ML20133C514
ML20133C514 | |
Person / Time | |
---|---|
Site: | Catawba, 05000000 |
Issue date: | 09/13/1983 |
From: | Mauldin L DUKE POWER CO. |
To: | |
Shared Package | |
ML20132B649 | List:
|
References | |
FOIA-84-722 NUDOCS 8507200516 | |
Download: ML20133C514 (4) | |
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20212J1651999-10-0101 October 1999
[Table view]Exemption from Requirements of 10CFR54 Re Renewal of Operating License for Npps.Commission Grants Licensee Exemption Which Removes Schedular Requirement Which Prohibit Licensee from Applying to Commission for Renewed License ML20198L0241998-12-29029 December 1998 Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57,re Isolation of Main Steam Branch Lines Penetrating Containment for Licenses NPF-35 & NPF-52, Respectively ML20197J2871998-12-11011 December 1998 Initial Decision (Application for Senior Reactor Operator License).* Appeal of R Herring of NRC Denial of Application for SRO License Denied.With Certificate of Svc.Served on 981211 ML20151W5721998-09-11011 September 1998 NRC Staff Presentation in Support of Denial of Senior Reactor Operator License for Dl Herring.* Staff Decision to Fail Dl Herring on Category a of SRO Exam,Clearly Justified. Staff Denial of Herring SRO License Should Be Sustained ML20151W5941998-09-11011 September 1998 Affidavit of Cd Payne.* Affidavit Re NRC Staff Proposed Denial of Rl Herring Application for Senior Reactor Operator License for Use at Catawba Nuclear Station,Units 1 & 2 ML20151Y0601998-09-11011 September 1998 Affidavit of DC Payne.* Supports Denial of Application of Rl Herring for SRO License ML20151W6131998-09-0808 September 1998 Affidavit of Mn Leach in Support of NRC Staff Response to Rl Herring Written Presentation.* ML20151W6311998-09-0808 September 1998 Affidavit of ET Beadle.* Affidavit Relates to Denial of Senior Reactor Operator License Application for Rl Herring. with Certificate of Svc ML20237B6931998-08-13013 August 1998 Rl Herring (Denial of Operator License for Plant).* Rl Herring Submitted Written Presentation Arguments,Data, Info Matl & Other Supporting Evidence,Per Presiding Officer 980630 Order & 10CFR2.1233.W/one Oversize Drawing ML20237B5571998-08-12012 August 1998 NRC Staff Request for Extension of Time to File Response to Rl Herring Written Presentation.* Granted by C Bechhoefer on 980818.W/Certificate of Svc.Served on 980818 ML20237A3831998-08-12012 August 1998 NRC Staff Request for Extension of Time to File Response to Rl Herring Written Presentation.* Staff Respectfully Requests Motion for Extension of Time of 2 Wks to Respond to Herring Presentation Be Granted.W/Certificate of Svc ML20236T8511998-07-21021 July 1998 Specification of Claims.* Rl Herring Claims That Answer Given on Exam Was Correct When TSs Are Considered & When Design Basis Document Considered in Conjunction W/Duke Power Nuclear Sys Div.W/Certificate of Svc.Served on 980727 ML20236F5391998-06-30030 June 1998 Memorandum & Order (Hearing File & Spec of Claim).* Orders That Brief Spec of Claims Should Be Filed by Herring,Telling Why He Believes Staff Erred in Grading Exam.Staff Must Furnish Hearing File.W/Certificate of Svc.Served on 980630 ML20236F5631998-06-30030 June 1998 Notice of Hearing.* Presiding Officer Has Granted Request of Rl Herring for Hearing on NRC Denial of Application for Operator License for Plant.W/Certificate of Svc.Served on 980630 ML20149K8221997-07-29029 July 1997 Exemption from Requirements of 10CFR70.24, Criticality Accident Requirements. Exemption Granted TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20087K9581995-08-17017 August 1995 Exemption from Requirement of 10CFR50,App J,Re Delay Performance of Type a Leakage Rate Test ML20081C1581995-03-0707 March 1995 Exemption from Requirements of 10CFR50,App J,Re Delay of Next Required Type a Leakage Rate Test for 16 Months ML20065P4491994-04-21021 April 1994 Comment Opposing Proposed Rule 10CFR50.55 Recommendation to Incorporate Proposed Rule to Adopt ASME Code Subsections IWE & Iwl ML20044G7371993-05-25025 May 1993 Comment on Proposed Rules 10CFR170 & 171, FY91 & 92 Proposed Rule Implementing Us Court of Appeals Decision & Rev of Fee Schedules;100% Fee Recovery,FY93. Opposes Rule ML20101R5931992-07-0606 July 1992 Comment on Proposed Rule 10CFR50 Re Loss of All Alternating Current Power & Draft Reg Guide 1.9,task DG-1021.Opposes Rule ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML20087F7471992-01-15015 January 1992 Comment Opposing Rev 1 of NUREG-1022, Event Reporting Sys ELV-01267, Comment on Proposed Rule 10CFR71 Re Compatibility of Pu Air Transport Regulations W/Iaea Stds.Supports EEI-UWASTE/NUMARC Comments to Be Provided to NRC by 9002091990-02-0707 February 1990 Comment on Proposed Rule 10CFR71 Re Compatibility of Pu Air Transport Regulations W/Iaea Stds.Supports EEI-UWASTE/NUMARC Comments to Be Provided to NRC by 900209 ML20011E4861990-02-0707 February 1990 Comment on Proposed Rule 10CFR71 Re Compatibility of Pu Air Transport Regulations W/Iaea Stds.Supports EEI-UWASTE/NUMARC Comments to Be Provided to NRC by 900209 ML20248D2831989-09-28028 September 1989 Notice of Appearance.* Advises That Author Will Enter Appearance in Proceeding on Behalf of Nrc.W/Certificate of Svc ML20247Q2661989-09-26026 September 1989 Establishment of Aslb.* Board Will Comprise of Mb Margulies, Chairman & Oh Paris & Fj Shon,Members.W/Certificate of Svc. Served on 890926 B13367, Comment on Proposed Rules 10CFR30,40,50,60,70,72 & 150 Re Preserving Free Flow of Info to Commission.Nrc Made Wise Choice to Not Impose Any Obligation on Private Parties to Include Affirmative Statement in Employment Agreements1989-09-20020 September 1989 Comment on Proposed Rules 10CFR30,40,50,60,70,72 & 150 Re Preserving Free Flow of Info to Commission.Nrc Made Wise Choice to Not Impose Any Obligation on Private Parties to Include Affirmative Statement in Employment Agreements ML20248C8751989-09-13013 September 1989 Response to Order Modifying Licenses & Order to Show Cause Why Licenses Should Not Be Revoked.* Requests Hearing on Issues,Including Funds for Equipment.Supporting Info Encl ML20246J6571989-08-31031 August 1989 Order Imposing Civil Monetary Penalty on Licensee in Amount of $75,000 for Violations Noted in Insp on 881127-890204. Payment of Civil Penalty Requested within 30 Days of Order Date.Evaluations & Conclusions Encl ML20247J8921989-08-31031 August 1989 Order Imposing Civil Monetary Penalty in Amount of $75,000, Based on Violations Noted in Insp on 881127-890204,including Operation in Modes 1-4 W/One Independent Containment Air Return & Hydrogen Skimmer Sys Inoperable for 42 Days ML20246C7141989-08-18018 August 1989 Order to Show Cause Why CPs CPEP-1 & CPEP-2 Should Not Be Revoked & Requiring Licensee to Notify Commission at Least 30 Days Before Taking Possession of Any Classified Equipment ML20245G0721989-08-0303 August 1989 Comment on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. Recommends That NRC Recommendation on Trust Agreement Wording Be Deleted or NRC Should Grandfather Existing Trusts Such as for Plants ML20248B6201989-08-0202 August 1989 Comments on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. NRC Should Permit Use of Potential Tax Refund as Source of Decommissioning Funds ELV-00674, Comment Opposing Proposed Rules 10CFR50,72 & 170 Re Storage of Spent Nuclear Fuel in NRC-Approved Storage Casks at Nuclear Power Reactor Sites. 10CFR72.6(c) Should Be Revised to Provide for Storage W/O ISFSI Requirement1989-07-0707 July 1989 Comment Opposing Proposed Rules 10CFR50,72 & 170 Re Storage of Spent Nuclear Fuel in NRC-Approved Storage Casks at Nuclear Power Reactor Sites. 10CFR72.6(c) Should Be Revised to Provide for Storage W/O ISFSI Requirement ELV-00679, Comment on Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components. Agrees W/Numarc Comments Provided to NRC on 8906261989-07-0505 July 1989 Comment on Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components. Agrees W/Numarc Comments Provided to NRC on 890626 ML20246K4801989-07-0505 July 1989 Comment Opposing Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components ML20246D8811989-06-30030 June 1989 Comment Supporting Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components ML20245D2481989-06-16016 June 1989 Comment on Proposed Rules 10CFR50,72 & 170 Re Storage of Spent Nuclear Fuel in NRC-Approved Storage Casks at Nuclear Power Reactor Sites. NRC Must Consider Provision in Rule to Permit Indiscriminate Storage of Spent Fuel at Reactors ML20246Q2971989-05-15015 May 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20245J0191989-04-14014 April 1989 Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20244B3241989-04-10010 April 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20247A2971989-04-0404 April 1989 Comment Supporting Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20246M2771989-03-20020 March 1989 Decision.* Affirms Board Decision LBP-89-05 Granting CP & OL to Licensee.Certificate of Svc Encl.Served on 890321 ML20246N9471989-03-0808 March 1989 Comment on Proposed Rev 3 to Reg Guide 1.9 Re Selection Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants B13113, Comments on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants. Reg Guide Does Not Provide Flexibility1989-03-0808 March 1989 Comments on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants. Reg Guide Does Not Provide Flexibility JPN-89-008, Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants1989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants B13136, Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants.Proposed Rule on Maint Will Not Improve Maint in Plants Nor Improve Safety or Reliability of Plants.Proposed Rule Much Too Vague1989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants.Proposed Rule on Maint Will Not Improve Maint in Plants Nor Improve Safety or Reliability of Plants.Proposed Rule Much Too Vague ML20235V8541989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants. Util Committed to Goal of Achieving Improved Reliability & Safety Through Better Maint ML20235T3581989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Maint Programs for Nuclear Power Plants.Util Endorses Comments Filed by NUMARC & Nuclear Util Backfitting & Reform Group.Rule Fails to Provide Basis for Determining Effective Maint Program 1999-10-01 Category:TRANSCRIPTS MONTHYEARML20247R4091988-12-31031 December 1988
[Table view]Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20207A6561988-01-0707 January 1988 Testimony of T Murley Before Senate Labor & Human Resources Committee Re Plant ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20215K9781986-09-26026 September 1986 Limited Appearance Statement in Proceeding.Compares Shoreham W/Chernobyl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20203G3571986-07-24024 July 1986 Transcript of Commission 860724 Affirmation/Discussion & Vote in Washington,Dc Re TMI-2 Leak Rate Data Falsification & ALAB-836.Pp 1-6 ML20207A6301986-07-17017 July 1986 Partially Withheld Transcript of Unidentified Witness 840717 Deposition in Glenn Rose,Tx Re Const Insp.Supporting Documentation Encl ML20199H5601986-06-23023 June 1986 Partially Withheld Transcript of Telcon Re Feedback & Interview W/Comanche Peak Technical Review Team.Pp 1-15. Supporting Documentation Encl ML20199H5371986-06-23023 June 1986 Partially Withheld Undated Transcript of Feedwater Interview W/Comanche Peak Technical Review Team.Pp 1-11.Supporting Documentation Encl ML20198C5771986-05-14014 May 1986 Transcript of 860514 Discussion/Possible Vote on Full Power OL for Catawba 2 in Washington,Dc.Pp 1-86.Viewgraphs Encl ML20205J5191986-02-13013 February 1986 Transcript of Commission 860213 Affirmation/Discussion & Vote in Washington,Dc on SECY-86-31 Re Request for Reconsideration of TMI-2 Leak Rate Proceeding & Order on Shoreham.Pp 1-3 ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20155H8941986-01-0606 January 1986 Transcript of 860106 Discussions W/B Daniels & B Dieterich in Herald,Ca.Pp 1-79.Supporting Documentation Encl ML20155H9111986-01-0606 January 1986 Transcript of J Jones 860106 Interview in Herald,Ca.Pp 1-12 NUREG-1195, Transcript of 860105 Meeting in Herald,Ca Re Status Report Update.Pp 1-241986-01-0505 January 1986 Transcript of 860105 Meeting in Herald,Ca Re Status Report Update.Pp 1-24 ML20155H8411986-01-0404 January 1986 Transcript of Brock 860104 Interview in Herald,Ca.Pp 1-42 ML20155H7981985-12-31031 December 1985 Transcript of D Whitney 851231 Exam in Herald,Ca.Pp 1-52 ML20155H7741985-12-31031 December 1985 Transcript of DD Whitney & G Coward Exam in Herald,Ca.Pp 1-116.Supporting Documentation Encl ML20155H7421985-12-30030 December 1985 Transcript of DD Whitney 851230 Exam in Herald,Ca.Pp 1-39 ML20155H7261985-12-30030 December 1985 Transcript of M Peterson & D Jenks 851230 Exam in Herald,Ca. Pp 1-47 ML20155H7201985-12-29029 December 1985 Transcript of G Simmons 851229 Exam in Herald,Ca.Pp 1-82 ML20138P8591985-12-18018 December 1985 Transcript of Commission 851218 Affirmation/Discussion & Vote in Washington,Dc on SECY-85-391 Re ASLB Decision on Shoreham & SECY-85-241(A) on TMI-2 Leak Rate Falsification. Pp 1-5 ML20138K0661985-12-12012 December 1985 Transcript of 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Palo Verde 1 Leaseback & SECY-85-371 on Refund on Black Fox License Fee.Pp 1-4 ML20137R8771985-11-26026 November 1985 Transcript of 851126 Affirmation/Discussion & Vote in Washington,Dc Re Extension of Environ Qualification Deadline for Fort St Vrain & Pilgrim.Pp 1-5 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20198E3301985-11-0505 November 1985 Transcript of ACRS Subcommittee on Cessar/Palo Verde Nuclear Generating Station 851105 Meeting in Washington,Dc.Pp 1-326. Supporting Documentation Encl ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20136G3881985-10-17017 October 1985 Transcript of 851017 Public Meeting in Glen Ellyn,Il W/Z Reytblatt Re Containment Leak Rates.Pp 1-135.Supporting Documentation Encl ML20134B2671985-08-0808 August 1985 Testimony of Jh Goldberg & RA Frazar Re Applicant Mgt of Facility Const.Pp 1-34.Supporting Documentation Encl ML20134B2891985-08-0808 August 1985 Testimony of DD Jordan Re Corporate Commitment to Safe Const & Operation of Facility.Pp 1-12.Supporting Documentation Encl ML20141H0991985-07-10010 July 1985 Testimony of Nj Palladino to Subcommittee on Energy Conservation & Power,Committee on Energy & Commerce,Us House of Representatives on Facility Licensing Process ML20127P0991985-06-28028 June 1985 Transcript of 850628 Supplemental Oral Argument in Bethesda, Md.Pg 99-169 ML20133C5201985-06-26026 June 1985 Undated Testimony of PM Reep Re Welding Inspector Concerns. Rept of Verbal Harassment Encl ML20137X5031985-06-25025 June 1985 Testimony of Hs Phillips Re Discovery of Quadrex Rept. Related Info Encl ML20137X5111985-06-21021 June 1985 Testimony of Hs Phillips Re Util Sys for Reporting Design & Const Deficiencies ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20199H5721985-06-17017 June 1985 Partially Withheld Transcript of 850617 Telcon in Bethesda, MD Re Discussion of Alleger Feedback on Facility.Pp 1-35. Supporting Documentation Encl ML20199A5431985-06-10010 June 1985 Partially Withheld Testimony of Wj Collins Re Welding Fabrication Concerns ML20147E7261985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Mj Stromberg in Parsippany,Nj.Pp 1-23 ML20147E5441985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Pr Clark in Parsippany,Nj.Pp 1-26 ML20147E6191985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Rl Long in Parsippany,Nj.Pp 1-20 ML20147E7391985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Nc Kazanas in Parsippany,Nj.Pp 1-45 ML20147E5171985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Bw Alatary in Parsippany,Nj.Pp 1-15.Marked-up 841107 & 19 Press Releases Also Encl 1988-07-21 Category:DEPOSITIONS MONTHYEARML20247R4091988-12-31031 December 1988
[Table view]Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20207A6561988-01-0707 January 1988 Testimony of T Murley Before Senate Labor & Human Resources Committee Re Plant ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20215K9781986-09-26026 September 1986 Limited Appearance Statement in Proceeding.Compares Shoreham W/Chernobyl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20203G3571986-07-24024 July 1986 Transcript of Commission 860724 Affirmation/Discussion & Vote in Washington,Dc Re TMI-2 Leak Rate Data Falsification & ALAB-836.Pp 1-6 ML20207A6301986-07-17017 July 1986 Partially Withheld Transcript of Unidentified Witness 840717 Deposition in Glenn Rose,Tx Re Const Insp.Supporting Documentation Encl ML20199H5601986-06-23023 June 1986 Partially Withheld Transcript of Telcon Re Feedback & Interview W/Comanche Peak Technical Review Team.Pp 1-15. Supporting Documentation Encl ML20199H5371986-06-23023 June 1986 Partially Withheld Undated Transcript of Feedwater Interview W/Comanche Peak Technical Review Team.Pp 1-11.Supporting Documentation Encl ML20198C5771986-05-14014 May 1986 Transcript of 860514 Discussion/Possible Vote on Full Power OL for Catawba 2 in Washington,Dc.Pp 1-86.Viewgraphs Encl ML20205J5191986-02-13013 February 1986 Transcript of Commission 860213 Affirmation/Discussion & Vote in Washington,Dc on SECY-86-31 Re Request for Reconsideration of TMI-2 Leak Rate Proceeding & Order on Shoreham.Pp 1-3 ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20155H8941986-01-0606 January 1986 Transcript of 860106 Discussions W/B Daniels & B Dieterich in Herald,Ca.Pp 1-79.Supporting Documentation Encl ML20155H9111986-01-0606 January 1986 Transcript of J Jones 860106 Interview in Herald,Ca.Pp 1-12 NUREG-1195, Transcript of 860105 Meeting in Herald,Ca Re Status Report Update.Pp 1-241986-01-0505 January 1986 Transcript of 860105 Meeting in Herald,Ca Re Status Report Update.Pp 1-24 ML20155H8411986-01-0404 January 1986 Transcript of Brock 860104 Interview in Herald,Ca.Pp 1-42 ML20155H7981985-12-31031 December 1985 Transcript of D Whitney 851231 Exam in Herald,Ca.Pp 1-52 ML20155H7741985-12-31031 December 1985 Transcript of DD Whitney & G Coward Exam in Herald,Ca.Pp 1-116.Supporting Documentation Encl ML20155H7421985-12-30030 December 1985 Transcript of DD Whitney 851230 Exam in Herald,Ca.Pp 1-39 ML20155H7261985-12-30030 December 1985 Transcript of M Peterson & D Jenks 851230 Exam in Herald,Ca. Pp 1-47 ML20155H7201985-12-29029 December 1985 Transcript of G Simmons 851229 Exam in Herald,Ca.Pp 1-82 ML20138P8591985-12-18018 December 1985 Transcript of Commission 851218 Affirmation/Discussion & Vote in Washington,Dc on SECY-85-391 Re ASLB Decision on Shoreham & SECY-85-241(A) on TMI-2 Leak Rate Falsification. Pp 1-5 ML20138K0661985-12-12012 December 1985 Transcript of 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Palo Verde 1 Leaseback & SECY-85-371 on Refund on Black Fox License Fee.Pp 1-4 ML20137R8771985-11-26026 November 1985 Transcript of 851126 Affirmation/Discussion & Vote in Washington,Dc Re Extension of Environ Qualification Deadline for Fort St Vrain & Pilgrim.Pp 1-5 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20198E3301985-11-0505 November 1985 Transcript of ACRS Subcommittee on Cessar/Palo Verde Nuclear Generating Station 851105 Meeting in Washington,Dc.Pp 1-326. Supporting Documentation Encl ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20136G3881985-10-17017 October 1985 Transcript of 851017 Public Meeting in Glen Ellyn,Il W/Z Reytblatt Re Containment Leak Rates.Pp 1-135.Supporting Documentation Encl ML20134B2671985-08-0808 August 1985 Testimony of Jh Goldberg & RA Frazar Re Applicant Mgt of Facility Const.Pp 1-34.Supporting Documentation Encl ML20134B2891985-08-0808 August 1985 Testimony of DD Jordan Re Corporate Commitment to Safe Const & Operation of Facility.Pp 1-12.Supporting Documentation Encl ML20141H0991985-07-10010 July 1985 Testimony of Nj Palladino to Subcommittee on Energy Conservation & Power,Committee on Energy & Commerce,Us House of Representatives on Facility Licensing Process ML20127P0991985-06-28028 June 1985 Transcript of 850628 Supplemental Oral Argument in Bethesda, Md.Pg 99-169 ML20133C5201985-06-26026 June 1985 Undated Testimony of PM Reep Re Welding Inspector Concerns. Rept of Verbal Harassment Encl ML20137X5031985-06-25025 June 1985 Testimony of Hs Phillips Re Discovery of Quadrex Rept. Related Info Encl ML20137X5111985-06-21021 June 1985 Testimony of Hs Phillips Re Util Sys for Reporting Design & Const Deficiencies ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20199H5721985-06-17017 June 1985 Partially Withheld Transcript of 850617 Telcon in Bethesda, MD Re Discussion of Alleger Feedback on Facility.Pp 1-35. Supporting Documentation Encl ML20199A5431985-06-10010 June 1985 Partially Withheld Testimony of Wj Collins Re Welding Fabrication Concerns ML20147E7261985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Mj Stromberg in Parsippany,Nj.Pp 1-23 ML20147E5441985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Pr Clark in Parsippany,Nj.Pp 1-26 ML20147E6191985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Rl Long in Parsippany,Nj.Pp 1-20 ML20147E7391985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Nc Kazanas in Parsippany,Nj.Pp 1-45 ML20147E5171985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Bw Alatary in Parsippany,Nj.Pp 1-15.Marked-up 841107 & 19 Press Releases Also Encl 1988-07-21 Category:NARRATIVE TESTIMONY MONTHYEARML20247R4091988-12-31031 December 1988
[Table view]Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 ML20196G0621988-06-21021 June 1988 Transcript of TVA 880621 Briefing in Bethesda,Md Re Util Reorganization & Plant Status ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20207A6561988-01-0707 January 1988 Testimony of T Murley Before Senate Labor & Human Resources Committee Re Plant ML20213F6861986-11-0707 November 1986 Transcript of Commission 861107 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-325A Concerning Perry Unit 1 OL & SECY-86-292A Concerning Order Re Dispute Between ASLB & Ofc of Investigations in Braidwood OL Hearing.Pp 1-4 ML20215K9781986-09-26026 September 1986 Limited Appearance Statement in Proceeding.Compares Shoreham W/Chernobyl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20203G3571986-07-24024 July 1986 Transcript of Commission 860724 Affirmation/Discussion & Vote in Washington,Dc Re TMI-2 Leak Rate Data Falsification & ALAB-836.Pp 1-6 ML20207A6301986-07-17017 July 1986 Partially Withheld Transcript of Unidentified Witness 840717 Deposition in Glenn Rose,Tx Re Const Insp.Supporting Documentation Encl ML20199H5601986-06-23023 June 1986 Partially Withheld Transcript of Telcon Re Feedback & Interview W/Comanche Peak Technical Review Team.Pp 1-15. Supporting Documentation Encl ML20199H5371986-06-23023 June 1986 Partially Withheld Undated Transcript of Feedwater Interview W/Comanche Peak Technical Review Team.Pp 1-11.Supporting Documentation Encl ML20198C5771986-05-14014 May 1986 Transcript of 860514 Discussion/Possible Vote on Full Power OL for Catawba 2 in Washington,Dc.Pp 1-86.Viewgraphs Encl ML20205J5191986-02-13013 February 1986 Transcript of Commission 860213 Affirmation/Discussion & Vote in Washington,Dc on SECY-86-31 Re Request for Reconsideration of TMI-2 Leak Rate Proceeding & Order on Shoreham.Pp 1-3 ML20137R9531986-02-0707 February 1986 Transcript of Commission 860207 Briefing in Washington,Dc on Staff Activities Re Tva.Pp 1-75 ML20155H8941986-01-0606 January 1986 Transcript of 860106 Discussions W/B Daniels & B Dieterich in Herald,Ca.Pp 1-79.Supporting Documentation Encl ML20155H9111986-01-0606 January 1986 Transcript of J Jones 860106 Interview in Herald,Ca.Pp 1-12 NUREG-1195, Transcript of 860105 Meeting in Herald,Ca Re Status Report Update.Pp 1-241986-01-0505 January 1986 Transcript of 860105 Meeting in Herald,Ca Re Status Report Update.Pp 1-24 ML20155H8411986-01-0404 January 1986 Transcript of Brock 860104 Interview in Herald,Ca.Pp 1-42 ML20155H7981985-12-31031 December 1985 Transcript of D Whitney 851231 Exam in Herald,Ca.Pp 1-52 ML20155H7741985-12-31031 December 1985 Transcript of DD Whitney & G Coward Exam in Herald,Ca.Pp 1-116.Supporting Documentation Encl ML20155H7421985-12-30030 December 1985 Transcript of DD Whitney 851230 Exam in Herald,Ca.Pp 1-39 ML20155H7261985-12-30030 December 1985 Transcript of M Peterson & D Jenks 851230 Exam in Herald,Ca. Pp 1-47 ML20155H7201985-12-29029 December 1985 Transcript of G Simmons 851229 Exam in Herald,Ca.Pp 1-82 ML20138P8591985-12-18018 December 1985 Transcript of Commission 851218 Affirmation/Discussion & Vote in Washington,Dc on SECY-85-391 Re ASLB Decision on Shoreham & SECY-85-241(A) on TMI-2 Leak Rate Falsification. Pp 1-5 ML20138K0661985-12-12012 December 1985 Transcript of 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Palo Verde 1 Leaseback & SECY-85-371 on Refund on Black Fox License Fee.Pp 1-4 ML20137R8771985-11-26026 November 1985 Transcript of 851126 Affirmation/Discussion & Vote in Washington,Dc Re Extension of Environ Qualification Deadline for Fort St Vrain & Pilgrim.Pp 1-5 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20198E3301985-11-0505 November 1985 Transcript of ACRS Subcommittee on Cessar/Palo Verde Nuclear Generating Station 851105 Meeting in Washington,Dc.Pp 1-326. Supporting Documentation Encl ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20136G3881985-10-17017 October 1985 Transcript of 851017 Public Meeting in Glen Ellyn,Il W/Z Reytblatt Re Containment Leak Rates.Pp 1-135.Supporting Documentation Encl ML20134B2671985-08-0808 August 1985 Testimony of Jh Goldberg & RA Frazar Re Applicant Mgt of Facility Const.Pp 1-34.Supporting Documentation Encl ML20134B2891985-08-0808 August 1985 Testimony of DD Jordan Re Corporate Commitment to Safe Const & Operation of Facility.Pp 1-12.Supporting Documentation Encl ML20141H0991985-07-10010 July 1985 Testimony of Nj Palladino to Subcommittee on Energy Conservation & Power,Committee on Energy & Commerce,Us House of Representatives on Facility Licensing Process ML20127P0991985-06-28028 June 1985 Transcript of 850628 Supplemental Oral Argument in Bethesda, Md.Pg 99-169 ML20133C5201985-06-26026 June 1985 Undated Testimony of PM Reep Re Welding Inspector Concerns. Rept of Verbal Harassment Encl ML20137X5031985-06-25025 June 1985 Testimony of Hs Phillips Re Discovery of Quadrex Rept. Related Info Encl ML20137X5111985-06-21021 June 1985 Testimony of Hs Phillips Re Util Sys for Reporting Design & Const Deficiencies ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20199H5721985-06-17017 June 1985 Partially Withheld Transcript of 850617 Telcon in Bethesda, MD Re Discussion of Alleger Feedback on Facility.Pp 1-35. Supporting Documentation Encl ML20199A5431985-06-10010 June 1985 Partially Withheld Testimony of Wj Collins Re Welding Fabrication Concerns ML20147E7261985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Mj Stromberg in Parsippany,Nj.Pp 1-23 ML20147E5441985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Pr Clark in Parsippany,Nj.Pp 1-26 ML20147E6191985-05-0808 May 1985 Transcript of 850508 Investigative Interview of Rl Long in Parsippany,Nj.Pp 1-20 ML20147E7391985-05-0808 May 1985 Partially Deleted Transcript of 850508 Investigative Interview of Nc Kazanas in Parsippany,Nj.Pp 1-45 ML20147E5171985-05-0202 May 1985 Transcript of 850502 Investigative Interview of Bw Alatary in Parsippany,Nj.Pp 1-15.Marked-up 841107 & 19 Press Releases Also Encl 1988-07-21 |
Text
.
Applicants' Exhibit
)
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
DUKE POWER COMPANY, et & )
Docket Nos.
50-413
)
50-414 (Catawba Nuclear Station,
)-
Units 1 and 2)
)
TESTIMONY OF LARRY MAULDIN 1
Q.
STATE YOUR NAME AND YOUR WORK ADDRESS.
2 A.
Larry Mauldin, Duke Power Company, Catawba Nuclear Station, 3
P.O. Box 223, Clover, SC 29710.
4 Q.
WHAT IS YOUR PRESENT JOB WITH DUKE POWER COMPANY?
5 A.
I am a U.T. Inspector.
6 Q.
SUMMARIZE YOUR EXPERIENCE AND QUALIFICATIONS, INCLUDING 7
OTHER NON-DUKE JOBS, EDUCATION, CERTIFICATIONS, AND 8
COMPANY SPONSORED COURSES AND TRAINING.
9 A.
I had no job related experience or qualifications until I came with 10 Duke.
I took the GED test at Gr.ston College for my high school 11 diploma and have had no other courses or training, except for 12 departmental policies.
I am certified in Magnetic Testing (MT),
13 Penetrant Testing (PT), Ultrasonic Testing (UT).
14 Q.
WHAT OTHER JOB POSITIONS HAVE YOU HELD WITH DUKE POWER 15 COMPANY?
16 A.
On August 1, 1978, I hired on with the utility crew at Catawba.
17 Then on March 5,
- 1979, I
was transferred into the NDE 18 Department.
I started as a learner but was promoted to General 19 Clerk B on June 25, 1979.
On January 21, 1980, I was promoted to 20 a General Clerk A until February 4,19P0 when I was certified as
\\
8507200516 850524 i
/, hl PDR FOIA BEL.L84-722 PDR p, g g 73 3
{
1 an Inspector B.
I stayed in this position until February 2,1982 g
l 2
and was promoted to my present position as an Inspector A.
3 Q.
ARE YOU FAMILIAR WITH WHAT IS COMMONLY REFERRED TO AS 4
THE WELDING INSPECTOR CONCERNS WHICH WERE EXPRESSED IN 5
LATE 1981/EARLY 1982?
6 A.
I am not familiar with these concerns.
7 Q.
WHAT IS YOUR UNDERSTANDING OF WHAT THESE CONCERNS 8
WERE?
9 A.
I do not know these concerns.
10 Q.
DID YOU EXPRESS ANY CONCERNS AS A WELDING INSPECTOR TO 11 ANY OF THE TASK FORCES OR TO DUKE POWER MANAGEMENT?
12 A.
No, I haven't discussed these concerns with a Task Force.
~
13 Q.
TO WHOM DID YOU EXPRESS YOUR CONCERNS?
14 A.
I was interviewed by a Task Force about 2 years ago but don't
_L 15 know which one.
The interviewer was from River Bend Steam 16 Station.
I don't recall his name, but this wasn't about the Welding 17 Inspector concerns.
18 Q.
DID YOU ATTEND ANY MEETINGS WITH TASK FORCE AND/OR QA 19 MANAGEMENT MEMBERS WHERE THE TASK FORCE FINDINGS,
20 CONCLUSIONS AND RECOMMENDATIONS WERE DISCUSSED?
21 A.
The only meeting with a Task Force that I had was about my job 22 and how I think that I performed it.
23 Q.
WERE THERE ANY CHANGES MADE IN THE QA PROGRAM AFTER 24 THE WELDING INSPECTOR CONCERNS AND THE TASK FORCE 25 INVESTIGATION OF THESE CONCERNS?
26 A.
The only change I noticed was a change in supervisors.
' b 1
Q.
THE WELDING INSPECTOR CONCERNS HAVE BEEN 2
CHARACTERIZED AS CONCERNS ABOUT THE QUALITY AND 3
SAFETY OF CONSTRUCTION AT CATAWBA.
DO YOU AGREE OR 4
DISA' GREE WITH THAT CHARACTERIZATION?
5 A.
I am not familiar enough with the concerns to characterize them.
6 In my job as a UT inspector, I inspect welds after the visual 7
inspection has been performed.
In my opinion the quality and 8
safety of construction at Catawba were not affected by these 9
concerns.
The quality of the work that was approved by 10 inspectors has not been affected by the concerns.
11 Q.
DO YOU BELIEVE THAT~ THERE WAS A BREAKDOWN IN THE QA 12 PROGRAM OR THAT THE QA PROGRAM WAS NO LONGER WORKING 13 AT THE TIME THESE CONCERNS WERE EXPRESSED?
14 A.
I don't think that there was a breakdown in the QA Program, then L
15 or now.
16 Q.
DO YOU BELIEVE THAT THE CATAWBA PROJECT IS NOT BEING 17 CONSTRUCTED SAFELY?
18 A.
Yes, in my opinion, Catawba was and is being constructed safely.
I 19 Q.
IN YOUR VIEW, HAS THE QA PROGRAM BEEN EFFECTIVE WHILE i
20 YOU HAVE WORKED AS AN INSPECTOR AT CATAWBA?
21 A.
Yes, very much so.
22 Q.
ARE YOU AWARE OF ANY DEFICIENCIES IN CONSTRUCTION OR IN 23 THE QA PROGRAM WHICH WOULD CAUSE YOU TO QUESTION l
24 WHETHER CATAWBA IS SAFELY BUILT?
IF SO, PLEASE EXPLAIN.
25 A.
No.
i
\\.,
j
1 Q.
IS THERE ANYTHING ELSE YOU WOULD LIKE TO ADD TO YOUR 2
TESTIMONY?
3 A.
. No.
4 5
6 7
I hereby certify that I have read and understand this document, and 8
believe it to be my true, accurate and complete testimony.
.n 9
.I GnYN 1
12 Larr7Maulding 13 14 15 Sworn d subscribed before me j
16 this day of September,1983.
(