MONTHYEARML20203L0281986-04-25025 April 1986 Informs of Planned Site Visit to Obtain Info Supporting Implementation of Emergency Response Data Sys,Including Availability of PWR or BWR Parameters in Digital Form & Characterization of Available Data Feed Points ML20147B1511978-09-27027 September 1978 /03L-0 on 780831:during Monthly Specific Gravity Readings on Reactor Depressurization Sys,Battery A,Cell 12 Read 1.193 Below Limit of 1.200 Specified in Tech Specs. Cause Unknown & Cell Was Replaced.(Encl to 7810060072) ML20147B1461978-09-27027 September 1978 /03L-0 on 780829:during Tests of Automatic Containment Isolation Valves,Valve CV/4027 Exhibited Excessive Leakage.Valve & Piping Flushed & Leakage Test Repeated Satisfactorily.(Encl to 7810060072) ML20204B0911978-09-15015 September 1978 /03L-0 on 780819:Failure of Check Valve Providing Containment Integrity in 2 Demineralized Water Line Contributed to Containment of Plant Demineralized Water Sys Check Valve Repaired 780905 ML20147A8221978-09-12012 September 1978 /01L on 780904:During Test of Containment Ventilation Isolation Valves,Supply Valve CV/4097 Leaked in Excess of TS Criteria.Butterfly Valve Disc Seal Was Readjusted & Valved Returned to Svc. (Encl to 7809190156) 1986-04-25
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217C3031999-09-28028 September 1999 Annual Rept of Facility Changes,Tests & Experiments ML20199A6621999-01-0505 January 1999 Special Rept:On 981230,hi Range Noble Gas Monitor Was Inoperable for Greater than Seven Days.Cause Unknown. Preplanned Alternate Method of Monitoring Appropriate Parameters within 72 H Was Established ML20206F6131998-12-31031 December 1998 1998 Consumers Energy Co Annual Rept. with ML20198K6611998-12-24024 December 1998 Safety Evaluation Supporting Amend 120 to License DPR-6 ML20154E0371998-09-30030 September 1998 Safety Evaluation Accepting Request for Exemption from Certain Portions of 10CFR50.47(b) & App E to 10CFR50 to Allow Brpnp to Discontinue Offsite EP Activities & Reduce Scope of Onsite EP as Result of Permanently Shutdown ML20154E0581998-09-30030 September 1998 Safety Evaluation Accepting Licensee Request from Exemption from Certain Portions of 10CFR50.47(b) ML20198K0091998-09-18018 September 1998 SER Accepting Licensee Request for Exemption from Certain 10CFR50 Requirements for Emergency Planning for Big Rock Nuclear Plant ML20217N2131998-04-24024 April 1998 Brpnp Zircaloy Oxidation Analysis ML20216K0011998-04-16016 April 1998 Safety Evaluation Approving Licensee Request Re Plant Training Program for Certified Fuel Handlers ML20217H4641998-03-26026 March 1998 Rev 2 to Post Shutdown Decommissioning Activities Rept (Psdar) ML20202G1941998-02-12012 February 1998 Rev 7 to Updated Final Hazards Summary Rept for Big Rock Point Plant ML20154A7591997-10-0808 October 1997 10CFR50.59 Annual Rept of Facility Changes,Tests & Experiments, Since 971008 ML20216E4731997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Big Rock Point Plant ML20141J8731997-08-14014 August 1997 Safety Evaluation Supporting Amend 119 to License DPR-6 ML20210H5601997-07-31031 July 1997 Monthly Operating Rept for July 1997 for Brpnp ML20148T4901997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Big Rock Point Nuclear Plant ML20148N9251997-06-0606 June 1997 Rev 18 to CPC-2A, Quality Program Description for Operational Nuclear Plants ML20140C8981997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Big Rock Nuclear Power Plant ML20138J0121997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Big Rock Point ML20137X0161997-04-18018 April 1997 Safety Evaluation Accepting Changes to Rev 17 of CPC Quality Program Description for Operational NPPs (CPC-2A) ML20137J9381997-04-0202 April 1997 Safety Evaluation Supporting Amend 118 to License DPR-6 ML20137P0391997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Big Rock Point Nuclear Plant ML20135F2361997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Big Rock Nuclear Plant ML20148N9181997-02-0101 February 1997 Rev 17 to CPC-2A, Quality Program Description for Operational Nuclear Plants ML20134H3691997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Big Rock Point Nuclear Plant ML20137F2101996-12-31031 December 1996 1996 Annual Financial Rept CMS Energy ML20133C5421996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Big Rock Point Nuclear Plant ML20135E5101996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Big Rock Point Nuclear Plant ML20134H3381996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Big Rock Point Nuclear Plant ML20211N1561996-10-0808 October 1996 Annual Rept of Facility Changes,Tests & Experiments, Consisting of Mods & Miscellaneous Changes Performed Since 961008 ML20128F9821996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Big Rock Point Nuclear Plant ML20059E8321993-12-31031 December 1993 Monthly Operating Rept for Dec 1993 for Big Rock Point Nuclear Plant ML20058K0931993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Big Rock Point Nuclear Plant ML20058E8961993-11-29029 November 1993 1993 ISI Rept 3-1 Big Rock Point Plant, for 930626-0905 ML20058F3441993-11-22022 November 1993 Safety Evaluation Concurring W/Contractor Findings Presented in Technical Evaluation Rept EGG-RTAP-10816, Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01;Big Rock Point ML20058G5981993-11-17017 November 1993 Part 21 Rept Re Westronics Recorders,Model 2100C.Signal Input Transition Printed Circuit Board Assembly Redesigned to Improve Recorder Immunity to Electromagnetic Interference.List of Affected Recorders & Locations Encl ML20058A1601993-11-15015 November 1993 Safety Evaluation Supporting Amend 112 to License DPR-6 ML20059J4531993-10-31031 October 1993 Monthly Operating Rept for Oct 1993 for Big Rock Point Nuclear Plant ML20057G1511993-10-0707 October 1993 Part 21 Rept Re Westronics Model 2100C Series Recorders. Informs That Over Several Tests,Observed That Recorder Would Reset During Peak Acceleration & Door Being Forced Off Recorder.Small Retaining Clips Added to Bottom of Door ML20057E1981993-10-0505 October 1993 Safety Evaluation Supporting Amend 111 to License DPR-6 ML20057E8341993-09-30030 September 1993 Monthly Operating Rept for Sept 1993 for Big Rock Point Nuclear Plant ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20056G9171993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for Big Rock Point Nuclear Plant ML20056E1661993-08-16016 August 1993 Safety Evaluation Supporting Amend 110 to License DPR-6 ML18058B8821993-06-15015 June 1993 Rev 13 to Quality Program Description for Operational Nuclear Power Plants. ML20128P5501993-02-18018 February 1993 Section 2.5 of Big Rock Point Updated Final Hazards Summary Rept ML20128F3511993-01-31031 January 1993 Monthly Operating Rept for Jan 1993 for Big Rock Point Nuclear Plant ML20128C4341993-01-29029 January 1993 Forwards Rev 3 to Updated Final Hazards Summary Rept ML20058L8721992-12-31031 December 1992 1992 Annual Rept,Cpc ML20127K8941992-12-31031 December 1992 Revised Pages to Graybook Rept for Dec 1992 for Big Rock Point Nuclear Plant 1999-09-28
[Table view] |
Text
-
. . . s Ci BIO ROCK POINT NRC FORM 368 U.S. NUCLEAR REGULATORY CoMMtS5 ton (7 77)
LICENSEE EVENT REPORT CONTROL OLoCK: l l l l l l elh (PLEASE PRINT oR TYPE ALL REQUIRED INFoRMATloN) i fo TTl l M l I l B l R l P l 1l@'l 0 l 0 l- ] 0 l 0 l 0 l 0 l 0 l - l 0 l 0 lgl26 4 l 1 l 1 l 1l 1 lgl l _jg 7 8 9 LicENsti Coog 14 !S LicEN66 NUMSER 2,6 Lic6N66 TYPE JO 67 6AT b6 con'T FoT l s'U %60LL_J@l 0 I 5 DOCKET i 0 i -NUMet I O Rl l i s I 685 ]@i O iEVENT 8i3 I l i 7 i 148 i@l 0 9REPoRTDATE l 2 l 7 l 7 l a80 l@
? 8 66 69 DATE 76 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h F6TF1 1 During monthly specific gravity readings on the Reactor Depressurization Io1311 System Battery A, Cell 12 read 1.193. This is below the limit of 1.200 l I o 14 i ispecified in T/S 11.4.5.3.A.2.(b). All other cells met specifications and j ioIsl I previous evaluation indicates that the channel was operable for this condi-l m ; tion. The battery was placed on equalizing charge on 8/31/78. Incident ,
goj7; l repetitive; see R0-77-39 dated 10/27/77, R0-77-50 dated 1/13/78 and R0 l ioisil 02 dated 2/17/78. t
' cec's" 'c^ois' sSci5e CouPoNsNT eoon sual"o'6e sEMe lalol l E [C l@ , y@ lX l@ IB l A l T l T l R lY l@ [Z_j@ W @
7 8 9 to is 12 13 18 19 20
,, stoVENTIAL OCCURRENCE RIPoRT REVisnoN.
(g n po EVENTYEAR REPORT No. Coof TvPE No.
@ ,Rg l247l8l 22 l-l 23 l 0 l3 [4 l 24 28
'g_j 27 l013l 28 29
[ L_j 30
[---J 31
[0J 32_
, TK N A oN o PL NT M HoVRs 5i FoR B. suPPLt MAN FA UR$R l_c.J@LZ_1@ Lz_l@ L2_JO 101010101 W@ l N i@ - [gj@ 44l E l 315 l Sl@
33 34 36 36 31 40 el 42 43 47 CAUSE DESCRIPT1oN AND CORRECTIVE ACTIONS @
lilolI Exact cause of failure is unknown. The cell did not respond adecuatelv to I li1311 the equalizing charge initiated on 8/31/78. Since the en11 hnn exhibited I
,,,,,l marginal performance over the past year, even following electrolyte addi- 1 i,,3, l tion, the cell was replaced with a new cell on 9/7/78. I lii.ii I
'sTTMTs" stoweR orarm STATUS @ Es*c"ovSEv' oiscov Rv osscR* Tion @
l i 15 I [E_J@ l 0 l 8 I O' l@l N/ A l, [3_j@l Routine Testinc l
' A TivtTV Co'NfENT Ritecto or RsLe Ase LocATiomorRetrass@
li is l LZj @ [Z_J@l NA suoVNT or AcimTv l NA @l l esRsoNNsL e = Posses NUueeR TvPe oescRmrioN @
l i } 7 l l 0 ) O l 0 l@[Z_J@l NA l P:RsoNNe't imu' lies NUuseR etscR+ Tion @
li In 8l l9 01010 l@l i2NA 7 it 20 l
TV E DEsORPT oN FGT1 LZJ@l10NA l 7 8 9 80 PUBLicITv NRL oNLY g 77tgrg"' ~ 7f /0 s Cao 7 7 i , , ,, ,