MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20205B9601999-03-24024 March 1999 Seventh Partial Response to FOIA Request for Documents. Records in App N Already Available in Pdr.App O Records Being Released in Entirety & App P Records Being Withheld in Part (Ref FOIA Exemptions 7C,2 & 5) ML20205A2771999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Vogtle PPR on 990208.PPR for Plant Involved Participation of All Technical Divs in Evaluating Insp Results & Safety Performance Info for Period of Dec 1997 - Jan 1999 ML20207L8281999-03-0808 March 1999 Forwards Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 & Notice of Violation ML20207J0431999-03-0303 March 1999 Forwards Insp Repts 50-424/98-10 & 50-425/98-10 on 981227- 990213.No Violations Noted.Licensee Conduct of Activities at Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20203G5691999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Candidates for Exam ML20202H9691999-01-29029 January 1999 Forwards Safety Evaluation Authorizing Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant, Unit 1 ML20199J7931999-01-20020 January 1999 Forwards Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226 at Vogtle Units 1 & 2.No Violations Were Identified.Conduct of Activities at Vogtle Was Generally Characterized by safety-conscious Operations ML20199K1381999-01-12012 January 1999 Informs That on 990117,Region II Implemented Staff Reorganization as Part of agency-wide Streamlining Effort, Due to Staffing Reductions in FY99 Budget.Organization Charts Encl ML20198S1601998-12-31031 December 1998 Forwards SER of Licensee Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Vogtle Electric Generating Plant Submitted on 970529. INEEL/EXT-98-01007 Rept Also Encl ML20199E4741998-12-23023 December 1998 Provides Summary of 981105 Training Managers Conference Held in Atlanta,Georgia.Conference Agenda,List of Conference Attendees,Presentation Slides & Preliminary Schedule for FY99 & FY00 Encl ML20199J9781998-12-22022 December 1998 Responds to 981209 Meeting Re Installation of Seismic Clips on Cutler Hammer Electrical Circuit Breakers.Forwards List of Attendees & Handouts ML20198F6711998-12-11011 December 1998 Forwards Insp Repts 50-424/98-08 & 425/98-08 on 980927-1114. No Violations Identified ML20198N9431998-12-10010 December 1998 Ack Receipt of Response, to NOV Issued on 980112 Re Surveillance Testing of Reactor Trip Sys P-4 Interlock Feature at Licensee Facility.Nrc Agrees That Surveillance Testing Not Required ML20196J2181998-12-0101 December 1998 Advises of Planned Insp Effort Resulting from 981102 Insp Planning Meeting.Historical Listing of Plant Issues Called Plant Issues Matrix & Insp Plan,Including Specific Insps Such as in Security & Radiological Protection Areas Encl ML20196J2581998-12-0101 December 1998 Confirms Arrangements Made Between J Bailey & B Holbrook, Re Info Meeting Scheduled for 990210 to Discuss Licensee Performance,New Initiatives & Other Regulatory Issues Pertaining to Listed Facilities ML20196B1231998-11-23023 November 1998 Confirms Telephone Conversation Between J Bailey & P Skinner on 981120 Re Info Meeting Which Has Been Scheduled for 981209 in Atlanta,Ga,To Discuss Issues Re Seismic Retainer Clips ML20196D4981998-11-13013 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copy of Answer Key & Master Bw/Pwr GFE Encl,Even Though Facility Did Not Participate in Exam.Without Encl ML20195B3391998-11-0909 November 1998 Forwards Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21).No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations & Sound Engineering ML20155H2501998-10-21021 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/98-05 & 50-425/98-05 Issued on 980723.Concluded for Reasons Stated That Example 2 Violation Occurred as Stated in NOV ML20155A7491998-10-15015 October 1998 Forwards Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926 & Nov.Insp Generally Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML20155B7771998-10-0909 October 1998 Extends Invitation to Attend Training Manager Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Effect Licensing of Reactor Plant Operators ML20155B4621998-09-25025 September 1998 Discusses OI Investigation Which Completed on 980728. Investigation Reviewed Circumstances Surrounding Apparent Disabling of Fire Computer Trouble Alarm by Unit Shift Supervisor.Concludes Enforcement Discretion Warranted ML20153B0401998-09-17017 September 1998 Responds to 980904 e-mail Message Making Certain Observations Re Apparent Increase in Reactor Trips at Plant, Units 1 & 2.NRC Concluded That Licensee post-trip Reviews Adequately Conducted & That No Adverse Trends,Apparent ML20153B9311998-09-16016 September 1998 Forwards RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations, Responses for Plant,Units 1 & 2 ML20153F7081998-09-11011 September 1998 Provides Summary of 980909 Meeting Held to Discuss TS & Other Regulatory Issues Re Vogtle Electric Generating Plant. List of Meeting Attendees & Copy of Presentation Slides Encl ML20154C4871998-09-10010 September 1998 Forwards Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815 & Nov.One Violation Involved Failure to Implement Adequate C/As for Repeated Failures to Enter Applicable TS Limiting Conditions for Operation ML20151U7901998-09-0909 September 1998 Discusses 980615 Request for Exemption from Requirement of 10CFR73.55(e)(1) & (f)(1) to Provide Continuous Staffing of Plant CAS During Contingency Events.Request Denied ML20151S7291998-09-0202 September 1998 Discusses Evaluation of Util Response to GL 97-05 for Plant, Units 1 & 2.NRC Did Not Identify Any Concerns W/Sg Tube Insp Techniques Employed at Plant ML20239A4251998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Nov.Nov Responses Will Be Formally Ack as Part of Periodically Issued Integrated Insp Repts 1999-09-01
[Table view] |
Text
August 23, 1992 Mr. Bryan B. Lavine Attorney at Law Troutman Sanders Nationsbank Plaza, Suite 5200 600 Peachtree Street, N.E.
Atlanta, Georgia 30308-2216
Dear Mr. Lavine:
The purpose of this letter is to formally accept your offer to present evidence, on behalf of your client, Georgia Power Company (GPC), in the matter of the alleged deliberate provision of inaccurate and incomplete information, by GPC to the Nuclear Regulatory Commission (NRC), regarding the testing of the emergency diesel generators at the Vogtle Electric Generating Plant, Unit 1, immediately subsequent to the Vogtle Site Area Emergency of March 20, 1990.
Regarding the NRC personnel to attend you, presentation, in addition to Office of Investigations personnel, it has been requested that representatives of the NRC Office of Enforcement ;
and Office of General Counsel also be present. I believe that i you would agree that such attendance is appropriate.
Please contact Investigator Larry L. Robinson of my office, at (404) 331-6509, to arrange a mutually agreeable schedule.
Sincerely, !
l 1
1 James Y. Vorse, Director l Office of Investigations Field Office, Region II i Distribtulon:
s/f-(2-90-020) c/f LLRobinson: pat:8/23/93: disk - Robinson: doc name - Lavine.020 ;
I, l OI:RII OI:RII l' [
'LLRobinson JYVorse
/l ' (' I 08//J/93 08p3/93 f k .
~
9610070002 960827 PDR FOIA ,
COLAPIN94-208 PDR .
1
~
UNITED STATES
!' NUCLEAF, REGULATORY COMMISSION :
"r e OFFICE OF INVESTIGATIONS FIELD OFFICE, REGION 11 l 4 ..r.
, 101 MARIETTA STREET NW, SUITE 2900 l
i
[% .)3 ~ ATLANTA, GEORGIA 30323 g, O Q f' -
/
4, f / N-
/
FACSIMILE TRANSMITTAL SEEET ,/d ,', [
MESSAGE TO (Name & Organisation) NUMBER OF PAGES 2
I FACSIMILE PEONE # (Including ,
Transmittal Sheet) l
\
Did// ops #y, 6I;#47 8-3e/- 30 +- 23 7 7 2 l
.i
)
1 J
I t
1 e
i a
MESSAGE FROM i (Name & Organisation) FACSIMILE PEONE 9 VERIFICATION $
[ M y I. h Afftu/ g;42 S-404-331-7038 s-404-33I-g502 t0 ,
I
\
i M i
. tU*,b L/
t
De apaMa banay fie acanta Conssem LOCAL MW$ _
... titrsdat lapuay 2p, ImM Ga. Power probed by feds : ,
a 11 _j s e t was undergoing maintenance at Those tapes werelater turned AllegCU l.IC 3DOut Salety Of VOgtie ihe time of the accideni and was over to the NRC. Accordin, io not operable. Mr. Kohn, the tapes are the
~
. r r . . . . - ;.,.'
IS 10CUS Of Crinlinal InVCStigat10n During the blackout, um tuu- " linchpin"of the criminalinves- . .
perature of water used to keep tigation. y , ~, " -
By David Beasley Mr.Mosbaugh who specializesin the nuclear fuel from melting Georgia Power spokesman i %~ ,,
stan wmrta whistleblower cases, said a fed. heated from 90 degrees to 136 Tal Wright declined to comment eral grand jury has been con. degrees, the NRC says. on the criminal imystigation. t ,
The U.S. Justice Department vened in Atlanta to consider the Georgia Powerofficials alleg- But in a ste ement,the utility a I is conducting a criminal investi- case. edly told NRC officials that the denied ever attempting to mis-
-1 ?
getion into allegations that Geor- Joe Whiticy, U.S Attorney generator's mechamcal prob- lead NRC. . .
4 gia Power Co. officials hed to the for the Northern District of lems were quickly corrected. ;" e ,
But, according to Mr. Mos- And they pomt out that a 14- ,
- 85 ,
Nuclesr Regulatory Commission Georgia, declined to confirm or (NRC) tbout the safety of Plant deny the existence of a grand baugh, the generator continued bor Department Iaw udge administrative g l that Mr. Mos- -
jury investigation as did a to be mechanically unreliable Vogtle near Augusta- b l
The investigation was con- spokesman for Georgia Power. and several components eventu. -
g' >
ally had to be replaced. *that decision is under review t firmed for the first time by the ,s Mr. Mosbaugh, formerly the by the omce of the US. Labor NRC in documents filed recentlY Most serious charge: They lied in the case of Allen L Mosbaugh, third highest ranking manager at Secretary. ,
z'4 , ,
a former high-ranking manager The most serious of Mr. Mos- Vogtle, claims in a complaint in a separate action,Mr. Mos-
@[p iA at the nuclear plant,invohed in a baugh's charges is that Georgia filed with the U S. Department of baugh has filed a petition with lergthy whistleblower action Power officials tied to the NRC labor under a law designed to NRC seeking to block transfer of *" ~
e ' ^
d' 5'
about the reliability of a crucial protect wListleblowers that he the Vogtle license from Georgia og: inst the utility, '
In the document. NRC de- backup generator following a was demoted after complaining Power to a utility subsidiary, clines to comment on Mr. Mos- March 1990 accident at the plant. about safety problems at the Southern Nuclear Operating - - ' ume
' +
b ugh's allegations because The generator failed after the plant. Company, because of the alleged lie later was fired after Geor- safety violations. ~ .' ~
"these silepations are being pur- regular power supply was "***UG" t
sued by the Department nf Jus- knocked out by a truck that hit a gia Powerlearned that h had se- In documents filed during ;
tice for possible criminal prose- pole, causing a 36-minute cretly tape-recorded conversa- that proceeding, NRC acknowl- An aNegation that Georgia Power officials tied to the NRC cution." blackout tions with fellow plant em- edges for the first time the exis. about the M?ty of a crucial backup generator following a Michael Kohn, attorney for A se nd backup generator playees. tence of a criminalinvestigation. March 1990 act dent at Plant Vogtle is under irwestigation.
-.~.-, - - . _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ - - . _ _ _ _ _ _ _ - - _ - _ - _ - _ _ - _ . - _ _ . _ _ _ _ . - _ - _ - _ _ _ _ . _ - - - - - - _ _ _ - _ - - _ _ _ . - . _ . . --
ua
&M/8 h
~
UNIT 1 /[/ / jPf DIESEL M TOR 18 /
WA DATE TIE COP 90TS 02/24/90 1425 Started for 24 Hour Run 02/25/90 2206 Secured from 24 Hour Run 2336 Started for ESFAS Testi,g 2348 Secured for ESFAS 02/27/90 0312 Started for ESFAS :
0424 Secured for ESFAS 0605 Started for ESFAS ,
0642 Secured for ESFAS ..
j 03/13/90 1518 Start for thint. Test 0146 Stopped 03/14/99 03/21/90 2149 Failed to start due to insufficient fuel in fuel lines after maintenance.
2156 Failed to Start Again 2202 Started and Governor Vented 2217 Stopped 2259 Started for Overspeed Trip Test 2301 Stopped Manually due to Low Lube Oil Pressure and High 011 Filter DP 2314 Started 2318 Stopped .
03/22/90 0017 Started 0023 Stopped for Maintenance 0426 Started for Testing 0429 Stopped 0714 Locally Started for Maintenance and Engineering Testing 03/22/90 1030 Locally Shutdom i,
03/22/90 1106 Started from CR 1243 Tripped on D/G High Lube Oil Temp. ;
d 03/23/90 0509 Started for Maintenance Run 1202 Stopped
/q
/
000:154-j 3-
-. -. . - . = - - . . - . . - -- - _-.. . .-_. - - _ . .
(,L ;' ;
4 l
. UNIT 1 DIESEL GENE 1tNTUlFIB (CONT'D) i DATE TIE Cop 0ENTS I
I 03/23/90 1730 started for 4 Hour Run ;
1731 Tripped on Low Jacket Water Pressure / Turbo Lube i
- 011 Pressure Low i
1744 Started for 4 Hour Run l
' 2222 Stopped 03/24/90 0048 Started for Maf atenan::a 4
0049 "Hi Jacket Water Temp" Alare In, Temp Verified
! i i
to be Noma 1. l
! 0121 Normal Stop J -
03/27/90 1649 Emergency Start Test l
1822 Normal Shutdown i
i 1909 Normal Start 1948 Stopped. Simulated Hi Temp Lube 011 Trip 1951 Started. Simulated LOSP at Engine Panel i
i 1954 Stopped. Simulated Hi Vibration Trip L 1957 Normal Start 1959 Stopped. Simulated Hi Crankcase Pressure Trip 2004 Started. Simulated SI at Engine Panel 2010 Stopped. Simulated to Lube 011 Pressure Trip I 2220 Started. Simulated Bus UY Signal i 2317 Nomal Shutdown ,
l 0403 Startad. Surveillance 14980-1 l' 03/28/90 0537 Normal Shutdown l
! 1350 Start to Perfom Functional Test for WO 1-89-03281 (Lo Lube 011 Pressure Trip Flow Orifices) e 1355 Nomal Shutdown 1356 Started. Simulated UV for Functional on WO
) 1-89-03281 1400 Normal Shutdown hygjg #
/
- - - -A
/- 04/01/90 1623 Nomal Start g/ggfy y 1744 Nomal Shutdown h
( Started for Maintenance 04/04/90 1632 1744 Stopped J
$ 9 000:1.96
LCS
- UNIT 1 DIESEL GDIE M 18 (CONT'D)
DATE TIE C(300fT5 j 04/05/90 0030 Started. T-ENG-90-17 0035 Stopped 0307 Started. 14980 0509 Stopped d
t 4 .
3 :
I i
I i
+ .
l l
i i
j i
o l
W 4
1 0003.C
b-hM6YA DIESEL TOR 1A 9.
DATE TIIE C089ENTS xa l 02/26/90 1509 Started. 24 Hour Run for ESFAS 02/28/90 0226 Secured from 24 Hour Run 02/28/90 0945 Started for ESFAS Testing j 1210 Secured for ESFAS Testing 1
02/28/90 1700 Started 3 Times in Series During ESFAS Testing 1 02/29/90 0218 Secured for ESFAS Testing )
03/01/90 0128 Started for ESFAS '
03/02/90 0215 Secured for ESFAS 0912 Started for Maintenance 1 1944 Secured for Maintenance J 03/12/90 1306 Started 2137 Stopped 03/13/90 0009 Started 0506 Stopped
- 03/20/90 0820 LOSF uccurred - Lost "A" RAT - DG1A Tied and 1 Tripped (Several Alarms came in - not noted in the log.)
0841 Auto Started after Sequencer Reset and Tripped on Low Jacket Water Pressure
! 0856 Emergency Break Glass Start Locally to Recover
- from Station Blackout, j 1029 RAT "B" Energized 1040 IBA03 Energized from "B" RAT 1326 Shutdown 2119 Started for Troubleshooting 2206 Shutdown 2223 Started for Trouble nooting 2228 Secured 2233 Started for Troubleshooting 2254 Secured 03/23/90 0254 Started for Maintenance Troubleshooting 0450 Secured 000:m5.
I l
, CCk i
. UllIT 1 DIESEL EENESTOR 1A .
DATE TIIE CopOENTS 2
03/23/90 1724 Started and Manually Stopped from CR j i
03/29/90 1109 Started. UV Test. Tied to 1AA02 o) 1158 Normal Shutdown 03/30/90 1920 Emergency Start !
- 2115 Stopped ;
. 2235 Local Start 2241 Trip Hi Temp Lube 011 2254 Local i i 2300 Trip High Yibration I t
2313 Normal Start ,
l 2316 Stopped. Hi Crank Case Pressure 2328 SI 2334 Low Lube 011 Pressure ,
! 2343 Normal Start 2347 Normal Stop s
- 2348 Nonnal Start ,
2358 Stop 03/31/90 0012 Normal Start 0024 Ndraal Stop
- 0016 SI 0019 CR 1827 Start Local 1837 Local Stop 1846 Local Start 1847 Stop i
1856 Local Start 1857 Local Stop 1904 Local Start 1906 Local Stop 1921 Local Start '
1922 Local Stop Onn.'t.%
. - = - _.. ..
DDb UNIT 1 DIESEL EEREBToa 1A DATE TIfE COBOENTS 03/31/90 1955 Local Start Local Stop 2012 2254 Started. UV Test, Tied to 1AA02 .
2320 Normal Shutdown 04/01/90- 0423 Started. Surveillance 14980-1 0556 Nonnal Shutdown 04/06/90 1345 Start. T-ENG-90-16 1346 Stop 1404 Start. T-ENG-90-16 1405 Stop
< 1419- Start. T-ENG-90-16 1430 Stop l 2347 Start. T-ENG-90-11 '
04/07/90 0213 Stop 4
i e
t k
J OOO!I.9FJ
u e..o => u...= =u- u .u a : ae w .nveo oax an = = . , ~ .
l 1
. '/ UNITED STATES .
' ~ ' ~ ~ ~ '
! t NUCLEAR REGULATORY COMMIS$10N D'
{
~
WASHINGTON, D C. 20065 Dir 4
% 4 Dan ' ~
%. July 6, 1993 ._._ Ad _ _ _ _ __
_FOIA enain"*" __Suppon __
File . /
) Copies to: A L -
l The Honorable Joseph I. Lieberman, Chairman Subcomittee on Clean Air and Nuclear "99ulation a Coenittee on Environment and Public Works United States Senate
- Washington, D.C. 20510
Dear Mr. Chairman:
4 l Pursuant to conversations with your staff. it is our understanding that you are planning to hold a hearing on the Nuclear Regulatory Comnission's handling of whistleblowers in the nuclear industry and that you may call Mr. Allen
- Mosbaugh and the Georgia Power Company to testify regarding Mr. Mosbaugh's experiences as a whistleblower prior to and after the site area emergency of j March 20, 1990, at the Vogtle nuclear power plant.
On June 24, 1993, the NRC Atomic Safety and Licensing Board in the ongoing
- Georgia Power Company license amendment proceeding determined that six tape recordings made by Mr. Mosbaugh, which are copies of portions of a larger number of tapes, should be released to Georgia Power Company in c',covery. We understano that these six tapes, which by agreement among the neties were to
- be re%ased on July 2,1993, were previously made available to the Subcomottee by Mr. Mosbaugh's attorney.
We understand that the Subcommittee does not intend to seek or compel the public disclosure of material compiled by the NRC's investigatory staff that
- is not already in the public record, or seek public disclosure of substantive
. conclusions that the investigators may have reached on matters under j investigation.
The Director of the Office of Investigations has concluded that public discussion by the Subcommittee of information relating to Mr. Mosbemoh's l allegations with either Mr. Mosbaugh or the Georgia Power Company wi'l not ,
i adversely affect any current matter under investigation by his .
- However, neither the Commission nor its staff will be in a pos s
- either the NRC investigation or any potential effect of the inves possible enforcement actions or on the angoing licensing proceeding.
Sincerely, l
. J l
Kenneth C. Rogers Acting Chaiman ,.
cc: Senator Alan K. Simpson
[
p
- -_ z ,
4
, JUL 19 '93 02:53PM OGC/MAILROOM P.i d'.
4 9
a h 9- / - WP 75) 7 -19 I
1 l
l l
i l
j i i
/
d[,-
L<__+g;( ji
/
j
. M 19 ,'93 .02 54PM O D iWIt'poon ' .
- ..ye.w v:3 g.s , ~ .
l i
i ELECTRICAL POWER SYSTEMS f SURVEILLANCE REQUIREMENTS (Continued) l At least ones per 10 years or after any modifications which could
- f.
affect diesel generator interdependence by starting both diese h i
generators simultaneously, during shutdown, a 7
equal to (103 seconds; and
- g. At least once per 10 years bye ,
1)
Draining each fuel oil storage tank, removing the accumulate sediment and cleaning the tank using a sodium hypochlorite solution, and Performing a pressure testsubsection of thoseNDportionsof the ASME of the diesel fu
- 2) oil system designed to Section III, 5 of the systes design Code at a test pressure equal to 110 pressure. (
l ator failures, valid or nonvalid, shall6.F.2 l 408.1.1.3 Ak oo be reported to W_rti - All diesel genere within 30 days.
id 1.108, Revi Commissio
- tion recommended in Regulatory Position C.3.b t shall be of Regulatory lt sion 1 August 1977.a per nuclear unit basis is greater than or.. equal to supplemented to include the additional i Position C.3 b of Regulatory Guide 1.108, Revision 1, August 1977 information recommen
. l l
t 4
a e
F m.
r -
p1 '
3/48f '
W tTt