|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment 1999-09-09
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245B3881989-06-15015 June 1989 Responds to Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels.Util Actions Do Not Have Adverse Impact on Nuclear Reactor Safety to Extent That Protection of Safety of Environ Affected ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245B4051989-04-14014 April 1989 Responds to 881004 & 890119,23 & 0310 Ltrs Re Status of Investigation of Concerns About Corrosion Inhibitors & Design of Sampling Sys.Low Velocity of Liquid in Hotwell Sampling Considered Satisfactory ML20246N1521989-02-22022 February 1989 Responds to Re Amended Indemnity Agreement W/ Utils to Permit Storage of Spent Nuclear Fuel.Fr Notice Encl ML20206D9201988-11-0909 November 1988 Responds to Re NRC 880331 Response to Questions Raised Concerning Conditions at Plants & Recipient Proposal to Station Senior Operator in Control Room at All Nuclear Plants to Oversee Plant Operations ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20154D3891988-08-22022 August 1988 Partial Response to FOIA Request for Documents.Forwards App T Documents.Apps & T Documents Available in PDR ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20206E0051988-07-27027 July 1988 Responds to Enclosing Prior Correspondence W/Nrc Re Conditions at Ref Plants & 10CFR50.54(x) & (Y).Issues Raised Will Be Given Wide Dissemination in Fr & Careful Consideration by NRC ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20155K0211988-06-13013 June 1988 Partial Response to FOIA Request for Documents.Forwards App D Documents.App C Documents Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5) ML20151Y4681988-04-15015 April 1988 Partial Response to FOIA Request for Documents Re Event Involving Problems W/Msiv.App a & B Documents Available in Pdr.App B Documents Also Encl ML20151C6641988-04-0404 April 1988 Partial Response to FOIA Request for Documents Re Info Assessment Team Notification & Alleged Valve Tampering. App a Documents Available in Pdr.Forwards App B Documents. App B Documents Also Available in PDR ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20149H8811988-02-18018 February 1988 Partial Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR ML20149G0731988-02-10010 February 1988 Responds to Re Announced Reorganization of NRC at TMI-2.NRC Personnel Stationed at Site,Region I & NRC Headquaters Will Continue to Provide Effective Regulatory Oversight of Cleanup Activities ML20147E6621988-01-19019 January 1988 Partial Response to FOIA Request.App G Documents Already Available in Pdr.App H Documents,Re INPO Accreditation Training,Encl & Available in PDR ML20147C0281988-01-12012 January 1988 Final Response to FOIA Request for Documents Re Safeteam Program.Forwards App I & J Documents.App H & I Documents Available in Pdr.Other Records Available in Pdr.App J Documents Partially Withheld (Ref FOIA Exemption 6) ML20147D4821988-01-0606 January 1988 Partial Response to FOIA Request for Documents.Forwards App B Documents.Documents Also Available in Pdr.Portions of App B Documents Withheld (Ref FOIA Exemptions 6 & 7) ML20236V7511987-12-0202 December 1987 Partial Response to FOIA Request for All NRC Records & Info Re Petition for Issuance of Show Cause Order.Forwards App N Documents.App M & N Documents Available in Pdr.Portions of App N Documents Deleted (Ref FOIA Exemption 6) ML20236L6761987-11-0909 November 1987 Ninth Partial Response to FOIA Request for Records,Including Notes of Interview of K Mcmahon.Forwards App K Documents. App K & L Documents Partially & Completely Withheld (Ref FOIA Exemptions 6 & 7,respectively) ML20245C4051987-10-29029 October 1987 Final Response to FOIA Request for Records.App a & B Documents Available in Pdr.App a Documents Encl ML20236D4491987-10-23023 October 1987 Partial Response to FOIA Request for Documents,Including Rd Martin 850716 Memo Re Allegation Processing Programs.Encl App E & F Documents in Pdr.App F & G Documents Partially & Completely Withheld (Ref FOIA Exemptions 5 & 6) ML20235R8521987-09-30030 September 1987 Responds to Re EIS for Meltdown of Large Reactors & NRC Compliance W/Nepa.As Result of TMI-2 Accident on 790329,NRC Included Class 9 Accidents in Assessments in Fes Re Licensing of Plants.Related Info Encl ML20235K3461987-09-30030 September 1987 Partial Response to FOIA Request.App C Documents Re Deficient Practices by Util Bolt Supplier Encl & Available in PDR ML20235F8141987-09-24024 September 1987 Partial Response to FOIA Request for Documents.Forwards App B,C & D Documents.App a & B Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemption 4).App D Documents Withheld in Entirety (Ref FOIA Exemptions 5 & 6) ML20235A4371987-09-17017 September 1987 Final Response to Appeal Re Denial of FOIA Request for Documents Re Concerns of Individual About Util & S&W Technical Svcs.Records Two Through Five on Encl App Forwarded.Record One Withheld (Ref FOIA Exemption 7) IA-87-512, Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees1987-09-14014 September 1987 Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees ML20238F7581987-09-14014 September 1987 Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees ML20238E3961987-09-11011 September 1987 Partial Response to FOIA Request Re Nprds.App F Documents Maintained in Pdr.App G Documents Encl & Available in PDR ML20238E3931987-09-10010 September 1987 Final Response to FOIA Request.App D Documents Re SALP Rept Preparation Encl & Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5).App F Documents Partially Withheld (Ref FOIA Exemption 4) ML20238E0081987-09-0101 September 1987 Responds to 870715 Questions Re Plant Concerning GE Pumps ML20237F5921987-08-19019 August 1987 Partial Response to FOIA Request.Lers Indicated in Request for Dockets 50-220,322 & 410 Not Issued by Licensee.Forwards Documents Listed in Apps a & B.App a Documents Available in Pdr.App B Documents Being Made Available in PDR ML20236K2621987-08-0404 August 1987 Partial Response to FOIA Request for Records Re AO Reporting.Forwards App D & E Documents.Documents Also Available in PDR ML20236H0831987-07-30030 July 1987 Responds to Re Possibility of LOCA at Plants. Majority of LOCA Research Complete & Understanding of ECCS Performance During LOCA Greatly Improved.Conservatism of Methods Specified in Commission Rules Demonstrated ML20235Y6091987-07-21021 July 1987 Forwards Photocopy of Fr Notice That Incorporates DOJ 740304 Advice Ltr in Entirety,Per Request for DOJ Advice Ltrs Rendered in Conjunction W/Cp Antitrust Review of Plants ML20215H4231987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Plant Feedwater Line Failure.Forwards App H Documents.App G & H Documents Available in Pdr.Document Listed in App I Completely Withheld (Ref FOIA Exemption 5) ML20238E0341987-05-28028 May 1987 Responds to Questions Raised in Re Plant ML20214E2841987-05-18018 May 1987 Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR IA-87-221, Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR1987-05-18018 May 1987 Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR ML20213G1241987-05-12012 May 1987 Final Response to FOIA Request.App a Documents Already Available in Pdr.App B Documents Encl & Available in PDR ML20215K5311987-05-0505 May 1987 Informs That Because Plants Adjudicatory Hearings Currently Before Nrc,Comments on Merits of Plant Issues Would Be Inappropriate,Per Encl Recipient .Served on 870506 1989-09-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20209E2701999-07-0101 July 1999 Forwards Insp Repts 50-413/99-03 & 50-414/99-03 on 990425- 0605.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20209E3931999-06-28028 June 1999 Informs of 990618 Meeting Conducted at Facility to Present Results of Most Recent Periodic Plant Performance Review for Plant.List of Attendees Encl ML20196G8861999-06-24024 June 1999 Discusses GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structrual Integrity 950816 & 960729 Responses.Rvid,Version 2 Released as Result of Review.Rvid Should Be Reviewed & Comments Should Be Received by 990901 If Not Acceptable for Plant ML20196G6541999-06-17017 June 1999 Confirms 990614 Telephone Conversation Re Rescheduling of Two Predecisional Enforcement Conferences Originally Scheduled for 990623.SSS Conference Rescheduled for 990712 & Ice Condenser Conference Rescheduled for 990720 ML20196A5781999-06-14014 June 1999 Discusses Notice of Enforcement Discretion for Duke Energy Corp Re Catawba Nuclear Station Unit 1 TSs 3.5.2 & 3.7.12 ML20195E9171999-06-0303 June 1999 Confirms Conversation with Bradshaw on 990526 Re Rescheduling 990607 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Repts 50-413/99-10 & 50-414/99-10.Conference Will Be on 990623 in Atlanta,Ga ML20195F4141999-06-0202 June 1999 Forwards Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503.Apparent Violation Identified & Being Considered for Escalated Enforcement Action.Violation Involved Failure to Maintain Unit 1 Ice Condenser Lower Inlet Door Operable ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20207C8721999-05-20020 May 1999 Forwards Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.Three Violations Occurred & Being Treated as non-cited Violations.Activities Generally Characterized by Safety Conscious Operations & Sound Engineering & Maint ML20207D0671999-05-20020 May 1999 Informs That During Meeting on 990512,arrangements Modified for Administration of Licensing Exams at Catawba Nuclear Station During Weeks of 990524 & 0607,respectively ML20207C8061999-05-19019 May 1999 Confirms 990510 Telcon with R Jones Re Predecisional Enforcement Conference Requested by NRC & Scheduled for 990607 in Atlanta,Ga to Discuss Apparent Violation Associated with Potential Inoperability of SSS 1999-09-24
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ -_-__
ef jog UNITED STATES E o NUCLEAR REGULATORY COMMISSION l g : E WASHINGTON, D. C. 20555
%.....) db MAY 2 419$5 Docket No. 50-413/414 Ms. Nina Bell Nuclear Information and Resource Service 1346 Connecticut Avenue, NW 4th Floor IN RESPONSE REFER Washington, DC 20036 TO F01A-84-722 r
Dear Ms. Bell:
This is a third partial response to your letter dated September 5,1984, in l which you requested, pursuant to the Freedom of Information Act (F0IA), copies of documents pertaining to four categories of information regarding Notices of Violation at the Catawba plant.
l The documents listed on the enclosed Appendix F are responsive to your reouest and are being placed in the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555. You may obtain access to these records by presenting a copy of this letter to the PDR staff or by requesting folder F01A-84-722 under your name.
1:.e document listed on the enclosed Appendix G is already available in the PDR. The file location is noted next to the description of the document.
The staff is continuing to review records subject to vour request. We will 1 notify you as soon as possible with regard to the remaining records.
Si erely A
. M. Felton, Director Division of Rules and Records Office of Administration
Enclosures:
As stated l
8507200491 850524 PDR FOIA BELL 84-722 PDR
l i
Re: F01A-84-722 (Third Response)
APPENDIX F Documents Being Placed in PDR l 1. Undated Appendix C, Chronology of Significant Events, Quality Assurance (QA) and Quality Cor. trol (QC) Organization Development For Catauba Nuclear Power Plant (3 pages)
- 2. Undated NRC Inspection and Enforcement Program (13 pages) i
- 3. Undated QA/QC Inquiry, Record Copy, Serial #16 (1 page)
- 4. Undated Handwritten notes of Low car RT over ride a visual inspection (2 pages)
- 5. Undated Letter from Lindsay Harvey Harris, Jr. (3 pages)
- 6. 09/13/83 Testimony of A.S. Gantt (40 pages)
- 7. 09/13/83 Testimony of Charles D. Crisp (8 pages) l
- 8. 09/23/83 Testimony of Dean Bentley (9 pages)
- 9. 09/24/83 Testimony of Larry R. Davison (43 pages)
- 10. Undated Testimony of Phillip M. Reep (8 pages)
- 11. 09/20/83 Testimony of Harold Edward Eubanks, Jr. (7 pages)
- 12. 09/22/83 Testimony of William H. Burr (7 pages) !
- 13. 09/13/83 Testimony of Richard Jones (7 pages)
- 14. 09/20/83 Testimony of William Larry Trout (4 pages)
- 15. 09/22/83 Testimony of Paul Dennis Wright (4 pages)
- 16. 09/20/83 Testimony of J. E. Henson (5 pages)
- 17. 09/20/83 Testimony of Charles Edward Ferrell, Jr. (5 pages) l
- 18. 09/20/83 Testimony of Billy Wayne Deaton (6 pages) l
- 19. 09/20/83 Testimony of Richard B. Childers (3 pages)
r ,
Re: F0!A-84-722 (Third Response)
APPENDIX F (Continued)
- 20. 09/20/83 Testimony of Thomas Joseph Costello (2 pages)
- 21. 09/13/83 Testimony of Larry Mauldin (4 pages)
- 22. 09/20/83 Testimony of Stanley Ledford (5 pages)
- 23. 09/13/83 Testimony of Eugene McDowell (5 pages)
- 24. 09/20/83 Testimony of Robert J. Rogers (3 pages)
- 25. 09/20/83 Testimony of Tommy Bumgardner (8 pages) 1
- 26. 09/20/83 Testimony of Jerry Standridge (7 pages) l
- 27. 09/20/83 Testimony of Mickey Standridge (8 pages)
- 28. 09/22/83 Testimony of Richard W. Irby (8 pages)
- 29. 09/13/83 Testimony of John R. McCoy (8 pages)
- 30. 06/15/73 Letter to Duke Power Company from Norman Moseley, w/ enclosures (8 pages)
- 31. 06/26/73 Letter in the matter of Duke Power Company from SEC Regulatory Staff w/ enclosures (15 pages)
- 32. 09/06/73 Supplemental Deicision, in the matter of Duke Power Company (9 pages)
- 33. 1981 Construction Department, Nonconforming Item Report (8 pages)
- 34. 08/81 Construction Department, Nonconforming Item Report (3 paaes)
- 35. 08/06/81 Attachment A (4 pages)
- 36. 12/04/81 Additional Resolution to NCI #13,165 (1 page) d
- 37. Undated Memo to File Response to R. W. Irby's request for a " Resolution of Technical Matters Involving Differences of Opinion" Involving NCI Serial No.13165 File No. K-1 (4 pages)
- 38. 01/11/82 Attachment A to J.R. Wells, and L.R. Davison, re: Catawba 1-2 4 Management Procedure 8030-0003, Resolution of Technical Matters (3pages) 'f
- 39. 01/14/82 Memorandum to Bob Morgan from Kenneth W. Karriker, subject:
Employee Recourse w/ testimony of Larry Salone Jackson, dated 9/20/83(15pages)
Re: F01A-84-722 (Third Response)
APPENDIX F (Continued) i
- 40. 01/18/82 NCI #9085 from V.C. Godfrey, Jr. (7 pages)
- 41. 01/19/82 Letter to Mr. R.A. Morgan from Ronald Kirkland, Testimony of Kenneth W. Karriher (6 pages)
- 42. 01/20/82 Letter from V.C. Godfrey, Jr. , w/ testimony of Lindsay H.
Harris, Jr. (6 pages)
- 43. 02/15/82 Verification-Individual Concern, file no. K-1 (1 page)
- 44. 03/04/83 IE Presenation to ACRS (5 pages)
- 45. 04/21/83 Letter to Benjamin Hayes and James O'Reilly from Billie Pirner Garde (2 pages)
- 46. 10/06/83 Memorandum for Virgil L. Brownlee fron Walter P. Haas, subject:
Duke Power Company Organization for QA w/ enclosures (3 pages)
- 47. 10/06/83 Letter to Chairman Nunzio Palladino from Billie Pirner Garde (2pages)
- 48. 10/12/83 Memorandum for Virgil Brownlee from Walter P. Haas, subject:
Duke Power Company Organization for QC w/ enclosures (5 pages)
- 49. 10/13/83 Letter to Quality Control Inspector from Billie Pirner Garde w/ enclosures (4 pages)
- 50. 11/01/83 Memorandum for Atomic Safety and Licensing Board for Catawba Nuclear Station, Units 1 and 2 from Thomas M. Novak, subject:
QA/QC Investigations at Catawba (Board Notification No.83-175)
(3 pages)
- 51. 11/01/83 Letter to Nunzio Palladino from Morris K. Udall (2 pages)
- 52. 11/23/83 Letter to Billie Pirner Garde from William Dircks w/ attachments (14 pages)
- 53. 12/19/83 Memorandum for Ben Hayes from Richard C. DeYoung, subject:
GAP Response to NRC Request for Additional Information on Catawba,w/ enclosure: 12/2/83 letter to DeYoung from Garde (79 pages)
- 54. 01/03/84 Limited Appearance Statement of Billie Pirner Garde, GAP (4 pages)
- 55. 01/13/84 Memorandum for Ben Hayes and George Messenger from James Lieberman, subject: Catawba %2.206 Petition (58 pages)
I .
, Re: F01A-84-722 (Third Response)
APPENDIX G Document Already in PDR e
[ 1. 11/01/83 Lettcr to Ms. Billie Garde from Richard C. DeYoung (2 pages)
Accession No. 8311100365 i
4 1
t
)
i 1
- g 9
L ei% ;
hucear In"ormation anc Resource Service 1346 Connecticut Avenue NW 4th Ficor. Washington. D C 20036 (202)296J552 l
September 5, 1984 1 James M. Felton, Director Division of Rules and Records FREEDOM OF INFORMATION Office of Adminstration i U.S. Nuclear Regulatory Commission ACT REQUEST l Washington, D.C. 20555 [OJA "/b M '
FPEEDOM OF INFORMATIO'N ACT REQUEST /d ~ N
Dear Mr. Felton:
Pursuant to the Freedom of Information Act, 5 U.S.C. 522, as amended, the Nuclear Information and Resource Service requests the following documents regarding a Notice of Violation at the Catawba plant. Please consider " documents" to include reports, studies, test results, correspondence, memoranda, meeting notes, )
meeting minutes, working papers, graphs, charts, diagrams, nctes l and summaries of conversations and interviews, computer records, '
and any other forms of written communication, including internal NRC Staff memoranda. In your resoonse. olease identify which documents correspond to which reauests below.
Pursuant to this request, please provide all documents prepared or utilized by, in the possession of, or routed through the NRC related to:
- 1. The Notices of Violation 84-88-01 and 84-39-01 (associated with Inspection Reports 50-413-84-88 and 50-414-84-39, respectively), concerning " Inadequate Implementation of Quality Assurance Requirements in the Welding Program";
- 2. All " raw data" (g2g. telephone interviews, affidavits, notes),
studies, and analyses done by Duke Power Company, the Brookhaven l National Laboratory, and other consultants relating to i
investigation (s) by Duke Power Company in connection with the
" Welder B" issue, and the above-referenced Notices of Violation; l
- 3. All " raw data", studies and analyses done by or for the NRC Staff (or its consultants) for the NRC Staff's investigation of l the " Welder B" issue and the above-referenced Notices of l Violation; and
- 4. The NRC Staff review of the Duke Power investigation and documents related to the investigation.
-a - a t> rh - ' a -
/g) %y G G*v y"))*)
o
~
In our opir. ion, it is appropriate in this case for you to waive search charges, pursuant to 5 U.S.C. 552(a)(4)(A) "because furnishing the information can be considered as primarily benefiting the general public." The Nuclear Informatiorc and Resource Service is a non-profit organization serving local ,
organizations concerned about nuclear power and providing infor- l mation to the general public. Information required by 10 CFR l 9.14a was provided by letter dated August 3, 1984. The documents requested by this letter will be used by the intervenors, the 1 Palmetto Alliance, in the Catawba operating license proceeding. !
Insofar as the information can lead to a full and public airing of issues related to public safety, in an ajudicatory proceeding, l the release of such documents will benefit the public living near l and around the Catawba plant.
I look forward to a response within the ten working days allowed by law.
Sincerely, m [1
.M medb Nina Bell Nuclear Safety Analyst ec: File
_ .. . - _ _ _ _ _ - ,