCNOC Proposed PASS Function Reduction ML20195D1791998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Wolf Creek Generating Station.With ML20154L4591998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Wolf Creek Generating Station.With ML20153G2771998-09-30030 September 1998 Rev 1 to WCAP-15079, Wolf Creek Heatup & Cooldown Limit Curves for Normal Operation ML20153G2851998-09-30030 September 1998 Rev 1 to WCAP-15080, Evaluation of Pressurized Thermal Shock for Wolf Creek ML20153G2691998-09-30030 September 1998 Rev 1 to WCAP-15078, Analysis of Capsule V from Wolf Creek Nuclear Operating Corp Wolf Creek Reactor Vessel Radiation Surveillance Program ML20153G7301998-09-23023 September 1998 Special Rept 98-003:on 980814,station Entered TS 3.3.3.6, Action Statment a Due to Inoperability of RVLIS B Train. Cause Has Not Yet Been Identified.Work Order 98-202813-000 Has Been Generated ML20151W1491998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Wcgs.With ML20237B7381998-08-14014 August 1998 Special Rept 98-001:on 980615,oxygen Analyzer on Wgs Was Declared Inoperable.Wgs Oxygen Analyzer OARC-1119A Was Indicating 0 Ppm on 980814 & Fluctuated Between 200 & 900 Ppm on 980615.Completed Work Order & Declared Wgs Operable ML20237B0841998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Wolf Creek Generating Station ML20236P3441998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Wolf Creek Generating Station ML20236P3481998-05-31031 May 1998 Corrected Page of MOR for May 1998 for Wolf Creek Generating Station ML20249A0171998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Wolf Creek Generating Station ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247H0901998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Wolf Creek Generating Station ML20216J7791998-04-15015 April 1998 SER Approving Requests for Relief I1R-46 Through I1R-49 & I2R-21 Submitted by Licensee on 970523.Relief for Exam Category B-A,Item B1.12,RPV Shell Welds Deferred Until Licensee Satisfies Regulations for Augmented Rv Exam ML20216C2641998-04-0606 April 1998 SER Accepting Addl Info Re GL 92-08, Thermo- Lag 330-1 Fire Barriers, for Plant ML20216F6101998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Wolf Creek Generating Station ML20217H3491998-03-31031 March 1998 SER Accepting Operational Quality Assurance Program Description Change for Wolf Creek Generating Station ML20217H7241998-03-30030 March 1998 SER Accepting Proposed Change to Operational Quality Assurance Program for Plant ML20216G1971998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Wolf Creek Nuclear Operating Corp ML20202H0721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Wolf Creek Generating Station ML20217G4311997-12-31031 December 1997 Western Resources 1997 Annual Rept & Financial Statements for Years Ended 971231 & 1996 for Ks Electric Power Cooperative,Inc ML20203H0151997-12-31031 December 1997 Annual Operating Rept 13 for Jan-Dec 1997 ML20217G3711997-12-31031 December 1997 Kansas City Power & Light Co 1997 Annual Rept ML20216D7771997-12-31031 December 1997 Annual SER 12 for Jan-Dec 1997, for Wolf Creek Generating Station 1999-09-30
[Table view] |
Text
.. .- -. _ _ . . . .- .. - - - _
. A
~
W@)NUCLEAROPERATING LF CREEK C Clay C. Warren Chief Operating Officer February 14, I'997 WO 97-0021 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk [
Mail Station P1-137 Washington, D. C. 20555 i
Subject:
Docket No. 50-482: January, 1997, Monthly Operating Report i
Gentlemen:
Attached to this letter is the January, 1997, Monthly Operating Report for ,
Wolf Creek Generating Station. This submittal is being made in accordance l 1
with the requirements of Technical Specification 6.9.1.8.
l Very truly yours, l Clay C. Warren CCW/jad I Attachment j i
cc: L. J. Callan (NRC), w/a ,
W. D. Johnson (NRC), w/a J. F. Ringwald (NRC), w/a 4
)
J. C. Stone (NRC), w/a y f' f g) l L
9702210142 970131 PDR ADOCK 05000482 R PDR PO. Box 411 i Burlington, KS 66839 / Phone: (316) 364 8831 An Equal Opporturuty Employer M F HCVET
- .. .. ._ . ._ _ .~. . . - _ _ . ,. .. . - _ . . . .
4 Attachment to WO 97-0021 page 1 of 6 l
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH: January YEAR: 1997 6
Docket No.: 50-482 Facility Operating License No.: NPF-42 l
Report No. 143 l
l
l Attachment to WO 97-0021 -
i I
i 't i i
SUMMARY
L The following report highlights the operating experience of Wolf Creek Generating Station l for the month of January, 1997. This report is being provided pursuant to Technical Specification 6.9.1.8.
t
,' I.
SUMMARY
OF OPERATING EXPERIENCE The unit operated at or near 100% power, Mode 1, January 1, 1997, through January
- 31, 1997.
4 II. MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES 4
The Turbine Driven Auxiliary Feedwater Pump was taken out of service for
, enhancements on the Turbine gland seal leak-off lines.
1 :
a i !
- I l
t i
r 4
i k
4 i
i h
J ii J
1
~
Wolf Creek Generating Station Monthly Operating Report January, 1997 Page 2 of 6
Attachmtnt to WO 97-0021 OPERATING DATA REPORT.
. DOCKET NO. 50-482 WOLF CREEK GENERATING STATION l WOLF CREEK NUCLEAR OPERATING CORPORATION l DATE 2-11-97 TELEPHONE lif_-364-BB31 OPERATING STATUS
- 1. Reporting Period: January, 1997 Gross Hours in Reporting Period: 744
- 2. Currently Authorized Power Level (BGit) -. 3565 Max. Depend. Capacity (MWe-Net) : 1163 Design Electrical Rating (MWe-Net) : 1170
- 3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
- 4. Reasons for Restriction (If Any) : N/A This Month Yr. to Date Cumulative
- 5. Number of Hours Reactor was Critical 744.0 744.0 82,495.9
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8
- 7. Hours Generator on Line 744.0 744.0 81,603.9
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWh) 2,648,915 2,648,915 272,875,482
- 10. Gross Electrical Energy Generated (MWh) 922,233 922,233 94,771,218 1
- 11. Net Electrical Energy Generated (MWh) 885,674 885,674 90,527,393 j l
- 12. Reactor Servic' Factor 100.0% 100.0% 82.4%
- 13. Reactor Availability Factor 100.0% 100.0% 82.8%
- 14. Unit Service Factor 100.0% 100.0% 81.6%
l
- 15. Unit Availability Factor 100.0% 100.0% 81.6%
l
- 16. Unit Capacity Factor (Using MDC) 102.4% 102.4% 79.4%
- 17. Unit Capacity Factor (Using Design MWe) 101.7% 101.7% 77.3%
- 18. Unit Forced Outage Rate 0.0% 0.0% 4.5%
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):
None
- 20. If Shut Down at End of Report Period, Estimate Date of Startup: N/A 3
Wolf Creek Generating Station Monthly Operating Report January, 1997 Page 3 of 6
Attechment to WO 97-0021
, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 2-11-97 TELEPHONE 316-364-8831 MONTH January, 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1192 17 1190 2 1191 18 1190 3 1192 19 1191 4 1192 20 1191 5 1191 21 1191 6 1191 22 1192 7 1191 23 1192 ,
8 1191 24 1188 9 1191 25 1187 10 1189 26 1189 11 1190 27 1189 12 1189 28 1190 13 1189 29 1192 l
14 1190 30 1192 l 15 1191 31 1192 l
16 1190 !
\
l Wolf Creek Generating Station ,
Monthly Operating Report i January, 1997 Page 4 of 6
Attachment to WO 97-0021 ,
UNIT SHUTDOWN AND POWER REDUCTIONS -
DOCKET NO. 50-482 WOLF CREEE GENERATING STATION WOLF CREEK NLCLEAR OPERATING CORPORATION DATE 2-11-97 TELEPHONF 316-364-8831 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours) (1) OR REDUCING POWER (2)
N/A N/A N/A N/A N/A N/A N/A
SUMMARY
- The unit operated at or near 100% power, Mode 1, January 1, 1997, through January 31, 1997,
- 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUED
- 5. REDUCED LOAD
- 9. OTHER Wolf Creek Generating Station Monthly Operating Report January, 1997 Page 5 of 6
. ~ . ~ _ ~ . . = _ . . - . _ _ .. . - . - _ . - -. - . ._ - . . ,
.,* l Attachm:nt to WO 97-0021 l
i WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION 1 i
l UNIT NO. 1 !
i i
MONTH January, 1997 l
SUMMARY
OF OPERATING EXPERIENCE 1
l l Listed below in chronological sequence is a summary of operating experiences for this j month which required load reduction or resulted in significant non-load related incidents.
DATE TIME EVENT N/A N/A N/A l
l t
i r
l Wolf Creek Generating Station Monthly Operating Report January, 1997 l Page 6 of 6 l
i:
I l