Text

.. _ _.. _ _ _. _. _ _ _ _. _ _ - _ _. _ _ _. _

l

.Sd- /W I

Consumers i

Power 1-1 rewannes

\\

MMMEAFS Pmanem i

July 1,1997 Nuclear Regulatory Commission Document Control Desk Washington,DC 20555

!i Dear Sir.

i Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period of June 1,1997 through June 30,1997.

l Sincerely, 3

i i)

N A.

K J Shields i

Reactor Engineer Enclosures cc: Administrator Region 111, Nuclear Regulatory Commission DR Hahn, Department of Enviromental Quality JR Padgett, Michigan Public Service Commission R Aben, Michigan Department of Labor MP Cass, American Nuclearinsures B Lewis, McGraw-Hill,inc.

l SM McIntyre, P26-201 KP Powers, Big Rock Point GC Withrow, Big Rock Point NRC Resident inspector, Big Rock Point Document Control, Big Rock Point,740*22*36*10

,0 9707090156 970630 goa ^=" **@

lll515!581,51,5ll 080080 A CAGGVE72GYCOMPANY

Omussumers8sery NUCLEAR OPERATIONS DEPARTMENT Unit Shutdown and Power Reductions s

W Month Docket Number Unit Date C _,

^_2 by Telephone June,1997 55-100 B6g Rock Point Plant July 1,1997 JR Johnston (616)547 4223 Method of Shutting Duration Down Licenese Event Sq C_.

_ I.

  • i 2

3 Number Date Type (Hours)

Reason Reactor Report Number Code Code Cause and Corrective Action To Prevent Recurrence 9742 96/2747 5

720 Hrs H

4 96/27197 at 17:44; The unit reached the "All Rods - All Out" Thru mode and started cost down towenis the 1997 refueling 06/3075T outage. (Total dorate hours:174.3) t I

l h

1 3

4 p.p g Q.

Method Enhibit G = Instruchons for 1

S = Scheduled A = Equipment Failure (Explain) 1 = Manuel Proporshon of Data Entry Sheets B = Mamtenance of Test 2 = Manuel Scram For Ucensee Event Report (l ER)

C = Refueling 3 = Automatic Scram F#e (NUREG -0161)

D = Regulatory Restriction 4 = Other (Explain)

E=WN kxhibit 1 = Same Source F = Administrative G = Operational Error (Explain)

H = Other (Emplain)

(

Fonn 31'J6 247

~!

i 1 STATS VERSION 97.001: EA-B-STATS-91-01 02/06/0F RLG IMEo07/01/97 11:18:50

Page 4 of 9

=

GREYB00K OPERATING DATA REPORT

. DOCKET NO. 50-155 DATE:

7 / 1 / 97 BY: 'JR JOHNSTON OPERATING STATUS PHONE: 616-547-8223

1. UNIT NAME: BIG ROCK POINT NUCLEAR PLANT NOTES:

f

2. REPORTING PERIOD:

6/97 l

3. LICENSED THERMAL POWER (MWT):

240

}

4. NAMEPLATE RATING (GROSS MWE):

75 E

5. DESIGN ELECTRICAL RATING (NET MWE):

72

[

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

71.0 l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

67.0

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT. GIVE REASONS:

4 i

9. POWER LEVEL TO WHICH RESTRICTED.IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS IF ANY:

{

a f

THIS MONTH YEAR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720.0 4343.0 300306.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 2118.5.

217822.1

13. REACTOR RESERVE SH' TDOWN HOURS 0.0 0.0 0.0 J
14. HOURS GENERATOR ON-LINE 720.0 2031.5 214408.7 I
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 f
16. GROSS THERMAL ENERGY GENERATED (MWH) 144379.0-406383.0 41580644.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 46676.0 130410.0 13216079.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 44238.8 123519.7 12504781.0
19. UNIT SERVICE FACTOR 100.0%

46.8%

11.4%

i

20. UNIT AVAILABILITY FACTDR 100.0%

46.8%

.71,4%

21. UNIT CAPACITY FACTOR (USING MDC NET) 91.7%

42.4%

61.9%

22. UNIT CAPACITY FACTOR (USING DER NET) 85.3%

39.5%

57.8%

23. UNIT FORCED OUTAGE RATE 0.0%

53.2%

12.0%

l

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. & DURATION OF EACH): Refueling, August 31' 1997. 60 Days.

I

25. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:

[

s t

i I

h i

l l

.[

b i

'1 STATS VERSius 97.001: EA-8-STATS-91-01 02/G2/97 RUNTIMEe07/01/97 11:18:50 Page 2 of 9 DAY AVERAGE DAILY POWER (MWT)

(MWEN)

( 6/97) - CYCLE 29 1

213.58 65.11 2

212.67 64.81 3

211.92 64.53 4

210.04 64.25 5

209.38 64.00 6

208.42 63.71 7

207.17 63.47 8

206.71 63.18 9

205.29 62.89 10 204.54 62.63 11 203.63 62.51 12 203.D8 62.06 13 202.50 61.95 14 201.83 61.70 15 200.54 61.49 16 199.75 61.25 17 199.00 60.99 18 198.04 60.79 19 197.46 60.55 20 196.92 60.35 21 195.87 60.15 22 196.00 59.90 23 194.00 59.65 24 193.67 59.42 25 191.88 59.22 26 192.63 59.03 27 190.54 58.78 28 190.50 58.54 29 189.75 58.32 30 188.71 58.07

~

Refuelina 1.1fonnation Reauest j

l i

1.

Facility Name:

Big Rock Point Plant i

i 2.

Scheduled date for next refueling shutdown-Decommissioning.

i 3.

Scheduled date for restart following shutdown:

}

Decommissioning.

4.

Will refueling or resumption of operation thereafter require a technical specification change or j

otherlicense amendment?

No.

if yes, explain:

3 If no, has the reload fuel design and core configuration been reviewed by Plant Safety Review i

Committee to determme whether any unreviewed safety questions as associated with the core i

j reload (Reference 10 CFR, Section 50.59) ?

Decommissioning.

if no review has taken place, when is it scheduled?

l 5.

Scheduled date(s) for submittal of proposed licensing action and supporting information:

N/A.

i i

6.

Important licensing considerations associated with refueling, eg. new or different fuel design j

or supplier, unreviewed design or performance analysis methods, significant changes in fuel design new operating procedures:

i None.

7.

Number of fuel assemblies in:

Core = 84.

l Spent Fuel Pool Storage = 358.

New Fuel Storage = 22. '

8.

Present licensed spent fuel pool storage capacity:

441 1

Size of any increase in licensed storage capacity that has been requested or planned (in j

number of fuel assemblies):

0 i

9.

Projected date oflast refueling that can be discharged to spent fuel pool assuming the present j

license capacity:

}

Last total core off load 1996.

4 Last refueling 1996.

1 4

May 1.1s07

i FORM 16.3.H l

Operating Status Report - Nuclear Regulatory Commission t

Prepared by:

Date:

/ ((2 J i Roslowed by 11 4 _

Date:

/

)

(Reactor $ineer or Alternate) l Copy to be sent to the following by the seventh day of each month:

Nuclear Regulatory Commission Robert Aben, Assistant Chief Document Control Desk Bureau of Construction Codes Washington,DC 20555 Michigan Department of Labor -

j 7150 Harris Drive, Box 30015 Lansing, MI 48909 Administrator American NuclearInsurers j

Region lit - USNRC Att: MP Cass 801 Warrenville Road Town Center, Suite 300S Lisle,IL 60532-4351 29 South Main Street West Hartford, CT 06107-2445 DR Hahn Barbara Lewis I

Department of Enviromental Quality McGraw-Hill, Inc.

3500 North Logan 1200 G Street, N.W.

Lansing, MI 48906 Suite 1100 i

Washington,DC 20005 JR Padgett Michigan Public Service Commission PO Box 30221 Lansing, MI 48909 Routing Copy:

SM McIntyre, P24-201 KP Powers, Dig Rock Point Plant CC Withrow, Big Rock Point Plant NRC Resident inspector, Big Rock Point Plant Document Control Center, Big Rock Point Plant DCC 740*22*35*10 (740*22*10*04) Cross Reference 16.3.3-17