Requests That Listed Documents Ordered by DOL Be Provided to Gpc by Mosbaugh on 910129
ML20129F694
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/05/1991
From: Vorse J
NRC OFFICE OF INVESTIGATIONS (OI)
To: Hayes B
NRC OFFICE OF INVESTIGATIONS (OI)
Shared Package
ML20129F106 List:
References
FOIA-94-208 NUDOCS 9610070019
Download: ML20129F694 (2)


Text

. - _ _ _ _ . _ _ _ _ _ _

. . i

+

l I

February 5, 1991 l MEMORANDUM FOR: Ben B. Hayes, Director i Office of Investigations FROM: James Y. Vorse, Director Office of Investigations Field Office, Region II j i

l

SUBJECT:

DEPARTMENT OF LABOR (DOL) ORDER REQUIRING MOSBAUGH TO PROVIDE V0GTLE DOCUMENTS TO THE GEORGIA POWER COMPANY (GPC) l L

1 It is hereby requested that the following documents, among those ordered by l DOL to be provided to GPC by Mosbaugh on January 29, 1991, be excepted from I review by GPC until the completion of OI:RII cases 2-90-001, 2-90-012, 2-90-020, and 2-91-003. The premature disclosure of these documents could reasonably be expected to interfere with the aforementioned pending investigations and/or i enforcement proceedings. These documents are described as follows:

1. Copy of transcript of interview of Allen Mosbaugh h the U.S. Nuclear j

~

Regulatory Comission (NRC), at Augusta, Georgia, en vely 18, 1990 (pp. 1-97), and July 19, 1990 (pp.98-255).

2. One-page handwritten note, headed "PRB- + Cliff & Ramsey 2-) 90."

'3. One-page handwritten note, dated August 14, 1990, headed "9:30 Parton."

4. Copy of one-page GPC interoffice correspondence, dated August 20, 1990, Re: Classification of Safeguard Documents.
5. One-page document entitled, " Alternate Radwaste Building Liquid ladwaste System Failure Offsite Dose Analysis."
6. Six-page document untitled, first line reads, "The Georgia Power Company has made two material false..."
7. Three-page document entitled, " Operation Outside the Design Basis Fire - l Plus '.0SP Defeats Safe Shutdown Design Capability."
8. Two-page document addressed to: Larry Robinson, NRC 01. The first .

sentence begins, "During my interview with you on 2-8-90, 3ou had l asked..." ,

[

/

9. Five-page document entitled, " Uncontrolled Safeguards Documents in '

)'  !

SONOPCO..."

.0 9610070019 960827  ? .I I. b-M "

PDR FOIA COLAPIN94-208 PDR g

1 I-Ben B. Hayes 2 February 5,1991

)

10. Two-page document entitled, " Failure to Perform Adequate Shutdown Margin  !

Calculations..."

11. Two-page document entitled, " Sequencer Out of Service Places Plant in TS.3.0.3 Action Statement."  !
12. Three-page document addressed to the NRC. The first line reads, "On 10-13-88 at approximately 10:30 and again at 1640 CST..." l
13. One-page document addressed to the NRC. The first line reads, "On 2-26-90 around 10:00 the NRC's resident inspector at..."
14. One-page document untitled. First line reads, " Suddenly it has become a i popular argument at plant..." i l
15. Three-page document untitled. First line reads, "On the morning of  ;

2-28-90 Operations personnel at Plant..." ,

i

16. Six-page document untitled. First line reads, " Georgia Power has made an additional material false..."
17. One-page document entitled, "Vogtle Procurement Policy Fails to Apply 10 CFR Part 21 Requirements..."

Mosbaugh Tape Transcript: The transcript of Mosbaugh Tape No. 255 is the only one of the original 13 tape transcriptions that can be cleared for release to

> GPC without the potential of compromising the pending 01 investigations, supra.