APR e 1987 MEMORANDUM FOR: Robert M. Bernaro, Director, Division of BWR Licensing Office of Nuclear Reactor FROM:
Charles E. Norelius, Director, Division'of Reactor Projects
SUBJECT:
ATTACHMENT 1 TO CLINTON FULL POWER Attached is a draft of Attachment 1 to the Clinton full power license.
Item 1 is the only deferred test remaining from the preoperational test program.
Item 2 is the same as item 2a of the low power license and has been rewritten to improve clarity.
ORIGINAL SIGNED BY C. E. NORM.m" Charles E. Norelius, Director Division of Reactor Projects
Attachment:
Attachment 1 to Clinton License cc w/ attachment:
A. B. Davis E. G. Greenman SRI Clinton Y='7 (jd RIII
/
RIII RIII fl/RIII RIII RII v\\
- A et,s f p
q p
Knop /jp k
Tnell Chrissotimos
-lus W6(L 7
,$pi 7
O 4hT[1 G704130577 8704cg
+
DR ADOCK 05000461 PDR
9 o to NPF-Prior to achieving the milestone indicated, the following items shall be completed to the satisfaction of Region III.
1.
Preoperational test PTP-FH, Fuel Handling System, shall be completed prior to off loading irradiated fuel.
2.
IP shall resolve audibility problems encountered on evacuation of l
personnel in high noise areas in accordance with IP letter dated July 8, 1986. A survey of high noise areas shall be completed within 30 days after achieving maximum anticipated noise level. All corrective actions required by the survey shall be completed prior to the completion of first refueling outage.
In the interim for those areas which are identified as having deficient siren audibility, temporary administrative measures will be taken to ensure that these areas are evacuated as required.
{