Requests Additional Info Re GL-92-08, Thermo-Lag 330-1 Fire Barriers. Response Requested within 45 Days
ML17229A121
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/06/1996
From: Wiens L
NRC (Affiliation Not Assigned)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
References
GL-92-08, GL-92-8, TAC-M85608, TAC-M85609, NUDOCS 9611070127
Download: ML17229A121 (5)


Text

~J'ovember 6,

199 Hr. Thomas F. Plunkett President, Nuclear Division Florida Power and Light Company Post Office Box 14000 Juno

Beach, Florida 33408-0420

SUBJECT:

REQUEST FOR ADDITIONAL,INFORHATION REGARDING GENERIC LETTER 92-08 ST.

LUCIE, UNITS 1

AND 2 (TAC NOS.

H85608 AND H85609)

Dear Hr. Plunkett:

We have reviewed Florida Power and Light's responses to our request for additional information (RAI) of October 5, 1995, regarding Generic Letter 92-08, nThermo-Lag 330-1 Fire Barriers."

On the basis of our review, we have determined that a review of specific calculations referenced in the RAI response is necessary to complete our review.

In addition, an assessment'f differences, if any, between fire barrier construction at the St. Lucie Plant and the Commanche Peak Steam Station is requested.

Details of the specific requests are discussed in the enclosed supplemental request for additional information.

We request that a response be submitted within 45 days of receipt of this letter.

Sincerely, Original signed by Leonard A. Wiens, Senior Project Hanager Project Directorate II-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation Docket Nos.

50-335 and 50-389

Enclosure:

Request for Additional Information cc:

See next page DISTRIBUTION R. Jenkins, EELB L. Tran Docket File J.

Johnson PUBLIC ACRS'T.

Lucie Rdg.

OGC S.

Varga J. Zwolinski 07002'OCUHENT NAHE:

G:iSTLUCIE.RAI I

To receive a copy of this document, indicate in the bosn C" I Copy without attachment/enclosure "E I Copy with attachment/enclosure N

~ No copy OFFICE PDII-3/PM PDII-3/LA PD I I-3/D NAME Llliens BCLa ton FHebdon DATE 11/

/96 11/

/96 11/4 /96 OFFICIAL RECORD COPY i

96ii070i27 96ii06 PDR ADOCK 05000335 fDR

. (g@gjsh

r g 4l II r,-

pjPp,. Pg

FOLLOWUP RE(UEST FOR ADDITIONAL INFORNATION REGARDING GENERIC LETTER 92-08, "THERMO-LAG 330-1 FIRE BARRIERS" ST.

LUCIE UNITS 1

AND 2 DOCKET NOS. 50-335 AND 50-389

1.0 BACKGROUND

By letters dated February 12, 1996 and August 27, 1996, Florida Power and Light Company (FPL, or the licensee) submitted responses to the staff Request for Additional Information dated October 5 1995, related to Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers," for St. Lucie Plant, Units 1 and 2.

The licensee compared the Thermo-Lag configurations installed at the St. Lucie plant with Texas Utilities Electric Company (TUEC) tested configurations and has determined that the TUEC test results bound those configurations with some analytical adjustments.

The licensee also determined that the subject Thermo-Lag configurations are acceptable for the purposes of satisfying the electrical separation criteria of Regulatory Guide 1.75.

The staff has completed its review of the licensee's submittal and require that the following questions be addressed by the licensee.

2.0 QUESTIONS

2. 1 The staff, through its examinations of other licensee submittals in this
area, have found several errors or points of concern pertaining to heat transfer assumptions and modeling with respect to ampacity derating calculations.

Therefore, the staff requests that the following licensee ampacity derating calculations be provided for our review:

a.

FPL Calculation PSL-OFJE-96-001, "Cable Derating in Conduits with Fire Barrier Coatings" b.

FPL Calculation PTN-BFJM-96-005, "Barrier Ampacity Correction Factors - Extrapolation of Test Results for 3-Hour Barrier" c.

FPL Evaluation JPN-PSL-SEES-96-059, "St. Lucie Unit 2 Regulatory Guide 1.75 Thermo-Lag Application Evaluation" 2.2 The licensee should confirm that all fire barrier construction for the applicable configurations are representative of the barrier construction used in the Comanche Peak Steam Electric Station (CPSES),

Unit 2, ampacity derating tests (i.e.,

TUEC tests).

If there are deviations or differences between St.

Lucie installed Thermo-Lag configurations and CPSES-tested configurations, the licensee should provide an assessment of the impact on the CPSES test results that are being credited by the licensee.

ATTACHMENT

Hr.

T.

F.

Pl un kett Florida Power and Light Company St.

Lucie Plant CC:

Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 Senior Resident Inspector St.

Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.

Hwy AIA Jensen

Beach, Florida 34957 Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 J.

R.

Newman

Morgan, Lewis

& Bockius 1800 H Street, N.W.

Washington, DC 20036 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. Thomas R.L. Kindred County Administrator St.

Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Hr. Charles

Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 H. N. Paduano, Manager Licensing

& Special Programs Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420 J.

A. Stall, Site Vice President St. Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, Florida 34954-0128 J. Scarola Plant General Hanager St.

Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, Florida 34954-0128 Hr. Kerry Landis U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323-0199 E. J.

Weinkam Licensing Manager St.

Lucie Nuclear Plant P.O.

Box 128 Fort Pierce, Florida 34954-0128