Category:INSPECTION REPORT
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:UTILITY
MONTHYEARIR 05000302/19900301990-11-17017 November 1990 Insp Rept 50-302/90-30 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Annual Emergency Exercise IR 05000302/19900291990-10-31031 October 1990 Insp Rept 50-302/90-29 on 900908-1005.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Facility Mods & Licensee Action on Previous Insp Items ML20058B0891990-10-17017 October 1990 Insp Rept 50-302/90-32 on 900918-1005.Violations Noted. Major Areas Inspected:Events Resulting in Breach of Reactor Bldg Containment & Lack of Leak Integrity of Encapsulation Assembly Providing Secondary Boundary to Decay Heat Sys IR 05000302/19900311990-10-10010 October 1990 Insp Rept 50-302/90-31 on 900917-20.No Violation Noted.Major Areas Inspected:Verification That Corrective Actions for Previous Findings Adequate IR 05000302/19900251990-09-24024 September 1990 Partially Withheld Insp Rept 50-302/90-25 on 900812-17 (Ref 10CFR2.790(d) & 73.21).One Unresolved Item Identified.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Programs,Organization & Audits IR 05000302/19900241990-08-31031 August 1990 Insp Rept 50-302/90-24 on 900707-0810.Violation Noted.Major Areas Inspected:Plant Operations,Security,Radioligical Controls,Lers & Nonconforming Operations Repts,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19900211990-07-27027 July 1990 Insp Rept 50-302/90-21 on 900602-0706.No Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19900171990-07-10010 July 1990 Insp Rept 50-302/90-17 on 900501-03.Noncited Violations Noted.Major Areas Inspected:Fitness for Duty Program as Required by 10CFR26,including Licensee Drug & Alcohol Abuse Policies,Training,Chemical Testing,Appeals & Repts & Audits IR 05000302/19900221990-07-0606 July 1990 Insp Repts 50-302/90-22 on 900612-16.Violations Noted But Not Cited.Major Areas Inspected:Review & Witnessing of Integrated Engineered Safeguards & Loss of Offsite Power Tests IR 05000302/19890241989-09-15015 September 1989 Insp Rept 50-302/89-24 on 890907-08.Violations Noted.Major Areas Inspected:Review of Events Resulting in Unplanned Shutdown of Facility IR 05000302/19890191989-08-31031 August 1989 Insp Rept 50-302/89-19 on 890708-0804.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Security,Fire Protection,Surveillance Observation,Maint Observation,Safety Sys Walkdown & LERs IR 05000302/19890211989-08-25025 August 1989 Insp Rept 50-302/89-21 on 890808.No Violations or Deviations Noted.Major Areas Inspected:Observation & Analysis of Ultrasonic Exam Capabilities for Opposite Surface Initiating Flaws in Various Matls Involved Re Stated Welds IR 05000302/19890181989-08-16016 August 1989 Insp Rept 50-302/89-18 on 890710-14.Violations Noted.Major Areas Inspected:Inservice Testing & Followup on Previous Insp Findings ML20245K2961989-08-10010 August 1989 Insp Rept 50-302/89-17 on 890619-20.Violations Noted.Major Areas Inspected:Followup to Events Surrounding 890616 Loss of off-site Power transient-review of Plant & Operator Response to Transient,Root Cause & Corrective Actions ML20245J0581989-08-0404 August 1989 Insp Rept 50-302/89-200 on 890424-0505.Weaknesses Noted. Major Areas Inspected:Implementation of Licensee Vendor Interface Program & Program for Procurement of Items for Use in safety-related Applications IR 05000302/19890121989-08-0101 August 1989 Insp Rept 50-302/89-12 on 890620-23.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Exercise,Emergency Operations Facility & Emergency News Ctr.One Weakness Noted IR 05000302/19890161989-08-0101 August 1989 Partially Withheld Insp Rept 50-302/89-16 on 890625-30 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected: Mgt Support,Security Program Plans & Audits,Detection & Assessment Aids & Packages & Vehicles ML20245K0421989-08-0101 August 1989 Insp Rept 50-302/89-15 on 890603-0707.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods,Onsite Events & Annual Emergency Drill ML20246E4491989-06-28028 June 1989 Insp Rept 50-302/89-11 on 890429-0602.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods,Review of IE Info Notices & Followup of Onsite Events ML20246K7561989-06-27027 June 1989 Insp Rept 50-302/89-14 on 890531-0602.Violations Noted.Major Areas inspected:890529 Event Involving Emergency Feedwater Piping & Containment Penetration Heated Above Design Limits & Unanalyzed Thermal Stresses Imposed on Steam Generator IR 05000302/19890131989-06-23023 June 1989 Insp Rept 50-302/89-13 on 890529-0602.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Radwaste Mgt,Transportation of Radioactive Matls & Followup on Previous Inspector Identified Items ML20244D2831989-06-0707 June 1989 Insp Rept 50-302/89-09 on 890424-28.Violations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment & Followup on Previous Insp Findings,Including Review of Util Implementation of 10CFR50.49 Program IR 05000302/19890101989-06-0707 June 1989 Insp Rept 50-302/89-10 on 890515-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Corrective Actions from Previous Findings Re Training & Emergency Operating Procedures IR 05000302/19890081989-05-10010 May 1989 Insp Rept 50-302/89-08 on 890401-28.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Nonconforming Operations Repts,Facility Mods & Followup of Onsite Events IR 05000302/19890061989-04-25025 April 1989 Insp Rept 50-302/89-06 on 890225-0331.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mod, Review of 10CFR21 Repts & Followup of Onsite Events IR 05000302/19890041989-04-0505 April 1989 Insp Rept 50-302/89-04 on 890227-0303.No Violations or Deviations Noted.Major Areas inspected:post-accident Sampling Sys,Confirmatory Measurements,Radiological Effluents & Reactor Coolant Chemistry IR 05000302/19890051989-03-24024 March 1989 Insp Rept 50-302/89-05 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Radiological Emergency Response Plan & Implementing Procedures & Emergency Facilities IR 05000302/19890031989-03-24024 March 1989 Insp Rept 50-302/89-03 on 890128-0224.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Lers & Nonconforming Operations Rept,Facility Mods & Licensee Actions on Insp IR 05000302/19890021989-02-27027 February 1989 Insp Rept 50-302/89-02 on 890130-31.No Violations Noted. Major Areas Inspected:Reactor Coolant Pump Vibration Monitoring Sys Data Acquisition,Interpretation & Written Instructions for Protective Measures in Event of Failure ML20235P0571989-02-16016 February 1989 Insp Rept 50-302/89-01 on 890101-27.Three Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler & Nonconforming Operations Repts,Followup on Onsite Events & Licensee Action on Previous Insp Items IR 05000302/19880321988-11-30030 November 1988 Insp Rept 50-302/88-32 on 881031-1102.No Violations or Deviations Identified.Major Areas Inspected:Followup on Allegations IR 05000302/19880291988-11-21021 November 1988 Insp Rept 50-302/88-29 on 880916-1021.Violations Noted.Major Areas Inspected:Plant Operations,Security Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Review of Plant Review Committee IR 05000302/19880281988-11-0202 November 1988 Partially Withheld Insp Rept 50-302/88-28 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Program,Security Program Audit & Testing & Maint IR 05000302/19880271988-10-0707 October 1988 Insp Rept 50-302/88-27 on 880829-0902.Violations Noted. Major Areas Inspected:Previously Identified Environ Qualification Deficiencies Documented on Justification for Continue Operation.Licensee Commitment Identified ML20204J8041988-10-0404 October 1988 Insp Rept 50-302/88-26 on 880813-0916.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19880251988-09-20020 September 1988 Insp Rept 50-302/88-25 on 880822-26.No Violations or Deviations Noted.Major Areas Inspected:Mods & Design Control ML20155A9181988-09-13013 September 1988 Insp Rept 50-302/88-24 on 880716-0812.Violations Noted.Major Areas Inspected:Plant Operation,Security,Radiological Controls,Lers & Nonconforming Operation Repts IR 05000302/19880201988-09-0707 September 1988 Insp Rept 50-302/88-20 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Complex Surveillance Testing & IE Bulletin Followup IR 05000302/19880221988-08-12012 August 1988 Insp Rept 50-302/88-22 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Including Emergency Plan & Implementing Procedures & Organization & Mgt Control ML20151X0061988-08-0505 August 1988 Insp Rept 50-302/88-18 on 880609-0715.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Security,Lers,Nonconforming Operations Repts, Review of Bulletins & Actions on Insp Items IR 05000302/19880211988-08-0505 August 1988 Insp Rept 50-302/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry, Corrosion Control & Pipe Thinning IR 05000302/19880191988-07-28028 July 1988 Insp Rept 50-302/88-19 on 880627-0701.No Violations or Deviations Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97 ML20151K2941988-07-20020 July 1988 Insp Rept 50-302/88-15 on 880607-09.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Key Emergency & Organizational Functions & Locations During Partial Participation Exercise ML20151D9521988-07-0707 July 1988 Insp Rept 50-302/88-16 on 880512-0608.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Lers,Security & Nonconforming Operations Repts IR 05000302/19880171988-06-10010 June 1988 Insp Rept 50-302/88-17 on 880523-27.No Violations Noted. Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Security Sys Power Supply,Lighting,Assessment Aids & Alarm Stations ML20196B1251988-06-0606 June 1988 Insp Rept 50-302/88-14 on 880416-0611.Violation & Deviation Noted.Major Areas Inspected:Plant Operations,Security, Radiological Controls,Lers & Nonconforming Operations Repts & Review of NRC Bulletins & Circulars IR 05000302/19880091988-06-0606 June 1988 Insp Rept 50-302/88-09 on 880328-0408.Numerous Deficiencies Noted.Major Areas Inspected:Review of Adequacy of Emergency Operating Procedures IR 05000302/19880121988-05-19019 May 1988 Insp Rept 50-302/88-12 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Review of Previously Identified Inspector Followup Items & Enforcement Matters, External Exposure Control & Control of Radioactive Matl IR 05000302/19880131988-05-12012 May 1988 Insp Rept 50-302/88-13 on 880418-22.No Violations Noted. Major Areas Inspected:Seismic Monitoring Program,Fire Protection/Prevention Program,Followup on Previously Identified Insp Items & LERs IR 05000302/19880111988-05-0202 May 1988 Insp Rept 50-302/88-11 on 880312-0415.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler & Noncomforming Operations Repts,Refueling Activities & Licensee Actions on Previous Items 1990-09-24
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist ML20199D6161999-01-0404 January 1999 Notice of Violation from Insp on 981025-1205.Violation Noted:Its Requirements for Valve Position Verifications Not Met as Evidenced by Listed Examples IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19983011998-07-31031 July 1998 NRC Operator Licensing Exam Rept 50-302/98-301,including Completed & Graded Tests,For Tests Administered on 980629-0702 IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20249A2941998-06-0808 June 1998 Notice of Violation from Insp on 980322-0509.Violation Noted:As of 980423,licensee Had Not Complied W/Requirements of Procedure CP-111,in That,Only Two of Discrepancies Identified in Ioc NL97-0262,had Been Documented IR 05000302/19980991998-06-0404 June 1998 SALP Rept 50-302/98-99 for 961006-980509 ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8871998-04-0808 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:On 980220,Axial Power Imbalance Alarm Was Inoperable for Approx 3.5 Hours & Axial Power Imbalance Was Not Verified to Be within Acceptable Operating Limits ML20248L6171998-03-16016 March 1998 Notice of Violations from Insp on 980126-30.Violations Noted:Test Program for ECCS Operating in Piggyback Mode Did Not Demonstrate That Sys Would Perform Satisfactorily in Service IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216E9291998-03-0404 March 1998 Notice of Violation from Insp on 980104-0207.Violations Noted:On 980203 Licensee Failed to Accomplish Required Posting of Bulletin Boards ML20203F5561998-02-23023 February 1998 Notice of Violation from Insp on 971021-24,1208-12 & 980105-09.Violations Noted:Implementation of Validation Program Did Not Adequately Demonstrate Usability of Emergency Procedures ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 9802051998-02-0202 February 1998 PNO-II-98-005:on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 PNO-II-98-004, on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License1998-01-30030 January 1998 PNO-II-98-004:on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-003, on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release1998-01-22022 January 1998 PNO-II-98-003:on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release ML20199G6761998-01-16016 January 1998 Notice of Violation from Insp on 971201-16.Violation Noted: as of 971211,licensee Health Physics Supervisors Failed to Identify & Correct Personnel Contamination Repts That Were Not Completed IAW Requirements of Procedure HPP-104 ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N6211997-12-29029 December 1997 Notice of Violation from Insp on 971026-1129.Violation Noted:On 971105,licensee Failed to Perform Adequate Se,Per 10CFR50.59 for Functional Test Procedure for B Emergency Diesel Generator Power Upgrade & Radiator Replacement Mods ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20199A2091997-12-22022 December 1997 EN-97-116:on 971229,informs Commission That Staff Intends to Exercise Enforcement Discretion in Accordance W/Section VII.B.2 of Enforcement Policy & Not Issue NOV or Proposed Imposition of Civil Penalty to Util for Violations PNO-II-97-063, on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified1997-12-19019 December 1997 PNO-II-97-063:on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified IR 05000302/19973011997-12-17017 December 1997 NRC Operator Licensing Exam Rept 50-302/97-301 Including Completed & Graded Test for Test Administered on 971118. Exam Results:Sro Candidate Passed Written Exam ML20203A1911997-12-0404 December 1997 Notice of Violation from Insp on 971006-24.Violation Noted:Work Request Numbers 333797 & 333798,issued in Mar 1997 to Install Stem Protectors on Actuators Were Closed W/O Performing Work ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20202D7301997-11-24024 November 1997 Notice of Violation from Insp on 970921-1025.Violation noted:10CFR50.59 SE Had Not Been Performed as Required within 90 Days on Wds Piping non-conforming Condition IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-97-059, on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities1997-11-18018 November 1997 PNO-II-97-059:on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities ML20212B9061997-10-16016 October 1997 Notice of Violation from Insp on 970817-0920.Violations Noted:Scaffolding Control Program Does Not Contain Measures to Assure That Deviations from Design Quality Std for safety-related Equipment Installed Have Adequate Control IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211Q2581997-10-14014 October 1997 Notice of Violation from Insp on 970922-26.Violation Noted:On 970820,individual Was Terminated & Authorized Access Was Not Removed from Plant Security Computer Until 970905 ML20211E4891997-09-12012 September 1997 Notice of Violation from Insp on 970713-0816.Violations Noted:On 970728,licensee Personnel Performed quality-related Work to Restore once-through SGs During Reduced RCS Inventory Operation Without Written & Approved Procedure ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support 1999-09-13
[Table view] |
Text
.
. .',
'
'
UNITED STATES j NUCLEAR REGULATORY COMMISSION
[
- [>R s E!vg'o,$ REGION 11 i
3 j 101 MARIETTA STREET, * * ATLANTA GEORGIA 30323
'%, ,$
.....
.
. Report No.: 50-302/85-45
' Licensee: Florida Power Corporation
-
3201 34th Street, South St. Petersburg, FL 33733 Docket No.:- 50-302 License No.: DPR-72 Facility Name: Crystal River 3 Inspection Conducted: December 9-13, 1985 Inspector: M ,N /- EbSG CW Date Signed Approved by: &LJ. LJwJti-- 1- 23 - sr G. A. Belisle, Actyg Section Chief Date Signed Division of Reactor Safety SUMMARY Scope: This routine, unannounced inspection involved 34 inspector-hours on site in the areas of licensee action on previous enforcement matters, design control, and tests and experiment Results: No violations or deviations were identifie ,
8602100072 960 M2 PDR ADOCK PDR G
..-
7., . ;
-
.
REPORT DETAILS Persons Contacted Licensee Employees
.
- J. Alberdi, Manager, Site Nuclear 3ervices *
- K. Baker,~ Assistant to the Manager, Nuclear Operations Engineering
- C. Brown, Assistant. Nuclear Outage and Modification Manager R. Carbiener, Nuclear Modifications Specialist J. colby, Manager, Site Nuclear Engineering *
- J. Cooper, Jr., Nuclear Surveillance and Modification Approval Record (MAR)TestSuperintendent
- D. Eggleston, Operations Superintendent C.~ Elan, Nuclear Modification Specialist
- T. Frijouf, Compliance Specialist
- P. Haines, Nuclear Licensing
- V. Hernandez, Senior Nuclear QA Specialist W. Johnson, Nuclear Modification Specialist W. Johnson, Nuclear Plant Engineering Superintendent M. Jones, Nuclear Modification Specialist K. Lancaster, Manager, Site Nuclear QA
- McLaughlin, Nuclear Modification Specialist W. Newman, III, Nuclear Reliability Supervisor
- S. Powell, Senior Nuclear. Licensing Engineer
- V. Roppel, Manager, Plant Engineering and Technical Services
- W. Rossfeld,' Site Nuclear Compliance Manager NRC Resident Inspector
- T. Stetka, Senior Resident Inspector
- Attended exit interview Exit Interview The inspection scope and findings were summarized on December 13, 1985, with those persons indicated in paragraph 1. above. The inspector described the areas -inspected and discussed in detail the inspection finding No dissenting comments were received from. the licensee. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio _ . __ _ _ _ _ .
-
. ,',
-
- .
'2
, Licensee Action on Previous Enforcement. Matters-(0 pen) Severity Level IV Violation (302/85-15-01): ' Failure to Assure That
- Conditions Adverse'to Quality.Were Promptly Corrected Licensee responses dated June 17 and September 17, 1985, denied this viola-
!
tion.- The. licensee response dated September 17, 1985, did state, however, .
that several' program enhancements -for elevating unresolved quality assurance
. (QA) audit. findings had been instituted. These included a memorandum issued
, from the Vice President, Nuclear 0perations, and a revision to' QAP-8, Quality Program Audits. The memorandum from the Vice President, Nuclear Operations, was issued prior to September 17, 1985. QAP-8 was revised to include these program enhancements on September 30, 1985, and issued on October 9,1985. These program enhancements should correct the identified weaknesses in audit finding resolution. Administrative errors appear to
be the reason for the delay in issuing QAP-8 by September 17, 1985; conse-quently, a deviation is not warrante Until implementation of these
- program enhancements can be fully evaluated, this item remains open.
4. . Design Program (37702)
,
References: (a) 10 CFR 50 Appendix B, Quality Assurance Criteria. for Nuclear Power Plants and Fuel Reprocessing Plants, i Criterion III (b) 10 CFR 50.54(a)(1), Conditions of Licenses (c) Regulatory Guide 1.64, Quality Assurance Requirements for the Design of Nuclear Power Plants (d) ANSI- N45.2.11-1974, . Quality Assurance Requirements for the Design of Nuclear Power Plants
) (e) Regulatory -Guide 1.33, Quality Assurance Requirements
'
'
(Operations)
(f) ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants (g) 10 CFR part 50.59, Changes, Tests and Experiments (h) Technical Specifications Section 6.5, Review and' Audit
'
The inspector reviewed the licensee design change program required by 7' - references- (a) through (h) to determine if these activities were conducted
! in accordance with regulatory requirements, industry guides and :tandards,
and technical specifications. The following criteria were used during the review to assess the overall acceptability of the established program:
,
e w-y-, - , - - , .-o7-- .,,,,+,,.,-.,y--r .e,,,_,w.y, ,,e,,a4, , , m= - -. , ,mc., ,- . , --+ . . rm,.,,,
- . ,
- . .-
.
._
,
-
Proce'dures have been established to control design changes which
'
include assurance that a proposed change does not involve an unreviewed safety question or a change in technical specifications as required by 10 CFR 50.5 Procedures and responsibilities for design control have been established including responsibilities and methods for conducting safety evaluation Administrative controls for design document control have been established for the following:
Controlling changes to approved design change documents Controlling or recalling obsolete design change documents such as revised drawings and modification procedures Release distribution of approved design change documents
-
Administrative controls and responsibilities have been established commensurate with the time frame for implementation to assure that design changes will be incorporated into:
Plant procedures Operator training programs Plant drawings to. reflect implemented design changes and modifica.tions
-
Design controls require that implementation will be in accordance with approved procedure Design controls require assigning responsibility for identifying post-modification testing requirements and acceptance criteria i approved test procedures and for evaluation of test result Procedures assign responsibility and delineate the method for reporting design changes to the NRC in accordance with 10 CFR 50.5 Controls require review and approval of temporary modifications in accordance with Section 6 of the Technical Specifications and 10 CFR 50.5 The documents listed below were reviewed to determine if these criteria had been incorporated into the licensee design program:
Florida Power Corporation FSAR Section 1.7.1.3, Design Control Section 1.7.1.16, Corrective Action l AI-400 Plant Operating Quality Assurance Manual Control Document, Revision 59 l
__ ,'
,
.
CP-11 Procedure for Handling Permanent Modifications, Temporary Modifications, . Modification Revisions, Field Change Notices, and Advanced Field Change Notices, Revision 42 CP-111 Documenting, Reporting, and Reviewing Nonconforming Operations Reports, Revision 32 CP-134 Preparation, Approval, and Performance of MAR Functional Test Procedures, Revision 7 AI-700 Conduct of Nuclear Plant Engineering and Technical Services, Revision 26 M0P-500 Modification, Revision 1 M0P-501 Site Approval of MAR Work Packages, Revision 4 M0P-504 Processing of MAR Field Change Notices, Revision 2 M0P-508 Turnover of Modifications (Completed / Partial) to Nuclear Operations, Revision 2 M0P-401 Control of Work Requests, Revision 4 M0P-402 Preparation of Work Packages, Revision 6 M0P-405 Job Completion, Walkdown, Turnover, and Nonconforming Item Reporting, Revision 5 M0P-600 Construction Verification, Revision 3 Nuclear Operations Modification Procedure 2, Modification Procedure, Revision 1 Safety Related Engineering Procedure 8, Corrective Action, Revision 5 Engineering Guideline No. 7, Engineering Disposition of Field Change Requests, Revision 0 The licensee has assigned responsibility for HAR preparation, which l documents the safety evaluations and review and approval of nuclear plant modification activities, to the on-site /off-site Nuclear Operations Engineering organization. The inspector conducted interviews with licensee management from the on-site Nuclear . 0perations Engineering group to ascertain their functional responsibilities, levels of authority, ~ and
!
l l
)
l
!
. .
_ ___ . . . _ .
~'
a :
"
$l, *
.
' internal"and external interface requirements in connection with design change program activities. The inspector determined.that station designed modifications are - performed within the limits of the resources of the-
- on-site Nuclear Operations Engineering group. - All- other nuclear plant modifications are performed by the off-site Nuclear Operations' Engineering organization;or their engineering consultan ;In-1984.ths licensee established what is referred to as a'n enhanced design program. This program.provides for systems / components walkdowns prior to and during. the detail . design process. Project walkdowns, as they are
. called,: are intended to establish communications between the design office:
.and site personnel on a continuing basis. Topics covered as they relate to
'the. design efforts are.as follows:
. Installation ,
Operations Testing Inspection
. Training Maintenance-ALARA 0ther particulars associated with nuclear plant modification
.{
The inspector inquired as to whether or not project walkdowns.were performed for. MARS that were installed during Cycle V refueling outage. Licensee-management stated that because of the advanced stage of the detail design
~
process, project walkdowns were not performed. 'The interface of the on-site:
Nuclear Operations Engineering with the' Nuclear Modification and Outage c ,
group was reviewed and discussed with licensee management. In particular, the implementation of' corrective action by. on-site Nuclear Operations .
Engineering for identified design nonconformances.and/or the processing and
- disposition
- of Field Change Notices were ' discussed. Based on - these 1-discussions and a. review of the program documents,-controls'for corrective !
action and' Field Change Notices appear to be adequat ,
The licensee has established a Nuclear Outage and Modification Program which l controls modification installation and testing activities.- This program .j also controls the interfaces of the Nuclear Outage and Modification '
organization with design, operating, and procurement organizations to assure
.that adequate controls are exercised over all' aspects of the modification effort. . A Nuclear- Modification Project Management Group from within this organization administers all work -activities for MARS. These activities start 'with the 'on-site receipt of-'an approved MAR package and continues -
until each MAR package has been installed, - tested, turned over to Operations, and closed out. Individual Nuclear Project Managers are given sole responsibility for' the administration of assigned MAR packages from initial on-site receipt to final close ou >
)
.. i
.._ . - . - - . -
-.
.:
y. .
.f
The inspector conducted interviews with selecced Nuclear Project Managers assigned responsibility for the following MAR packages. These MAR packages have not yet been closed out for various reason . MAR #77-07, NNI Cabinet Modification MAR #80-02-80, CX Solenoid Replacement,
. MAR ~#80-04-06, Condensate. System Low F1ow MAR #81-05-33, Smoke Detectors Discussions concerning the outstanding items associated with each MAR package were conducted with licensee managemen Further discussion concerning the administration of the Incomplete Items List (ICIL) and exceptions identified during the construction verification phase of the design program were also held. .The inspector reviewed the programmatic controls for transforming ICILs/ Exceptions into Field Change Notices and ensured that the~ program requires the participation of Nuclear Operation Engineering in the resolution and disposition of nonconformances.' Based on discussions with the licensee management and a review of the program documents, the programmatic controls appear adequate with the following exceptio Nuclear Modification and Outage Procedure M0P-405, paragraph 4.2.6.6, assigns responsibility to the installer for providing a preliminary disposition and obtaining: resolution of an Exception if the item can be reworked in accordance with the original approved MAR, Work Request / Package, procedure, et This - occurs prior to the review and approval of. the disposition by the cognizant Nuclear Project Manager. Additionally, if this disposition is approved by the Nuclear Project Manager, because the program defines " Rework Exceptions" as dispositions of nonconformances-in accordance with an approved MAR, Work Package, etc., Nuclear Operation Engineering is not provided an opportunity for review and approval of these disposition The inspector discussed the significance of introducing unintended design-changes into approved MAR packages via the disposition of " Rework Exceptions" by the installers, concurrent with the Nuclear Project Manager's l approval. Licensee management confirmed that. all nonconformances were dispositioned by use of Field Change Notices (FCNs) which afforded Nuclear Operations Engineering the opportunity for review and approval of these FCN This potential problem is fully addressed and documented in Inspection Report No. 50-302/86-0 The licensee Construction and Verification group is assigned responsibility
"
to ensure that completed work is in conformance with specifications, drawings, and instructions provided with a MAR Work Package and associated FCN This feature of the enhanced design program was implemented for MAR
! Work Packages installed during the Cycle V refueling outage. The inspector
' conducted discussions with the Nuclear MAR Test Supervisor who has been 1 assigned responsibility for these activitie A listing of post-modifica-tion - tests performed for completed MARS was reviewe Additional t
.
-
.
,
A
. , - , e --,-n.--- . , . , , . + . , , , - - - . .,,,--,,,,.,,....,,,e ,-.,--n~ .--.-n,n-v,
.
,,,n-, . - _ . -- e--a ---,
e lf.. '.'
,
discussions concerning the corrective actions for nonconformances (Exceptions) identified during post-modificetion tests were also hel Licensee management confirmed that nonconformances identified during post-modification testing are processed in. accordance with M0P-405. Licensee management ~further stated that nonconformances identified after turnover of the modified system / component to operations are processed in accordance with CP-11 .
Pursuant- to discussions with' licensee management concerning the general topic of corrective action, and the implementation of the Construction Verification program, a narrow scope in-depth inspection of this area will be required to be performed in order to verify the effectiveness of this part of the enhanced design program, c Within this area, no violations or deviations were identifie . Tests anc Experiments (37703)
References: (a) 10 CFR 50 Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants
,
(b) 10 CFR 50.59, Changes, Tests and Experiments (c) 10CFR50.54(1)(1), Conditions of Licenses (d) Technical Specification 6.5, Review and Audit (e) Regulatory Guide 1.33, Quality Assurance Requirements (Operations)
(f) ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants
.
The inspector reviewed the licensee's tests and experiment programs required by references (a) through (f) to determine if the program was in conformance with regulatory requirements, commitments in the application, and industry guides and standards. The following criteria were used during this review to assess the overall acceptability of the established proaram:
- A formal method has been established to handle all requests or proposals for conducting plant tests involving safety related component Provisions have been made to assure that all tests will be performed in accordance with approved written procedure Responsibilities have been assigned for reviewing and approving test procedure l
- ,,'
..
-
A formal system, including assignment of responsibility, has been established to assure that all proposed tests will be reviewed to determine whether they are as described in the FSA Responsibilities have been assigned to assure that a written safety evaluation required by 10 CFR 50.59 will be developed for each test to assure that it does not involve an unreviewed safety question or a change in Technical Specifications (TS).
The documents listed below were reviewed to determine if the previously
' listed criteria had been _ incorporated into the licensee's tests and experiments program:
Florida Power Corporation FSAR Section 1.7.1.11, Test Control Section 1.7.1.16, Corrective Action AI-400 Plant Operating Quality Assurance Manual Control Document, (P0QAM), Revision 59 CP-134 Preparation, Approval and Performance of MAR Functional Test Procedures, Revision 7 The- inspector reviewed the licensee's tests and experiments program documents to determine if a test program had been established to assure that all testing required to demonstrate satisfactory in service operation of structures, systems, and components had been . identified. Additionally, all testing is performed in .accordance with approved written procedure The inspector verified that provisions had been established for performing
. written safety evaluations (required by 10 CFR 50.59) for special tests to assure that unreviewed safety questions or changes to the TS do not exis The scope of the program documents, which delineate the controls 'for the
= plant test program, is described in AI-400 and the controls are as follows:
Volume X - Surveillance Procedure Volume XVI - Performance Testing Procedures Volume XV,Section IV - Pump and Valve Program Additional requirements of the test program are delineated in CP-134 for MAR Functional Test procedure The inspector conducted interviews with licensee management to ascertain the administrative controls applicable to the performance of special tests as defined in 10 CFR 50.5 Licensee management stated that special tests are conducted within the controls of the test program described in any of the above documents. Administrative controls for special test, per se, have not-been established. The inspector verified that required Nuclear Safety
--
,
.
, . -;.
.
Evaluations for' Unreviewed Safety Question determination (USQD), and Technical Specification reviews and approvals are performed for special .
tests. Based on discussions with licensee management and a review of th program documents, the administrative controls appear to be adequat The licensee's post-modification functional test requirements delineated in CP-134 are intended to verify that modified system / subsystems and/or -
components. meet the design acceptance criteria. An inspection of the -
implementation 'of the post-modification test program will be required to assure procedural and regulatory compliance.
'
Within this area, no violations or deviations bere identifie .
Y