Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
___
.' .' i I
, P9CCECURE ,
AEVISICN AAGE i F./.AS UT1UTIES GENERATING CC ; W.MB ER h.83Nc A
. CPSE3 1
i JAN 1 o sg, 1 of 6 l lCP-QP-13.8 ,
_n ,_~ n l PREPARED 3' - 4 " +ts /;AR'Nh j - ;ws- ;
RECORDS VERIFICATION ;
i i
l I APPROVED BY. .
) /
.7AR l
t I I i
1.0 REFERENCES
! 1-A CP-QP-2.2 " Training of Record Veri fication Personnel" l 1-B STA-302, " Station Records" 2.0 l 2.1 GENERAL PURPOSE (nM.TO'}.e(nCOM
- 5. t .'
pCL y s
t The pu nose of this procedure is to outline the steos '
l
~ necessary to verify that QC Records are satisfactory for l' all installed itens'. j f ^ 2.2 SCOPE i This procedure includes all Non-A94E Code items requiring ,
- inspection in accordance with existing QA/0C procedures and
- j instructions. Tra.ining of recorcs verification personnel ,
j shall be in accordance with Reference 1-A.
5
- 2.3 RESPONSIBILITY AND AUTHCRITY ,
i 2.3.1 TUGC0 Site QA
! The TUGC0 Site QA Supervisor shall have overall responsibility l for administration of this procedure.
l 2.3.2 Building OC l l
Building QC Supervi sors shall have responsibility for
- inspection activities identified as required from records !
i- verification.
i l
?
I i ,
em mo6a c4 8511060475 851016 PDR FO!A PDR CARDE85-59
PROCEDURE REVISION PAGE TEXAS UTILITIES GENERATING CO.
CPSES CP-QP-18.8 1 JAN 10 lc3 2 of 6 2.3.3 OA Records Management The Quality Assurance Supervisor shall have responsibility for implementation of document research and review ;
activities for records generated prior to establi shment of the Paper Flow Group (PFG) in the Building Matrix Organization.
2.3.4 Building Matrix Organization The Paper Flow Group within the building matrix omanization !
shall have the responsibility to verify the completeness of records prior to submittal to the Permanent Plant Records Vault (PPRV).
3.0 PROCEDURE 3.1 EXISTING RECORDS l
The Records Management personnel in the PPRV will audit the existing vault records to ensure that all records that have been generated are accounted for or in the vault. The records will be audited against: Inspection Report Logs l for each series (Attachment 1), Traveler Logs for each i series (Attachment 2), Permanent Equipment Transfer (PET)
Logs, Pull Megger Origin Destination Cards (PM00) Logs. '
and Nonconformance Report (NCR) Logs. Copies of all logs will be forwarded to the PPRV by the cognizant omanization.
3.2 RECORDS BASELINE To identify itms requiring records verification, a records baseline will be established by the Records Management Group consisting of data from the following sources:
- a. Cable / raceway Schedule
- b. Cable Card File (PPRV)
- c. Cable Tray Hanger List
- d. Gibbs & Hill Equipment List
- e. Westinghouse Equipment Lists
- f. Engineering Instrumentation Lists
- g. Subsystem Turnover Lists
- h. Electrical Card File (Electrical QC)
- 1. Separation Deficiency Reports
- j. And other lists as appropriate l
,_, r== =
t .
i l PROCEDURE REVISION I U PACE NUMBEM TEXAS UT!UT! GENERATING CO. ;
3 of 6 I l
1 The baseline will be frozen at the point where the PFG is establi shed. Items already verified by room inventory will be removed fran the baseline and will not be reverified.
3.3 DOCUMENT DEFICIENCY LIST (DDL)
A Occument Deficiency List will be generated by the Records Management Group. The exi sting records identi fied in !
- Section 3.1 will be compared to the requi red records identified in the baseline in Section 3.2 and all deficiencies identified on the COL. The DDL is to be transmitted to the appropriate Building Management for closure.
3.4 RECORD CLOSECUT AND TURNOVER Building Management will assu re that activi ties are accomplished and documentation generated to close out the CDL.
For activities accomplished after the PFG is established, the PFG will assure that traveler packages are verified and closed out prior to transmittal to the PPRV.
Turnover of verifi ed ar.d closed documentation. to TUGC0 Operctions Group shall be in accordance with Reference 1-8.
i i
i i
i
. I i .
I l
.. l i
,,,,,,3 TUGCO OA j _.
i i PRCCECURE REVISION ISSUE PAGE I
NUMBER DATE
~ TEXAS UT1UTIES GENERATING CO.
CP-QP-18.8 7 JAN 10 52f 4 of 6 !
ATTACHMENT I- A INSPECTION REPORT SERIES -
RECORDS VERIFICATION HISTORY (7-11-78 to 11-11-83)
IR Series Effective CP-QP-18.0 Series Descriotion Dates Revs File A Product Assurance 01-23-79 to 09-16-79 1 ASP As Built Piping 02-02-82 to 08-12-82 7 P BP Sase Plate 11-16-82 to present 10- S C Civil 07-11-78 to present 0- P DCV Design Change Verif. 08-13-82 to present 8-DG Diesel Generator 08-13-82 to present 8- S E Electrical 07-11-78 to present 0- P, S EC Electrical Cable 06-15-80 to present 4- S 01 Ecuipment Mounting 05-19-83 to present 11- S ET Electrical Teminations 05-15-80 to present 4- S FF Fire Protection 10-16-82 to present 9- S IRI Instrumentation 07-11-78 to present 0- S IRH Instrumentation Hiltis 05-15-80 to present 4- S M Mechanical 01-23-79 to present 1- 5 ME Mecnanical Electrical 05-15-80 to present 4- , P MEF* Meenanical Electrical Final MH Mechanical Hilti 05-15-80 to present 4-MH5 Mechanical Hilti - Class 5 02-02-82 to present 7- 'P M5V Mecnanical Hilti - Class 5 Vendor Certified MI Mecnanical Eculp. 05-15-80 to present 4- S MP Mecnanical Piping 06-17-81 to present 5- P MPI Mecn. Piping Insulation 10-16-82 to present 9- P MS Misc. Steel 06-17-81 to present 5- S P Paint 10-16-82 to present 9-P Protective Coating 07-11-78 to 10-22-81 0-5 PC Protective Coating 10-23-81 to present 6- S PCR Protective Coating Reinspec. 02-02-82 to present 7- S t PS Plant Surveillance 10-23-81 to present 6- S PSI Preservice Inspection 10-16-82 to present 9- S RI Richmond Inserts 11-16-82 to present 10- S SL Steel Liners 05-15-80 to presen* 8-T Turnover 01-23-79 to 05-14-80 1-3 TW Tack Weld 10-23-81 to present 6- S j
Notes:
4 inactive IR series 27 active IR series l
2 subseries 1
! Key to File Sequences S - Sequential P - Package de
- - Also required by QI-QP-11.10-1 Paragraph 3.8.2a
- ,,,, m - ruoco eA - _.~
i PRCCEDURE ISSUE '
REVISION PAGE NUMBER OATE l TEXAS UT1UTIES GENERATING CO.
CPSES CP-QP-18.8 7 JANyg g 5 of 6 l
t ATTAQiMENT 1-B INSPECTION REPORT SERIES PROCEDURE REVISION HISTORY j l
CP-QP-18.0 Rev. History I Changes Rev Start End to Sec. 3 0 07-11-78* 01-22-79 X 1 01/23/79 09/16/79 2 09/17/79* 03/12/80 X 3 03-13-80 05-14-80 4 05-15-80 06-16-81 5 06-17-81* 10-22-81 X l
6 10-23-81* 02-01-82 X ;
7 02-02-82 08-12-82 X ;
8 08-13-82 10-15-82 l 9 10-16-82 11-15-82 :
10 11-16-82 05-18-83 !
11 05-19-83* 07-18-83 X 12 07-19-83 present
- Dates indicate milestone for cnanges in records verification procedure, i
i i
p.,,,, g 3 TUGCC QA
-- y - - - . .
I I I I
! ! PACCEDURE ! REVIS!CN { ISSUE PAGE NUMBER l
' j DATE
, TEXAS UTILITIES GENERATING CC. l CPSES gp,qp,gg,3 g 6 of 6 .
t l JAN I 0 icad (
i i
ATTACHMENT 2 TRAVELER SERIES Series Series Code Descriotion AM Area Management (Themolag)
CD Cviil CE Civil Engineering CP Civil Piping -
CS Civil Structural EE Electrical Engineering [
EF Electrical Field ID Insulation Installation IE Instrumentation Engineering E Mechanical / Electrical MEV Mecnanical/ Electrical - Valves MP Mechanical - Piping IN Mechanical - Welding QCV Quality Control - Valves t RI Rigging f l I Startup Notes: All travelers are filed with a package. ;
i l
I i
l l l
l i
I
%3 TuocooA
_.