Rev 0 to Procedure CP-QP-19.3, Surveillance of Piping Erection
ML20138P174
Person / Time
Site: Comanche Peak, 05000000
Issue date: 05/15/1981
From: Tolson R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20138M609 List: ... further results
References
FOIA-85-59 CP-QP-19.3, NUDOCS 8511060483
Download: ML20138P174 (3)


Text

- . .

'0EFECTE: 0.' 37:!S'.'T: ".. E::,",E'.;5cy isgugg g + c p .;;: _ ; ; , 3 , p g, ' A C E W I TH 7.

_ .7 5 CC F ,

PROCEDURE REVISION ISSU,E, NUMBER DATc PAGE TEXAS UTILITIES GENERATING CO CPSES 4

'0 D CP-QP-19 '

.(n .

_0_ , vw tur t of a L/

N J pg Sl!RVEILLANCE i

PREPARED B _ /

v ~

OF PIPING ERECTION I 5CATE' 5/8/ !

APPROVED BY:

I l

1.0 REFERENCES

\

1-A MS-100, " Piping Erection Specification" i 1-B CP-QP-16.0, "Ncnconfomances and Deficiencies" 1-C CP-QP-17.0, " Corrective Acti on" 2.0 GENERAL 2.1 PURPOSE AND SCOPE The purpose of this procedure is to describe the methods I utilized by Construction Quality Assurance in perfomance of (

surteillance to assure that safety related and Seismic Category i 1 Piping is being' installed within design tolerances as reflected l in Reference 1-A and applicable design drawings.

3.0 PROCEDURE 3.1 SELECTION OF SAMPLE SIZE The TUGC0 Quality Assurance Specialist Super <isor shall select l a sample of pipe spools fran the list of installed spools I prepared by the B&R Piping Superintendent. '

NOTE: The size of sample and the frequency of the surveillance shall be as directed by the TUGC0 Site Quality Assurance Supe rvisor.

3.2 FIELD VERIFICATION Field Engineering shall detemine actual location of the piping in the sample selected by the Quality Assurance Specialist Supervisor.

The Quality Assurance Specialist shall monitor the activities of the Field Engineering Group and review their reconis to determine if an out-of-tolerance condition exists.

8511060403 851016 PDR FOIA CARDE85-59 PDR g

pm % 2 TUGCC CA

[

i

. REVISION I8 NU BER O '

PAGE I

TEXAS UTILITIES GENERATING CO.

j CPSES i j  ;

! CP-0P-19.3 0 :MAY 1:  ?? l -

2 of 3 3.3 00CUMENTATION Actual location shall be recorded on the marked up flow ,

di agram. In the event that an established bench ma rk is not used, the nanter of the Field Engineering Log Book shall be entered on the Piping Erection Surveillance Fom, Attachment 1. The Quality Assurance Specialist shall cmplete Attachnent 1 indicating results of the rands surveillance.

The marked up flow diagram shall be attached to the Piping Erection Surveillance Form and forwarded to the Pemanent Plant Records Vault for mtention.

3.4 NONCONFORMANCES Out-of-tolenince conditions shall be mported in accordance with Reference 1-8.

~

3.5 CORRECTIVE ACTION

~

The QA Specialist Supervisor shall review the surveillance

  • results and reconmend required corrective action per the provisions of Refe rence 1-C.

l.

9 4

5 r

b o

Poem me TUGC0 CA _

f~

~ ..

i i I

U I NU BER l REVISION , PAGE  !

I l 3 TEXAS UTILITIES GENERATING CO. I

. CPSES .

- CP-OP-10.3 1 0 MAY 15 1981 3 of 3 ATTACHMENT 1 PIPING ERECTION SURVEILLANCE FORM DESCRIPTION OF PIPING INSPECTED (LINE NO., PIECE N0(S).)

DATE OF SURVEILLANCE DRAWIMG MO. AND REVISION CF ATTACHED FLOW DIAGRAM (S)

DESCRIPTICN OF QUT OF TCLEPANCE CONDITIONS QA wu,IALIST DATE Form No. 3 TUGCO OA t

. ..