MONTHYEARML20196L0051999-07-0808 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Recently Signed Asset Purchase Agreement Between Illinois Power & Amergen Energy Co & Proposed Transfer of License to Be Submitted to NRC ML20206F2481999-04-22022 April 1999 Informs That Operational Readiness Insp Team Completed Insp at Clinton Power Station Including Two Weeks on Site & Two Separate Instances of Continuous 72 Hours Control Room Observation.Operational Performance Adequate ML20206F2361999-04-21021 April 1999 Documents Completion of Insp Activities Performed During Week of 990412,to Assess Licensee Implemented & Planned Corrective Actions Associated with NRC Manual Chapter 0350 Case Specific Checklist Restart Item II.1 ML20206F2331999-04-19019 April 1999 Discusses Results of Clinton Power Station Corrective Action Insp & Recommendations to Close Demand for Info Ltr.Insp Team Focused on Operations,Maintenance & Plant Support Organizations ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20198S0601999-01-0606 January 1999 Notification of 990121 Meeting with Util to Discuss Potential Change to Clinton Degraded Voltage Relay Setpoints ML20154L1161998-10-14014 October 1998 Notification of 981027 Meeting with Util in Rockville,Md to Discuss Licensee Proposed Mod of keep-fill Sys for Feed Water Sys Check Valves to Eliminate Containment Leakage Concern ML20154J9271998-10-13013 October 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam Administered on 980901 ML20154J7921998-10-13013 October 1998 Forwards NRC Operator Licensing Retake Exam & Insp Rept 50-461/98-301(OL) Administered on 980901 ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D6711998-08-25025 August 1998 Notification of 980917 Meeting W/Util in Rockville,Md to Hold NRC Insp Manual Chapter 0350 Restart Panel Meeting W/Illinois Power to Discuss Progress of Clinton Power Station Toward Restart ML20217C9871998-03-24024 March 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980126-0202 ML20217C9761998-03-24024 March 1998 Forwards NRC Operating Licensing Exam Rept 50-461/97-313OL (Including Completed & Graded Tests) for Tests Administered on 980126-0202 ML20197B6811998-03-0606 March 1998 Notification of 980319 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Fix for Issue of Degraded Electrical Grid Voltage ML20198R5561998-01-16016 January 1998 Notification of 980127 Meeting W/Illinois Power Co in Rockville,Md to Discuss Potential Fix for Issue of Degraded Voltage ML20199L0221997-11-24024 November 1997 Notification of 971211 Meeting W/Illinois Power Co in Clinton,Il to Discuss Findings of NRC Special Evaluation Team ML20210T2701997-09-11011 September 1997 Notification of Significant Licensee Meeting W/Util on 970924 to Discuss Objectives,Scope & Schedule of Special Evaluation Team Evaluation of Integrated Safety Assessment Being Conducted by Illinois Power Co ML20210H7531997-08-0505 August 1997 Informs That Licensee Restart & Performance Review Panel Has Determined That Plant Has Satisfactorily Completed Items & Corrective Actions Identified as Restraints to Restarting of Cps,W/Exception as Listed ML20149E8691997-07-16016 July 1997 Notification of 970717 Meeting W/Util in Rockville,Md to Discuss Voltage Available from 345 Kv Offsite Electrical Supply & Possible Effect on Plant Equipment in Case of Accident ML20140C3151997-04-0202 April 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss License Amend Application ,re Degraded Voltage Setpoints & Proposed Administrative Actions ML20137F3391997-03-26026 March 1997 Notification of 970421 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Re Thermo-Lag Fire Barriers & Ampacity Derating ML20136F3351997-03-0505 March 1997 Forwards Southwestern Electric Cooperative 970228 Request for Hearing,Submitted in Response to Fr Addressing Commission Consideration of Issuance of Order Approving Transfer of OL from Soyland Power to Illinois Power Co ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134L6581996-11-19019 November 1996 Notification of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Soyland Power Cooperative Minority Ownership of Facility to Illinois Power Marketing Inc ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20056F3811993-08-12012 August 1993 Notifies of 930830 Meeting W/Util in Rockville,Md to Discuss Licensee GL 89-10 Valve Testing Program Schedule ML20127B6031993-01-0707 January 1993 Summarizes 921217 Telcon Re Implementation of Erosion/ Corrosion Monitoring Program Per Generic Ltr 89-08.Response Acceptable Contingent on Commitment to Formalize Procedural Controls ML20058B1721990-10-25025 October 1990 Notification of 901102 Meeting W/Util in Rockville,Md to Discuss Util Approach on Performing IPE W/Nrc & Contractors ML20059B3281990-07-19019 July 1990 Discusses Author Observation of INPO Evaluation Process at Clinton Nuclear Power Plant on 900514-25.Recommends That NRC Observe Addl INPO Evaluations.Description of INPO Process & List of Qualifications & Experience of INPO Members Encl ML20206L8841988-11-17017 November 1988 Forwards Fr Notice of Proposed Amend to License NPF-62 Re Merger of Soyland Power Cooperative,Inc & Western Illinois Power Cooperative,Inc & Request for Comments on Antitrust Issues ML20206C5861988-11-0909 November 1988 Notification of 881213 Meeting W/Util in Rockville,Md to Discuss Tech Spec Interpretation Re Inoperability of Sys Providing Support Function ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20206F2011988-11-0202 November 1988 Discusses Tech Spec Interpretation Re Inoperability of Sys Providing Support Function.Actions to Close Out Listed ML20154J0191988-09-16016 September 1988 Responds to Request for NRR Assistance on Allegation Re Containment Integrity & Inservice Testing Program.Safety Significance of Not Performing Inservice Testing of Certain Affected Valves During First Yr of Plant Operation Minimal ML20207D6321988-08-11011 August 1988 Responds to 871027 Request for Technical Assistance in Interpretation of Tech Spec 4.1.5.B.3.Any Standby Liquid Control Sys Valve Which Could Affect Amount of Flow Delivered to Reactor Should Be Considered in Flow Path ML20195D4011988-06-17017 June 1988 Forwards Evaluation of Items Identified by NRC Inspectors During 1980-87 That Required Significant Corrective Actions by Licensee.Addl 10-15 Instances Noted Where Inspectors Found Problems W/Util Methods to Close Out Items ML20195D8371988-06-0303 June 1988 Notification of 880623 Meeting W/Hydrogen Control Owners Group in Rockville,Md to Discuss Emergency Procedure Guidelines for Mark III Containments.Attendees Listed ML20154L3021988-05-19019 May 1988 Informs That Settlement Stipulation Along W/Egm 88-01 & Paragraph B of Regional Procedure 1460 Reviewed.No Further Action Required Based on Review ML20153F9601988-05-0404 May 1988 Informs That Ray Ready to Stand Before Oral Certification Board Scheduled to Be Held in Region III Ofcs on 880531. Board Will Consist of Listed Individuals & Author ML20151B7961988-04-0505 April 1988 Forwards Facility Master Activities Plan (Map) & Map List of Activities for Apr-June 1988 ML20149F7971988-02-11011 February 1988 Discusses Evaluation of motor-operated Valves,Including Overall Industry Effort to Respond to EDO Request to NUMARC Consisting of Recommendations in AEOD Rept C603.Findings, Conclusions &/Or Recommendations Will Be Provided ML20236J1081987-11-0303 November 1987 Notification of 871109-10 Meetings W/Util in Bethesda,Md to Discuss Tech Spec Amend Package ML20235R6291987-10-0101 October 1987 Notification of 871007-08 Meetings W/Mark III Containment Hydrogen Control Owners Group (Hcog) in Bethesda,Md to Discuss Hcog Submittals Including Impact of Station Blackout & ATWS Considerations on Hcog Programs.Attendee List Encl ML20237L3341987-08-26026 August 1987 Requests Review of Plant Specific & STS with Respect to Allowable Number of Safety Relief Valves Out of Svc at Bwrs. Related Matl Encl ML20206E3131987-04-0808 April 1987 Forwards Draft Attachment 1 to Facility Full Power License. Item 1 Only Deferred Test Remaining from Preoperational Test Program,Item 2 Identical to Item 2a of Low Power License & Item 2 Rewritten for Clarity ML20205N0311987-03-26026 March 1987 Forwards Records of Coordination from Util That Provide Requested Clarification & Corrections Re Util 870303 Tech Spec Change Request Concerning Trip Setpoint & MSIV Leakage Control Sys ML20210B0471987-02-0202 February 1987 Provides Info Re Preparedness of Facility to Exceed 5% Power.Progress Toward Initial Criticality Proceeding Slower than Expected.Activities Required to Be Completed Prior to Exceeding 5% Power Will Be Completed During Mar 1987 ML20212J1871987-01-16016 January 1987 Forwards Updated Plant Licensing Status for Facilities.Info Current as of 870116 ML20207Q1141987-01-15015 January 1987 Notification of 870123 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md to Discuss Emergency Procedure Guidelines & CLASIX-3 Computer Code Validation.Meeting Originally Scheduled for 870127 1999-07-08
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20196L0051999-07-0808 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Recently Signed Asset Purchase Agreement Between Illinois Power & Amergen Energy Co & Proposed Transfer of License to Be Submitted to NRC ML20206F2481999-04-22022 April 1999 Informs That Operational Readiness Insp Team Completed Insp at Clinton Power Station Including Two Weeks on Site & Two Separate Instances of Continuous 72 Hours Control Room Observation.Operational Performance Adequate ML20206F2361999-04-21021 April 1999 Documents Completion of Insp Activities Performed During Week of 990412,to Assess Licensee Implemented & Planned Corrective Actions Associated with NRC Manual Chapter 0350 Case Specific Checklist Restart Item II.1 ML20206F2331999-04-19019 April 1999 Discusses Results of Clinton Power Station Corrective Action Insp & Recommendations to Close Demand for Info Ltr.Insp Team Focused on Operations,Maintenance & Plant Support Organizations ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20198S0601999-01-0606 January 1999 Notification of 990121 Meeting with Util to Discuss Potential Change to Clinton Degraded Voltage Relay Setpoints ML20154L1161998-10-14014 October 1998 Notification of 981027 Meeting with Util in Rockville,Md to Discuss Licensee Proposed Mod of keep-fill Sys for Feed Water Sys Check Valves to Eliminate Containment Leakage Concern ML20154J7921998-10-13013 October 1998 Forwards NRC Operator Licensing Retake Exam & Insp Rept 50-461/98-301(OL) Administered on 980901 ML20154J9271998-10-13013 October 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam Administered on 980901 ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D6711998-08-25025 August 1998 Notification of 980917 Meeting W/Util in Rockville,Md to Hold NRC Insp Manual Chapter 0350 Restart Panel Meeting W/Illinois Power to Discuss Progress of Clinton Power Station Toward Restart ML20217C9761998-03-24024 March 1998 Forwards NRC Operating Licensing Exam Rept 50-461/97-313OL (Including Completed & Graded Tests) for Tests Administered on 980126-0202 ML20217C9871998-03-24024 March 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980126-0202 ML20197B6811998-03-0606 March 1998 Notification of 980319 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Fix for Issue of Degraded Electrical Grid Voltage ML20198R5561998-01-16016 January 1998 Notification of 980127 Meeting W/Illinois Power Co in Rockville,Md to Discuss Potential Fix for Issue of Degraded Voltage ML20199L0221997-11-24024 November 1997 Notification of 971211 Meeting W/Illinois Power Co in Clinton,Il to Discuss Findings of NRC Special Evaluation Team ML20210T2701997-09-11011 September 1997 Notification of Significant Licensee Meeting W/Util on 970924 to Discuss Objectives,Scope & Schedule of Special Evaluation Team Evaluation of Integrated Safety Assessment Being Conducted by Illinois Power Co ML20210H7531997-08-0505 August 1997 Informs That Licensee Restart & Performance Review Panel Has Determined That Plant Has Satisfactorily Completed Items & Corrective Actions Identified as Restraints to Restarting of Cps,W/Exception as Listed ML20149E8691997-07-16016 July 1997 Notification of 970717 Meeting W/Util in Rockville,Md to Discuss Voltage Available from 345 Kv Offsite Electrical Supply & Possible Effect on Plant Equipment in Case of Accident ML20140C3151997-04-0202 April 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss License Amend Application ,re Degraded Voltage Setpoints & Proposed Administrative Actions ML20137F3391997-03-26026 March 1997 Notification of 970421 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Re Thermo-Lag Fire Barriers & Ampacity Derating ML20136F3351997-03-0505 March 1997 Forwards Southwestern Electric Cooperative 970228 Request for Hearing,Submitted in Response to Fr Addressing Commission Consideration of Issuance of Order Approving Transfer of OL from Soyland Power to Illinois Power Co ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134L6581996-11-19019 November 1996 Notification of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Soyland Power Cooperative Minority Ownership of Facility to Illinois Power Marketing Inc ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20056F3811993-08-12012 August 1993 Notifies of 930830 Meeting W/Util in Rockville,Md to Discuss Licensee GL 89-10 Valve Testing Program Schedule ML20127B6031993-01-0707 January 1993 Summarizes 921217 Telcon Re Implementation of Erosion/ Corrosion Monitoring Program Per Generic Ltr 89-08.Response Acceptable Contingent on Commitment to Formalize Procedural Controls ML20058B1721990-10-25025 October 1990 Notification of 901102 Meeting W/Util in Rockville,Md to Discuss Util Approach on Performing IPE W/Nrc & Contractors ML20059B3281990-07-19019 July 1990 Discusses Author Observation of INPO Evaluation Process at Clinton Nuclear Power Plant on 900514-25.Recommends That NRC Observe Addl INPO Evaluations.Description of INPO Process & List of Qualifications & Experience of INPO Members Encl ML20206L8841988-11-17017 November 1988 Forwards Fr Notice of Proposed Amend to License NPF-62 Re Merger of Soyland Power Cooperative,Inc & Western Illinois Power Cooperative,Inc & Request for Comments on Antitrust Issues ML20206C5861988-11-0909 November 1988 Notification of 881213 Meeting W/Util in Rockville,Md to Discuss Tech Spec Interpretation Re Inoperability of Sys Providing Support Function ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20206F2011988-11-0202 November 1988 Discusses Tech Spec Interpretation Re Inoperability of Sys Providing Support Function.Actions to Close Out Listed ML20154J0191988-09-16016 September 1988 Responds to Request for NRR Assistance on Allegation Re Containment Integrity & Inservice Testing Program.Safety Significance of Not Performing Inservice Testing of Certain Affected Valves During First Yr of Plant Operation Minimal ML20207D6321988-08-11011 August 1988 Responds to 871027 Request for Technical Assistance in Interpretation of Tech Spec 4.1.5.B.3.Any Standby Liquid Control Sys Valve Which Could Affect Amount of Flow Delivered to Reactor Should Be Considered in Flow Path ML20195D4011988-06-17017 June 1988 Forwards Evaluation of Items Identified by NRC Inspectors During 1980-87 That Required Significant Corrective Actions by Licensee.Addl 10-15 Instances Noted Where Inspectors Found Problems W/Util Methods to Close Out Items ML20195D8371988-06-0303 June 1988 Notification of 880623 Meeting W/Hydrogen Control Owners Group in Rockville,Md to Discuss Emergency Procedure Guidelines for Mark III Containments.Attendees Listed ML20154L3021988-05-19019 May 1988 Informs That Settlement Stipulation Along W/Egm 88-01 & Paragraph B of Regional Procedure 1460 Reviewed.No Further Action Required Based on Review ML20153F9601988-05-0404 May 1988 Informs That Ray Ready to Stand Before Oral Certification Board Scheduled to Be Held in Region III Ofcs on 880531. Board Will Consist of Listed Individuals & Author ML20151B7961988-04-0505 April 1988 Forwards Facility Master Activities Plan (Map) & Map List of Activities for Apr-June 1988 ML20149F7971988-02-11011 February 1988 Discusses Evaluation of motor-operated Valves,Including Overall Industry Effort to Respond to EDO Request to NUMARC Consisting of Recommendations in AEOD Rept C603.Findings, Conclusions &/Or Recommendations Will Be Provided ML20236J1081987-11-0303 November 1987 Notification of 871109-10 Meetings W/Util in Bethesda,Md to Discuss Tech Spec Amend Package ML20235R6291987-10-0101 October 1987 Notification of 871007-08 Meetings W/Mark III Containment Hydrogen Control Owners Group (Hcog) in Bethesda,Md to Discuss Hcog Submittals Including Impact of Station Blackout & ATWS Considerations on Hcog Programs.Attendee List Encl ML20237L3341987-08-26026 August 1987 Requests Review of Plant Specific & STS with Respect to Allowable Number of Safety Relief Valves Out of Svc at Bwrs. Related Matl Encl ML20206S3461987-04-17017 April 1987 Staff Requirements Memo Re Commission 870410 Discussion & Possible Vote in Washington,Dc on Readiness of Util to Receive Full Power Ol.Commission Approved Issuance of License.Slow & Cautious Approach to Full Power Urged ML20206E3131987-04-0808 April 1987 Forwards Draft Attachment 1 to Facility Full Power License. Item 1 Only Deferred Test Remaining from Preoperational Test Program,Item 2 Identical to Item 2a of Low Power License & Item 2 Rewritten for Clarity ML20205N0311987-03-26026 March 1987 Forwards Records of Coordination from Util That Provide Requested Clarification & Corrections Re Util 870303 Tech Spec Change Request Concerning Trip Setpoint & MSIV Leakage Control Sys ML20210B0471987-02-0202 February 1987 Provides Info Re Preparedness of Facility to Exceed 5% Power.Progress Toward Initial Criticality Proceeding Slower than Expected.Activities Required to Be Completed Prior to Exceeding 5% Power Will Be Completed During Mar 1987 ML20212J1871987-01-16016 January 1987 Forwards Updated Plant Licensing Status for Facilities.Info Current as of 870116 1999-07-08
[Table view] |
Text
.
JAN 0 31986 MEMORANDUM FOR: Those on Attached List FROM: Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing
SUBJECT:
CLINTON POWER STATI0fi: COMPLETION OF LICENSING ACTIVITIES INITIATED PRIOR TO NRR REOFCANIZATION In Mr. Denton's memorandum, dated November 20, 1985, he provided reorganizational guidelines for reactor licensing activities. To. assist you in scheduling work assignments for your staff in accordance with these guidelines, we are providing in the enclosure an identification of the prior commitments of those members of your staff associated with the review of licensing activities related to Clinton Power Station.
< The applicant has recently changed its proposed fuel load date fron January 3, 1986 to between late February and late March 1986. The completion dates. for the reviews of the itens identified in the enclosure support the applicant's earliest proposed fuel load date and includes time for issuance of the SSER.
The information in the enclosure in most instances reflects input received from the reviewers.
If you have any questions regarding the schedule contained in the enclosure please contact the Clinton Licensing Project Manager Byron Siegel (x28344).
Original si.= 111 llalter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated DISTRIBUTION
{DocRetlile Silest NRC PDR AWagner Local PDR PHearns PD#4 Reading AMasciantonio BSiegel LRuth EHylton Alee RKendall JLonbardo JLazevnick RPichumani ANotafrancesco kWangler AGarg JLee DYue RLi KParczenski RKirkwcod l CTan JRajam PDi4/D 8601090540 860103 PD#)/P PDR ADOCK 05000461 CSiege < WButler E- PDR 1/j7/8'6 1/ 2./86
[y'!f
Addressees - Memorandum dated JAN O 31986 G.' Lainas, Assistant Director for Technical Support, DBL B. D. Liaw, Chief Engineering Branch, DBL G. Hulman, Chief Plant Systems Branch, DBL M. Srinivasan, Chief Electrical, Instrumsntation & Control Systems Branch, DBL W. Hodges, Acting Chief Reactor Systems Branch, DBL D. Vassallo, Chief Facilities Operations Branch, DBL W. Regan, Chief Facility Operations Branch, DBL
- 0. Parr, Chief Electrical,' Instrumentation and Control Systems Branch, DPWR-B F. Rosa, Chief Electrical, Instrumentation and Control
- a Systems Branch, DPWR-A W. Gannill, Chief Plant Systems Branch, PWR-1 M. Williams, Chief Technical Assistance !!anagement Branch, PPAS W. Johnston, Chief Engineering Branch, PWR-B R. Bosnak, Chief Engineering Issues Branch, DSR0 l
l 1
- po l f og*ok UNITED STATES l 3 o NUCLEAR REGULATORY COMMISSION u ; wAsmNGTON, D. C. 20555
%, * " * * / i JAN 0 31986 i NEMORANDUM FOR: Those on Attached List FROM: Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing
SUBJECT:
CLINTON POWER STATION: COMPLETION OF LICENSING ACTIVITIES INITIATED PRIOR TO NRR REORGANIZATION l
In Mr. Denton's memorandum, dated November 20, 1985, he provided reorganizational guidelines for reactor licensing activities. To assist you in scheduling work assignments for your staff in accordance with these guidelines, we are providing in the enclosure an identification of the prior commitments of those members of your staff associated with the review of licensing activities related to Clinton Power Station.
The applicant has recently changed its proposed fuel load date from January 3, 1986 to between late February and late March 1986. The completion dates for the reviews of the items identified in the enclosure support the applicant's earliest proposed fuel load date and includes time for issuance of the SSER.
The information .in the enclosure in most instances reflects input received from the reviewers.
If you have any questions regarding the schedule contained in the enclosure please contact the Clinton Licensing Project Manager Byron Siegel (x28344).
Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated
CLINTON SER OR MAN HRS REQ'D NAME SSER SECTION SUBJECT 1 COMPLETE TO COMPLETE COMPLETION DATE A. Les SER 3.10 SQRT 90 16 1/31/86 SSER 1-22 Equipment Seismic Assessment Program 60 30 1/15/86
~
J. Lombardo SER 3.10 PVORT 85 60 1/31/86 R. Pichumani SER 3.6.2 Jet Impingement & Pipe Rupture Analysis 80 60 1/15/86 SER 3.9.2 Review Results of Testing Program (Vibr.,
Thermal, Dynamic) 0 **
4 M. W:ngler 00CM 85 10 1/15/86 J. Lee Review Revised FSAR Section 11.4 10 80 2/15/86 SER 11.4.1 PCP and Compliance Program (10 CFR 61) 10 80 2/15/86 SER 12.3.1 Provide Initial Leak Rate Test Results 0 **
R. Li SER 3.9.6, 5.2.4 IST 0 2/15/86 R. Kirkwood Instrument Tubing - Code Relief Request 85 12 1/15/86 J. Rajim SSER 1-22 Equ!pment Seismic Assessment Program 0 40 1/15/85 l
C. P. Tan SSER 6.2.1.8 Sur eey Grand Gulf Inplant Tests of SRV's 90 1/15/85
- 30 Days from Receipt of Information from Applicant
2 4
4
s 4
9
^
/
LICENS DG ACTIVITIES INITIATED PRIOR TO NRR RECRGANIZATION CLINTON SER OR . MAN HRS REQ'D NAME SSER SECTION SMJECT % COMPLEll 10 COMPLETE COMPLET10N DATE R. Kendall Compitance with 10 CFR 50.62 (ATWS) 5 ? 2/15/86 SSER 2-7.2.3.3 Self Test System 90 8 1/15/86 SER 7.4.3.1 Remote Shutdown; Compliance GDC 19 70 15 1/15/86 SER 7.7.3.1 Control' 5}Memt failures From HELB 5 60 2/15/86 SER 15.2.1 fi 7.2.3.1 ATWS Rectrculation Pump Trip 95 2 1/15/86 SSER 2-7.3.3.7 Design Cha..ges to 00P Valves for LOCA 85 ' u ' ' 2 1/15/86 SER 7.3.2.3 Vacuum Breaker Position Indication Concerns 90 2 1/15/86
) J. Laz:vnick CAT Inspection - Cable Separation 85 32 1/31/86 Issues Resulting From Site Review 20 30 Change in Scope in Voltage Verification Test 85 30 1/31/86 A. N:tafrancesco SER 6.2.7 H Control - Preliminary Analysis Review 40 100 1/31/86 2
. A. G rg (Total) 1/15/86 D. Yue 1/15/86 K. Parczenski 1/15/86 C. Tan 1/15/86 S. West SER 3-9.5.14 Auto. Fire Detection in Safety Releated Areas ,95 20 1/15/86 SER 9.5.1 Safe Shutdown Anal / Fire Protection Eval. Rpt 75 120 1/31/86 Use of Other Than Rigid Steel Conducts 50 5 1/15/86 N. Wagner SER 3.6.1 HELB/MELB Flooding 60 10 1/15/86 SER 3.6.1 NELB Containment Spray , 60 10 ' 1/15/86
, CAT Inspection - Floor Grating 25 30 1/31/86 P. Hearns Analysis of Piping Failures Outside Containment 10 1/31/86 SER 3.11 Equipment Qualification of Elect.& Mechanical Equip. 95 40 A. Masciantonio i
L. Ruth SER 6.2.1.8 Suppression Pool Hydrodynamic Loads 90 16 1/31/86 SER 6.2.1.9 Humphrey Containment Issues 90 16 1/31/86 t