REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 92 ST. LUCIE, UNITS 1 AND 2 (TAC N05. M85608 AND M85609)
)
We have reviewed Florida Power and Light's responses to our request for additional information (RAI) of October 5,1995, regarding Generic Letter 92-08, "Thorno-Lag 330-1 Fire Barriers." The licensee was required, pursuant to j
Section 182A of the Atomic Energy Act of 1954, as amended, and 10 CFR i
50.54(f), to submit written reports, under oath of affirmation, that provided the infomation specified in the RAI. On the basis of our review, we have i
i determined that the licensee's responses to the RAI are incomplete. The i
specific areas where we found the licensee's responses to be incomplete are j
discussed in the attachment. Please forward this RAI to the licensee for a revised response. We recommend that the licensee be given 45 days to submit its revised response.
j Docket Nos.: 50-33' J' e i
50-389 ter i
EEL 8 R/F l
i SPLB TSI Flie i
Attachment:
As stated Glainas i
JStrosnider j
LWiens CONTACT: Ronaldo V. Jenkins, NRR/0E LTranh 415-2985 SWest l
APal DISK /.00Cl3EN MAM:
G:
=c \\ SHARED \\.STLUCIE.RAI ra r.e i.
- r. ines e :
i
. c., w. ee ns.ner w c., w.ee n ner w. m n..
no aner e co m i
0FC EEL 8:DE A
SC: EEL 8:DE C: EEL 8:DE MAK RVJenkins:Je ASG111 b JAcalvo m
DATE A /S.9/9N
/0/I/96
/0 / J / /96 i
j wmin acomcwv oQ e
(
i j
[
kl 1
MM 3-lL( (} $4 -' N 4
i
@od o3/17
\\
g UN0rE3 STATES i
s
]
NUCLEAR REGULATORY COMMISSION WASNisseTON. o.C. SegeHeM
% e....
October 31, 1996 EERAELM To:
F. Mark Reinhart, Acting Director Project Directorate Il-1 Division of Reactor Projects I/II i
FROM:
Jose A. Calvo, Chief f
(
Electrical Engineering Branch j
Division of Engineering
/
i
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING I
l GENERIC LETTER 92 ST. LUCIE, UNITS 1 A W 2 (TAC N05. M85608 AND MB5609) l
?
i We have reviewed Florida Power and Light's responses to our request for additional information (RAI) of October 5,1995, regarding Generic Letter 92-08, "Themo-Lag 330-1 Fire Barriers." The licensee was regJired, pursuant to Section 182A of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54(f), to submit written reports, under oath of affirmation, that provided i
the infomation specified in the RAI. On the basis of our review, we have i
detemined that the licensee's responses to the RAI are incomplete. The i
specific areas where we found the licensee's responses to be incomplete are discussed in the attachment. Please fomard this RAI to the licensee for a revised response. We recommend that the licensee be given 45 d es to submit 4
J tts revised response.
Docket Nos.: 50-335 50-389 4
Attachment:
As stated F
i CONTACT: Ronaldo V. Jenkins, NRR/DE 415-2985 i
}
i i
{
1
b.
ane i
p UNITED STATES d
NUCLEAR REQULATORY COMMISSION wasameron, o.c. sesso.een FOLLOWP REQUEST FOR ADDITICIIAL IllFORMTICII REGARDIIIS GDIERIC LETTER 92-08,
'THERND-LAS 330-1 FIRE BARRIER 5' ST. LUCIE 1811TS 1 Alm 2 DOCKET 1103. 50-335 Ale 50-389 j
1.0 RACKGROUND By letters dated February 12, 1996 and August 27 1996, Florida Power and Light Company (the licensee) submitted responses,to the staff Request for 4
Additional Information (RAI) dated October 5 1995, related to Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers," for St. Lucie Plant, Units 1 and 2.
The licensee compared the Thermo-Lag configurations installed at the St. Lucie plant with Texas Utilities Electric Company TUEC) tested configurations and has determined that the TUEC test results bou(nd those configurations with l
analytical adjustments. The licensee also determined that the subject Thermo-Lag configurations are acceptable for the purposes of satisfying the electrical separation criteria of Regulatory Guide 1.75.
The staff has completed its review of the licensee's submittal and require that the following questions be addressed by the licensee.
j 2.0 QUESTIONS 2.1 The staff, through its examinatt'ons of other licensee submittals in this area, have found several errors or points of concern pertaining to heat transfer assum calculations. ptions and modeling with respect to ampacity dorating Therefore, the staff requests that the following licensee ampacity derating calculations be provided for our review:
FPL Calculation PSL-0FJE-96-001, " Cable Derating in Conduits with a.
Fire Barrier Coatings" b.
FPL Calculation PTM-BFJM-96-005, " Barrier Ampacity Correction Factors - Extrapolation of Test Results for 3-Hour Barrier" FPL Evaluation JPN-PSL-SEES-96-059, "St. Lucie Unit 2 Regulatory c.
n.
Guide 1.75 Thermo-Lag Application Evaluation" O
L 2.2 The licensee should confirm that all fire barrier construction for the applicable configurations are representative of the barrier construction p
uswd in the Comanche Peak Steam Electric Station (CPSES), Unit 2 O
i i
ATTAugIDIT 1
4
4 o
g i'
ampacity derating tests (i.e., TUEC tests).
If there are deviations or 4,
differences between St. Lucie installed Therno-Lag configurations and CPSES-tested configurations, the licensee should provide an assessment of the impact on the CPSES test results that are wing credited by the licensee.