ML20133M483

From kanterella
Jump to navigation Jump to search
Staff Requirements Memo Re 790628 Briefing in Washington,Dc on Seismic Design Capability of Operating Reactors & Responses to IE Bulletin on Seismic Analysis.Ie Will Issue Bulletin on Verification of Seismic Design Capability
ML20133M483
Person / Time
Issue date: 06/29/1979
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20133M133 List:
References
FOIA-85-301, REF-10CFR9.7 NUDOCS 8508130139
Download: ML20133M483 (7)


Text

"

p an.<,- I i 1- ShKLIMini KcGUKU UUP.L

& UNITED STATES -

8 ,, f [ NUCLEAR REGULATORY COMMlb..JN W ASHIN GTON,0.C. 20555

g"j . t

'*A N e June 29, 1979 OFFICE OF THE SECRETARY MEMORANDUM FOR THE RECORD i FROM: amuel J. Chilk, cretary

SUBJECT:

BRIEFING ON SEISMIC DESIGN CAPABILITY OF OPERATING REACTORS AND RESPONSES TO OIE BULLETIN ON SEISMIC ANALYSIS, 9:30 A.M., THURSDAY, JUNE 28, 1979, COMMISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)

Chairman Hendrie and Commissioner Gilinsky were provided a summary briefing concerning the ongoing review of seismic design capability of operating reactors, and were informed of the responses to the I&E bulletins that have been issued on this subject.

Although the Commission placed no requirements on the staff at this meeting, they noted that:

1. I&E would be issuing a bulletin on verification of seismic design capability the week of June 25, 1979, and;
2. staff will periodically inform the Commission on their findings in the seismic design area.

CC:

Public Document Room I'

( j lk.

/

8508130139 850703 PDR FDIA

(

HERRMAN85-301 PDR

  • h' 4

-e

I i

U.S. SEISMIC ZONE MAP l

g .

y -

y i y '

is-SEISMIC DATA ADAPTED FROM: EERl, JULY 1976, VOL.10, NO. 4, I ALGERMISSEN & PERKINS, U.S.G.S., PG. 78.

l 'arNUCLEAR POWER PLANT DATA FROM: NU_C_ LEAR NEWS INDUSTRY REPORT 1977-78 A REPRINT, LA GRANGE PARK, ILL.1978 Rnna

. .,g, t

, i ,

\, :

i .,'-

i

'  : Q,,, T . - - - . . ,

,. g

,g' j;,j, -).

' i.' y t=TaOir _ _

    • - ,c.

- ==

T

/

..Q s .

m 1_

g' ,

N. ,;,,:  :. ,,,

', ' > ,:, , v - ,l:' : '

5 .- _..;.__

^ .

'^!' i q>l:,,.,, ,=,( A f /6

~

>:),;iiiij,h.-._.._'

vn. . f, 7. .. ,n,.

" F:a=. a, s 8.

LEGEND' . L,; uS i  ;

. m

' un ' ~

>06g s-is g -

s '-%

. y k :ljy,,,'i.,

I e,

t ,,

,, p' :'-MILES 0 200 400

',' [

. se  ;

(06 g > 03 g e, - - ~ _g __

0 2* d#

NUCLEAR POdER se -

8 KIL METERS g!!!!!!!,

n

' <039>0'9 PLANTS e g

, (o1g & OPERATING IAgdi ORDERED OR UNDER wiss amiumums

% CONSTRUCTION eg og ""

. tp* e 1)( i 1[ i i i i i

DATE DESCRIPTION OF ITEM NRC SPECIAL INSPECTION (Item 7 only)

/1/79

- Proposed S&W Briefings ,

Chronology Table - Pipe Stress Analysis Issue BEAVER VALLEY FASR MAINE YANKEE FSAR CHAPTER 16 - Current Trends in the Seismic Analysis and Design of High-Rise Structures - N. M. Newmark 6/9/72 ON THE SIMULTANEOUS APPLICATION OF THE VERTICAL AND HORIZONTAL RESPONSE SPECTRA IN THE SEISMIC ANALYSIS ,

11/24/75 SRP NUREG 75/087 - SEISMIC SYSTEM ANALYSIS Ltr Maine Yankee to R. Reid, ORS No. 4 re: MYAPC Ltr 5/5/79 to NRC dtd 5/4/79 - and transmittal of an evaluation performed by MY of the conservatism inherent in the design of MY May 1973 Regulatory Guide 1.48 - Design Limits and Loading Combinations for Seismic Category 1 Fluid System Components 0

L _

DATE D SCRIPTION OF ITEM 5ff5 Af f t n ullEr, July 16, 1979 Memo to Regions frm EJordan, IE RE: CRITERIA FOR EVALUATING OPERABILITY OF SEISMIC DESIGN PIPING SUPPORTS RELATING TO IEB 79-02 & 79-14 June 29, 1979 MEM0 JORDAN TO EISENHUT RE: Review Responsibility for IE Bulletins 79-02, 04 and 07 March 5, 1979 Memo N. Moseley, IE to Regions re: IE Bulletin; No.

79-02 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts June 21, 1979 Memo N. Moseley, IE to Regions re: IE Bulletin 79-02 Revision No.1, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts March 30,1979 ' Memo N. Moseley, IE to Regions re: IE Bulletin 79-04 Incorrect Weights for S2 wing Check Valves Manufactured by Velan Engineering Corporation April 14, 1979 Memo N. Moseley, IE to Regions re: IE Bulletin 79-07, Seismic Stress Analysis of Safety-Related Piping July 18, 1979 Ltr to Met Ed frm Grier transmitting IE Bulletin 79-14, Revision 1 July 18, 1979 Memo dtd 7/19/79 to Grier and Regions frm Jordan, IE re: Temporary Instruction re IE Bulleting 79-14

DATE DESCRIPTION OF ITEMS 6/12/79 Note to Russell frm B. Jackson re: modification to '

overview cf Beaver Valley 4/26/79 Memo Denton to Kennedy thru Gossick re: Seismic Evaluations of Five Nuclear Power Plants M r oR 0e( f/ay + con &edi/4tysM May 24, 1979 Ltr Reid to Groce Yankee Atomic re: Tennination of Order to Show Cause, SER, Discussion of Conservatisms in MY's Seismic Design 8/8/79 Ltr to Dunn, Duquesne frm Denton re: Order for Termination of proceeding initiated by Show Cause Order dtd 3/13/79 8/14/79 Ltr Case to Berry, PASNY re: Order lifting the suspension 7/11/79 ACRS 6/28/79 COMMISSION BRIEFING t

i 6/14/79 COMMISSION BRIEFING l 5/30/79 COMMISSION BRIEFING 5/3/79 COMMISSION BRIEFING l )

l l

i  :- - -

DESCRIPTION OF DOCUMENT RELATED TO DATE 2/5/80 Ltr fm Russell to Moskovitz in response to Moskovitz ltr of 1/28/80 & phone call of 2/4/80 - provides infomation requested 1/30/80 Ltr fm Russell to Moskovitz in response to his 1tr dtd 12/3/79 regarding testimony of Ronald W. Haupt 1/29/80 Note to Moskovitz fm Russell per phone conversation of 1/29/80 - sent ltr dtd 12/12/79 to H. Myers 1/28/80 Moskovitz to Russell transmitting" request from intervenors (copy attached).

1/24/80 Ltr Duquesne Light to Grierre: LER80-3/01P 1/16/80 Ltr Ahearne to Udall in response to Udall's ,

ltr of 12/3/79 requesting clarification ,

on algebraic summantion uesne re: Seismic

! Nanaiyhik Shhegm g 1/3/80 (B) Daily Highlight - Beaver Valley calculations 12/28/79 Russell to M6skovitz in response to ltr dtd 12/18/79 fm Moskovitz - provides technical qualifications - Senator Hart's 1tr of 10/25/79 contains updated table 12/20/79 Russell to Moskovitz regarding testimony i

of 10/25/79 and changes to same also the problems of having to rtn to testify 12/20/79 Ltr to Gerald G. Fain, Stone & Webster fm Udall in response to Fain's 1tr of 11/16/79 regarding c&lculations related to the seismic design of 5 plants 12/18/79 4 ) Ltr Moskovitz to Russell re errata sheet prepared by Gerald Amero indicating correction I

to deposition & reguest for qualifications (see answer dtd 12/28/79) l i

i

,---7+-

, , ~ ~ - ,- _,

$ESCRIPTION OF DOCUMENT RELATED TO GATE 10/25/79 Ltr Hendrie to Hart in response to Hart's 6/26/79 ltr on shutdown of 5 plants 12/28/79 Letter S

hhete!Mnf6n9UbSne"lihi$of$$Nhan 10/11/79 Letter 10/16/79 Mtg sumary of Mtg of 9/5/79 re: Seismic Analyses for Surry Units 1 and 2. Steam Generator Repair for Surry Unit 2 and Licensing of North Anna 10/11/79 LTR to R. Ryan fm Dignman re: MY Investigation 10/23/79 Letter 8/29/79 Ltr to Power Engineering (F. Olds) fm Eisenhut re: article in 7/79 issue of Power Engineering "No Cause for Seismic Shutdowns" 8/10/79 Memo to Seyfriet, RIV fm Reinmuth, IE re: Irispection of S&W (Rept. No. 99900509/79-03)-

7/24/79 Ltr Maine Yankee to NRC re: MY Piping Seismic Analysis Compargfi0 79 Letter 5/29/79 MY Ltr to NRC re: request to defer mtg 5/2/79 Letter 5/22/79 Memo Ahearne to Denton re: Maine Yankee Seismic 4

Anay1 sis Order .

Memo Choamissioner Kennedy to Denton re: Proposed 5/18/79 (A)

Temination of Order to Show Cause (Maine Yankee) 5/18/79 (B) MY to NRC re: Maine Yankee Piping Seismic Review 5/16/79 Memo Comissioners thru EDO fm Denton re: Staff Requirements from the 5/3/79 Connission briefing on the Status of Maine Yankee 4/10/79 Memo to File fm D. A. Beckman, IE Inspector re: Record of Telecon with Mr. Dan Ford, UCS, 3/20/79 4/5/79 Memo to Gilinsky fm D'enton re: Beaver Valley Water Hammer m & Pipe Vibration Problems 3/22/79 (A) Memo to NRR DD's frm HRDenton re: Review of 5 Plant 12/28/79 Letter Shutdown l

VEPCO ltr to O'Reilly, IE, Region II re: LER 79-004/01T-0 2/5/80 Request 1 3/22/79 (B)

$nkueScb"$flkC$$uS8N!b0d $n k. h PASNY Ltr to Grier, Region 1 re: LER 79-014/01t-0 2/5/80 Request 1 3/21 /79

      • 3/27/79 Memo Fine to Crutchfield, re: Cost of Replacement Power

^ ~~

~' ~ ~~ ~ ~

. . . ^T~  :::: : :L