ML20135G610
ML20135G610 | |
Person / Time | |
---|---|
Site: | Diablo Canyon, 05000000 |
Issue date: | 08/11/1982 |
From: | James Shea NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP) |
To: | Bartolome Z PHILIPPINES |
Shared Package | |
ML20132A535 | List:
|
References | |
FOIA-84-559 NUDOCS 8509190550 | |
Download: ML20135G610 (1) | |
Similar Documents at Diablo Canyon, 05000000 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212B1681999-09-13013 September 1999
[Table view]Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML16343A4801997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld 1999-09-13 Category:NRC TO FOREIGN GOVERNMENT AGENCY MONTHYEARML20135H3541985-03-20020 March 1985
[Table view]Forwards Matl Prepared for Limerick & Indian Point Hearings Per 850123 Request & NRC Documents Ref During Discussions. Jan 1985 Seismogeological Siting Criteria & Guidelines, Forwarded to L Reiter NUREG-0981, Forwards Matl Prepared for Limerick & Indian Point Hearings Per 850123 Request & NRC Documents Ref During Discussions. Jan 1985 Seismogeological Siting Criteria & Guidelines, Forwarded to L Reiter1985-03-20020 March 1985 Forwards Matl Prepared for Limerick & Indian Point Hearings Per 850123 Request & NRC Documents Ref During Discussions. Jan 1985 Seismogeological Siting Criteria & Guidelines, Forwarded to L Reiter ML20135G6101982-08-11011 August 1982 Responds to G Santos Ltr Requesting Seismic Info Submitted in License Application.Problems Encountered in Collecting Requested Info ML20135G5851982-06-0707 June 1982 Forwards SERs for Facilities Using Model F Steam Generator. NRC Does Not Grant Approvals for Sys or Components.Fsar Section 5.4.2,including Appropriate Tables & Drawings for Snupps Facility,Encl.W/O Encl ML20135G6181982-06-0202 June 1982 Advises That SERs for Facilities That Use Model F Steam Generators Will Be Transmitted.Bartolome 820518 Telex Not Received.P Rodriguez Arrived on 820602 & Began Training ML20135G6561981-07-28028 July 1981 Submits Schedule of Exercises at Listed Plants.Nrc Does Not Have Funds to Assist Observers in Program.Iaea May Help W/Travel & Cost Subsistence Costs.No Other Cost or Fee Involved ML20135G6671981-03-0202 March 1981 Forwards Repts Re Low Pressure Turbine Incident & Two Generic Issue Repts on Low Pressure Turbine Disc Cracking. NRC Currently Evaluating Low Pressure Disc Cracking as Generic Problem 1985-03-20 Category:OUTGOING CORRESPONDENCE MONTHYEARML20212B1681999-09-13013 September 1999
[Table view]Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright ML20149H8171994-12-23023 December 1994 Advises That 941010 & 1102 Changes 4 & 5 to Rev 18 of Physical Security Plan,Respectively Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20059L5031994-01-28028 January 1994 Extends Invitation to Participate in Workshop Re Emergency Preparedness & Incident Response on 940222 in Arlington,Tx ML20058A1211993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld IR 05000275/19930211993-08-27027 August 1993 Forwards Insp Repts 50-275/93-21 & 50-323/93-21 on 930726-30.Non-cited Violations Identified.Insp Repts Withheld in Entirety Ref 10CFR73.21 ML20057B3241993-05-0404 May 1993 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App Q Which Are Being Made Available at Pdr.Documents Listed in App R Are Partially Withheld (Ref FOIA Exemption 5) ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20056C2811993-01-29029 January 1993 Ltr Contract,Mod 1 to Task Order 5,providing Incremental Funding of Listed Amount,To IPE Reviews,Internal Events Back-End-Only ML20127F1091993-01-13013 January 1993 Extends Invitation to Participate as Breakout Session Facilitator on 930217-18 at Workshop Hosted by Regions IV & V in Arlington,Tx to Discuss Operability/Degraded Equipment as Specified in GL 91-18.Record Copy IR 05000275/19920321992-12-11011 December 1992 Forwards Insp Repts 50-275/92-32 & 50-323/92-32 on 921116-19 & Notice of Violation.Violation Noted Re Failure to Withdraw Security Safeguards Access List.Encls Withheld (Ref 10CFR73.21) IR 05000275/19920281992-12-0202 December 1992 Forwards Insp Repts 50-275/92-28 & 50-323/92-28 on 921005-09.No Violations Noted.Encl Withheld (Ref 10CFR73.21) ML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML20058N8501990-08-10010 August 1990 Responds to Forwarding Correspondence from Bl Boxer & Le Panetta Re Seismic Safety of Plant.Nrc Will Complete Review of Plant Seismic Reevaluation Program & Will Document Findings in SER DD-90-03, Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc1990-07-27027 July 1990 Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248F0321989-09-14014 September 1989 Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20247G2781989-09-13013 September 1989 Partial Response to FOIA Request for Records.Apps F & G Records Available in Pdr.App H Records Partially Withheld & App I Record Completely Withheld (Ref FOIA Exemption 5) ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246Q0121989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246K4721989-08-28028 August 1989 Advises That 880419 Rev 2 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246K8571989-08-25025 August 1989 Discusses NRC Actions in Reponse to Constituent Concerns Re Excessive Overtime Worked by Employees of Plants ML20246E5321989-08-22022 August 1989 Forward Summary of Sys Engineering/Design Engineering Initiatives & ...Quarterly Sys Status Rept,2nd Quarter 1989.... Rept Demonstrates Depth,Scope & Usefulness of Walkdown as Tool for Assessing Sys Status,Problems & Trends ML20246C7101989-08-18018 August 1989 Forwards Order,Effective Immediately,Modifying CPs CPEP-1 & CPEP-2 to Require Notification of Commission Before Taking Possession of Any Classified Equipment & to Show Cause Why CPs Should Not Be Revoked 1999-09-13 |
Text
.
N-bec: JRShea (IP-131)
Jhaf AUG 111382 WSlaV]eur ine
^
f le-Phil Adm BBuckley, NRR ,
- I 3,[,-.- 2T
- Dr. Zoilo Bartolome Comissioner Philippine Atomic Energy Comission P. O. Box 932 Metro Manila, The Philippines .
~
Dear Dr. Bartolome:
This is to respond to a letter received from Mr. Gabriel Santos, Jr.. requesting seismic infomation submitted to NRC by the license applicant for the Diablo Canyon nuclear power plant.
Please infom Mr. Santos that I have encountered several problems in collecting the requested infomation. First, the seismic infomation submitted to NRC in the PSAR and FSAR was not in a fomat consistent with the present fomat of lUREG-0300 and therefore to obtain infomation reganiing vibratory ground notion and surface faulting would require a geologist's detailed review of the PSAR and FSAR and obtaining the infomation from several sections. Second, seismic issues related to the Diablo Canyon license application have been the subject of many neetings during the licensing review and hearing process and a great volume of correspondence and reports exist. The requested information would have to be separated out of the above cited infomation.
NRC makes the following suggestion for Mr. Santos. Regulatory Guide 1.70 describes the fomat and contents of the Safety Analysis Report (SAR). The Standard Review Plan describes how NRC staff will review the SAR. If f!r. Santos, after a review of the pertinent sections of each of these documents, has specific questions related to vibratory ground motion or surface faulting, I shall try to obtain answers to his questions.
Please contact me if I can be of further assistance. ,
Sincerely, OMon! Si! midi
.. .g D. taricur, R.
l) James R. Shea, Director
/ Office of International Programs 8509190550 850007 PDR FOIA SCHLEMM 84-559 PDR d ' f .,
0[,,,l-_,
v.ml. . .IPg[,. , SRRh[
WS.tay.i.ne.;eb
.Jogleur C n
-, ..BBuc91 et. ..
/ g../ga 8
oan ) . ./../.Q../82. ...
8/.g/.82
. . . ... . 8/i
....l.c / 82
../J'.,82. . . . . . . . . . . . . . . . . . . . . .
L:renv m x n, ecu ex OFFICIAL RECORD COPY w :. c ,,, .I