Text
%
PROCEDURE f
REVISION ISSUE TEXAS UTILITIES GENERATING CO l NUMBER j
OATE PAGE CPSES CP-QP-18. 07 0
2/27/81 1 of 2 PREPARED BY:
8 N-5 and N-3 CODE DATA.
OATE
~
u REPORTS APPROVED 'dY:
7[27/g/
w
~
DATE' s
1.0 REFERENCES
t-ASME Section III Olvision 1 (bvro00 ED COPY 1.1 n i r.
cctfiR01.110. M,gQ 2.0 GENERAL 2.1 PURPOSE the femat for the preparation'of' the N-5 a 3.0
_ PROCEDURE
~
s 3.1
_N-5 OATA REPORT 84R Site QA ? tanager on an ongoing bas subsystem are complete.
This will be accomplished by in pertinent information into'a Sstens 6 computer program, putting fnclude all of the following:
which will A.
Conponents 8.
Appurtenances C.
Piping Subassemblies D.
Fleid Welds E.
Component Supports Data Report, along with a description of the mentation for each (Code Data Report, itanufacturer's Transmitta the file location of the hard copy of each of t The program shall status each of these support documents wh have been satisfactorily reviewed by 84R and their ANI.
l g10g3851016 GARDESS-59
,, PDR
%y,
- TuoC0 CA --
TEXAS UTILITIES GENERATING CO.
2/ 27 / 81 2 of 2 Upon. completion of satisfactory review of documentation for all items contained in the system, a copy of the computer printout shall be attached to,a N-5 Data Report similar in format to the sample fom in Appendix V of ASME Section III, Subsection NA.
j g
Brown & Root and their Afil will certify the N-S I
factory hydrostatic / pneumatic test and all other required items I
such as Code Stress Analysis have been completed.
with requirements of ASME Section III Division 1. c This shall 3.2 N-3 OATA REPORT have an N-5 Data Report certified by both B&
l attached, complete with the computer printo The the N-5 Data Report.
i each nanufacturer or installer was the hold
[
Certificate of Authorization, and that all components and instal-l ation complies with the requirements of ASME Section !!!, Div Authorized Nuclear Inspector for his review a f
i i