JAN 0 31986 MEMORANDUM FOR: Those on Attached List FROM: Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

SUBJECT:

CLINTON POWER STATI0fi: COMPLETION OF LICENSING ACTIVITIES INITIATED PRIOR TO NRR REOFCANIZATION In Mr. Denton's memorandum, dated November 20, 1985, he provided reorganizational guidelines for reactor licensing activities. To. assist you in scheduling work assignments for your staff in accordance with these guidelines, we are providing in the enclosure an identification of the prior commitments of those members of your staff associated with the review of licensing activities related to Clinton Power Station.

< The applicant has recently changed its proposed fuel load date fron January 3, 1986 to between late February and late March 1986. The completion dates. for the reviews of the itens identified in the enclosure support the applicant's earliest proposed fuel load date and includes time for issuance of the SSER.

The information in the enclosure in most instances reflects input received from the reviewers.

If you have any questions regarding the schedule contained in the enclosure please contact the Clinton Licensing Project Manager Byron Siegel (x28344).

Original si.= 111 llalter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated DISTRIBUTION

{DocRetlile Silest NRC PDR AWagner Local PDR PHearns PD#4 Reading AMasciantonio BSiegel LRuth EHylton Alee RKendall JLonbardo JLazevnick RPichumani ANotafrancesco kWangler AGarg JLee DYue RLi KParczenski RKirkwcod l CTan JRajam PDi4/D 8601090540 860103 PD#)/P PDR ADOCK 05000461 CSiege < WButler E- PDR 1/j7/8'6 1/ 2./86

[y'!f

Addressees - Memorandum dated JAN O 31986 G.' Lainas, Assistant Director for Technical Support, DBL B. D. Liaw, Chief Engineering Branch, DBL G. Hulman, Chief Plant Systems Branch, DBL M. Srinivasan, Chief Electrical, Instrumsntation & Control Systems Branch, DBL W. Hodges, Acting Chief Reactor Systems Branch, DBL D. Vassallo, Chief Facilities Operations Branch, DBL W. Regan, Chief Facility Operations Branch, DBL

0. Parr, Chief Electrical,' Instrumentation and Control Systems Branch, DPWR-B F. Rosa, Chief Electrical, Instrumentation and Control
a Systems Branch, DPWR-A W. Gannill, Chief Plant Systems Branch, PWR-1 M. Williams, Chief Technical Assistance !!anagement Branch, PPAS W. Johnston, Chief Engineering Branch, PWR-B R. Bosnak, Chief Engineering Issues Branch, DSR0 l

l 1

  • po l f og*ok UNITED STATES l 3 o NUCLEAR REGULATORY COMMISSION u  ; wAsmNGTON, D. C. 20555

%, * " * * / i JAN 0 31986 i NEMORANDUM FOR: Those on Attached List FROM: Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

SUBJECT:

CLINTON POWER STATION: COMPLETION OF LICENSING ACTIVITIES INITIATED PRIOR TO NRR REORGANIZATION l

In Mr. Denton's memorandum, dated November 20, 1985, he provided reorganizational guidelines for reactor licensing activities. To assist you in scheduling work assignments for your staff in accordance with these guidelines, we are providing in the enclosure an identification of the prior commitments of those members of your staff associated with the review of licensing activities related to Clinton Power Station.

The applicant has recently changed its proposed fuel load date from January 3, 1986 to between late February and late March 1986. The completion dates for the reviews of the items identified in the enclosure support the applicant's earliest proposed fuel load date and includes time for issuance of the SSER.

The information .in the enclosure in most instances reflects input received from the reviewers.

If you have any questions regarding the schedule contained in the enclosure please contact the Clinton Licensing Project Manager Byron Siegel (x28344).

Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated

CLINTON SER OR MAN HRS REQ'D NAME SSER SECTION SUBJECT 1 COMPLETE TO COMPLETE COMPLETION DATE A. Les SER 3.10 SQRT 90 16 1/31/86 SSER 1-22 Equipment Seismic Assessment Program 60 30 1/15/86

~

J. Lombardo SER 3.10 PVORT 85 60 1/31/86 R. Pichumani SER 3.6.2 Jet Impingement & Pipe Rupture Analysis 80 60 1/15/86 SER 3.9.2 Review Results of Testing Program (Vibr.,

Thermal, Dynamic) 0 **

4 M. W:ngler 00CM 85 10 1/15/86 J. Lee Review Revised FSAR Section 11.4 10 80 2/15/86 SER 11.4.1 PCP and Compliance Program (10 CFR 61) 10 80 2/15/86 SER 12.3.1 Provide Initial Leak Rate Test Results 0 **

R. Li SER 3.9.6, 5.2.4 IST 0 2/15/86 R. Kirkwood Instrument Tubing - Code Relief Request 85 12 1/15/86 J. Rajim SSER 1-22 Equ!pment Seismic Assessment Program 0 40 1/15/85 l

C. P. Tan SSER 6.2.1.8 Sur eey Grand Gulf Inplant Tests of SRV's 90 1/15/85

  • 30 Days from Receipt of Information from Applicant
    • Aftzr Fuel Load 2

2 4

4

s 4

9

^

/

LICENS DG ACTIVITIES INITIATED PRIOR TO NRR RECRGANIZATION CLINTON SER OR . MAN HRS REQ'D NAME SSER SECTION SMJECT  % COMPLEll 10 COMPLETE COMPLET10N DATE R. Kendall Compitance with 10 CFR 50.62 (ATWS) 5  ? 2/15/86 SSER 2-7.2.3.3 Self Test System 90 8 1/15/86 SER 7.4.3.1 Remote Shutdown; Compliance GDC 19 70 15 1/15/86 SER 7.7.3.1 Control' 5}Memt failures From HELB 5 60 2/15/86 SER 15.2.1 fi 7.2.3.1 ATWS Rectrculation Pump Trip 95 2 1/15/86 SSER 2-7.3.3.7 Design Cha..ges to 00P Valves for LOCA 85 ' u ' ' 2 1/15/86 SER 7.3.2.3 Vacuum Breaker Position Indication Concerns 90 2 1/15/86

) J. Laz:vnick CAT Inspection - Cable Separation 85 32 1/31/86 Issues Resulting From Site Review 20 30 Change in Scope in Voltage Verification Test 85 30 1/31/86 A. N:tafrancesco SER 6.2.7 H Control - Preliminary Analysis Review 40 100 1/31/86 2

. A. G rg (Total) 1/15/86 D. Yue 1/15/86 K. Parczenski 1/15/86 C. Tan 1/15/86 S. West SER 3-9.5.14 Auto. Fire Detection in Safety Releated Areas ,95 20 1/15/86 SER 9.5.1 Safe Shutdown Anal / Fire Protection Eval. Rpt 75 120 1/31/86 Use of Other Than Rigid Steel Conducts 50 5 1/15/86 N. Wagner SER 3.6.1 HELB/MELB Flooding 60 10 1/15/86 SER 3.6.1 NELB Containment Spray , 60 10 ' 1/15/86

, CAT Inspection - Floor Grating 25 30 1/31/86 P. Hearns Analysis of Piping Failures Outside Containment 10 1/31/86 SER 3.11 Equipment Qualification of Elect.& Mechanical Equip. 95 40 A. Masciantonio i

L. Ruth SER 6.2.1.8 Suppression Pool Hydrodynamic Loads 90 16 1/31/86 SER 6.2.1.9 Humphrey Containment Issues 90 16 1/31/86 t