ML20133N418

From kanterella
Jump to navigation Jump to search
Advises That IE Bulletin 79-02,Rev 1, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts Should Be Dispatched for Action by 790621 to Licensees & CP Holders.Draft Ltr to Licensees Encl
ML20133N418
Person / Time
Issue date: 06/21/1979
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Grier B, James Keppler, James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20133M133 List:
References
FOIA-85-301 IEB-79-02, IEB-79-2, NUDOCS 8508130482
Download: ML20133N418 (2)


Text

_

[og UNITED STATES

[

NUCLEAR REGULATORY COMMISSION g ,

WASHINGTON, D. C. 20555

,g jy j

  • Q' Ci *ooo'4,$

& fa

  • p M N .'

JY, g/*

June 21, 1979 8 6f MEMORANDUM FOR: B. H. Grier, Director; Region 1 J. P. O'Reilly, Director, Region II J. G. Keppler, Director, Region III K. V. Seyfrit, Director, Region IV R. H. Engelken, Director, Region V Q f4p-E=UN

-FROM: Norman C. Moseley, Director, Division of Reactor Operations DEkb *.

Inspection, IE 97.7 7 n-

SUBJECT:

IE BULLETIN NO. 79-02 REVISION NO. 1, PIPE SUPPORT BASE PLATE DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS Th3 subject IE Bulletin should be dispatched for action by June 21, 1979, to all power reactor facilities with an operating license or a construction permit.

Th3 text of the bulletin and draft' letter to the licensee are enclosed for this purpose.

,,.cf W Norman C.'Moseley, Director Division of Reactor Operations Inspection

. Office of Inspection and Enforcement

Enclosures:

1. Draft Transmittal Letter
2. IE Bulletin No. 79-02 Revision No. 1 CONTA'CT: H. Wong, IE 49-28180 l

l 8508130482 850703 PDR FOIA HERRMAN85-301 PDR

. . .~ . - - . = . . . . . .

f.~~~ =~ (Draft letter to all power reactor facilities with an operating license or a

~9{! 7 constructionpermit)

IE Bulletin No. 79-02 (Revision No. 1)

. Addressee: .

Enclosed is IE Bulletin No. 79-02 Revision No.1, which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, Signature (Regional Director)

~

gj -

Enclosure:

IE Bulletin No. 79-02 Revision No. 1

?

W 7,"7. .

.~~':""

  • e e es. ee , m m

,