k ENCLOSURE 1 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION BELATED TO THE INSERVICE TESTING PROGRAM RE0 VEST FOR RELIEF FLORIDA POWER & LIGHT CO.
ST. LUCIE PLANT. UNIT 1 DOCKET NUMBER 50-335 1.0 INTR 000CTION The Code of Federal Regulations,10 CFR 50.55a, requires that inservice testing (IST) of certain ASME Code Class 1, 2, and 3 pumps and valves be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code (the Code) and applicable addenda, excest where alternatives have been authorized or relief has been requested by tie licensee and granted by the Commission pursuant to Sections (a)(3)(1), (a)(3)(ii), or (f)(6)(1) of 10 CFR 50.55a.
In proposing alternatives or requesting relief, the licensee must demonstrate that:
(1) the proposed alternatives provide an acceptable level of quality and safety; (2) compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety; or (3) conformance is impractical for its facility. NRC guidance contained in Generic Letter (GL) 89-04, " Guidance on Developing Acceptable Inservice Testing Programs," provides alternatives to the Code requirements determined acceptable to the staff without further NRC review.
Implementation of the GL 89-04 positions is subject to inspection.
Section 10 CFR 50.55a authorizes the Commission to approve alternatives and to grant relief from ASME Code requirements upon making the necessary findings.
The NRC staff's findings with respect to authorizing alternatives and granting or not granting the relief requested as part of the licensee's IST program are contained in this Safety Evaluation (SE).
Florida Power & Light Company's letter dated January 7, 1994, submitted modified Relief Request PR-12. The staff was also informed that Relief Request PR-13 was deleted following further evaluation by the licensee. PR-12 had been previously granted in NRC's SE dated January 29, 1993, on an interim basis to allow the licensee to further review the basis for relief. The revised relief request containing additional information to support the licensee's proposed alternate method of testing is evaluated below.
l 2.0 EVALUATION OF RELIEF RE00EST PR-12 i
Relief from the requirements of IWP-4520(b) has been requested for the reactor coolant charging pumps lA,18, and 10.
IWP-4520(b) requires that the frequency response range of the readout system for measuring vibration amplitude shall be from one-half minimum speed to at least maximum pump shaft rotational speed.
i l
1 9703260164 970301 PDR FOIA BINDER 96-485 PDR
_ - - - - - - _ -. - -. -.. - - - _ -.. ~ _
l
- 4-2.1 Licensee's Basis for Relief
}
The licenses states:
1 The reactor coolant charging pumps operate at approximately 210 -
i 215 rps which equates to a rotational frequency of 3.50 Hz. The i
one-half minimum speed frequency response required for the i
vibration instrumentation correlates to 1.75 Hz (105 cpm [ cycles j
perminute]).
i The vibration instrumentation presently in use at St. Lucie is the i
Bently Nevada model TK-81 with 270 cpm probes. The TK-81 integrator frequency response is essentially flat down to 120 cpm (cyc'es per minute slightly increases)to approximately +1 d8 at 100 cpm.where the display The -3 d8 frequency response is reached at approximately 54 cym. The velocity probes used with the TK-81 are a special low frequency i"
probe nominally rated down to 270 cpm (-3 dB). This is only
{
slightly higher than the expected rotational (IX) speed of the charging pump (205 - 210 cps). The IX (205 cpe) vibration j
frequency components will be somewhat attenuated by the probes, but not cut off. Overall vibration levels would still show an a
increasing value if some problem developed whose characteristic l
frequency was IX running speed.
There are virtually no mechanical degradations where only a sub-j.
synchronous vibration component would develop on the charging pumps. For example:
Oil whirl (0.38X - 0.48X) is not applicable to a horizontal, j
a.
triplex, reciprocating pump.
i b.
A light rub / impact could generate 0.5X (102.5 cpe) vibration i
components, but would also usually generate a sequence of integer and half integer running speed components. A heavy
{
rub generates increased integer values of multiple running i
speed components, as well as processing the IX phase j
measurement.
In either case, the overall vibration level i
would still show an increase from both the attenuated sub-synchronous and IX vibration components as well as the higher i
j harmonic vibration components.
Looseness in the power train would likely be indicated by c.
increasing IX and 2X vibration components. These signals would be slightly attenuated but again not completely cut off.
i Based on the above information, it is our evaluation that the present use of the Bently Nevada 270 cpm probes with the portable TK-81 instrument is capable
)
of collecting sufficiently reliable data to identify changes from baseline readings to indicate possible problems with the pumps.
l s
i i
.2 J
f i
1
je!
t 2.2 Alternative Testina The licensee proposes:
During testing of these pumps, the vibration instrumentation used e
will be the.Bently Nevada model TK-81 with 270 cpm probes or equivalent.
2.3 Evaluation IWP-4520(b) requires that the frequency response range of the readout system-
~
for measuring vibration amplitude be from one-half minimum speed to at least maximum pump shaft rotational speed.
In ASME Operations and Maintenance:
Standards, Part 6, " Inservice Testing of Pumps in Light-Water Reactor Power Plants," the frequency response is changed to one-third minimum pump rotational speed to at least 1000 Hz.
In a paper entitled " Introduction to l'
ASME/ ANSI OMa-1989A, Part 6
' Inservice Testing of Pumps in Light-Water Reactor Power Plants' - and Technical Differences Between Part 6 and ASME a
{
'Section XI, Subsection IWP," by' John Zudans of Florida Power and Light i
Company, included in NUREG/CP-0111, " Proceedings of the Symposium on Inservice l
Testing of Pumps and Valves " the change in the frequency response range is discussed. According to the paper, the change in the frequency response range from "1/2 minimum speed to at least maximum pump shaft rotational speed" in 4
3 Section XI, IWP, to "l/3 minimum pump shaft rotational speed to at least 1000
. Hertz" in OM-6 was based on a publication on measuring vibration for L
" velocity" testing, to more adequately envelope all potential noise j
contributors. OM-6 allows the use of either velocity units (inches per -
second) or amplitude units (mils displacement) for vibration measurements.
j 1
The Code requirements for frequency response ranges are general in order to f
cover the various types of pumps installed in safety-related applications in nuclear power plants. ' The vibration monitoring requirements apply most generally to pumps operating above 600 rps and may be either too prescriptive or not prescriptive enough for other specific pump applications. Moreover,
'the frequency spectrum of the complex signals generated by machines is characteristic of each machine or each pump, constituting a unique pattern, referred to as the " machine signature." Analysis of the signature allows'
)
identification of vibration sources, and monitoring of the change over time permits evaluation of the mechanical condition of the pump. Though vibration instrumentation in low frequency response ranges is available, it is not in wide use, is difficult to calibrate, and may not be as commercially available as other instrumentation.
l To identify sources of noise and. vibration, the peaks of the measured
' frequency spectra are correlated with data pertaining to the possible vibration source components in'the machine. Vibrations at one-half of running i
speed, or lower, may indicate " oil whip" in journal bearings, or looseness in l
other types of bearings. Though the relief request basis does not describe the type of bearings in the charging pumps, it does indicate that oil-whip-is not applicable to this type of pump.
3
l !-
- l-Though the instrumentation does not conform with the lower frequency r range requirements of IW low frequency responses.P (1/2 rotational speed), the urobes are designed for of pue ps that pose a concern in meeting the requirements.The pumps from the baseline conditions, providing an acceptable Using the proposed the operational readiness of the pumps in consideration of the lim j
vibration monitoring for the very slow-speed reciprocating pumps. itations of a burden to require the licensee to procure new vibration instrumentation, It would be 4
which is not currently widely available in the commercial market at very low frequency ranges testing program., Imposition of the requirements could result i of inservice tests using specialized vibration equipment or possibly necessitate the replacement of pumps if no means of meeting the code requirements was available.
For the design of the pumps (very low speed t'.ere are limitations in the commercially available vibration monitoring),
i equipment; therefore, it is impractical to comply with the code requirements at the current time.
licensee should withdraw this relief request and measure dow of 1/2 minimum pump rotational speed.
1 l
2.4 Conclusion Relief is granted to use the proposed vibration monitoring equipment oursuant i
to 10 CFR 50.55a(f)(6)(1) based on the impracticality of meeting the Code I
limitations in commercially available vibration equipment. requ j
The alternative method provides adequate assurance of the operational readiness of the reactor coolant charging pumps by comparing changes in amplitude to a baseline value.
t Principal Contributor:
P. Campbell, DE/EMEB i
i i
i 6
4
T-)%!.
U 2l 1%i, Docket Nos. 50-250 and 50-2E1 50-335 and 50-389 10 CFR 2.206 MEMORANDUM FOR:
Michael T. Lesar, Acting Chief Rules Review Section Regulatory Publication Branch FROM:
Joseph R. Gray, Deputy Director f
office of Enforcement
SUBJECT:
RECEIPT OF PETITION UNDER 10 CFR 2.206 (Saporito v. Florida Power and Light Co.)
A signed original of the notice of receipt of Petition under 10 CFR 2.206 is enclosed for your transmittal to the Office of,
the Federal Reaister for publication.
Additional conformed copies (5) of the Order are enclosed for your use.
M/
Joseph R.
Gray, Deputy Director Office of Enforcement i
Enclosure:
As Stated cc:
J.
Goldberg, OGC DISTRIBUTION:
JGray, OE DRosano Day File EA File DCS 600 l o ( L/ b m
6/2 7/94 6