Safety Evaluation Accepting Corporate Restructuring of Great Bay Power Corp & Formation of Holding Company,North Atlantic Energy Svc CorpML20133P912 |
Person / Time |
---|
Site: |
Seabrook |
---|
Issue date: |
01/22/1997 |
---|
From: |
NRC (Affiliation Not Assigned) |
---|
To: |
|
---|
Shared Package |
---|
ML20133P880 |
List: |
---|
References |
---|
NUDOCS 9701270151 |
Download: ML20133P912 (4) |
|
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20137T9941997-04-0909 April 1997 Safety Evaluation Accepting Proposed Use of ASME Code Case N-524 for North Atlantic Energy Service Corp,Seabrook Station,Unit 1 ML20133P9121997-01-22022 January 1997 Safety Evaluation Accepting Corporate Restructuring of Great Bay Power Corp & Formation of Holding Company,North Atlantic Energy Svc Corp ML20059J2381993-11-0505 November 1993 Safety Evaluation Accepting 921125 TS Changes,Augmented by 930702 Response to NRC Rai,Allowing Use of Fixed Incore Detector Sys at Facility ML20247N5901989-07-28028 July 1989 Safety Evaluation Concluding That Overall State of Onsite & Offsite Emergency Preparedness Provides Reasonable Assurance That Adequate Protective Measures Can & Will Be Taken in Event of Radiological Emergency at Plant ML20245A9091989-06-15015 June 1989 SER Supporting Util Actions to Comply W/Atws Rule (10CFR50.62),pending Resolution of Tech Spec Issue.Licensee Should Continue W/Scheduled Installation & Implementation of ATWS Design Using Administrative Controlled Procedures ML20246H5711989-05-0303 May 1989 Safety Evaluation Supporting Util Decommissioning Funding Assurance Plan for Facility Per Commission Decision 88-10 ML20246N8731989-03-21021 March 1989 Safety Evaluation Accepting Util 881118 Submittal on Isolation Devices ML20154Q9881988-09-27027 September 1988 Safety Evaluation Supporting Amend 1 to License NPF-56 ML20153D2321988-08-24024 August 1988 Safety Evaluation Accepting Licenseee Proposed Mod to Control Room Habitability Sys ML20235G9651987-09-24024 September 1987 SER Re Setpoint Methodology for Rosemont Replacement Transmitters.Licensee Proposed Methodology Not Adequate to Allow Approval to Be Used in Application of Units ML20235U6021986-06-17017 June 1986 Sser Supporting Util 860528 Request for Relief from Impractical Preservice Insp Requirements of ASME Code Section XI IA-87-213, SER Finding Facility Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 3,except for Accumulator Tank Level & Pressure Instrumentation,Containment Sump Water Temp Instrumentation & Quench Tank Temp Instrumentation1986-06-11011 June 1986 SER Finding Facility Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 3,except for Accumulator Tank Level & Pressure Instrumentation,Containment Sump Water Temp Instrumentation & Quench Tank Temp Instrumentation ML20215G1691986-06-11011 June 1986 SER Finding Facility Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 3,except for Accumulator Tank Level & Pressure Instrumentation,Containment Sump Water Temp Instrumentation & Quench Tank Temp Instrumentation ML20136D6751985-04-30030 April 1985 Safety Evaluation Re Elimination of Arbitrary Intermediate Pipe Breaks in High Energy Piping Sys.Pipe Rupture Postulation & Associated Effects Are Adequately Considered in Design.Deviation from SRP Acceptable ML20235U0031985-03-31031 March 1985 Safety Evaluation Supporting Util 850207 Request to Eliminate Arbitrary Intermediate Pipe Breaks in All High Energy Piping Sys Except Main Feedwater Sys at Facility ML20235T6911985-02-22022 February 1985 Safety Evaluation Supporting Util Request for Exemption from GDC-4 for Facility.Util Occupational Dose Saving Estimate for Plant Personnel of Approx 1,400 Person Rem Is Reasonable ML20235T6631985-01-18018 January 1985 Safety Evaluation Supporting Util Technical Justification for Not Providing Protective Devices Against Dynamic Effects of Postulated Pipe Breaks 1999-09-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
_ -
l
, M E:oq j k
l
, ei UNITED STATES
- Q NUCLEAR RESULATORY COMMISSION
- WASHINGTON. D.C. 20666-0001 3_(FETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION CORPORATE RESTRUCTURING OF GREAT BAY POWER CORPORATION AND FORMATION OF A HOLDING COMPANY NORTH ATLANTIC ENERGY SERVICE CORPORATION. ET AL SEABROOK STATION. UNIT NO. 1 DOCKET NO. 50-443
1.0 INTRODUCTION
By letter dated May 8,1996, North Atlantic Energy Service Corporation, acting for itself and as agent for the joint owners of Seabrook Station, Unit No.1 (Seabrook), submitted an application, pursuant to 10 CFR 50.80, for approval l of a proposed corporate restructuring of Great Bay Power Company (Great Bay) that would involve the formation of a holding company, Great Bay Holdings Corporation, of which Great Bay would become a wholly-owned subsidiary. Under the terms of the reorganization, the equity owners of Great Bay will exchange their ownership in Great Bay for ownership in Great Bay Holdings Corporation on a share for share basis. Following the restructuring, Great Bay will continue to be a licensee of Seabrook, and no direct transfer of the operating )
license or other interests in Seabrook will result from the restructuring. l The application was supplemented with additional information submitted on October 18, 1996, and December 9, 1996.
Great Bay was established in 1994 as a successor to EUA Power Company, which l had filed for reorganization under Chapter 11 of the U.S. Bankruptcy Code.
Great Bay is a non-operating owner of an undivided 12.1324 percent share of !
Seabrook. Great Bay sells its proportionate share (about 140 MWe) of the power from Seabrook on the wholesale electricity market. Great Bay's stated i intent has been to sell wholesale power through long-term power contracts with purchasers.
Although the formation of the holding company, in and of itself, is neither
< unusual nor suggestive of unique safety concerns, the application contained information that indicates that Great Bay may not be an electric utility, irrespective of the proposed reorganization. The staff believes that Great Bay does not meet the NRC's definition of electric utfifty as provided in 10 CFR 50.2. Great Bay has successfully entered only one long-term contract for 10 MWe. It sells its remaining 130 MWe share of Seabrook power on the spot wholesale market, which by definition is subject to market-set rates.
Pursuant to 10 CFR 50.80, no license for a production or utilization facility, or any right thereunder, shall be transferred, assigned, or in any manner 9701270151 970122 PDR ADOCK 05000443 P PDR ,
l
. disposed of either voluntarily or involuntarily, directly or indirectly, through transfer of control of the license to any person, unless the Commission gives its consent in writing. The Commission may approve the transfer of control of a license, after notice to interested persons (61 FR 60121). The approval is contingent upon the Commission's determination that the proposed transferee is qualified to hold the license and the transfer of such control is otherwise consistent with the applicable provisions of law, regulations, and orders of the Commission.
2.0 fjNANCIAL QUALIFICATION ANALYSIS Based on the information provided in Great Bay's application and a follow-up meeting with Great Bay on September 30, 1996, the staff finds that there will be no near-term worsening, and there may be near- and longer-term enhancement, of Great Bay's financial ability to contribute appropriately to the operation and decommissioning of Seabrook as a result of the proposed restructuring.
If Great Bay is no longer an electric utility, Great Bay is required to meet the financial qualifications review requirements of 10 CFR 50.33(f)(2). In reviewing Great Bay's current financial statements submitted with its May 8, 1996, application to form a holding company, and supplemental projections
, through 1998 submitted on October 18, 1996, the staff concluded that Great Bay appears to meet these requirements. Great Bay has prcjected operating income and cash flow based on what appear to be reasonable projections of the spot l market price of power from Seabrook for the foreseeable future. Great Bay ,
indicates that these projections would be the same with or without formation !
of the proposed holding company. Thus, Great Bay has demonstrated that it 1
" possesses or has reasonable assurance of obtaining the funds necessary to l cover estimated operation costs for the period of the license," and thus, is financially qualified to hold the license, notwithstanding the proposed restructuring.
In a separate, but related action, the Commission has granted a 6-month temporary exemption to Great Bay from certain requirements of 10 CFR 50.75(e)(2) which allows Great Bay time to obtain a surety bond or other allowable decommissioning funding assurance mechanism for non-electric utilities. In view of this exemption, the staff concludes that Great Bay's lack of a surety bond or other mechanism does not impact the staff's financial qualifications analysis.
1 However, because of the NRC's concern that corporate restructuring can lead to !
a diminution of assets necessary for the safe operation and decommissioning of l a licensee's nuclear power plants, the NRC has sought to obtain commitments I from licensees that initiate restructuring actions not to transfer significant assets from the licensee without notifying the NRC. In its submittal date1 December 9, 1996, Great Bay stated that:
... Great Bay agrees to provide the Director of Nuclear Reactor Regulation with a copy of any application to any other regulatory authority, at the time it is filed, to transfer (excluding grants of a i security interest or liens) from Great Bay to its proposed parent
i . . l P
j company, or to any other affiliated company, facilities for the prduction, transmission or distribution of electric energy having a depreciated book value exceeding ten percent (10%) of Great Bay Power Corporation's consolidated net utility plant, as recorded on its j books of account."
-! The staff believes that this commitment, as a condition to the NRC's consent 4 - to the proposed restructuring, enables the NRC to ensure that Great Bay will l 2
continue to maintain adequate resources to contribute to the safe operation i and decommissioning of Seabrook.
l In view of the foregoing, the staff concludes that the proposed restructuring will not adversely affect Great Bay's financial qualifications with respect to the operation and decommissioning of the Seabrook unit.
3.0 ANTITRUST REVIEW
- - According to Great Bay, after the formation of the parent holding company over Great Bay, the current equity owners of Great Bay will become the equity l owners of Great Bay Holdings Corporation, the parent company. The staff has
! conducted a threshold competitive (antitrust) review to determine whether any
- significant changes in the relevant markets will result from the restructuring. The staff concludes that there is no apparent basis on which a finding that significant changes will result can be made.
l Thus, there do not appear to be antitrust issues for which the NRC is responsible that have been raised by Great ifay's proposed action.
l 4.0 FOREIGN OWNERSHIP. CONTROL. OR DOMINATION
. None of Great Bay, or its new parent company will be owned, controlled, or dominated by any alien, foreign corporation, or foreign government.
5.0 ENVIRONMENTAL CONSIDERATION
S
! Pursuant to 10 CFR 51.21 and 51.35, an environmental assessment and finding of r i~
no significant impact was published in the Federal Reaister on January 22, 1997 (62 FR 3317). ;
6.0 CONCLUSION
S In view of the foregoing, the staff concludes that Great Bay's proposed
- corporate reorganization and formation of a parent holding company which will own 100 percent of Great Bay:
(1) will not affect the qualifications of Great Bay as a non-operating .
holder of the Seabrook license; and r !
8 r-(2) is otherwise consistent with the applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto.
4 Principal Contributors: R. Wood A. De Agazio
]
Date: January 22, 1997 l-i r
4 l
1 a
d
/
i Y
h' e 1
i 1
e i
- '~
. . - s .911IRIBUTION:
Docket File -
PUBLIC PDI-1RF F. Miraglia/A. Thadani R. Zimmerman
,. S. Varga t
'J. Zwolinski
. S. Bajwa S. Little A. De Agazio
. 0GC G. Hill (2)
- -ACRS.
SECY W. Dean J. Rogge, Region I 1
o :
1-
+
l d
t c