ML20148T490
| ML20148T490 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 06/30/1997 |
| From: | Jeanne Johnston, Shields K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9707090156 | |
| Download: ML20148T490 (6) | |
Text
.. _ _.. _ _ _. _. _ _ _ _. _ _ - _ _. _ _ _. _
l
.Sd- /W I
Consumers i
Power 1-1 rewannes
\\
MMMEAFS Pmanem i
July 1,1997 Nuclear Regulatory Commission Document Control Desk Washington,DC 20555
!i Dear Sir.
i Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period of June 1,1997 through June 30,1997.
l Sincerely, 3
i i)
N A.
K J Shields i
Reactor Engineer Enclosures cc: Administrator Region 111, Nuclear Regulatory Commission DR Hahn, Department of Enviromental Quality JR Padgett, Michigan Public Service Commission R Aben, Michigan Department of Labor MP Cass, American Nuclearinsures B Lewis, McGraw-Hill,inc.
l SM McIntyre, P26-201 KP Powers, Big Rock Point GC Withrow, Big Rock Point NRC Resident inspector, Big Rock Point Document Control, Big Rock Point,740*22*36*10
,0 9707090156 970630 goa ^=" **@
lll515!581,51,5ll 080080 A CAGGVE72GYCOMPANY
Omussumers8sery NUCLEAR OPERATIONS DEPARTMENT Unit Shutdown and Power Reductions s
W Month Docket Number Unit Date C _,
^_2 by Telephone June,1997 55-100 B6g Rock Point Plant July 1,1997 JR Johnston (616)547 4223 Method of Shutting Duration Down Licenese Event Sq C_.
_ I.
- i 2
3 Number Date Type (Hours)
Reason Reactor Report Number Code Code Cause and Corrective Action To Prevent Recurrence 9742 96/2747 5
720 Hrs H
4 96/27197 at 17:44; The unit reached the "All Rods - All Out" Thru mode and started cost down towenis the 1997 refueling 06/3075T outage. (Total dorate hours:174.3) t I
l h
1 3
4 p.p g Q.
Method Enhibit G = Instruchons for 1
S = Scheduled A = Equipment Failure (Explain) 1 = Manuel Proporshon of Data Entry Sheets B = Mamtenance of Test 2 = Manuel Scram For Ucensee Event Report (l ER)
C = Refueling 3 = Automatic Scram F#e (NUREG -0161)
D = Regulatory Restriction 4 = Other (Explain)
E=WN kxhibit 1 = Same Source F = Administrative G = Operational Error (Explain)
H = Other (Emplain)
(
Fonn 31'J6 247
~!
i 1 STATS VERSION 97.001: EA-B-STATS-91-01 02/06/0F RLG IMEo07/01/97 11:18:50
- Page 4 of 9
=
GREYB00K OPERATING DATA REPORT
. DOCKET NO. 50-155 DATE:
7 / 1 / 97 BY: 'JR JOHNSTON OPERATING STATUS PHONE: 616-547-8223
- 1. UNIT NAME: BIG ROCK POINT NUCLEAR PLANT NOTES:
f
- 2. REPORTING PERIOD:
6/97 l
- 3. LICENSED THERMAL POWER (MWT):
240
}
- 4. NAMEPLATE RATING (GROSS MWE):
75 E
- 5. DESIGN ELECTRICAL RATING (NET MWE):
72
[
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
71.0 l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
67.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT. GIVE REASONS:
4 i
- 9. POWER LEVEL TO WHICH RESTRICTED.IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS IF ANY:
{
a f
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 4343.0 300306.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 2118.5.
217822.1
- 13. REACTOR RESERVE SH' TDOWN HOURS 0.0 0.0 0.0 J
- 14. HOURS GENERATOR ON-LINE 720.0 2031.5 214408.7 I
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 f
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 144379.0-406383.0 41580644.0
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 46676.0 130410.0 13216079.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 44238.8 123519.7 12504781.0
- 19. UNIT SERVICE FACTOR 100.0%
46.8%
11.4%
i
- 20. UNIT AVAILABILITY FACTDR 100.0%
46.8%
.71,4%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 91.7%
42.4%
61.9%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 85.3%
39.5%
57.8%
- 23. UNIT FORCED OUTAGE RATE 0.0%
53.2%
12.0%
l
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. & DURATION OF EACH): Refueling, August 31' 1997. 60 Days.
I
- 25. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:
[
s t
i I
h i
l l
.[
b i
'1 STATS VERSius 97.001: EA-8-STATS-91-01 02/G2/97 RUNTIMEe07/01/97 11:18:50 Page 2 of 9 DAY AVERAGE DAILY POWER (MWT)
(MWEN)
( 6/97) - CYCLE 29 1
213.58 65.11 2
212.67 64.81 3
211.92 64.53 4
210.04 64.25 5
209.38 64.00 6
208.42 63.71 7
207.17 63.47 8
206.71 63.18 9
205.29 62.89 10 204.54 62.63 11 203.63 62.51 12 203.D8 62.06 13 202.50 61.95 14 201.83 61.70 15 200.54 61.49 16 199.75 61.25 17 199.00 60.99 18 198.04 60.79 19 197.46 60.55 20 196.92 60.35 21 195.87 60.15 22 196.00 59.90 23 194.00 59.65 24 193.67 59.42 25 191.88 59.22 26 192.63 59.03 27 190.54 58.78 28 190.50 58.54 29 189.75 58.32 30 188.71 58.07
~
Refuelina 1.1fonnation Reauest j
l i
1.
Facility Name:
Big Rock Point Plant i
i 2.
Scheduled date for next refueling shutdown-Decommissioning.
i 3.
Scheduled date for restart following shutdown:
}
Decommissioning.
4.
Will refueling or resumption of operation thereafter require a technical specification change or j
otherlicense amendment?
No.
if yes, explain:
3 If no, has the reload fuel design and core configuration been reviewed by Plant Safety Review i
Committee to determme whether any unreviewed safety questions as associated with the core i
j reload (Reference 10 CFR, Section 50.59) ?
Decommissioning.
if no review has taken place, when is it scheduled?
l 5.
Scheduled date(s) for submittal of proposed licensing action and supporting information:
N/A.
i i
6.
Important licensing considerations associated with refueling, eg. new or different fuel design j
or supplier, unreviewed design or performance analysis methods, significant changes in fuel design new operating procedures:
i None.
7.
Number of fuel assemblies in:
Core = 84.
l Spent Fuel Pool Storage = 358.
New Fuel Storage = 22. '
8.
Present licensed spent fuel pool storage capacity:
441 1
Size of any increase in licensed storage capacity that has been requested or planned (in j
number of fuel assemblies):
0 i
9.
Projected date oflast refueling that can be discharged to spent fuel pool assuming the present j
license capacity:
}
Last total core off load 1996.
4 Last refueling 1996.
1 4
May 1.1s07
i FORM 16.3.H l
Operating Status Report - Nuclear Regulatory Commission t
Prepared by:
Date:
/ ((2 J i Roslowed by 11 4 _
Date:
/
)
(Reactor $ineer or Alternate) l Copy to be sent to the following by the seventh day of each month:
Nuclear Regulatory Commission Robert Aben, Assistant Chief Document Control Desk Bureau of Construction Codes Washington,DC 20555 Michigan Department of Labor -
j 7150 Harris Drive, Box 30015 Lansing, MI 48909 Administrator American NuclearInsurers j
Region lit - USNRC Att: MP Cass 801 Warrenville Road Town Center, Suite 300S Lisle,IL 60532-4351 29 South Main Street West Hartford, CT 06107-2445 DR Hahn Barbara Lewis I
Department of Enviromental Quality McGraw-Hill, Inc.
3500 North Logan 1200 G Street, N.W.
Lansing, MI 48906 Suite 1100 i
Washington,DC 20005 JR Padgett Michigan Public Service Commission PO Box 30221 Lansing, MI 48909 Routing Copy:
SM McIntyre, P24-201 KP Powers, Dig Rock Point Plant CC Withrow, Big Rock Point Plant NRC Resident inspector, Big Rock Point Plant Document Control Center, Big Rock Point Plant DCC 740*22*35*10 (740*22*10*04) Cross Reference 16.3.3-17