Consumers NUCLEAR OPERATIONS DEPARTMENT Company Unit Shutdowns and Power Reductions Report Month Docket Number Unit Date Completed by Telephone December 1992

$5-150 Dig Rock Etnint Plant January 4, 1993 JE JottNSToM g616) 521-8223 i

Method of l

Shutting Duration Down IJcensee Event System Componpt 3

2 3

Code Cause and Corrective Action To Prevent Recu vence Number Date Type (Hours)

Reason Reactor Report Numtwr Code 92-22 12/06/92 S

90.0 A

2

- The amit was removed free service due to steam leaks thru Brs rm the Reactor Depressurizing System (RDS). The RDS 12/10/92 "A" train had a pinhole leak in a socket weld, and the EDS "B" trnin had a valve flange leak. The nasit fs retu.-ned to service after the completing the rep.,rs.

s

).

1 4

I 2

3 4

F = Forced Reason:

Method:

Exhibit G = Instructions for S = Scheduled A = Equipment Failure (Explain) 1 = Manual Preparation of Data Entry Sheets 4

B = Maintenance of Test 2 = Manual Scram for Licensee Event Report (LER) i C = Refueling 3 = Automatic Scram File (NUREG-0161)

D = Regulatory Restriction 4 = Other (Explain)

E = Operator Training and License Examination 5Exhibit i = Same Source F = Administrative G = Operational Error (Explain)

H = Other (Explsin) 9301260262 930115 Form 3156 1-82 PDR ADOCK 05000155 R

PDR

a M

GREYBOOK OPERATING DATA REPORT 6

{~ '

~

DOCKET 'NO; 50-1's5 ' -~ DATE:

i / iS / 93 ~

~

' ~ ~

'. Q s} -

BY: JR JOH'45 TON OPERATING STATUS FHOt4E :

616-547-6537sEXT 223 a

1. UNIT NAME: BIG ROCK POINT NUCLEAR PLnNT NOTES:

().

2. REFORTING PERIOO:

12 / 92

=

e.

3. LICENSED THERMAL POWER (MWT): '

240

~

~~~~~"

- ~~' ~~

~ ~

f 47 NAMEPLATE RATING ~(GROS 5 MWE):

75

- Q sj L DESIGN ELECTRICAL RATING (NET NWE):

72

  • L 6_. NAXIMUM,DE'ENDABLE CAPACITY _(Gross MWE)2 71.0
7. MAXIMUM CEPENC%BLE Ci4PACITY (NET MWE)r 67.0

' O 8.

IF CHANGES OCCUR IN CAPACITY RATING 5(ITEM 5 3 TH't.U 7) SINCE LAST REPORT, GIVE REA50tJ5:

c, "9.' POWER LEVE*. TO WHICH RESTRICTED,IF ANY (NCT ' t1WC l :

~~

.O;lo.REA50t45FORRESTRICTIOt45, IF ANY:

e H

2 Q;

e

=g

'~~

=

THI5 MONTH YEAR-TO-DuTE cut 4ULaT IVE on

= 11. HOURS IN REPORTING PERIOO 744.0 8734.0 260999.0 d12.' NUMBER OF HOURS REACTOR Wa5' CRITICAL'

~~

~

' 6 5 3.7' ^ ~ ~ ~ ~

~4790.5~

~

'188159.4,

~

~

C (d 13. REACTOR RE5ERVE SHUTDOWN HOURS 0.0 0.0 0.0 m

s 15. UNIT RESERVE SH8JTDOWN HOURS 0.0 4700.6_

_ 185145.7 14._ HOUR 5 GENERATOR ON-LINE 654.1 0.0 0.0 C* 16. GROSS THERMAL ENERGY GENERATED (MWH) 198262.0 896669.0 35494707.0 e

= 17. GROSS ELECTRICnL ENERGY GEi4ERATED (MWH) 46716.0 287419.0

[167f4ET ELECTRICAL ENERGY GENERATED (MWH)~

~' '~'

54341.7~~

~ ' ' '

'271422.O'

~

~

11272005.0 10663180.4'

~

19. UNIT SERVICE F ACTOR 87.9%

53.5%

71.0%

e C(d20. UNIT AVAILABILITY FACTOR

~

~

' 07.9%

~

53.5%

~

'60.7%

~

~ ~~

71.0%

215~ UNIT'APACITY FACTOR (U5ING MDC NET) 09.0%

46.1%

~C

=

08 22. UNIT CAPACITY FACTOR (USING DER NCT) 62.8%

42.9%

56.8%

e

23. _ UNIT FORCED OUTAGE RATE 0.0%, _ _

11.2%.

12.9%

=

e-e

24. 5HUTDOWN5. 5CHEDULED OVER NEXT 6 mot 4TH5(TYPE,4eTE, & DURATIOtt OF E"ACHl

,c' e

~

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DHTE OF STARTUP:

~

"~ ~

g.4 e