ML20138P218

From kanterella
Jump to navigation Jump to search
Rev 1 to Procedure CP-QP-11.18, NDE Activities
ML20138P218
Person / Time
Site: Comanche Peak, 05000000
Issue date: 08/12/1983
From: Tolson R, Warner M
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20138M609 List: ... further results
References
FOIA-85-59 CP-QP-11.18, NUDOCS 8511070006
Download: ML20138P218 (2)


Text

. _ - - _

PROCEDURE l

ISSUE RNSICN PAGE TEXAS UTluT1ES GENERATING CO NUMBER l

DATE CPSES CP-QP-11.18 1

l 1 of 2 All91

  • 1083i i

^

NONDESTRUCTIVE h

~

EXAMINATION ACTIVITIES APPROVED SY

/

CATE

1.0 REFERENCES

1-A AWS D1.1-75, " Structural Welding Code" 1-B ANSI 831.1, American National Standard Code for Pressure Piping 1973 Edition, Winter 1974 Addenda 1-C CP-QP-2.4, " Nondestructive Examination Personnel Training, Qualification and Certification" 1-0 CP-QP-13.0, " Control of Measuring and Tes t Equipment" 1-E CP-QP-16.0, "Nonconformances and Deficiencies" 1-F CP-QP-17.0, " Corrective Action" CONTROL.D C0?Y zo cEse"*

CO,". TROL N0. 'M ' A 2.1 PURPOSE AND SCOPE The purpose of this procedure is to outline the Nondes tructive Examination (NDE) Program to satisfy the requirements of Reference 1-A and 1-B.

This procedure applies to all Non-ASME items and components.

2.2 RESPONSIBILITY AND AUTHORITY The Quality Engineering Supervisor, or his designee, is responsible for the development of specific ins pection instructions for inspector use.

i The Quality Control Supervisor is responsible for the

,mplementation and administration of inspection activities.

3.0 PROCEDURE I

3.1 PERSONNEL TRAINING l

Penonnel training shall be provided in accordance with Reference 1-C to assure tha t NDE personnel achieve and maintain inspection proficiency.

p.,,,,,,,, a TU9CQ CA 8511070006 851016 PDR FOIA i

GARDE 85-59 PDR

_ - ~ _..

i

{

I l

1 PROCEDURE REVISION ISSUE i

l NUMSER DATE pggg i

TEXAS UTluTIES GENERATING CO.

j CP-QP-11.18 1

AUS I ' 1993 2 of 2 I

~

3.2 INSPECTION DETAlt.S

]

i Quali ty Instructions supplementing this Procedure identify the NDE activities and delineate inspection criteria to assure that cons truction activities comply wi th design i

specifications and applicable codes and standards.

j 3.3 MEASURING AND TEST EQUIPMENT 1

i Measuring and tes t equipment is calibrated, adjus te.d and j

maintained at prescribed intervals to provide confidence in the accuracy of the resulting data. Calibration responsi-i bilities and requirements are defined in Reference 1-0.

i j

3.4 STATUS INDICATORS l

The status of inspected items is identified on appropriate

]

documentation as defined by the applicable Quality Instruction.

j 3.5 NONCONFORMING ITEMS 1

Nonconfomances shall be reported as outlined in each i

j Quality Instruction.

't i

3.6 DOCUMENTATION METH005

}

Quali ty Ins tructions specify the documentation required to l

provide objective evidence of compliance with specified

)

Engineering / Cons truction criteria.

Upon completion, these j

records shall be submitted for review, processing and filing in accordance with CPSES requirements for QA records.

1 3.7 CORRECTIVE ACTION i

]

The Quality Engineering Supervisor, or his designee, shall i

j review deficiencies and nonconfonnances and recommend required I

corrective action in accordance with Reference 1-F.

l l

i 1

i l

I TUGCC OA

,, 3 w-y<

+-m..-,---4,,%.T-1vwer-.-*-

'*-e-'r-r' c'*--Me*rm-.-

---amwm..

e,en-_.

,-,.,--,r+%v.-,

-,---,.enr

+-,-e.-ce,-ew-.w---

-