. - _ _ _ _. _ _ _ _ _ _
i
+
l I
February 5, 1991 l
MEMORANDUM FOR:
Ben B. Hayes, Director i
Office of Investigations FROM:
James Y. Vorse, Director Office of Investigations Field Office, Region II j
i
SUBJECT:
DEPARTMENT OF LABOR (DOL) ORDER REQUIRING MOSBAUGH TO PROVIDE V0GTLE DOCUMENTS TO THE GEORGIA POWER COMPANY (GPC) 1 It is hereby requested that the following documents, among those ordered by DOL to be provided to GPC by Mosbaugh on January 29, 1991, be excepted from review by GPC until the completion of OI:RII cases 2-90-001, 2-90-012, 2-90-020, and 2-91-003.
The premature disclosure of these documents could reasonably be expected to interfere with the aforementioned pending investigations and/or i
enforcement proceedings. These documents are described as follows:
1.
Copy of transcript of interview of Allen Mosbaugh h the U.S. Nuclear j
Regulatory Comission (NRC), at Augusta, Georgia, en vely 18, 1990
~
(pp. 1-97), and July 19, 1990 (pp.98-255).
2.
One-page handwritten note, headed "PRB- + Cliff & Ramsey 2-) 90."
'3.
One-page handwritten note, dated August 14, 1990, headed "9:30 Parton."
4.
Copy of one-page GPC interoffice correspondence, dated August 20, 1990, Re: Classification of Safeguard Documents.
5.
One-page document entitled, " Alternate Radwaste Building Liquid ladwaste System Failure Offsite Dose Analysis."
6.
Six-page document untitled, first line reads, "The Georgia Power Company has made two material false..."
7.
Three-page document entitled, " Operation Outside the Design Basis Fire -
Plus '.0SP Defeats Safe Shutdown Design Capability."
8.
Two-page document addressed to: Larry Robinson, NRC 01. The first sentence begins, "During my interview with you on 2-8-90, 3ou had
[
asked..."
/
9.
Five-page document entitled, " Uncontrolled Safeguards Documents in
)'
SONOPCO..."
.0 9610070019 960827
?
.I I. b-M PDR FOIA COLAPIN94-208 PDR g
1 I
Ben B. Hayes 2
February 5,1991
)
- 10. Two-page document entitled, " Failure to Perform Adequate Shutdown Margin Calculations..."
11.
Two-page document entitled, " Sequencer Out of Service Places Plant in TS.3.0.3 Action Statement."
12.
Three-page document addressed to the NRC. The first line reads, "On 10-13-88 at approximately 10:30 and again at 1640 CST..."
l 13.
One-page document addressed to the NRC.
The first line reads, "On 2-26-90 around 10:00 the NRC's resident inspector at..."
14.
One-page document untitled.
First line reads, " Suddenly it has become a i
popular argument at plant..."
i 15.
Three-page document untitled.
First line reads, "On the morning of 2-28-90 Operations personnel at Plant..."
i 16.
Six-page document untitled.
First line reads, " Georgia Power has made an additional material false..."
- 17. One-page document entitled, "Vogtle Procurement Policy Fails to Apply 10 CFR Part 21 Requirements..."
Mosbaugh Tape Transcript: The transcript of Mosbaugh Tape No. 255 is the only one of the original 13 tape transcriptions that can be cleared for release to GPC without the potential of compromising the pending 01 investigations, supra.