IR 05000302/1985036

From kanterella
(Redirected from ML20133J480)
Jump to navigation Jump to search
Insp Rept 50-302/85-36 on 850823.No Violation or Deviation Noted.Major Areas Inspected:Emergency Preparedness,Emergency Response Facilities,Nrc Response Team Coordination & NRC Hurricane Response Procedures
ML20133J480
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/26/1985
From: Cunningham A, Stansberry W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20133J473 List:
References
50-302-85-36, NUDOCS 8510180463
Download: ML20133J480 (2)


Text

{{#Wiki_filter:r

 .

pm Krco UNITED STATES g 'o NUCLEAR REGULATORY COMMISSION

[' ',    REGION 11 g  j   101 MARIETTA STREET. *
 *   ATLANTA. GEORGI A 30323
\,
 *****
 /    OCT 1 1985 Report No.: 50-302/85-36 Licensee: Florida Power Corporation 3201 34th Street, South St. Petersburg, FL 33733 Docket No.: 50-302      License No.:  DPR-72 Facility Name: Crystal River 3 Inspection Conducted: A  st 23 1985 Inspector:   2 _  /     ,2Y $[

W. W;'Stansberr-y ~ f., SteSfigned Approved by: [ eg u < /. [[ 4 b' A.' L. Cunninghani, Agi41ig Section Chief Dite Signed Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, announced inspection entailed 8 inspector-hours onsite in the areas of emergency preparedness, emergency response facilities, NRC Response 1 Team coordination and NRC hurricane response procedures and high frequency radio equipment on sit Results: Of the four areas inspected, no violations or deviations were identifie . 8510180463 851001 PDR ADOCK 05000302 G PDR ~ ~ _ _ _ . - - - , ~.. . _ _ . - - . _ _ _ _ . _ . . . _ . _ - _ . _ _ _ , - . _ _ _ _ _ - - ~ . . _ . , . - _ _ _ . . .

       .

- _

 .
 *
 .
,

REPORT DETAILS Persons contacted Licensee Employees

  * Sarah Johnson, Radiological Planning Specialist
  *Karl Newschaefer, Supervisor, Emergency Planning
  * John Stephenson, Radiological Emergency Planning Specialist
  * Larry Hill, Manager, Site Nuclear Services Other licensee employees contacted included four security force members and one office personne * Attended exit interview Exit Interview The inspection scope and findings were summarized on August 23, 1985, with
       '

those persons indicated in paragraph 1 above. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio . Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspectio . Independent Inspection Effort (92706) The inspector held discussions with licensee representatives regarding emergency preparedness, emergency response facilities, Region II Incident Respense Teams, NRC-licensee interface during emergencies, and NRC hurricane response procedures, and high frequency radio equipment. Experiences and lessons-learned from the Full Field Exercise of the Federal Radiological Emergency Response Plan at St. Lucie in March 1984 were discussed. A draft copy of the logistical needs of the Region II Incident Response Teams was presented and discusse The inspector discussed NRC response team organization, NRC concept of operation, roles and responsibility of the site team, and interface areas between NRC and licensee response team. The NRC Hurricane response team and High Frequency Radio equipment installed at their facility were reviewed and discussed. The licensee was informed that the antenna and tuners have been mounted and should not be dismounte Region II future plans to improve the hurricane communication system was also discusse , w____.___..._____...__________._._____.___ }}